QUANTITY ESTIMATE OF: PILECAP

DATA REQUIREMENT
No. Items A B H Qty.
1 Type 1 1.50 1.50 0.50 20.00
2 Type 2 - - - -
3 Type 3 - - - -
4 Type 4 - - - -
5 Type 5 - - - -

a Unit steel in concrete pilecap 140.00 kg/m3


b Thickness of stone backfill 0.20 m
c Thickness of lean concrete 0.10 m

SUMMARY RESULT
No. Total Qty. Unit
1 CONCRETE 22.50 m3
2 STEEL BAR 3,150.00 kg
3 FORMWORK 60.00 m2
4 SOIL EXCAVATION 51.90 m3
5 SOIL BACK FILL 29.40 m3
6 STONE BACK FILL 11.60 m3
7 LEAN CONCRETE 5.80 m3

RESULT
No. Items A B H Qty. Total Qty. Unit
CONCRETE
1 Type 1 1.50 1.50 0.50 20.00 22.50 m3
2 Type 2 - - - - - m3
3 Type 3 - - - - - m3
4 Type 4 - - - - - m3
5 Type 5 - - - - - m3

Total 22.50 m3

No. Items V (m3) Unit Steel - - Total Qty. Unit


STEEL BAR
1 Type 1 22.50 140.00 - - 3,150.00 kg
2 Type 2 - 140.00 - - - kg
3 Type 3 - 140.00 - - - kg
4 Type 4 - 140.00 - - - kg
5 Type 5 - 140.00 - - - kg

Total 3,150.00 kg

No. Items A B H Qty. Total Qty. Unit


FORMWORK
1 Type 1 3.00 3.00 0.50 20.00 60.00 m2
2 Type 2 - - - - - m2
3 Type 3 - - - - - m2
4 Type 4 - - - - - m2
5 Type 5 - - - - - m2

Page 1 of 8
Total 60.00 m2

No. Items A B H Qty. Total Qty. Unit


SOIL EXCAVATION
1 Type 1 1.80 1.80 0.80 20.00 51.90 m3
2 Type 2 0.30 0.30 0.30 - - m3
3 Type 3 0.30 0.30 0.30 - - m3
4 Type 4 0.30 0.30 0.30 - - m3
5 Type 5 0.30 0.30 0.30 - - m3

Total 51.90 m3

No. Items V (con) V (exca) H Qty. Total Qty. Unit


SOIL BACK FILL
1 Type 1 22.50 51.90 - - 29.40 m3
2 Type 2 - - - - - m3
3 Type 3 - - - - - m3
4 Type 4 - - - - - m3
5 Type 5 - - - - - m3

Total 29.40 m3

No. Items A B H Qty. Total Qty. Unit


STONE BACK FILL
1 Type 1 1.70 1.70 0.20 20.00 11.60 m3
2 Type 2 0.20 0.20 0.20 - - m3
3 Type 3 0.20 0.20 0.20 - - m3
4 Type 4 0.20 0.20 0.20 - - m3
5 Type 5 0.20 0.20 0.20 - - m3

Total 11.60 m3

No. Items A B H Qty. Total Qty. Unit


LEAN CONCRETE
1 Type 1 1.70 1.70 0.10 20.00 5.80 m3
2 Type 2 0.20 0.20 0.10 - - m3
3 Type 3 0.20 0.20 0.10 - - m3
4 Type 4 0.20 0.20 0.10 - - m3
5 Type 5 0.20 0.20 0.10 - - m3

Total 5.80 m3

Page 2 of 8
QUANTITY ESTIMATE OF: STUM COLUMN
DATA REQUIREMENT
No. Items A B H Qty.
1 Type 1 0.20 0.30 0.50 20.00
2 Type 2 - - - -
3 Type 3 - - - -
4 Type 4 - - - -
5 Type 5 - - - -

a Unit steel in concrete of stump 160.00 kg/m3


column

SUMMARY RESULT
No. Total Qty. Unit
1 CONCRETE 0.60 m3
2 STEEL BAR 96.00 kg
3 FORMWORK 10.00 m2

RESULT
No. Items A B H Qty. Total Qty. Unit
CONCRETE
1 Type 1 0.20 0.30 0.50 20.00 0.60 m3
2 Type 2 - - - - - m3
3 Type 3 - - - - - m3
4 Type 4 - - - - - m3
5 Type 5 - - - - - m3

Total 0.60 m3

No. Items V (m3) Unit Steel - - Total Qty. Unit


STEEL BAR
1 Type 1 0.60 160.00 - - 96.00 kg
2 Type 2 - 160.00 - - - kg
3 Type 3 - 160.00 - - - kg
4 Type 4 - 160.00 - - - kg
5 Type 5 - 160.00 - - - kg

Total 96.00 kg

No. Items A B H Qty. Total Qty. Unit


FORMWORK
1 Type 1 0.40 0.60 0.50 20.00 10.00 m2
2 Type 2 - - - - - m2
3 Type 3 - - - - - m2
4 Type 4 - - - - - m2
5 Type 5 - - - - - m2

Total 10.00 m2

Page 3 of 8
QUANTITY ESTIMATE OF: GROUND BEAM
DATA REQUIREMENT
No. Items A B L Qty.
1 Type 1 0.20 0.40 12.00 5.00
2 Type 2 0.20 0.40 18.10 4.00
3 Type 3 0.20 0.40 4.00 4.00
4 Type 4 - - - -
5 Type 5 - - - -

a Unit steel in concrete ground beam 140.00 kg/m3

b Thickness of stone backfill 0.10 m


c Thickness of lean concrete 0.05 m

SUMMARY RESULT
No. Total Qty. Unit
1 CONCRETE 11.90 m3
2 STEEL BAR 1,666.00 kg
3 FORMWORK 118.80 m2
4 SOIL EXCAVATION 45.80 m3
5 SOIL BACK FILL 33.90 m3
6 STONE BACK FILL 6.00 m3
7 LEAN CONCRETE 3.10 m3

RESULT
No. Items A B L Qty. Total Qty. Unit
CONCRETE
1 Type 1 0.20 0.40 12.00 5.00 4.80 m3
2 Type 2 0.20 0.40 18.10 4.00 5.80 m3
3 Type 3 0.20 0.40 4.00 4.00 1.30 m3
4 Type 4 - - - - - m3
5 Type 5 - - - - - m3

Total 11.90 m3

No. Items V (m3) Unit Steel - - Total Qty. Unit


STEEL BAR
1 Type 1 4.80 140.00 - - 672.00 kg
2 Type 2 5.80 140.00 - - 812.00 kg
3 Type 3 1.30 140.00 - - 182.00 kg
4 Type 4 - 140.00 - - - kg
5 Type 5 - 140.00 - - - kg

Total 1,666.00 kg

No. Items A B L Qty. Total Qty. Unit


FORMWORK
1 Type 1 1.00 0.80 12.00 5.00 48.00 m2
2 Type 2 1.00 0.80 18.10 4.00 58.00 m2
3 Type 3 1.00 0.80 4.00 4.00 12.80 m2
4 Type 4 1.00 - - - - m2
5 Type 5 1.00 - - - - m2

Page 4 of 8
Total 118.80 m2

No. Items A B L Qty. Total Qty. Unit


SOIL EXCAVATION
1 Type 1 0.50 0.60 12.30 5.00 18.50 m3
2 Type 2 0.50 0.60 18.40 4.00 22.10 m3
3 Type 3 0.50 0.60 4.30 4.00 5.20 m3
4 Type 4 0.30 0.20 0.30 - - m3
5 Type 5 0.30 0.20 0.30 - - m3

Total 45.80 m3

No. Items V (con) V (exca) L Qty. Total Qty. Unit


SOIL BACK FILL
1 Type 1 4.80 18.50 - - 13.70 m3
2 Type 2 5.80 22.10 - - 16.30 m3
3 Type 3 1.30 5.20 - - 3.90 m3
4 Type 4 - - - - - m3
5 Type 5 - - - - - m3

Total 33.90 m3

No. Items A t, stone L Qty. Total Qty. Unit


STONE BACK FILL
1 Type 1 0.40 0.10 12.00 5.00 2.40 m3
2 Type 2 0.40 0.10 18.10 4.00 2.90 m3
3 Type 3 0.40 0.10 4.00 4.00 0.70 m3
4 Type 4 0.20 0.10 - - - m3
5 Type 5 0.20 0.10 - - - m3

Total 6.00 m3

No. Items A t, lean L Qty. Total Qty. Unit


LEAN CONCRETE
1 Type 1 0.40 0.05 12.00 5.00 1.20 m3
2 Type 2 0.40 0.05 18.10 4.00 1.50 m3
3 Type 3 0.40 0.05 4.00 4.00 0.40 m3
4 Type 4 0.20 0.05 - - - m3
5 Type 5 0.20 0.05 - - - m3

Total 3.10 m3

Page 5 of 8
QUANTITY ESTIMATE OF: STUM COLUMN
DATA REQUIREMENT
No. Items A B H Qty.
1 Type 1 - - - -
2 Type 2 - - - -
3 Type 3 - - - -
4 Type 4 - - - -
5 Type 5 - - - -

a Unit steel in concrete of stump 160.00 kg/m3


column

SUMMARY RESULT
No. Total Qty. Unit
1 CONCRETE - m3
2 STEEL BAR - kg
3 FORMWORK - m2

RESULT
No. Items A B H Qty. Total Qty. Unit
CONCRETE
1 Type 1 - - - - - m3
2 Type 2 - - - - - m3
3 Type 3 - - - - - m3
4 Type 4 - - - - - m3
5 Type 5 - - - - - m3

Total - m3

No. Items V (m3) Unit Steel - - Total Qty. Unit


STEEL BAR
1 Type 1 - 160.00 - - - kg
2 Type 2 - 160.00 - - - kg
3 Type 3 - 160.00 - - - kg
4 Type 4 - 160.00 - - - kg
5 Type 5 - 160.00 - - - kg

Total - kg

No. Items A B H Qty. Total Qty. Unit


FORMWORK
1 Type 1 - - - - - m2
2 Type 2 - - - - - m2
3 Type 3 - - - - - m2
4 Type 4 - - - - - m2
5 Type 5 - - - - - m2

Total - m2

Page 6 of 8
QUANTITY ESTIMATE OF: GROUND BEAM
DATA REQUIREMENT
No. Items A B L Qty.
1 Type 1 - - - -
2 Type 2 - - - -
3 Type 3 - - - -
4 Type 4 - - - -
5 Type 5 - - - -

a Unit steel in concrete ground beam 140.00 kg/m3

SUMMARY RESULT
No. Total Qty. Unit
1 CONCRETE - m3
2 STEEL BAR - kg
3 FORMWORK - m2

RESULT
No. Items A B L Qty. Total Qty. Unit
CONCRETE
1 Type 1 - - - - - m3
2 Type 2 - - - - - m3
3 Type 3 - - - - - m3
4 Type 4 - - - - - m3
5 Type 5 - - - - - m3

Total - m3

No. Items V (m3) Unit Steel - - Total Qty. Unit


STEEL BAR
1 Type 1 - 140.00 - - - kg
2 Type 2 - 140.00 - - - kg
3 Type 3 - 140.00 - - - kg
4 Type 4 - 140.00 - - - kg
5 Type 5 - 140.00 - - - kg

Total - kg

No. Items A B L Qty. Total Qty. Unit


FORMWORK
1 Type 1 - - - - - m2
2 Type 2 - - - - - m2
3 Type 3 - - - - - m2
4 Type 4 - - - - - m2
5 Type 5 - - - - - m2

Total - m2

Page 7 of 8
QUANTITY ESTIMATE OF: SLAB
DATA REQUIREMENT
No. Items A B H Qty.
1 Type 1 - - - -
2 Type 2 - - - -
3 Type 3 - - - -
4 Type 4 - - - -
5 Type 5 - - - -

a Unit steel in concrete ground beam 120.00 kg/m3

SUMMARY RESULT
No. Total Qty. Unit
1 CONCRETE - m3
2 STEEL BAR - kg
3 FORMWORK - m2

RESULT
No. Items A B H Qty. Total Qty. Unit
CONCRETE
1 Type 1 - - - - - m3
2 Type 2 - - - - - m3
3 Type 3 - - - - - m3
4 Type 4 - - - - - m3
5 Type 5 - - - - - m3

Total - m3

No. Items V (m3) Unit Steel - - Total Qty. Unit


STEEL BAR
1 Type 1 - 120.00 - - - kg
2 Type 2 - 120.00 - - - kg
3 Type 3 - 120.00 - - - kg
4 Type 4 - 120.00 - - - kg
5 Type 5 - 120.00 - - - kg

Total - kg

No. Items A B - Qty. Total Qty. Unit


FORMWORK
1 Type 1 - - - - - m2
2 Type 2 - - - - - m2
3 Type 3 - - - - - m2
4 Type 4 - - - - - m2
5 Type 5 - - - - - m2

Total - m2

Page 8 of 8