Roof Safe System Analysis

User Mass 100 kg


Free Fall 1m
# Users 1 2 3 4

D D D D
C Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Span Length Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection
(m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m)
5 5.8 5 1 0.49 6.2 5 1.3 0.51 6.3 5.25 1.5 0.53 6.7 5.5 1.6 0.63
10 6.4 5 1.6 0.54 6.9 5 2.1 0.7 7.4 5.25 2.3 0.77 7.5 5.5 2.4 0.84
15 6.4 5 1.7 0.54 7.2 5.5 2.4 0.72 7.8 6 2.8 0.93 8.3 6 2.9 1.04

User Mass 100 kg


Free Fall 2m
# Users 1 2 3 4

D D D D
C Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Span Length Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection
(m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m)
5 6 5.5 1.2 0.49 6.5 5.5 1.5 0.58 6.7 5.5 1.6 0.64 6.8 5.5 1.7 0.67
10 6.6 5.5 1.8 0.61 7.2 5.5 2.2 0.7 7.6 5.5 2.6 0.86 7.8 5.5 2.7 0.96
15 6.8 6 2.2 0.66 7.7 6 2.8 0.96 8.1 6 3.1 1.02 8.6 6 3.3 1.14

User Mass 141 kg


Free Fall 1m
# Users 1 2 3 4

D D D D
C Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Span Length Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection
(m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m)
5 5.9 6.5 1.2 0.55 6.3 6.5 1.5 0.73 6.6 6.5 1.7 0.82 6.9 6.5 1.9 0.87
10 6.4 6.5 1.6 0.63 7.1 6.5 2 0.83 7.5 6.5 2.3 0.95 7.6 7 2.4 1.1
15 6.8 6.5 2 0.79 7.3 7 2.8 1.11 8.1 7 3 1.27 8.5 7 3.3 1.38

User Mass 141 kg


Free Fall 2m
# Users 1 2 3 4

D D D D
C Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Clearance
Required Peak End Peak HLL
Combined
Post
Span Length Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection Below the Anchor Load Deflection Deflection
(m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m) HLL - (m) (kN) (m) (m)
5 6.1 6.5 1.4 0.66 6.6 6.5 1.6 0.74 6.8 6.5 1.8 0.83 7.1 6.5 1.9 0.92
10 6.5 6.5 1.8 0.76 7.3 6.5 2.3 0.96 7.7 6.5 2.5 1.1 7.9 7 2.7 1.2
15 6.9 6.5 2.1 0.8 7.4 7.3 2.8 1.15 8.2 7.3 3 1.3 8.8 7.5 3.3 1.4

Assumptions:
• 1:1 Test Mass
• Sequential Fall Procedure
• Test performed on a Single Span System with End Post at both ends.
• 100 kg tests done with CE Lanyard. 141 kg tests done with EZ-Stop Lanyard.
• Clearance Calculation include 1.5 m D-Ring Height, 0.3 m Harness Stretch, 1 m Clearance Margin
Fall Clearance

A Distance to a Fall Hazard


B Clearance below Work Surface
C HLL Span Length (from charts)
D Clearance required below HLL
(from charts)

Clearance Remaining = A+B-D