You are on page 1of 3

UNIVERSIDAD NACIONAL DE PIURA

Instituto de Idiomas UNP

 TEMA:
 Bridging the gap

 ASIGNATURA:
 Ingles Intermedio

 FECHA:
 25 de agosto del 2020

 ALUMNO:
 Zurita García Jeferson Tharly

 DOCENTE:
 José Enrique Zapatel

Piura – Perú
LISTENING
2.- listen again and complete the information in the chart.
Zurich-Milan Tunnel
Form of transport: Rail
Record: World’s longest rail tunnel
Distance: 115 km
Opening to the public: 2017
New travel time: 90 minutes
Problems: Deaths during building,
environmental damage to
mountains.

Hong-Kong-Macau-Zhuhai Bridge & tunnel project


Form of transport: Road
Record: World’s longest road bridge
Completion date: 2016
New travel time: 40 minutes
Problems: Damage to habitat of Chinese white
dolphin

3.-Read transcript 5.4 on page 163 and find words or phrases that
mean.
1.- solutions can be found to these problems.
 There are ways round these obstacles.
2.- come to an important moment in its development.
 Reached a milestone.
3.- has caused a lot of discussion.
 Has been controversial.
4.- have given their permission
 Have given the go-ahead
4.which of the two projects do you think will be completed first? Why?
What are the advantages and disadvantages of carrying out these
projects?
I believe that the bridge will be completed first, since it is easier, less
expensive and faster to design a bridge over water than a tunnel in water.
A disadvantage of carrying out this type of work is that they generate
expenses, time, etc. the advantage would be that they allow us to save time,
unite places and benefit people.

5.- would you prefer to travel in the Swiss tunnel or on the Chinese
bridge project? why?
I prefer to travel by bridge, in order to be able to observe the landscape
around me, in this case the sea.

You might also like