Data emiterii IUNIE 2011 ASM Nr/No: C 001

inițiale /Original Sonda/ Well: Page 1 of 1


Issue Date: Rev: 0
Supervisor: (Nume și Data/ Date:
Intocmit de / Work Group Preparing : Poziția / Name and Position)
ing. Petre Florin, ing. Ordeanu Petre, ing. Milosescu Gheorghe, ing. Capezeanu Adrian
Descrierea operaților / Description of work
activities:
Cimentare
P -PROBABILITATE/ LIKELIHOOD G -GRAVITATE/ SEVERITY PROBABILITATE / LIKELIHOOD REZULTAT / RESULT

GRAVITATE / SEVERITY
CATEG. DEFINIRE CATEG. DEFINIRE/DEFINITIONS
Mic / Low 1 2 3 Acceptabil / Acceptable
Mic /Low(1)
Ocazional
Mic/Low(1)
Rănire minoră Fără daune Fara poluare
Remote Minor injury No Damage No pollution
Mediu / Medium 2 4 6 Tolerabil /Tolerable
Mediu/Medium (2)
Posibil Rănire serioasă Daune Minore Poluare minora
Possible Mediu/Medium
Serious Injury (2) Minor Damage Minor Pollution
Mare / High 3 6 9
Neacceptabil /
Mare/High(3) Mare/High(3)
Unacceptable
Probabil Rănire majoră Daune Majore Poluare majora
Probable Major Injury Major Damage Major Pollution L M H
Risc Neeliminat / Acceptable?
No. / Risc / Risk Etapă in Diminuarea Riscurilor /
Step / Pasul Hazard / Pericol Risk Remaining Tolerable?
Nr Step To Lower Risk
P G R P G R Unacceptable?
Realizare instructaj inainte de operatie si revizuire pasi, riscuri si
Etape sarite sau riscuri necunoscute pot duce la aparitia unui Revizuire toate etapele si riscurile / Acceptabil /
1 metode de control a riscurilor / Hold safety meeting and review the 2 2 4 1 2 2
accident / Missed step or unknown hazard can lead to accident Review all the steps and hazards Acceptable
steps, hazards and risk controls
Help the cementers to rig up their cement head. Bring to floor with the Stay clear below picking up
2 Pinch points. Dropped objects. 2 3 6 1 0 0 0
crane equipment
3 The cementers install the head on the casing Crush point at the stump 2 3 6 No hands on stump. Clear signals 1 3 3 Tolerabil /Tolerable
Help the cementers bring their lines to the floor and rig them up. Hook Stay clear on catwalk picking up
4 up the 2" hose to the cement lines and circulate as required. Use safety Pinch points. Dropped objects. Hit by hammer. 2 3 6 equipment 1 3 3 Tolerabil /Tolerable
cable on hose.
When the cementers are ready, they will press test their lines. Make Make sure all are clear.
5 High pressure leak 2 3 6 1 3 3 Tolerabil /Tolerable
sure all hands are clear of the lines. Follow High Pressure checklist.
6 Cementers mix cement. Cement can burn the skin. Dust is bad for lungs. 2 3 6 Cementers wear PPE. All others 1 3 3 Tolerabil /Tolerable
stay away
7 Cementers follow program to pump cement drop plugs. High pressure cement lines can leak. 2 3 6 Stay clear of pumping lines. Report 1 3 3 Tolerabil /Tolerable
leaks to supervisor.
As required, the cementers will signal the floor and the displacement of Make sure the correct valves are
8 the cement will be done with the rig pump following the cementing Pump against closed valve. Line could burst. 2 3 6 open/closed. Stay clear of pumping 1 3 3 Tolerabil /Tolerable
program. lines.
Have trained personnel to supervise
Pump cement. Watch for cement returns at the shakers. Divert High pressure. Cement can burn the skin and eyes. Cement the returns and dumping of cement.
9 2 3 6 1 3 3 Tolerabil /Tolerable
cement returns to the pit. can harden in lines tanks, valves etc.& ruin the equipment Wash everything right away.

10 Bump plug and pressure test as required by the cementing program. High pressure. Cement can burn the skin and eyes. 2 3 6 Stay clear of pumping lines. 1 3 3 Tolerabil /Tolerable
Wash out all equipment that was exposed to cement. Make sure
Wear PPE. Wash cement off with
BOPs, diverter, shakers flowlines etc. are drained of cement and Cement is caustic and can burn the skin. Cement can damage
11 2 3 6 water. Use the cellar jet when 1 3 3 Tolerabil /Tolerable
flushed out. Check every line and every hose and clean it before the equipment if it sets.
cement is in cellar.
cement is hard.
Correct hand, foot & body
Rig out cementing lines & send to catwalk. Remove cement head when
12 Pinch points. Hit by hammer. Hit by swinging or dropping load 2 3 6 placement. Stay clear on CW when 1 3 3 Tolerabil /Tolerable
OK. Send to the CW with winch. Control with CW winch.

13 0 0 0 0
14 0 0 0 0
15 0 0 0 0
16 0 0 0 0
17 0 0 0 0
18 0 0 0 0
19 0 0 0 0
20 0 0 0 0
21 0 0 0 0
22 0 0 0 0
23 0 0 0 0
24 0 0 0 0
25 0 0 0 0
26 0 0 0 0
27 0 0 0 0
28 0 0 0 0
29 0 0 0 0
30 0 0 0 0
31 0 0 0 0
32 0 0 0 0
33 0 0 0 0
34 0 0 0 0
35 0 0 0 0
36 0 0 0 0
37 0 0 0 0
38 0 0 0 0
39 0 0 0 0
40 0 0 0 0
41 0 0 0 0
42 0 0 0 0
43 0 0 0 0
44 0 0 0 0

F-4.3.1-02-01