HAZARD IDENTIFICATION & RISK ASSESSMENT (HIRA)

OHS-PR-09-03-F02 (A) HIRA-Hazard ID and Risk Assessment Form and Register


Operating Area: Project Name:
Contractors: Project Type: Contract No.:
Risk Assessment (Baseline and full RA)
TASK/ACTIVITY/PROCESS NAME: Excavation work using equipment DEPARTMENT/AREA:
RA Number: DATE:
SEVERITY / CONSEQUENCE (Impact/Hazard Effect) (Where an event has more than one ' Loss Type ', choose the ' Consequence' with the highest rating)

Loss Type Additional "Loss Types" may exist for


an event: Identify & rate accordingly (1) Insignificant (2) Minor (3) Moderate (4) Major (5) Catastrophic

Loss Time Injury / Reversible Impact on


(S/H) Harm to People (Safety/Health) First Aid Case/Exposure to Minor Health Risk Medical Treatment Case/Exposure to Major Health Risk
Health Single Fatality or Loss of Quality of Life / Irreversible impact on Health Multiple Fatalities / Impact on health Ultimately Fatal

Material Environment harm (RST) Serious


(EI) Environmental Impact Minimal environment harm incident with workplace Material Environment harm (RST)
environmental harm incident (RMT)
Major environmental incident (RLT) Major environmental harm – Incident Irreversible

(BI/MD) Business Interruption / Material / Fire No disruption to operation / 1000 SR to Less than 10k SR Brief Disruption to Operation / 10k SR to Less Than 100k SR Partial Shutdown/100k SR to Less than 1M SR Partial Loss of Operation/1M SR to Less than10M SR Substantial or Total Loss of Operation / 10M SR and more
Damage & Other Consequential Losses
LIKELIHOOD Examples (Consider Near-Hits as well as actual events) RISK RATING / PROFILE
The unwanted event has occurred frequently : Occurs in order of (1) or more
(5) ALMOST CERTAIN per year & is likely to reoccur within 1 year 5 (M) 10 (H) 15 (Ex) 20 (Ex) 25 (Ex)
The unwanted event has occurred infrequently : Occurs in order of less than
(4) LIKELY once per year & is likely to reoccur within 5 yrs. 4 (M) 8 (H) 12 (H) 16 (Ex) 20 (Ex)
The unwanted event has occurred in the business at some time: or could
(3) POSSIBLE happen within 10 years. 3 (L) 6 (M) 9 (H) 12 (H) 15 (Ex)
The unwanted event has occurred in the business at some time: or could
(2) UNLIKELY happen within 20 years. 2 (L) 4 (M) 6 (M) 8 (H) 10 (H)
The unwanted event has never known to occur in the business or it is highly
(1) RARE unlikely to occur within 20 years. 1 (L) 2 (L) 3 (L) 4 (M) 5 (M)
RA TEAM (Names) DESIGNATION SIGNATURE RISK RATING RISK LEVEL GUIDELINES FOR RISK MATRIX
Stop operation and review controls- Eliminate, avoid risk & implement high
1. 15 to 25 (Ex) - Extreme priority action plans
Proactively manage & implement specific controls/action plans-Review after 7
2. 8 to 12 (H) - High days
Actively manage & monitor – Additional controls is advised & review after 14
3. 4 to 6 (M) - Medium days

4. 1 to 3 (L) - Low Risk acceptable – Monitor & manage as appropriate with frequent review

Review by: Signature: Date: APPROVED BY / MANAGER or SUPERVISOR: DATE: NEXT REVIEW DATE:
Identify the hazard on the given task and conduct assessment of the actual site condition, all identified risk should provide with a plan to eliminate or control the risk.
HAZARD IDENTIFICATION CONTROL RISK RISK REDUCTION ACTION PLAN
ASSESSMENT

Consequence

Consequence

Risk Ranking
Risk Issue

Likelihood

Likelihood
Controls

Ranking
(Improve Existing Controls/ Follow up By Whom (Name) Implemented
Item #

Work Activity Hazards (Possible Incident) (What can go wrong) Existing Controls
(Process, Equipment, Materials) (Accident/ Ill health to person, fire or property Implement new controls) & By When (Date) (Yes / No)
loss)
Site Manager
1 Obtain Permit to Work ⬧ Unauthorized work to be performed within ⬧ Accident resulting serious injury or death to
⬧ Permit to Work shall be obtained as a ⬧ Permit Receiver shall be trained and Site Manager
Site Engineer
3 2 6 3 1 3 YES
a defined location and boundary worker prerequisite Safety Engineer
⬧ Significant property and appurtenances ⬧ A safe worktopractice performshall work be implemented to 2 2 4
authorized
⬧ All workers byattending
the Manager the to receive
toolbox a
meeting 2 1 2
Site
Site Engineer
ManagerForeman.
Supervisor/ YES
damage ⬧ Workthe
reduce shallpossibilities
not be started until duly
of accident /at approved
incident Permit
shall to on
Work Safety Engineer
⬧ Uncontrolled Personnel entering a ⬧ Loss of production ⬧ Permit
Permit to to
WorkWork is shall
available be displayed
at site and the worksite
that Safety 2 3 6 ⬧ All sign
workers
Permit
the
Receivershallattendance
attend
shall be the sheet
toolbox
responsible
attached
to 2 1 2
Site Engineer
Supervisor/ Foreman. YES
restricted location ⬧ Permit
⬧ Permit Receiver
Receiver shall and Permit not leave Issuer shall
areavisit to the specific Permit to conducted
Work Site Manager
Safety Engineer
⬧ Significant cost due to damages Toolbox
⬧ Permitmeeting
together Receiver
at the was
site shall
to conducted
account
ensure that allthe
workers
workplace
for the
under 3 2 6
meeting
oversee
⬧ Permitfor on athe
Receiverdaily basis
safety
and of
allall workers
workers by
shall the
under
not his 3 1 3 Site Manager
EngineerForeman.
Supervisor/ YES
whole

hisWork duration
Permitshallto not
Work ofproceed
work
before without
the start theof presence
work of Supervising
Permit
start to Work
with the Engineer,
work Foreman
without the and
writtenPermit Site EngineerForeman.
⬧ Unidentified hazards with unplanned ⬧ Governmental violation hazards
⬧ Manager, are adequately
Supervisor, identified
Foreman andall
and mitigating
workers 3 2 6 ⬧ Permit Issuer and Permit Receiver shall
Receiver 3 1 3 Supervisor/ YES
approvedshall
measure Permit to Work with the Permit Receiver approval Permit to Work Site Manager
Safety Engineer
safety
⬧ mitigating
Inadequate measures and area control ⬧ Environmental complaint
coordination shall
Siteadhere
overseeing
⬧ Manager, tobe
the all established
requirements
activity
Supervising set forth
Engineer, in the
Foreman conduct
⬧ Permitsite visit toand
Receiver identify actualshall
all workers situation
not Site Manager
Permit to Work,aRisk Assessment, Method 3 2 6 and identify hazard to establish accurate 2 1 2 EngineerForeman.
Supervisor/ YES
2 Mobilization of materials, protocol
⬧ Lack of safety awareness and knowledge ⬧ Physical injury and damage to property due ⬧ shall designate
Obtain valid Permit Receiver competent start with the work
talkwithout
must bethe written and Site EngineerForeman.
Supervisor/
Statement,
enough tothatJobPermit
take Safety to
responsibility
Work and
Procedure in securing other the 3 2 6 ⬧ Daily
appropriate
approval
tool box
Permitcontrolto measures
Work
implemented 3 1 3 Site Manager
Safety Engineer
YES
manpower and equipment at site for the job/Incompetent Personnel
⬧ Equipment and tool’s condition to lack of safety
⬧ Equipment breakdown awareness and incompetence ⬧ Ensure
relevant safety
⬧ Only equipment all workers
practices are
and undergo
standards safety ⬧
⬧ Additional safetywill trainings must be the Site
Site Engineer
Permit
induction to Work with valid third party 3 2 6 Proper checklist
conducted
be used during 2 1 2 ManagerForeman.
Supervisor/
Safety Engineer
YES
⬧ Working without wearing appropriate ⬧ Physical injury
⬧ Physical/Fatal Injury and damage to property ⬧ Only certification
Ensure will be
that all workers deployed are withfor the
provided task inspection of tools and equipment Site Engineer
⬧ Property damage ⬧ All toolsoperators
and and drivers
equipment will beEquipmentvalidwith
inspected requiredprior 2 2 4 ⬧ Conduct trainings for Personnel Protective 2
⬧ All inspected tools and equipment will be 1 2 Site ManagerForeman.
Supervisor/
Safety Engineer
YES
Personnel Protective Equipment
⬧ Improper manual handling (PPE) due to lack
⬧ Hand Injury of safety awareness and mandatory
third
⬧ Useofparty
hand Personnel
certification
gloves for handprotective
and SAG License will be(PPE) Equipment as per activity Site Engineer
competency start
⬧ Mandatoryactivity PPE to isensure
required allprotection
are in
to wear good in working
the site 3 2 6 ⬧ Conduct
color
⬧ Close codedtraining
Conduct according
daily
in proper
toolfrom
boxto talk manual handling 3
its condition
as per specific 1 3 Site ManagerForeman.
Supervisor/
Safety Engineer
YES
⬧ Physical Injury from slip, trip and fall deployed
⬧ 20kg
condition is for the
allowable task to each worker to lift ⬧ supervision
All defective tools Supervisor
and equipment / be
will Site Manager
Engineer
3 Checking and verification of any ⬧ Damage to underground utilities prior to ⬧ Damage to property ⬧
⬧ Locate
while underground
working
Conduct toolaccess
box talk services
regarding referring
theblocking
safe towork
the site 3 2 6 ⬧ Supervisor
activity and Foreman shall closely 3 1 3 Site
Supervisor/ Foreman. YES
underground utilities excavation due to failure to perform pre- ⬧ Back injury
⬧ Collision
Disruption ⬧ Ensure that is clear without the Foreman
removed from the site Safety Engineer
⬧ Traffic hazard ⬧ ontoother
production
vehicle map
 / drawing.
Helmet
procedure
⬧ Ensure (ANSI
priorZ89.1,
necessary to start
permitsCEthe EN397)
work authorities are
from monitor
⬧ to ensure accurate
Close supervision required,readingsupervisor is and Site Manager
Site Engineer
checks. ⬧ Arm injury
⬧ Accident resulting injury
Serious Personnel in injury to worker walkway

 Use suitable
Safety
secured Glass
prior detectors
start of manual
activityto check and locate any 3 2 6 obtained
foreman must be presentexisting
at site facilities
3 1 3 Supervisor/
Safety Foreman.
Engineer
Site Manager
Engineer
YES
4 Perform excavation using Excavator ⬧ Underground utilities ( unsecured ) ⬧ Damaged to existing plant / underground ⬧
⬧ Ensure
Area
underground thatbe
must proper
scanned
utilities. handling procedure
for underground services 4 4 16 ⬧ Acquired underground
Report accordingly any noticed 3 2 6 Site
Supervisor/ Foreman. YES
⬧ Fatality 
⬧ Cover
Early
will all
warning
be implemented sign (plastic barrier) must be ⬧ Refresher course/training to all banks man Safety Engineer
Equipment ⬧ Collapse of excavation, cave in vibration facilities
⬧ Personnel injury &


⬧ permit
Worker
Dust
Check Maskto
thewhoexcavate
willwith
condition issued
perform of before
the
excavation work
verification
atmake shall
all times be 4
for drawing
underground
⬧ Close prior utility
supervisionto anyrequired,
task to besupervisor
done and Site
Site Engineer
ManagerForeman.
⬧ Permanent
Fatal / severe disability
physical injury installed
⬧ Buddy-buddy
commences. properly system aissafe distance
advisable to before ifthe
the 3 12 asClose
⬧ deemsupervision
necessary required, supervisor and 3 1 3 Supervisor/ YES
and waterof workers / equipment / tools into ⬧ knowledgeable
 Safety Gloves and trained in using and Safety Engineer
⬧ Falling ⬧ Fatality
property
Physical damage
injury possibility
banks
load
⬧ Fallis man
more ofand
prevention collapse
than equipment
the
barriersor cave-in
capacity with of excavation
load
signage of worker
shall be 3 2 6
foreman
⬧ must
Proper and adequate be present at site.
supervision
at site by
Site
Site Engineer
ManagerForeman.
excavation
Property
⬧ Property damage
Property damage
damage All
walls.

underground
interpreting
 Safety
OnlyWhen Shoes the
deeper
experienced
utilities
instrument
thantrained
and 1.5must
atmeter
be
banks
identified,
mustman bewill sloped
be
foreman
⬧ Trainingmust on be present
working at excavation and Tool 3 1 3 Supervisor/
Safety Engineer
YES
⬧ Build up of harmful gases in the excavation ⬧
⬧ Health hazards (asphyxiation / collapse due erected
marked

/Stop
benched
around
or
Excavations relocated.
more
toorassist
excavation
shored than
depending 4 ft. least
deep 1(1.20
on type
meter away.
ofm) that 4 4 16
supervisor/


BoxConduct
Provide
talk
foreman.
safety
watcher
should betoolbox
to monitor
provided meeting the and
theentry & 3 1 3
Site
Site Engineer
ManagerForeman. YES
for 1.2 meters deep or more (confined to inhalation of hazardous gases)
assigned
⬧ Only
may blocks
trained
develop installed
hazardous
and
competent atmanage
aatmospheres
safe
operatorstraffic
distance from
shall
shall be be ⬧ Site
discussed
exit of safetythe
entrant officer
work to ensuretothat
procedures prior
workers
all to start
Supervisor/
Safety
Site Engineer
Engineer
⬧ Poor Access/Egress ⬧ Physical injury from slip, trips & fall materials
⬧ which aremust
Each excavation being be excavated
provided with proper prior
⬧ to start is thesitework.
space) excavation
assigned
considered
⬧ topreventing
If equipment aoperate
confined
is being any vehicles
equipment
space.
used
fromduring
above the
falling
trench
into 3 2 6 ofContact
excavation
⬧ work using
Practice
When
the
good providedareawithin advance
housekeeping
remote
all while
controlled
and agree 2
necessary working
equipment
1 2 Site ManagerForeman.
Supervisor/
Safety Engineer
YES
access and egress
excavation.
mechanical excavation works. that
safety access to
of the
requirements specificperarea
aswarning is5-Star
SECdevice aacceptable
Health Site Manager
Engineer
⬧ Traffic Hazards – struck by Vehicles and ⬧ Serious Injury ⬧ Provision
Use
then
⬧ PPE
safe
no
Ladders

of
access
operatives
Hardmust
proper
hats,be while traffic
should
secured
Safety
entering
be
when
glass, inOperators
management
and
the
Safety
exiting
trench
workers Mask,
must
such
when
are
be
as 3 2 6 ⬧
in

and
At
and all
Provision
anSafety stages
around
excavation,
Hoses/Cables
of the
e.g. excavation,
audible
excavations
shall
Management
and
compactors,
be positioned
System
competent
trenches. and
in such a 3
shoring
standards
1 3 Site
Supervisor/
Safety Foreman.
Engineer
YES
traffic collisions ⬧
⬧ Permanent disability carrying
designated
excavations valid isSaudi
routes
and driving
for
intrenches. vehicles/ license and third-party
equipment and for person
lighting
Follow must
beacons
safe supervise
work for all the work
vehicles and
filledthe
particularly Site Manager
Engineer
⬧ Defective mechanical equipment Physical injury / Property damage
⬧ Fatality and Damage to property
the
⬧ machine
Only
required
Safety equipment
toroutes.
gloves,
certificates.
pedestrian workSafety use
with
inside shoes valid
for manualthird party
excavation. 3 2 6 should

way
workers
heavy thatnot
Equipment it be
will
given
equipment notpractices.
extracted
checklist
clear create unless
should bethe
obstruction
instructions on
up
on
working 3 1 3 Site
Supervisor/
Safety Foreman.
Engineer
YES
⬧ Provide
All excavated
certification
Avoid taking Gas willTest
short equipment
materials
becutsdeployed or must
jumpingforand
bethe conduct
moved
in task
&dust
out atofgas
least ⬧ Conduct
equipment
regularly
access confined
can
bywork space
be removed
operator prior to training
from
use.the for the Site Engineer
⬧ Airborne dust ⬧ Eye injury and respiratory illness due to ⬧
⬧ Proper
Used
Manual
Adequate
test
(1) by
one
ofaccess
appropriate
excavation
competent
meter warning
away
and egress
PPE
only
signs
persons
from
particularly
in
and
the if the vicinity
barriers
suspected
edge of asof have
to
excavation
maska 3
or 2 6 ⬧
safely inand
Supervisor
Provide
involved
excavation the andareas
defensive
Personnel.
without
foreman
excavation drivingtofor
Personnel
ensure
allbe operators
entering. 3 1 3 Site ManagerForeman.
Supervisor/ YES
contact with dust ⬧
⬧ Pre-operational
excavation.
Provide
must be proper
worn during check
illumination will
excavation. be or done
blinker to all
lights ⬧ Any
adequate damaged
Warning signs and
monitoring equipment
safety
of must
barricades
activities. removed
should Safety Engineer
Site Engineer
⬧ High ambient temperature ⬧ Heat Stress (stroke, cramps, skin rashes etc.) ⬧ underground
boundaries
buildup
⬧ Provide for
ofpathwaysservices.
unknown both
sufficient routes.
gas.
drinking water and ⬧ Follow existing traffic rules inside the area.
totally
equipment
Access
along removed
the
Watering
Electrical
to
excavation from
ensure
of excavation
cablesground to itthe
in
adjacentbe is site.
in
kept
order
surfaces good clear
to be
toand fromscheduled
working
identified
reduce any
dust 3 2 6 ⬧
be Conduct
Report
fromused
⬧ Regular
anytemperature/humidity
sitewhenever signs aofslip,
immediately
inventory
cave-ins
of and send
trip
dust ortofall
mask formonitoring
supervisor.
ensure 2
repair.
tohazard 1 2 Supervisor/ Foreman.
Safety Engineer
YES

⬧ Mechanical
breaks.
Provide
condition
obstruction.
during night
disturbance temporary
time. sumworks pittoand excavation
subhauling
pump should
of
to to ensure safe
has been identified
sufficient
working
supplymustbut
condition.
cannot be corrected
be isolated
materials
⬧ Any
Drinking by bydumpElectrician
containers truck shall issuing
mustbe bepermit
provided
protected to
fromisolate.
with ⬧ Supervisor/ Foreman.
1  HIRA-Hazard ID and Risk Assessment Form and Register
removed
⬧ No tools
banks
water
obstructions
man and
insideshall
equipment
/ spotters
excavation.
be
to assist
OHS-PR-09-03-F02 moved
to be thestored and kept
(A) closed to
machine orAll Personnel
removed immediately undergo in a Heat Stress
Rev. 0     Revision Date (May 2021)
direct exposure from the sunlight. Awareness Training.
Site Manager
⬧ Ingress of water and mud ⬧ Biological hazards ⬧ Manually or using submersible pump to removed 3 ⬧ No work to be allowed in presence of water 3 Site Manager
Site Engineer
2 6 1 3 YES
⬧ Safety Engineer
5 Loading / transferring the ⬧ Traffic Hazards ⬧ collapse
Struck byofVehicles
excavation
and traffic collisions the accumulating
⬧ Provision of proper water inside
traffic the excavation
management suchdueas 3 2 6
in excavation.
⬧ All operators must be certified and Site
Site Engineer
ManagerForeman.
excavated materials to dump truck ⬧ Equipment without 3rd party certificate ⬧ to rain or leakage from some utilities damage ⬧ Continuous dewatering until the excavation 2 1 2 Supervisor/
Safety Engineer YES
⬧ Serious
PhysicalInjury
injury / Property damage designated
⬧ All equipment
throughout
routes
excavation.
for for
used vehicles / equipment
excavation must have and afor
3 2 6
authorized
⬧ Supervisor
is empty withof and
waterforeman to ensure 3 1 3 Site Engineer
Site ManagerForeman.
Supervisor/ YES
⬧ Permanent disability pedestrian routes.
third-party certification to ensure safe operation. ⬧ Retraining
adequate banks of
monitoring man and spotters as Safety Engineer
⬧ Incompetent operator Physical injury / Property damage
⬧ Fatality ⬧
⬧ Use of
Adequate appropriate
Conduct tool box talk
warning and
signs complete
priorandstart
barriers PPEs
to work.
as (i.e. 3 2 6 ⬧ Proper
deem training
necessary for theactivities.
operator 3 1 3
Site
Site Engineer
ManagerForeman.
Supervisor/ YES

⬧ Pre-operational
waterproof
All operators gloves and check
and using
boots)
drivers mustproper
be checklist
trained and ⬧ Drivers
⬧ Proper training
to undergo for the operator
defensive driving Safety
Site Engineer
Engineer
⬧ Airborne dust ⬧
⬧ Damage
Eye Injurytoandproperty
respiratory illness boundaries
⬧ Ensure
must that
be valid
done forcompany
inboth routes.
alldriving will provide an appropriate 3
equipment 2 6 Provision ofappropriate
⬧ Additional two-way radio PPE asas deem
per activity. 3 1 3 Site ManagerForeman.
Supervisor/ YES
possess

PPEExperienced SAG
for the specific and trained
activity. license
banks and
man third
/ party
spotters training
necessary
⬧ Conduct for
Conduct training clear
training for communication
for Proper
Respiratory of banks
protection. Safety Engineer
Site Manager
Engineer
⬧ Improper handling ⬧ Physical injury / Property damage ⬧ Implement
certificate
will be assigned thetoproper
assist manual
the machine handlingoperators 3 2 6 ⬧
man and operator manual 3 1 3 Site
Supervisor/ Foreman. YES

⬧ Ensure that mask
Buddy-buddy systemprovided
if the is
loadappropriate
is exceed with
to keep
the Handling. Safety Engineer
Site Manager
Engineer
6 Shifting and offloading of excavated ⬧ Other moving equipment in the area (such⬧ Struck by Vehicles and traffic collisions and

the driverstrained
Provide
hazard regarding traffic
flagman conditions
equipped and
with to
green 3 2 6 Speed
⬧ All breakermust
operators to bebeinstalled
certifiedasanddeem 2 1 2 Site
Supervisor/ Foreman. YES
soils into the designated area as dump truck, etc.) ⬧ capacity
/ isolate load for the
all unauthorized person Personnel away from the necessary Safety Engineer
⬧ Exposure to Dust ⬧ Serious Injury
Excess dust may lead to respiratory diseases and
⬧ redcontrol
Dust flags toneed
controlto bethe movement
done around of the 3 2 6
authorized
⬧Area
Dailyshould
toolboxbemeeting 3 1 3
Site
Site Engineer
ManagerForeman.
Supervisor/ YES
⬧ Permanent disability area.
equipment. ⬧⬧Retraining illuminated
ofworkers
banks man andatspotters
night. as Safety Engineer
7 Housekeeping ⬧ Unwanted materials that lay inside and Physical injury from slip, trips & fall excavated
⬧ Conduct area to
and Maintain control the dust flow
daily housekeeping ⬧ Rotation
Maintain of assignment
daily proper housekeeping to lessen Site
Site Engineer
ManagerForeman.
⬧ Fatality ⬧ Suitable
Appropriate traffic management
dust mask must plan
be shall be
use. 3 2 6 deem necessary
the exposure of Personnel in the related 3 1 3 Supervisor/ YES
outside Safety Engineer
⬧ Ladderthe
andexcavation
hand toolsarea.
that block in the ⬧
⬧ Damage to property
Getting injured from hard objects blocking ⬧

Foreman
established
Housekeeping
Educate
must
such
the worker
designate
as segregation
shall be done
/ staff
1 or 2ofpersons
before,
about pedestrian
theduring
to lanes
and 3
dust related 2 6 ⬧ Provision of two-way radio
⬧ Additional person for housekeeping if
hazard as deem 3 1 3
Site
Site Engineer
ManagerForeman.
Supervisor/ YES
walkway the walkway maintain
from
after the good
vehicle
job housekeeping.
access ways. necessary for clear communication of banks
necessary. Safety
Site Engineer
Engineer
8 Closing of Permit to Work ⬧ Poor housekeeping ⬧ Environmental complaint hazards

⬧ Permit
⬧ Separate,
Designated
Receiver
clearly
access
shall
marked
shall
ensure orfreethat housekeeping 2
demarcated 2 4 ⬧
manSupervisor
and operatorto monitor their respective area 2 1 2 Site ManagerForeman.
Supervisor/ YES
⬧ Undisposed waste materials ⬧ Governmental
⬧ Accident resulting serious injury or death to
violation in
⬧ done before,
walkways
Mobile with signs
equipment during andbe
posted.
shall after
properly
from
the workany
parked on a forSupervising
⬧ housekeeping
Filled dump Engineer
trucksbefore
shall and
and after theshall
beForeman
covered with
Safety
Site
Engineer
Site Manager
Engineer
worker obstruction
⬧ All waste materials generated fromshallthe bework 2 2 4 activity 1 1 1 Supervisor/ Foreman. YES
⬧ Governmental
Accident resulting serious injury or death to ⬧ Designated
designated offloadinglaydown
equipment (dump site) screen or
adhere equivalent
toallthethe
proper materials
housekeeping to prevent
and Safety Engineer
Site Manager
Engineer
⬧ Unaccounted workers ⬧ violation ⬧ Security/guard
shall be disposed should
properly be mobilized
and shall as notandbe signs
left 3 2 6 ⬧ TBT for
Enough waste workers
bins and proper 3 1 3 Site YES
worker established
⬧ All materials with suitable
used at the demarcation
site such chemicals, spoils
storage from
of spilling
materials onatshall
the
the be
road provided
while
designated Supervisor/
Safety Foreman.
Engineer
⬧ Inadequate communication ⬧ Loss of production
Accident resulting ⬧ Log in and
unattended atout theshould
worksite be implemented, belog book monitoring Site Engineer
⬧ Significant cost dueserious injury or death to
to damages ⬧ Regular
posted.
flammable
must
coordination
and
be provided combustible
and
meeting shouldshall
materials done
be for 2 2 4 ⬧ Practice constant
transporting
Training fortothe
location dump communication
site between
pertaining 2 1 2 Site ManagerForeman.
Supervisor/ YES
⬧ All materials used at always siteavailable
thestorage such as chemicals, ⬧ security/guard Safety Engineer
⬧ Poor storage of chemical, flammable and worker
⬧ Significant property and appurtenances communication
stored
⬧ Permit at the
Receiver
Coordination
flammable
designated
shall ensure
between
and combustible
at
that
HR materials
and PMT the
proper
forend
shall
of
storage
newbe 2 2 4
PMT


to
Foreman
Site
Must Manager
log inhave
shall
and out
ensure
shall be that cover
responsible
chemical holder with proper is installed
on the 2 1 2 Site
Site Engineer
ManagerForeman.
Supervisor/ YES
combustible materials and etc. damage each
of day induction
chemical iscondition
doneshould
before, during properly.
effective implementation of the Permit to Safety Engineer
⬧ Unattended unsafe condition ⬧ Loss of production workers,
stored

⬧ All at the
unsafe
Electrical designated
equipment must
shall
be
storage
be atand
provided
be identified
properlytheafter
end
by ofthe
the
secured, 2 2 4
training

⬧ Site
TBT Manager
Work should beshall donebeand responsible
all pending onunsafe
the 2 1 2 Site
Site Engineer
ManagerForeman.
Supervisor/ YES
⬧ Accident
Governmental violation work
each day ⬧ SDS must
effective be available
implementation of the Log in logout Safety Engineer
⬧ Unsecured electrical equipment, energized ⬧ Significantresulting
property serious injury or death to
and appurtenances safety
⬧ Permitrep.
distribution and
Receiver must
board shall be
closed rectified right
and padlocked
ensure that away.
housekeeping condition
⬧ Permit must
Issuerand
Receiver be
shalldiscussed
visit
shall the work
account byall location to 2
worker Site Engineer
equipment
⬧ Environmental
worker
damage
complaint ⬧ All

in Areawaste
Permit
done with materials
un attended
Receiver
before, shall
during
generated
unsafe
account
and after
from
condition
all
the
the work
worker
work must
under be 3 2 6 Supervision
system
⬧ Supervising
verify
under good
his Engineermonitoring
housekeeping
Permit to Work and Foreman
was
and
the
conducted
ensure shall
all have
1 2 Supervisor/ Foreman.
Safety Engineer
YES
⬧ Accident resulting serious injury or death to shall be disposed properly and shall not be left 0 supervisor
Select must take place ###
⬧ Accident resulting serious injury or death to
worker
identified
hisElectrical
⬧ Permit toequipment
unattended atWork and shall
the worksite ensure be all have signed
properly secured, out beforeControl
adhere
signed to the
closing
out Method
proper rectification
the attendance
on the Permit to Work
sheet ofand
the clear
open 0 Supervisor/ Foreman.
worker on the attendance
distribution board closed sheet and
andto clear of the
padlocked area 0 observation
Select
of Control Method
the area 0 ###
⬧ Significant cost due to damages ⬧ Safety information on how handle chemical ⬧ Site Manager shall be responsible on the
⬧ LOTO procedure
materials must be posted should be available and ⬧ Site Manager shall be responsible on the
properly implemented effective
effective implementation
implementation of the Permit to
⬧ All materials used at the site such as chemicals,
flammable and combustible materials shall be Work
stored at the designated storage at the end of ⬧ Monthly inspection and color code should
each day be implemented
⬧ Electrical equipment checklist and registry
should be updated

2  HIRA-Hazard ID and Risk Assessment Form and Register OHS-PR-09-03-F02 (A) Rev. 0     Revision Date (May 2021)
SEVERITY / CONSEQUENCE (Impact/Hazard Effect) (Where an event has more than one ' Loss Type ', choo
Loss Type Additional "Loss Types" may exist for
an event: Identify & rate accordingly (1) Insignificant (2) Minor
Medical Treatment Case
(S/H) Harm to People (Safety/Health)
First Aid Case/Exposure to Minor Exposure to Major Health Risk
Health Risk

(EI) Environmental Impact


Minimal environment harm incident Material Environment harm (RST)
with workplace

(BI/MD) Business Interruption / Material / Fire Damage & No disruption to operation / 1000 SR Brief Disruption to Operation / 10k
Other Consequential Losses to Less than 10k SR SR to Less Than 100k SR

LIKELIHOOD Examples (Consider Near-Hits as well as actual events)


(5) ALMOST CERTAIN The unwanted event has occurred frequently : Occurs in order of (1)
or more per year & is likely to reoccur within 1 year 5 (M)
(4) LIKELY The unwanted event has occurred infrequently : Occurs in order of
less than once per year & is likely to reoccur within 5 yrs. 4 (M)
(3) POSSIBLE The unwanted event has occurred in the business at some time: or
could happen within 10 years. 3 (L)
(2) UNLIKELY The unwanted event has occurred in the business at some time: or
could happen within 20 years. 2 (L)
(1) RARE The unwanted event has never known to occur in the business or it is
highly unlikely to occur within 20 years. 1 (L)

RISK RISK LEVEL GUIDELINES FOR RISK MATRIX


RATING
Stop operation and review controls- Eliminate, avoid risk &
15 to 25 (Ex) - Extreme implement high priority action plans

Proactively manage & implement specific controls/action


8 to 12 (H) - High plans-Review after 7 days
Actively manage & monitor – Additional controls is advised
4 to 6 (M) - Medium & review after 14 days
Risk acceptable – Monitor & manage as appropriate with
1 to 3 (L) - Low frequent review
than one ' Loss Type ', choose the ' Consequence' with the highest rating)

2) Minor (3) Moderate (4) Major (5) Catastrophic


Treatment Case Loss Time Injury / Single Fatality or
o Major Health Risk Reversible Impact on Loss of Quality of Multiple Fatalities / Impact on
Health Life / Irreversible health Ultimately Fatal
impact on Health
Material Environment
ironment harm (RST) harm (RST) Serious Major environmental Major environmental harm –
environmental harm incident (RLT) Incident Irreversible
incident (RMT)
Partial Loss of
Operation/1M SR
on to Operation / 10k Partial Shutdown/100k To Less than10M SR Substantial or Total Loss of
ss Than 100k SR SR to Less than 1M SR Operation / 10M SR and more

RISK RATING / PROFILE


5 (M) 10 (H) 15 (H) 20 (Ex) 25 (Ex)

4 (M) 8 (H) 12 (H) 16 (Ex) 20 (Ex)

3 (L) 6 (M) 9 (H) 12 (H) 15 (Ex)

2 (L) 4 (M) 6 (M) 8 (H) 10 (H)

1 (L) 2 (L) 3 (L) 4 (M) 5 (M)


Area/Department
Date Compiled Date Revised
Compiled by:
Management Action
Priority
Ref No. Description of Risk Risk Score Action Responsible person
Rating
Target Action
Responsible person
date complete