TECHNICS OFFSHORE ENGINEERING PTE LTD

72 LOYONG WAY ,SINGAPORE 508762, TEL:6545 9968 , FAX:6545 0668


Website : www.technicsgrp.cpm

FINAL DIMENSION REPORT


PROJECT TITLE :- SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT FOR 15 TAG NO. : V-7511A
MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION
CLIENT : PETRONAS DRAWING NO. : 91013010-M-DW-101-16 REV-A

PROJECT NO. : TOE-13068E U-STAMP NO : TOE-U-1035-14

DESCRIPTION : PRIMARY OIL SEPARATOR REPORT NO : 13068-DIM-01

REQUIRED ACTUAL REQUIRED ACTUAL NOZZ .PROJECTION NOZZ .PROJECTION


SL NO DESCRIPTION ACC/REJ REMARKS
LOCATION LOCATION DIMENSION DIMENSION FROM SHELL OD FROM OD ACTUAL

1 CS#2 TO NOZZLE N1 CENTRE 270° 270° 835 834 200 197 ACC 6" SCH-80, 300# WNRF FLANGE

2 CS#2 TO NOZZLE N2 CENTRE 135° 50° 2745 2746 200 202 ACC 4" SCH-160, 300# WNRF FLANGE

3 CS#2 TO NOZZLE N4A CENTRE 180° 0° 240 242 200 201 ACC 3" SCH-160, 300# WNRF FLANGE

4 CS#2 TO NOZZLE BN4A CENTRE 90° 90° 240 241 200 203 ACC 3" SCH-160, 300# WNRF FLANGE

5 TAN LINE TO NOZZLE N7 CENTRE 0° 180° 350 352 - - ACC 2" SCH-160, 300# WNRF FLANGE

6 NOZZLE A1 (TOP FLANGE) TO NOZZLE N9 CENTRE 270° 270° 250 251 - - ACC 2" SCH-160, 300# WNRF FLANGE

7 CS#2 TO NOZZLE N11A CENTRE 135° 45° 900 901 200 201 ACC 3" SCH-160, 300# WNRF FLANGE

8 CS#2 TO NOZZLE N12 CENTRE 305° 235° 1100 1101 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

9 CS#2 TO NOZZLE BN12 CENTRE 90° 90° 1150 1152 200 200 ACC 2" SCH-160, 300# WNRF FLANGE

10 CS#2 TO NOZZLE N13 CENTRE 135° 45° 380 381 200 200 ACC 3" SCH-160, 300# WNRF FLANGE

11 CS#2 TO NOZZLE N14 CENTRE 205° 335° 240 240 200 201 ACC 2" SCH-160, 300# WNRF FLANGE

12 CS#2 TO NOZZLE N15 CENTRE 270° 270° 380 381 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

13 CS#2 TO NOZZLE N16 CENTRE 0° 180° 250 251 200 202 ACC 8" SCH-80, 300# WNRF FLANGE

14 CS#2 TO NOZZLE N22 CENTRE 0° 180° 1150 1152 200 201 ACC 2" SCH-160, 300# WNRF FLANGE
NOTES :
1) All Dimensions are in MM
2) Equipment Used: Measuring Tape

WITNESSED BY WITNESSED BY WITNESSED BY


TOE Q.C INSPECTOR ABS(AI) INSPECTOR BUREAU VERITAS (BV) INSPECTOR CLIENT INSPECTOR
NAME: TILAK NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:

1 of 7
TECHNICS OFFSHORE ENGINEERING PTE LTD
72 LOYONG WAY ,SINGAPORE 508762, TEL:6545 9968 , FAX:6545 0668
Website : www.technicsgrp.cpm

FINAL DIMENSION REPORT


PROJECT TITLE :- SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT FOR 15 TAG NO. : V-7511A
MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION
CLIENT : PETRONAS DRAWING NO. : 91013010-M-DW-101-16 REV-A

PROJECT NO. : TOE-13068E U-STAMP NO : TOE-U-1035-14

DESCRIPTION : PRIMARY OIL SEPARATOR REPORT NO : 13068-DIM-01

REQUIRED ACTUAL REQUIRED ACTUAL NOZZ .PROJECTION NOZZ .PROJECTION


SL NO DESCRIPTION ACC/REJ REMARKS
LOCATION LOCATION DIMENSION DIMENSION FROM SHELL OD FROM OD ACTUAL

15 CS#2 TO NOZZLE N30 CENTRE 325° 215° 100 100 200 201 ACC 2" SCH-160, 300# WNRF FLANGE

16 CS#2 TO NOZZLE N37A CENTRE 225° 315° 1100 1101 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

17 CS#2 TO NOZZLE N37B CENTRE 225° 315° 100 102 200 200 ACC 2" SCH-160, 300# WNRF FLANGE

18 CS#2 TO NOZZLE N37C CENTRE 50° 130° 1100 1100 200 201 ACC 2" SCH-160, 300# WNRF FLANGE

19 CS#2 TO NOZZLE N37D CENTRE 50° 130° 100 102 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

20 CS#2 TO NOZZLE BN37D CENTRE 305° 235° 100 102 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

21 NOZZLE A1 (TOP FLANGE) TO SUPPORT BRACKET 2PCS 135° & 315° 135° & 315° 850 852 245 246 ACC -

22 CS#2 TO LIFTING LUG TRUNNION 2PCS 0° & 180° 0° & 180° 2450 2450 282 282 ACC -

23 NAME PLATE 0° 180° 735 735 65 65 ACC -

24 INSULATION RING (TAN LINE TO 75MM & 1435MM ) - - 50 50 38 38 ACC -

25 INSULATION RING (NOZZLE A1 (TOP FLANGE) TO BELOW 272MM - - 50 50 38 38 ACC -

26 TOTAL LENGTH - - 3727 3727 - - ACC -

NOTES :
1) All Dimensions are in MM
2) Equipment Used: Measuring Tape

TOE Q.C INSPECTOR ABS(AI) INSPECTOR BUREAU VERITAS (BV) INSPECTOR CLIENT INSPECTOR
NAME: TILAK NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:

2 of 7
TECHNICS OFFSHORE ENGINEERING PTE LTD
72 LOYONG WAY ,SINGAPORE 508762, TEL:6545 9968 , FAX:6545 0668
Website : www.technicsgrp.cpm

FINAL DIMENSION REPORT


PROJECT TITLE :- SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT FOR 15 TAG NO. : V-7511B
MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION
CLIENT : PETRONAS DRAWING NO. : 91013010-M-DW-101-16 REV-A

PROJECT NO. : TOE-13068E U-STAMP NO : TOE-U-1036-14

DESCRIPTION : PRIMARY OIL SEPARATOR REPORT NO : 13068-DIM-01

REQUIRED ACTUAL REQUIRED ACTUAL NOZZ .PROJECTION NOZZ .PROJECTION


SL NO DESCRIPTION ACC/REJ REMARKS
LOCATION LOCATION DIMENSION DIMENSION FROM SHELL OD FROM OD ACTUAL

1 CS#2 TO NOZZLE N1 CENTRE 270° 270° 835 835 200 197 ACC 6" SCH-80, 300# WNRF FLANGE

2 CS#2 TO NOZZLE N2 CENTRE 135° 50° 2745 2747 200 202 ACC 4" SCH-160, 300# WNRF FLANGE

3 CS#2 TO NOZZLE N4A CENTRE 180° 0° 240 240 200 202 ACC 3" SCH-160, 300# WNRF FLANGE

4 TAN LINE TO NOZZLE N7 CENTRE 0° 180° 350 352 - - ACC 2" SCH-160, 300# WNRF FLANGE

5 NOZZLE A1 (TOP FLANGE) TO NOZZLE N9 CENTRE 270° 270° 250 250 - - ACC 2" SCH-160, 300# WNRF FLANGE

6 CS#2 TO NOZZLE N11A CENTRE 135° 45° 900 900 200 201 ACC 3" SCH-160, 300# WNRF FLANGE

7 CS#2 TO NOZZLE N12 CENTRE 305° 235° 1100 1100 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

8 CS#2 TO NOZZLE N13 CENTRE 135° 45° 380 380 200 200 ACC 3" SCH-160, 300# WNRF FLANGE

9 CS#2 TO NOZZLE N14 CENTRE 205° 335° 240 242 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

10 CS#2 TO NOZZLE N15 CENTRE 270° 270° 380 380 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

11 CS#2 TO NOZZLE N16 CENTRE 0° 180° 250 252 200 202 ACC 8" SCH-80, 300# WNRF FLANGE

12 CS#2 TO NOZZLE N22 CENTRE 0° 180° 1150 1151 200 201 ACC 2" SCH-160, 300# WNRF FLANGE
NOTES :
1) All Dimensions are in MM
2) Equipment Used: Measuring Tape

WITNESSED BY WITNESSED BY WITNESSED BY


TOE Q.C INSPECTOR ABS(AI) INSPECTOR BUREAU VERITAS (BV) INSPECTOR CLIENT INSPECTOR
NAME: TILAK NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:

3 of 7
TECHNICS OFFSHORE ENGINEERING PTE LTD
72 LOYONG WAY ,SINGAPORE 508762, TEL:6545 9968 , FAX:6545 0668
Website : www.technicsgrp.cpm

FINAL DIMENSION REPORT


PROJECT TITLE :- SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT FOR 15 TAG NO. : V-7511B
MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION
CLIENT : PETRONAS DRAWING NO. : 91013010-M-DW-101-16 REV-A

PROJECT NO. : TOE-13068E U-STAMP NO : TOE-U-1036-14

DESCRIPTION : PRIMARY OIL SEPARATOR REPORT NO : 13068-DIM-01

REQUIRED ACTUAL REQUIRED ACTUAL NOZZ .PROJECTION NOZZ .PROJECTION


SL NO DESCRIPTION ACC/REJ REMARKS
LOCATION LOCATION DIMENSION DIMENSION FROM SHELL OD FROM OD ACTUAL

13 CS#2 TO NOZZLE N30 CENTRE 325° 215° 100 100 200 201 ACC 2" SCH-160, 300# WNRF FLANGE

14 CS#2 TO NOZZLE N37A CENTRE 225° 315° 1100 1102 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

15 CS#2 TO NOZZLE N37B CENTRE 225° 315° 100 101 200 200 ACC 2" SCH-160, 300# WNRF FLANGE

16 CS#2 TO NOZZLE N37C CENTRE 50° 130° 1100 1100 200 201 ACC 2" SCH-160, 300# WNRF FLANGE

17 CS#2 TO NOZZLE N37D CENTRE 50° 130° 100 101 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

18 NOZZLE A1 (TOP FLANGE) TO SUPPORT BRACKET 2PCS 135° & 315° 135° & 315° 850 852 245 246 ACC -

19 CS#2 TO LIFTING LUG TRUNNION 2PCS 0° & 180° 0° & 180° 2450 2450 282 282 ACC -

20 NAME PLATE 0° 180° 735 735 65 65 ACC -

21 INSULATION RING (TAN LINE TO 75MM & 1435MM ) - - 50 50 38 38 ACC -

22 INSULATION RING (NOZZLE A1 (TOP FLANGE) TO BELOW 272MM - - 50 50 38 38 ACC -

23 TOTAL LENGTH - - 3727 3727 ACC

NOTES :
1) All Dimensions are in MM
2) Equipment Used: Measuring Tape

TOE Q.C INSPECTOR ABS(AI) INSPECTOR BUREAU VERITAS (BV) INSPECTOR CLIENT INSPECTOR
NAME: TILAK NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:

4 of 7
TECHNICS OFFSHORE ENGINEERING PTE LTD
72 LOYONG WAY ,SINGAPORE 508762, TEL:6545 9968 , FAX:6545 0668
Website : www.technicsgrp.cpm

FINAL DIMENSION REPORT


PROJECT TITLE :- SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT FOR 15 TAG NO. : V-7511C
MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION
CLIENT : PETRONAS DRAWING NO. : 91013010-M-DW-101-16 REV-A

PROJECT NO. : TOE-13068E U-STAMP NO : TOE-U-1037-14

DESCRIPTION : PRIMARY OIL SEPARATOR REPORT NO : 13068-DIM-01

REQUIRED ACTUAL REQUIRED ACTUAL NOZZ .PROJECTION NOZZ .PROJECTION


SL NO DESCRIPTION ACC/REJ REMARKS
LOCATION LOCATION DIMENSION DIMENSION FROM SHELL OD FROM OD ACTUAL

1 CS#2 TO NOZZLE N1 CENTRE 270° 270° 835 833 200 198 ACC 6" SCH-80, 300# WNRF FLANGE

2 CS#2 TO NOZZLE N2 CENTRE 135° 50° 2745 2744 200 202 ACC 4" SCH-160, 300# WNRF FLANGE

3 CS#2 TO NOZZLE N4A CENTRE 180° 0° 240 240 200 201 ACC 3" SCH-160, 300# WNRF FLANGE

4 CS#2 TO NOZZLE BN4A CENTRE 90° 90° 240 241 200 203 ACC 3" SCH-160, 300# WNRF FLANGE

5 TAN LINE TO NOZZLE N7 CENTRE 0° 180° 350 350 - - ACC 2" SCH-160, 300# WNRF FLANGE

6 NOZZLE A1 (TOP FLANGE) TO NOZZLE N9 CENTRE 270° 270° 250 250 - - ACC 2" SCH-160, 300# WNRF FLANGE

7 CS#2 TO NOZZLE N11A CENTRE 135° 45° 900 902 200 201 ACC 3" SCH-160, 300# WNRF FLANGE

8 CS#2 TO NOZZLE N12 CENTRE 305° 235° 1100 1100 200 201 ACC 2" SCH-160, 300# WNRF FLANGE

9 CS#2 TO NOZZLE BN12 CENTRE 90° 90° 1150 1150 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

10 CS#2 TO NOZZLE N13 CENTRE 135° 45° 380 378 200 201 ACC 3" SCH-160, 300# WNRF FLANGE

11 CS#2 TO NOZZLE N14 CENTRE 205° 335° 240 240 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

12 CS#2 TO NOZZLE N15 CENTRE 270° 270° 380 380 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

13 CS#2 TO NOZZLE N16 CENTRE 0° 180° 250 252 200 201 ACC 8" SCH-80, 300# WNRF FLANGE

14 CS#2 TO NOZZLE N22 CENTRE 0° 180° 1150 1151 200 202 ACC 2" SCH-160, 300# WNRF FLANGE
NOTES :
1) All Dimensions are in MM
2) Equipment Used: Measuring Tape

WITNESSED BY WITNESSED BY WITNESSED BY


TOE Q.C INSPECTOR ABS(AI) INSPECTOR BUREAU VERITAS (BV) INSPECTOR CLIENT INSPECTOR
NAME: TILAK NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:

5 of 7
TECHNICS OFFSHORE ENGINEERING PTE LTD
72 LOYONG WAY ,SINGAPORE 508762, TEL:6545 9968 , FAX:6545 0668
Website : www.technicsgrp.cpm

FINAL DIMENSION REPORT


PROJECT TITLE :- SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT FOR 15 TAG NO. : V-7511C
MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION
CLIENT : PETRONAS DRAWING NO. : 91013010-M-DW-101-16 REV-A

PROJECT NO. : TOE-13068E U-STAMP NO : TOE-U-1037-14

DESCRIPTION : PRIMARY OIL SEPARATOR REPORT NO : 13068-DIM-01

REQUIRED ACTUAL REQUIRED ACTUAL NOZZ .PROJECTION NOZZ .PROJECTION


SL NO DESCRIPTION ACC/REJ REMARKS
LOCATION LOCATION DIMENSION DIMENSION FROM SHELL OD FROM OD ACTUAL

15 CS#2 TO NOZZLE N30 CENTRE 325° 215° 100 100 200 201 ACC 2" SCH-160, 300# WNRF FLANGE

16 CS#2 TO NOZZLE N37A CENTRE 225° 315° 1100 1102 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

17 CS#2 TO NOZZLE N37B CENTRE 225° 315° 100 100 200 201 ACC 2" SCH-160, 300# WNRF FLANGE

18 CS#2 TO NOZZLE N37C CENTRE 50° 130° 1100 1101 200 201 ACC 2" SCH-160, 300# WNRF FLANGE

19 CS#2 TO NOZZLE N37D CENTRE 50° 130° 100 102 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

20 CS#2 TO NOZZLE BN37D CENTRE 305° 235° 100 100 200 202 ACC 2" SCH-160, 300# WNRF FLANGE

21 NOZZLE A1 (TOP FLANGE) TO SUPPORT BRACKET 2PCS 135° & 315° 135° & 315° 850 852 245 246 ACC -

22 CS#2 TO LIFTING LUG TRUNNION 2PCS 0° & 180° 0° & 180° 2450 2450 282 282 ACC -

23 NAME PLATE 0° 180° 735 735 65 65 ACC -

24 INSULATION RING (TAN LINE TO 75MM & 1435MM ) - - 50 50 38 38 ACC -

25 INSULATION RING (NOZZLE A1 (TOP FLANGE) TO BELOW 272MM - - 50 50 38 38 ACC -

26 TOTAL LENGTH - - 3727 3727 ACC

NOTES :
1) All Dimensions are in MM
2) Equipment Used: Measuring Tape

TOE Q.C INSPECTOR ABS(AI) INSPECTOR BUREAU VERITAS (BV) INSPECTOR CLIENT INSPECTOR
NAME: TILAK NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE: DATE:


6 of 7
TECHNICS OFFSHORE ENGINEERING PTE LTD
72 LOYONG WAY ,SINGAPORE 508762, TEL:6545 9968 , FAX:6545 0668
Website : www.technicsgrp.cpm

FINAL DIMENSION REPORT


PROJECT TITLE :- SUPPLY AND DELIVERY OF FUEL GAS CONDITIONING UNIT(FGCU) AND ASSOCIATED EQUIPMENT FOR 15 TAG NO. : V-7511C
MW POWER PLANT FOR GARRAF DEVELOPMENT FACILITY OPERATION
CLIENT : PETRONAS DRAWING NO. : 91013010-M-DW-101-16 REV-A

PROJECT NO. : TOE-13068E U-STAMP NO : TOE-U-1037-14

DESCRIPTION : PRIMARY OIL SEPARATOR REPORT NO : 13068-DIM-01

REQUIRED ACTUAL REQUIRED ACTUAL NOZZ .PROJECTION NOZZ .PROJECTION


SL NO DESCRIPTION ACC/REJ REMARKS
LOCATION LOCATION DIMENSION DIMENSION FROM SHELL OD FROM OD ACTUAL

7 of 7

You might also like