You are on page 1of 15

DMRC Contract DC-02: Part Design and Construction of Elevated Viaduct fr

(excluding) including Bridge across river Yamuna, Integrated Elevated Via


metro line at upper deck from Yamuna Vihar to Bhajanpura and 08 Eleva
Corridor of Delhi MRTSPhase-IV projec

Trial Mix Su

REFERENCE CEMENT

CEMENT
Sr. No Ref No. DATE OF TRIAL GRADE CEMENT BRAND WEEK
TYPE

1 D-01 13-Mar M-35 Ultratech OPC-53 9

2 D-02 16-Mar M-35 Ultratech OPC-53 9

3 D-03 16-Mar M-40 Ultratech OPC-53 9

4 D-04 17-Mar M-40 Ultratech OPC-53 9

6 D-06 18-Mar M-35 Ultratech OPC-53 11

7 D-07 18-Mar M-35 Ultratech OPC-53 11

8 D-08 19-Mar M-40 Ultratech OPC-53 11

9 D-09 19-Mar M-40 Ultratech OPC-53 11

10 D-10 12-May M45 Ultratech OPC-53 13

11 D-11 12-May M45 Ultratech OPC-53 13

12 D-12 14-May M50 Ultratech OPC-53 13

13 D-13 14-May M50 Ultratech OPC-53 13

15 D-14 16-May M50 Ultratech OPC-53 13

16 D-15 18-May M55 Ultratech OPC-53 13

14 D-16 18-May M55 Ultratech OPC-53 13

17 D-17 19-May M55 Ultratech OPC-53 13

18 D-18 19-May M55 Ultratech OPC-53 13

19 D-19 20-May M-35 Ultratech OPC-53 20


20 D-20 21-May M-35 Ultratech OPC-53 20

21 D-21 21-May M-35 Ultratech OPC-53 20

22 D-22 26-May M-35 Ultratech OPC-53 20

23 D-23 27-May M-35 Ultratech OPC-53 20

24 D-24 28-May M55 Ultratech OPC-53 20

25 D-25 28-May M-35 Ultratech OPC-53 20

27 D-26 29-May M-35 Ultratech OPC-53 20

26 D-27 29-May M-35 Ultratech OPC-53 20

28 D-28 30-May M55 Ultratech OPC-53 20

29 D-29 1-Jun M45 Ultratech OPC-53 20

30 D-30 1-Jun M50 Ultratech OPC-53 20

31 D-31 2-Jun M-55 Ultratech OPC-53 22

32 D-32 3-Jun M-40 Ultratech OPC-53 22

33 D-33 5-Jun M45 Ultratech OPC-53 22

34 D-34 6-Jun M50 Ultratech OPC-53 22

35 D-35 8-Jun M-55 Ultratech OPC-53 22

36 D-36 10-Jun M-55 Ultratech OPC-53 22

M-55
37 D-37 11-Jun Pile Ultratech OPC-53 22

38 D-38 13-Jun M-40 Ultratech OPC-53 22

39 D-39 15-Jun M-25 Ultratech OPC-53 22

40 D-40 24-Jun M-35 Ultratech OPC-53 22

41 D-41 25-Jun M-35 Ultratech OPC-53 22

42 D-42 26-Jun M55 Ultratech OPC-53 22

43 D-43 27-Jun M55 Ultratech OPC-53 22


44 D-44 29-Jun M-40 Ultratech OPC-53 22

45 D-45 4-Jul M-40 Ultratech OPC-53 22


ign and Construction of Elevated Viaduct from Maujpur (excluding) to Majlis Park
ross river Yamuna, Integrated Elevated Viaduct with PWD flyover at lower deck &
m Yamuna Vihar to Bhajanpura and 08 Elevated Stations of Majlis Park – Maujpur
Corridor of Delhi MRTSPhase-IV project)) LONGJIAN – KEC JV

Trial Mix Summary Sheet

CEMENT AGGREGATE QUANTITY

CEMENT MICRO Admixtur


Admixture WATER 20MM 10MM C.Sand
QTY SILICA e

SIKA 5003 NS 410 0 170 691 458 774 2.05

CAC G PLUS 410 0 170 691 458 774 2.05

SIKA 5003 NS 420 0 170 687 457 770 2.31

SIKA 5003 NS 420 0 170 687 457 770 2.52

CAC PLUS G 410 0 170 690 458 774 2.05

SIKA 5003 NS 410 0 170 690 458 774 2.05

CAC PLUS G 420 0 170 687 457 770 2.1

SIKA 5003 NS 420 0 170 687 457 770 2.1

SIKA 5003 NS 430 0 169 685 454 768 2.58

CAC G PLUS 430 0 169 685 454 768 2.15

CAC R-100 450 0 171 677 450 760 2.25

SIKA 5003 NS 450 0 171 677 450 760 2.25

SIKA 5003 NS 450 0 171 677 450 760 2.7

CAC R-100+ELKEM 450 24 169 679 450 731 3.1047

SIKA 5003NS+ELKEM 450 24 169 679 450 731 3.081

SIKA 5003NS+ROCKFIT 450 24 169 679 450 731 3.318

CAC R-100+ROCKFIT 450 24 169 679 450 731 3.318

ATPL AT CARPOL S 79 410 0 170 690 458 774 2.05


CAC G PLUS 410 0 170 690 458 774 2.46

CAC G PLUS 410 0 170 690 458 774 2.87

FOSROC AURAMIX 400 410 0 170 690 458 774 2.46

BASF 8327 410 0 170 690 458 774 2.46

SIKA 2002+ELKEM 450 24 156 682 453 739 3.79

SIKA 5003 NS 400 0 156 697 463 787 2.4

FOSROC AURAMIX 400 400 0 156 697 463 787 2.4

BASF 8653 400 0 156 697 463 787 2.4

SIKA 2002 + ELKEM 450 24 169 679 450 731 2.844

SIKA 5003 NS 430 0 169 685 454 768 2.58

SIKA 5003 NS 450 0 171 677 450 760 2.7

SIKA 2002 + ELKEM 450 24 169 679 450 731 3.792

FOSROC AURAMIX 400 420 0 170 687 457 770 2.52

FOSROC AURAMIX 400 430 0 169 685 454 768 2.795

FOSROC AURAMIX 400 450 0 171 677 450 760 2.7

FOSROC AURAMIX 400 + ELKEM 450 24 169 679 450 731 3.318

FOSROC AURAMIX 400 + ELKEM 450 24 169 679 450 731 3.318

FOSROC AURAMIX 400 + Rockfit 450 24 169 679 450 731 3.792

SIKA 5003 NS 420 0 170 687 457 770 2.52

SIKA 5003 NS 330 0 179 707 469 793 1.32

SIKA 5003 NS 352 88 170 672 447 7559 2.2

SIKA 5003 NS 352 88 170 672 447 7559 2.2

CAC R 150+ELKEM 450 24 156 682 453 739 3.32

CAC R 100+ELKEM 450 24 156 682 453 739 3.32


SIKA 5003 NS 370 92 170 687 457 770 2.22

CAC G PLUS 370 92 170 687 457 770 2.22

Mixes Propose for Approval


LONGJIAN – KEC JV

SLUMP IN MM Date of Testing

% Admixture W/C Slump Initial Slump 60 Min Slump @ 120 Slump @180 7 Days

0.5 0.38 Collapse 190 170 20-Mar-20

0.5 0.38 Collapse Collapse 180 160 23-Mar-20

0.55 0.37 HEAVY 23-Mar-20


BLEEDING

0.6 0.37 Collapse Collapse 180 150 24-Mar-20

0.5 0.38 Collapse 200 170 25-Mar-20

0.5 0.38 Collapse 220 180 25-Mar-20

0.5 0.37 Collapse Collapse 180 170 26-Mar-20

0.5 0.37 Collapse Collapse 170 26-Mar-20

0.6 0.36 Collapse Collapse 170 19-May-20

0.5 0.36 Collapse 210 165 19-May-20

0.5 0.35 Collapse Collapse 220 205 21-May-20

0.5 0.35 Collapse 190 21-May-20

0.60 0.35 Collapse 220 150 23-May-20

0.655 0.33 Collapse 190 170 25-May-20

0.65 0.33 Collapse 195 170 25-May-20

0.7 0.33 Collapse 200 170 26-May-20

0.7 0.33 Collapse Collapse 160 26-May-20

0.5 0.38 Collapse 180 110 27-May-20


0.6 0.38 Collapse 140 28-May-20

0.7 0.38 Collapse 210 160 28-May-20

0.6 0.38 Collapse 200 160 2-Jun-20

0.6 0.38 Collapse 190 125 3-Jun-20

0.8 0.33 Collapse 210 170 4-Jun-20

0.6 0.39 Collapse 200 165 4-Jun-20

0.6 0.39 Collapse 200 140 5-Jun-20

0.6 0.39 Collapse 170 90 5-Jun-20

0.6 0.33 Collapse 180 140 6-Jun-20

0.6 0.36 Collapse 200 155 8-Jun-20

0.6 0.35 Collapse 210 175 8-Jun-20

0.8 0.33 Collapse 200 175 9-Jun-20

0.6 0.37 Collapse 190 140 10-Jun-20

0.65 0.36 Collapse 190 165 12-Jun-20

0.6 0.35 Collapse 200 160 13-Jun-20

0.7 0.33 Collapse 180 95 15-Jun-20

0.7 0.33 Collapse 200 150 17-Jun-20

0.8 0.33 Collapse 200 180 18-Jun-20

0.6 0.37 Collapse 200 165 20-Jun-20

0.4 0.48 Collapse 200 160 22-Jun-20

0.5 0.38 Collapse 215 180 1-Jul-20

0.5 0.38 Collapse 190 175 2-Jul-20

0.7 0.33 Collapse 175 150 3-Jul-20

0.7 0.33 Collapse 180 155 4-Jul-20


0.6 0.37 Collapse 200 180 6-Jul-20

0.6 0.37 Collapse 200 180 11-Jul-20


Date of Testing Weight ACT

28 Days 3 Days 3 Days 7Day 28Days (After 28 1/2 h) 3 Days

10-Apr-20 8.390 8.465

13-Apr-20 8.392 8.517

13-Apr-20 -

14-Apr-20 8.410 8.489 58.180

15-Apr-20 8.440 8.472 59.160

15-Apr-20 8.420 8.422 60.470

16-Apr-20 8.440 8.456

16-Apr-20 8.440 8.474

9-Jun-20 8.42 8.37 8.39 38.74

9-Jun-20 8.46 8.52 8.67 39.92

11-Jun-20 8.79 8.78

11-Jun-20 8.42 8.47

13-Jun-20 8.60 8.66

15-Jun-20 8.50 8.55

15-Jun-20 8.42 8.43

16-Jun-20 8.49 8.46

16-Jun-20 8.50 8.49

17-Jun-20 - -
18-Jun-20 - -

18-Jun-20 8.51 8.61

23-Jun-20 8.46 8.50

24-Jun-20 - -

25-Jun-20 8.50 8.58

25-Jun-20 8.43 8.48

26-Jun-20 8.48 8.52

26-Jun-20 - -

27-Jun-20 8.39 -

29-Jun-20 8.49 -

29-Jun-20 8.62 -

30-Jun-20 8.49 8.57

1-Jul-20 8.60 8.51

3-Jul-20 8.55 8.61

4-Jul-20 8.62 8.59

6-Jul-20 - -

8-Jul-20 8.48

9-Jul-20 8.58

11-Jul-20 8.52

13-Jul-20 8.34

22-Jul-20 8.30

23-Jul-20 8.25

24-Jul-20 8.46

25-Jul-20 30-Jun-20 8.52 8.50 41.53


27-Jul-20

1-Aug-20
Compressive Stength REMARKS

7 Days 28 Days 3 Days

39.44 66.65

37.48 65.44

DISCARDED

41.28 62.07

39.32 62.40

40.44 63.54

65.02

63.38

44.63 55.21

49.07 54.64

61.85 73.05 Initial bleeding

51.08 61.35 after 90 min-125mm

50.62 58.37 after 90 min-200mm

64.28 75.92 Afrer 90min-175mm

57.02 68.43 Afrer 90min-180mm

63.22 65.30 Afrer 90min-170mm

63.53 69.50 Afrer 90min-200mm

- - Initially Bleeding observered for first 20 minuutes &


suddenly Drop. Mix discarded
- - Initially collapse slump suddenly drop after 1
hour,then mix discarded

41.37 57.92 Initially Bleeding observered for first 15 minuutes mix


is good and cohesive.

50.93 61.82

- - Initially Bleeding observered for first 10 minutes &


slump drop after 1 hour. Mix discarded

64.07 73.46

47.54 57.78

46.51 56.41

Initially Bleeding observered for first 10 minutes &


- - slump drop after 1 hour. Mix discarded

54.42 - Same as D-15, Re Trail done to cast cube and cylinder


for RCPT, WPT and Split tensile

54.48 - Same as D-10, Re Trail done to cast cube and cylinder


for RCPT, WPT and Split tensile
Same as D-14, Re Trail done to cast cube and cylinder
56.66 - for RCPT, WPT and Split tensile

55.72 64.51 PILE

44.40 53.04

47.88 59.48

51.65 60.17

- - Initially Collapse & slump drop after 1 hour. Mix


discarded

54.41

51.84

46.88 7 Days results of curing compound is Weight 8.330


and strength 46.90

27.85

39.13

38.54

59.03 7 Days results of curing compound is Weight 8.390


and strength 58.89
for checking of 3 days, 7 days and 28 days strength for
54.37 destressing and lifting of girder