You are on page 1of 124

Upper Solu Hydro Electric Company Limited

Solu Hydro electric Project


Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : BHADRA Day: 01


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 10.95 10.91 10.93 293.28 306.30 287.86 4.93 -2.67 0.88
2 10.96 10.91 10.93 294.88 308.82 288.80 4.93 -2.68 0.88
3 10.96 10.92 10.93 296.24 309.72 289.52 4.93 -2.75 0.87
4
5 11.09 11.05 11.06 279.66 295.41 277.84 4.91 -2.39 0.90
6 11.08 11.04 11.06 276.07 289.67 271.41 4.89 -2.13 0.92
7 11.20 11.16 11.17 269.49 284.02 265.32 4.94 -1.87 0.93
8
9
10
11 GRID UNAVA
12 PL
13
14
15
16 11.20 11.16 11.17 273.75 286.02 269.44 5.02 -1.90 0.93
17 11.20 11.16 11.17 273.09 287.69 268.61 4.99 -1.92 0.93
18 11.2 11.16 11.17 273.61 287.18 269.36 5.01 -1.9 0.93
19 11.19 11.16 11.16 268.91 281.57 267.91 5 -1.67 0.95
20 11.18 11.15 11.15 264.42 277.56 267.75 5 -1.4 0.96
21 11.2 11.16 11.17 270.41 285.54 286.45 5 -1.86 0.94
22 11.2 11.17 11.18 274.84 288.18 271.76 5 -2.03 0.93
23 11.2 11.16 11.18 273.95 288.31 271.09 5 -2.01 0.93
24 11.21 11.17 11.18 275.31 289.01 271.54 4.99 -2.03 0.93

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
50.03 17639
50.01 17643.8
50.00 17648.8
NEA GRID SYSTEM FAILURE FROM (3:44 TO 4:17)
49.91 17655.2
50 17660.3
50.01 17661.8

GRID UNAVAILABLE FROM 7:08 AM TO 9:50 AM DUE TO BREAKER MAINTENANCE AT LAHAN SUB-STATION
PLANT SHUT DOWN FROM 9:50 AM TO 14:58 PM DUE TO GUIDE VANE MAINTENANCE

50.04 17667.3
49.99 17672.2
49.82 17677.1
49.88 17682.2
50 17687.2
50.02 17692.2
50 17697.1
49.99 17702.2
49.98 17707.3

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
132.85 132.89 132.28 23.67 25.14 24.67 4.84
132.89 132.92 132.28 23.67 25.20 24.71 4.83
132.97 132.98 132.36 23.87 25.41 24.88 4.83
TO 4:17)
134.2 134.36 133.65 22.72 24.08 23.9 4.82
134.07 134 133.42 22.29 23.89 23.34 4.82
135.21 135.2 134.65 21.78 23.17 22.82 4.84

N SUB-STATION
NANCE

135.15 135.20 134.67 22.10 23.38 23.10 4.92


135.18 135.19 134.65 22.07 23.41 23.09 4.92
135.23 135.23 134.72 22.14 23.5 23.13 4.91
134.85 134.99 134.45 21.86 22.91 22.92 4.92
135.05 135.32 134.67 21.89 22.76 23.02 4.92
135.12 135.29 134.69 21.99 23.14 23.1 4.89
135.29 135.4 134.81 22.15 23.41 23.19 4.88
135.33 135.38 134.8 22.13 23.43 23.22 4.91
135.34 135.39 134.82 22.16 23.49 23.24 4.92

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.90 0.86 50.01 19074
-2.90 0.86 50.01 19079
-2.97 0.85 49.98 19084

-2.59 0.88 49.91 19090


-2.35 0.9 50.02 19095
-2.09 0.92 50.06 19097

-2.11 0.92 50.05 19102


-2.11 0.92 50 19107
-2.13 0.92 49.79 19112
-1.86 0.94 49.88 19116
-1.79 0.94 50.06 19121
-2.1 0.92 50.01 19126
-2.25 0.91 50.02 19131
-2.21 0.91 49.98 19136
-2.23 0.91 49.96 19141
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 02


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.21 11.17 11.18 275 289.39 271.43 4.99 -2.04 0.93
2 11.21 11.17 11.18 280.70 295.20 276.93 5.05 -2.15 0.92
3 11.21 11.17 11.18 282.48 296.65 277.57 5.06 -2.24 0.91
4 11.21 11.17 11.19 282.34 295.77 277.62 5.04 -2.25 0.91
5 11.22 11.17 11.19 284.12 297.25 278.7 5.06 -2.33 0.91
6 11.23 11.18 11.19 286.68 301.54 281.76 5.04 -2.46 0.90
7 11.20 11.16 11.18 277.79 290.76 273.27 5.05 -1.98 0.93
8 11.20 11.16 11.17 274.27 287.33 270.15 5.04 -1.86 0.94
9 11.01 10.96 10.98 286.27 298.89 281.51 5.48 -2.15 0.92
10 10.99 10.96 10.97 281.13 293.44 277.39 5.40 -1.91 0.94
11 11.01 10.97 10.98 286.67 300.38 281.16 5.04 -2.19 0.92
12 11.00 10.96 10.98 284.73 297.74 278.99 5.05 -2.09 0.92
13 10.99 10.96 10.97 280.03 285.57 276.98 5.03 -2.01 0.93
14 11.00 10.96 10.97 281.54 295.57 277.36 5.03 -1.97 0.93
15 10.99 10.96 10.96 278.01 290.56 275.64 5.04 -1.77 0.94
16 10.95 10.91 10.92 289.27 301.16 285.16 4.99 -2.35 0.90
17 10.94 10.91 10.92 287.59 299.04 283.70 4.99 -2.28 0.91
18 10.96 10.92 10.94 294.43 305.92 288.83 5.02 -2.54 0.89
19 10.93 10.90 10.91 278.96 293.16 276.97 5.01 -1.88 0.94
20 11.02 10.99 10.99 269.97 286.67 270.62 5 -1.61 0.95
21 11.01 10.98 10.98 263.43 282.46 269.28 5 -1.32 0.97
22 11.02 10.99 10.99 268.23 286.7 272.49 5 -1.58 0.95
23 11.04 11 11 275.17 294.63 278.79 5 -2.02 0.93
24 11.04 11 11 273.75 293.05 277.35 4.99 -1.94 0.93

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
50.04 17712.20
49.98 17717.30
49.97 17722.20
49.97 17727.20
49.87 17732.3
50.02 17737.4
50.01 17742.40
50.04 17747.70
49.96 17752.60
50.00 17757.60
49.97 17762.60
49.99 17767.80
50.01 17772.70
49.98 17777.60
50.02 17782.90
50.02 17785.80
50.03 17790.80
50.02 17795.70
50.01 17800.8
50.04 17805.8
50.04 17810.8
50.01 17815.7
50.04 17820.8
50.02 17825.8

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
135.39 135.45 134.85 22.23 23.60 23.29 4.90
135.47 135.52 134.92 22.60 23.98 23.64 4.96
135.63 135.65 135.50 22.77 24.24 23.83 4.95
135.61 135.65 135.08 22.82 24.21 23.83 4.96
135.72 135.73 135.19 22.96 24.34 23.89 4.95
135.88 135.92 135.27 23.12 24.65 24.22 4.96
135.31 135.31 134.82 22.37 23.76 23.36 4.95
135.15 135.16 134.64 22.21 23.52 23.19 4.95
133.10 133.11 132.57 23.12 24.45 24.12 4.96
132.79 132.80 132.32 22.70 23.92 23.60 4.94
133.12 133.11 132.56 23.03 24.42 24.02 4.94
132.86 132.89 132.32 22.67 24.02 23.75 4.96
133.09 133.03 132.52 22.99 24.45 23.94 4.96
132.96 132.92 132.38 22.74 24.19 23.77 4.95
132.86 132.89 132.32 22.67 24.02 23.75 4.96
132.59 132.63 132.63 22.56 23.70 23.45 4.95
132.51 132.61 132.10 23.44 24.62 24.30 4.90
132.46 132.52 132.01 23.37 24.56 24.14 4.92
131.97 132.1 131.49 22.61 23.81 23.7 4.91
134.36 133.77 133.76 22.3 23.92 22.37 4.96
132.53 132.84 132.06 21.51 22.55 23 4.9
132.83 133.1 132.33 21.87 23.02 23.32 4.91
133.26 133.58 132.72 22.36 23.06 23.87 4.9
133.23 133.54 132.72 22.29 23.53 23.8 4.91

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.25 0.91 50.00 19146
-2.33 0.90 49.97 19151
-2.47 0.89 49.97 19156
-2.46 0.89 49.95 19161
-2.55 0.89 49.89 19166
-2.69 0.88 49.99 19171
-2.21 0.91 50.01 19176
-2.06 0.92 50.03 19181
-2.39 0.90 49.99 19186
-2.12 0.92 49.99 19190
-2.39 0.90 50.01 19195
-2.17 0.92 49.96 19210
-2.34 0.90 50.04 19200
-2.21 0.91 50.02 19205
-2.17 0.92 49.96 19210
-1.96 0.93 50.01 19215
-2.55 0.89 50.09 19218
-2.46 0.89 50.01 19223
-2.06 0.92 50.01 19233
-1.88 0.94 49.94 19238
-1.58 0.95 50.03 19243
-1.8 0.94 50.02 19248
-2.19 0.91 50.04 19253
-2.16 0.92 50.02 19257
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 03


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.04 11 11 273.8 291.78 276.55 4.99 -1.92 0.93
2 11.04 11.00 11.01 276.72 292.00 273.93 4.99 -1.95 0.93
3 11.04 11.00 11.01 277.76 292.99 275.11 4.99 -2.01 0.92
4 11.05 11.01 11.01 283.06 298.23 279.41 5.01 -2.19 0.92
5 11.04 11 11.02 282.37 297.62 279.32 5.02 -2.17 0.92
6 11.05 11 11.01 285.31 299.08 279.72 5.01 -2.22 0.91
7 11.05 11.02 11.02 266.87 281.71 268.03 4.96 -1.65 0.95
8 11.06 11.01 11.02 266.35 280.73 264.37 4.96 -1.52 0.95
9 11.07 11.03 11.04 276.31 287.23 271.04 4.97 -1.94 0.95
10 11.08 11.04 11.05 278.66 292.06 275.22 4.95 -2.14 0.92
11 11.03 11.01 11.01 261.67 275.37 263.83 4.99 -1.11 0.98
12 11.04 11.01 11.01 265.35 278.12 265.37 5.01 -1.14 0.97
13 11.06 11.02 11.03 370.54 385.19 369.98 7.02 -1.52 0.98
14 11.08 11.04 11.06 379.69 395.86 375.07 7.01 -2.17 0.95
15 10.75 10.71 10.73 397.01 413.61 392.26 7.01 -2.53 0.94
16 11.02 10.97 11.01 384.70 399.36 377.60 6.99 -2.34 0.95
17 11.01 10.97 10.98 376.50 393.86 373.80 7.01 -1.84 0.97
18 11.04 10.99 11.01 391.30 406.38 388.02 7.00 -2.73 0.98
19 10.99 10.95 10.96 369.7 386.48 370.58 7 -1.41 0.98
20 11 10.96 10.97 279.38 295.83 276.12 5.07 -1.84 0.94
21 10.99 10.95 10.96 274.74 290.56 276.87 5.06 -1.58 0.95
22 11 10.96 10.98 279.16 294.95 274.63 5.07 -1.79 0.94
23 11 10.96 10.97 278.7 294.77 273.4 5.06 -1.77 0.94
24 11.01 10.96 10.98 280.61 296.41 276.94 5.07 -1.9 0.94

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
50.03 17830.80
49.99 17835.80
50.01 17840.70
50.03 17845.80
50 17850.8
49.99 17855.8
50.00 17859.9
49.96 17864.9
50.01 17869.7
50.06 17874.7
50.06 17879.9
50.04 17885.0
49.98 17891.6
50.03 17898.6
49.98 17904.3
50.06 17911.1
49.87 17918.1
49.97 17925.1
50.01 17932.3
50.01 17937.6
50.02 17942.5
49.95 17947.6
50 17952.7
50.04 17957.7

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
133.22 133.49 132.73 22.33 23.52 23.71 4.90
133.33 133.39 132.76 22.39 23.77 23.54 4.90
133.58 133.64 133.00 22.62 24.00 23.76 4.89
133.58 133.64 133.00 22.83 24.30 23.98 4.92
133.56 113.62 133 22.83 24.24 23.98 4.92
133.69 133.66 133.07 22.98 24.47 23.95 4.93
133.29 133.50 132.89 21.81 22.88 22.96 4.86
133.23 133.27 132.71 21.58 22.92 22.70 4.86
133.72 133.67 133.20 22.37 23.66 23.18 4.87
133.97 134.00 133.43 22.52 23.91 23.50 4.96
132.62 132.89 132.38 21.45 22.34 22.42 4.91
132.78 132.96 132.40 21.54 22.61 22.67 4.93
133.18 133.25 132.68 30.15 31.43 31.32 6.92
134.05 134.01 133.40 30.78 32.35 32.01 6.92
130.40 130.48 130.44 32.32 33.96 33.58 6.91
133.52 133.63 132.91 31.31 33.06 32.42 6.91
133.75 133.63 133.05 31.52 33.27 32.33 6.90
133.31 133.76 133.19 31.69 33.50 32.79 6.91
132.34 132.47 131.83 30.29 31.56 31.61 6.9
132.88 132.89 132.24 22.48 24.06 23.75 4.96
132.58 132.59 131.96 22.1 23.57 23.31 4.96
135.85 132.79 132.2 22.38 24.02 23.63 4.98
132.84 132.75 132.15 22.3 24.05 23.63 4.98
132.96 132.95 132.32 22.59 24.15 23.78 4.97

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.14 0.92 50.02 19262
-2.15 0.91 49.99 19267
-2.36 0.90 50.01 19272
-2.40 0.90 50.01 19277
-2.38 0.9 49.98 19282
-2.43 0.9 50 19287
-1.85 0.93 50.03 19291 U#1 sync. At 3:38AM.
-1.73 0.94 50.04 19296
-2.20 0.91 50.01 19301
-1.88 0.94 49.94 19305
-1.32 0.96 50.05 19310
-1.37 0.96 50.01 19316
-1.84 0.97 50.01 19322
-2.53 0.94 50.01 19329 U#1 sync at 14:58
-2.94 0.92 50.01 19335
-2.81 0.93 50.04 19341
-2.65 0.93 49.88 19348
-3.01 0.91 49.78 19355
-1.79 0.97 49.97 19362
-2.05 0.92 49.98 19367
-1.8 0.94 50.03 19372
-2 0.93 50.02 19377
-1.98 0.93 49.99 19382
-2.12 0.92 50.03 19387
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 04


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.01 10.96 10.98 282.34 297.35 277.60 5.06 -1.97 0.93
2 11.01 10.97 10.98 285.13 300.34 279.03 5.05 -2.10 0.92
3 11.02 10.97 10.99 284.56 299.89 278.74 5.06 -2.10 0.92
4 11.01 10.97 10.99 284.02 298.91 279.15 5.05 -2.09 0.92
5 11.02 10.98 10.99 291.56 305.61 284.04 5.06 -2.39 0.90
6
7 11.02 10.97 10.99 284.25 298.30 276.93 5.04 -2.09 0.92
8 11.01 10.96 10.98 276.02 291.18 272.54 5.32 -1.75 0.94
9 11.01 10.96 10.98 276.88 293.11 277.93 5.02 -1.82 0.94
10 11.00 10.96 10.98 276.86 291.95 272.43 5.02 -1.74 0.95
11 11.01 10.96 10.98 277.51 291.89 273.54 5.02 -1.78 0.94
12 11.02 10.97 10.99 282.99 297.58 276.58 5.04 -2.07 0.92
13 11.04 10.99 11.02 273.75 287.71 266.17 4.99 -1.73 0.95
14 11.31 11.27 11.29 265.52 278.89 257.64 4.88 -1.88 0.93
15 GRID UNAVAIBLE FROM 14:54 TO…... DUE TL FAULT IN BETN JALJALE TO BUIPA
16 " "
17 " "
18 " "
19
20 GRID UNAVAIL
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
49.99 17962.80
50.04 17967.80
49.99 17972.90
49.92 17977.90
49.97 17983
GRID UNAVAILABLE FROM 5:55 AM TO 6:00 AM DUE TO NEA GRID SYSTEM FAILU
49.94 17992.10
50.01 17997.10
50.05 18002.10
49.98 18007.20
50.04 18012.10
49.91 18017.10
50.02 18021.10
50.03 18025.20
LE TO BUIPA

GRID UNAVAILABLE FROM 18:45 PM TO 24:00 AM DUE TO 33KV TRANSMISSION LINE FAULT BETWEEN SOLU S/S (LAMANE)

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
133.04 133.04 132.38 22.69 24.29 23.90 4.96
133.19 133.15 132.53 22.88 24.50 24.03 4.97
133.19 133.13 132.51 22.84 24.54 24.05 4.97
133.17 133.11 132.51 22.95 24.55 24.04 4.96
133.52 133.45 132.85 23.43 25.06 24.46 4.96
E TO NEA GRID SYSTEM FAILURE
132.38 133.19 132.59 22.77 24.44 23.90 4.93
132.84 132.82 132.23 22.30 23.73 23.47 4.94
132.90 132.87 132.30 22.35 23.87 23.47 4.95
132.80 132.79 132.18 22.25 23.67 23.40 4.95
132.82 132.82 132.22 22.18 23.70 23.40 4.93
133.18 133.12 132.58 22.72 24.34 23.82 4.94
133.40 133.24 132.75 22.07 23.71 23.17 4.88
136.61 136.65 135.97 21.16 22.86 22.19 4.78

" "
" "
" "

TWEEN SOLU S/S (LAMANE) AND OKHALDHUNGA S/S

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.21 0.91 50.03 19392
-2.31 0.91 50.03 19397
-2.31 0.91 50.05 19402
-2.29 0.91 49.94 19407
-2.6 0.88 49.96 19412
U#1 sunc at 6:06 am
-2.31 0.90 49.94 19421.00
-1.93 0.93 50.01 19426.00
-2.03 0.92 50.04 19431.00
-1.92 0.93 49.99 19436.00
-2.00 0.93 50.06 19441.00
-2.26 0.91 49.94 19445.00
-2.01 0.92 50.01 19449.00
-2.18 0.91 50.03 19453.00

"
"
"
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 05


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3 GRID UNAVAILAB
4
5
6
7
8
9
10
11
12
13 11.07 11.02 11.05 284.73 798.21 276.53 5.06 -2.10 0.92
14 11.05 11.00 11.02 271.71 285.56 267.32 5.05 -1.47 0.96
15 11.04 11.00 11.02 270.13 285.16 265.60 5.05 -1.33 0.97
16 11.04 11.00 11.02 270.24 284.82 265.52 5.04 -1.36 0.97
17 11.05 11.01 11.03 274.19 288.42 268.65 5.04 -1.57 0.95
18 11.06 11.01 11.04 277.61 291.56 270.96 5.04 -1.76 0.94
19 11.05 11.01 11.02 270.13 286.45 268.14 5.05 -1.44 0.96
20 11.05 11 11.02 270.05 286.54 268.82 5.05 -1.41 0.96
21 11.05 11.01 11.02 270.46 286.26 268.23 5.05 -1.45 0.96
22 11.05 11.01 11.02 270.43 286.37 266.51 5.04 -1.44 0.96
23 11.05 11 11.03 272.75 287.48 266.7 5.04 -1.52 0.96
24 11.05. 11.01 11.03 275.18 289.21 267.94 5.04 -1.59 0.95

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

GRID UNAVAILABLE FROM 1:00 AM TO 12.13 PM________ DUE TO 33KV TRANSMISSION LINE FAULT BETWEEN SOLU S/S (L

49.98 18031.80
50.04 18036.90
49.99 18041.90
49.99 18046.90
50.05 18052
50.06 18056.9
49.98 18062.1
49.88 18067.1
49.95 18072.2
50 18077.3
50.02 18082.3
49.94 18087.4

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

FAULT BETWEEN SOLU S/S (LAMANE) AND OKHALDHUNGA S/S

133.87 133.75 133.21 22.68 24.28 23.77 4.94


133.19 133.06 132.54 21.80 23.33 22.90 4.95
133.04 132.93 132.40 21.69 23.19 22.91 4.96
133.06 132.92 132.46 21.76 23.18 22.84 4.96
133.28 133.19 132.62 21.92 23.45 23.04 4.94
133.57 133.44 132.9 22.28 23.86 23.35 4.95
133.1 133.12 132.53 21.81 23.2 23.04 4.94
133.1 133.14 132.53 21.73 23.07 22.96 4.96
133.12 133.14 132.56 21.76 23.12 22.97 4.95
133.2 133.12 132.58 21.75 23.23 22.89 4.94
133.33 133.18 132.67 21.95 23.54 22.94 4.94
133.4 133.21 132.74 21.99 23.6 23.05 4.95

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark

-2.31 0.90 49.95 19460.00


-1.65 0.95 50.06 19465.00
-1.53 0.95 50.00 19470.00
-1.53 0.95 49.99 19475.00
-1.57 0.94 49.99 19480.00
-1.97 0.93 50.05 19484
-1.65 0.95 50.01 19489
-1.63 0.95 49.9 19494
-1.65 0.95 49.94 19499
-1.65 0.95 50 19504
-1.76 0.94 50.03 19509
-1.8 0.94 49.93 19514
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 06


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.06 11.02 11.04 280.26 294.30 272.73 5.04 -1.87 0.94
2 11.07 11.01 11.05 280.05 295.79 266.70 5.05 -1.85 0.94
3 11.67 11.02 11.05 281.81 295.14 271.91 5.04 -1.98 0.93
4
5 G
6
7 11.01 10.95 10.98 281.15 296.32 292.99 5.05 -1.83 0.94
8 GRID UNAVAILABLE FROM 7:18AM TO 19:52 PM DUE TO T/L FAULT BETWEEN BUIPA S/S AND JALJALE
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
49.94 18092.50
49.97 18097.50
50.01 18102.40

GRID UNAVAILABLE FROM 3:21 AM TO _________ DUE TO 33KV TRANSMISSION LINE FAULT BETWEEN BUIPA S

50.00 18105.10
EN BUIPA S/S AND JALJALE S/S.

GRID AVAILABLE FROM 19:52 PM BUT MACHINE NOT SYNC DUE TO VERY POOR WATER QUALITY

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
133.68 133.52 133.03 22.40 24.01 23.39 4.96
133.89 133.43 132.94 22.11 24.33 23.25 4.94
133.87 133.67 133.64 22.44 24.19 23.41 4.93

NE FAULT BETWEEN BUIPA S/S AND JALJALE S/S

133 132.81 132.28 22.42 24.17 23.49 4.95


GRID UNAVAILABLE FROM 7:18AM TO : PM DUE TO T/L FAULT BETWEEN BUIPA

OR WATER QUALITY

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.10 0.92 49.92 19519
-2.07 0.92 50.00 19524
-2.19 0.91 50.01 19529

-2.05 0.92 50.04 19532


O T/L FAULT BETWEEN BUIPA S/S AND JALJALE S/S.
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 07


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2 11.18 11.14 11.15 268.70 283.56 264.38 5.08 -1.37 0.96
3 11.06 11.02 11.05 285.48 297.90 275.71 5.05 -2.15 0.92
4 10.72 10.67 10.77 299.28 311.10 288.89 5.03 -2.31 0.91
5 GRID UNAVAILABLE FROM 4:27 AM TO 24:00 AM DUE TO TRAWNSMISS
6 " "
7" "
8" "
9" "
10 " "
11 " "
12 " "
13 " "
14 " "
15 " "
16 " "
17 " "
18 " "
19 " "
20 GRID UNAVAILABLE FROM 4:27 AM TO
21 " "
22 " "
23 " "
24 " "

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
Machine not sync. Due to very poor water quality
49.98 18109.90
50.01 18113.50
49.96 18115.40
:00 AM DUE TO TRAWNSMISSION LINE FAULT IN BETWEEN JALJALE AND BUIPA S/S
"
"
"
"
"
"
"
"
"
"
"
"
"
"
NAVAILABLE FROM 4:27 AM TO 24:00 AM DUE TO TRAWNSMISSION LINE FAULT IN BETWEEN JALJALE AND BUIPA S/S
"
"
"
"

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
ater quality
134.66 134.59 134.08 21.56 23.02 22.64 4.95
133.94 133.77 133.30 22.84 24.48 23.66 4.93
129.98 129.75 129.29 23.93 25.57 24.74 4.95

"
"
"
"
"
"
"
"
"
"
"
"
"
"
BUIPA S/S
"
"
"
"

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark

-1.60 0.96 50.02 19536


-2.36 0.90 50.02 19540
-2.52 0.89 49.95 19542

"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 08


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 GRID UNAVAILABLE FROM 4:27 AM TO 16:06 PM DUE TO TRANSMISSION LINE FAULT IN BETWEE
2" "
3" "
4" "
5" "
6" "
7" "
8 " "
9" "
10 " "
11 " "
12 " "
13 " "
14 " "
15 " "
16 " "
17 10.79 10.75 10.77 277.96 293.46 275.13 5.04 -1.5 0.96
18 10.81 10.77 10.78 282.29 298.25 279.04 5.02 -1.82 0.94
19 10.8 10.76 10.77 278.97 293.4 278.59 5.04 -1.64 0.95
20 10.8 10.77 10.77 278.02 284.17 278.4 5.03 -1.65 0.95
21 10.8 10.76 10.77 277.79 291.68 277.35 5.03 -1.57 0.95
22 10.81 10.76 10.78 295.77 277.54 277.54 5.03 -1.74 0.94
23
24 10.76 10.72 10.74 291.36 304.74 285.14 5.04 -2.13 0.92

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
ISSION LINE FAULT IN BETWEEN JALJALE TO BUIPA S/S
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
49.88 18121.8
49.95 18126.7
49.94 18131.9
49.97 18136.8
50.03 18141.8
50.07 18146.9
GRID UNAVAILABLE FROM 22:57 PM TO 22:59 PM DUE TO BREAKER TRIP FROM LAMANE S/S
50.08 18156

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
130.24 130.21 129.6 22.34 23.75 23.57 4.92
130.52 130.53 129.91 22.7 24.13 23.9 4.91
130.25 130.37 129.78 22.54 23.7 23.66 4.93
130.31 130.42 129.79 22.56 23.79 23.82 4.99
130.17 130.32 129.75 22.5 23.53 23.67 4.92
130.44 130.45 129.88 22.62 24.01 23.75 4.92
P FROM LAMANE S/S
130.23 130.16 129.62 23.43 24.89 24.4 4.93

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
-1.74 0.94 49.9 19548
-2.03 0.92 49.97 19553
-1.84 0.94 49.93 19558
-1.85 0.93 49.96 19563
-1.79 0.94 50.02 19568
-1.94 0.93 50.05 19572
U#1 sync at 23:08 pm
-2.32 0.9 50.09 19581
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 09


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 10.77 10.72 10.75 295.78 309.17 287.79 5.04 -2.35 0.93
2 10.77 10.72 10.75 296.00 309.22 288.06 5.04 -2.34 0.91
3 10.77 10.73 10.75 297.06 310.19 289.13 5.02 -2.39 0.90
4 10.77 10.73 10.75 297.87 309.31 287.92 5.03 -2.40 0.90
5 10.77 10.73 10.75 296.85 309.22 288.41 5.03 -2.4 0.90
6 10.77 10.73 10.75 298.04 311.69 290.69 5.03 -2.46 0.9
7 11.04 10.99 11.01 287.16 301.12 280.26 5.02 -2.28 0.92
8
9 10.55 10.50 10.50 322.44 336.60 314.11 5.03 -3.07 0.85
10 10.55 10.50 10.51 296.55 311.57 289.19 5.03 -2.46 0.89
11 10.92 10.88 10.89 292.86 309.00 287.67 5.02 -2.44 0.90
12 11.08 11.04 11.05 261.09 278.32 264.48 5.00 -1.16 0.97
13
14 11.08 11.04 11.05 279.18 293.30 274.26 5.02 -1.98 0.93
15 11.03 10.99 11.01 278.31 292.14 272.36 5.03 -1.89 0.94
16 11.03 10.99 11.01 278.30 293.23 273.76 5.03 -1.94 0.94
17 11.05 11.01 11.02 285.93 300.34 280.45 5.02 -2.27 0.91
18
19 11.02 10.97 10.98 277.79 294.69 275.81 5.07 -1.83 0.94
20 11.01 10.97 10.98 274.21 291.05 273.42 5.07 -1.58 0.95
21 11.01 10.97 10.98 275.20 292.20 273.52 5.05 -1.66 0.95
22 11.02 10.98 10.98 275.57 289.74 273.41 5.05 -1.70 0.95
23 11.02 10.98 10.99 280.62 294.98 276.23 5.05 -1.92 0.93
24 11.02 10.98 10.99 279.91 293.80 275.36 5.06 -1.86 0.94

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
50.00 18161.10
50.00 18166.00
50.04 18171.10
50.04 18176.10
50.04 18181.1
50.04 18186.1
49.99 18191.1
GRID UNAVAIABLE FROM 7 :56 TO 8:03 DUE TO NEA GRID SYSTEM FAILURE
49.95 18200.00
50.04 18204.90
50.04 18209.90
49.97 18214.30
GRID UNAVAILABLE FROM 12:29 TO 12:48 DUE TO BREAKER TRIP FROM JALJALE
50.01 18221.00
50.05 18225.40
50.04 18230.40
49.98 18235.40
GRID UNAVAILABLE FROM 17:51 TO 18:09 DUE TO NEA GRID SYSTEM FA
49.98 18241.50
49.76 18246.30
49.97 17251.40
49.99 18256.50
50.03 18261.50
49.97 18266.50

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
130.54 130.44 129.88 23.82 25.43 24.81 4.93
130.51 130.39 129.84 23.78 25.37 24.74 4.92
130.59 130.50 129.95 23.85 25.42 24.82 4.90
130.59 130.45 129.94 23.92 25.51 24.79 4.92
130.62 130.54 130.02 23.99 25.51 24.84 4.92
130.65 130.56 130.02 24 25.57 24.92 4.92
133.59 133.54 132.96 23.19 24.73 24.19 4.93
NEA GRID SYSTEM FAILURE
128.36 128.35 127.68 25.97 27.65 26.95 4.95
132.29 132.34 131.70 23.72 25.22 24.82 4.93
132.30 132.34 131.64 23.62 25.23 24.86 4.94
132.38 132.34 131.63 23.61 25.22 24.86 4.93
AKER TRIP FROM JALJALE
133.91 133.93 133.35 22.48 23.95 23.59 4.91
133.25 133.21 132.66 22.40 23.91 23.44 4.94
133.32 133.34 132.74 22.57 23.97 23.65 4.94
133.71 133.73 133.14 23.09 24.57 24.14 4.93
DUE TO NEA GRID SYSTEM FAILURE
132.98 133.05 132.16 22.41 23.69 23.86 4.96
132.64 132.73 132.09 22.15 23.46 23.36 4.97
132.79 132.81 132.22 22.14 23.56 23.40 4.95
132.83 132.90 132.33 22.30 23.55 23.36 4.94
133.15 133.14 132.60 22.54 23.95 23.63 4.95
133.04 133.04 132.50 22.48 23.90 23.52 4.95

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.58 0.88 50.00 19586
-2.55 0.89 49.99 19591
-2.61 0.88 50.05 19596
-2.62 0.88 50.04 19601
-2.67 0.88 50.03 19606
-2.69 0.88 50.03 19611
-2.52 0.89 49.99 19616
U1 sync at 8:09
-3.30 0.83 49.97 19624.00
-2.71 0.88 50.04 19629.00
-2.67 0.88 50.03 19634.00 U1 sync at 11:45
-2.65 0.88 49.97 19639.00
U1 SYNC AT 13:07
-2.22 0.91 50.00 19645.00
-2.09 0.92 50.03 19649.00
-2.17 0.92 50.02 19655.00
-2.52 0.89 49.97 19659.00

-2.03 0.93 50.01 19665.00


-1.77 0.94 49.76 19670.00
-1.85 0.94 49.96 19675.00
-1.91 0.93 50.01 19680.00
-2.13 0.92 50.03 19685.00
-2.07 0.92 49.99 19690.00
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 10


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.02 10.98 11 283.34 297.40 277.17 5.06 -2.03 0.93
2 11.03 10.98 11.00 285.36 299.18 278.76 5.04 -2.15 0.92
3 11.04 10.99 11.01 289.17 303.84 281.55 5.04 -2.34 0.91
4 11.03 10.99 11.01 287.54 301.02 280.27 5.03 -2.27 0.91
5 11.03 10.99 11.01 289.23 302.98 382.32 5.05 -2.32 0.91
6 11.04 11 11.01 992.54 306.17 205.17 5.03 -2.49 0.9
7 11.04 10.99 11.01 289.76 304.99 283.69 5.04 -2.41 0.90
8 11.03 10.98 11.00 282.23 299.88 278.10 5.03 -2.10 0.92
9 11.04 10.99 11.01 290.06 304.40 283.81 5.03 -2.41 0.90
10 11.02 10.97 10.99 279.03 293.19 273.60 5.03 -1.88 0.94
11 11.02 10.98 11.00 282.38 296.96 276.14 5.04 -2.01 0.93
12 11.02 10.98 10.99 277.59 294.07 278.31 5.04 -1.91 0.94
13 11.05 11.00 11.02 297.00 310.70 289.13 5.05 -2.69 0.88
14 11.01 10.99 11.01 289.18 304.10 282.64 5.03 -2.40 0.90
15 11.03 10.98 11.00 284.70 298.91 279.00 5.04 -2.16 0.92
16
17
18
19
20
21 11 10.96 10.97 279.74 295.16 277.84 5.06 -1.86 0.94
22 11.01 10.96 10.98 280.44 295.42 276.65 5.07 -1.9 0.94
23 11.02 10.97 10.99 287.02 299.32 279.72 5.07 -2.17 0.92
24 11 10.96 10.98 279.01 294.29 276.71 5.04 -1.82 0.94

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
49.99 18271.60
49.97 18276.60
50.01 18281.70
50.02 18286.70
49.98 18291.8
50.04 18296.8
50.02 18301.90
50.02 18306.90
50.01 18311.90
49.96 18317.00
50.00 18322.00
49.99 18327.10
50.01 18332.10
50.01 18337.10
49.92 18342.10
Plant Shutdown taken from 15:46 to #### due to poor quality of water

49.99 18346.2
50.03 18351.3
50.06 18356.4
50.02 18361.4

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
133.30 133.24 132.69 22.71 24.26 23.79 4.94
133.43 133.35 132.79 22.86 24.40 23.88 4.93
133.62 133.65 133.55 23.22 24.80 24.22 4.92
133.54 133.48 132.92 23.08 24.61 24.08 4.93
133.59 133.54 132.97 23.14 24.65 24.14 4.95
133.8 133.76 133.2 23.58 25.15 24.58 4.95
133.70 133.67 133.03 23.28 24.89 24.42 4.95
133.36 133.36 132.66 22.72 24.32 24.03 4.94
133.70 133.68 133.06 23.34 24.88 24.42 4.94
133.12 133.06 132.49 22.44 23.97 23.56 4.94
133.26 133.2 132.75 22.8 24.41 23.92 4.95
133.01 133.23 132.56 22.55 23.77 23.79 4.93
134.06 133.99 133.42 23.93 25.52 24.87 4.93
133.69 133.64 133.07 23.37 24.91 24.31 4.93
133.42 133.39 132.81 22.99 24.49 24.00 4.95
r quality of water

132.81 132.91 132.32 22.55 23.87 23.73 4.96


132.91 132.95 132.32 22.57 23.99 23.75 4.94
133.32 133.26 132.71 23.09 24.56 24.08 4.96
132.83 132.85 132.28 22.55 23.93 23.67 4.94

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.25 0.91 50.01 19695
-2.37 0.90 49.99 19700
-2.56 0.89 50.02 19705
-2.48 0.89 50.04 19710
-2.52 0.89 49.97 19715
-2.72 0.88 50.03 19719
-2.61 0.88 50.03 19724.00
-2.30 0.90 50.05 19729.00
-2.64 0.88 50.03 19734.00
-2.1 0.92 49.96 19739
-2.34 0.9 49.98 19744
-2.14 0.92 49.99 19749.00
-2.93 0.86 50.01 19754.00
-2.61 0.88 49.97 19759.00
-2.39 0.90 49.91 19764.00

-2.08 0.92 50 19768


-2.12 0.92 50.03 19773
-2.4 0.9 50.04 19778
-2.05 0.92 50.03 19783
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 11


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.01 10.96 10.98 281.64 296.11 276.33 5.05 -1.94 0.93
2 11.01 10.97 10.98 283.83 297.82 279.00 5.07 -2.07 0.93
3 11.01 10.97 10.99 286.14 299.59 279.71 5.05 -2.14 0.92
4 11.02 10.97 10.99 288.27 301.99 280.46 5.06 -2.22 0.92
5 11.01 10.97 10.99 287.24 300.85 280.72 5.06 -2.22 0.92
6 11.02 10.98 11 291.03 305.11 283.77 5.05 -2.39 0.91
7 PLANT(U#1) SHUTDOWN FROM 6:57AM TO 7:05AM DUE TO NEA GRID SYSTEM FAILURE.
8 11.11 11.07 11.08 280.61 293.29 273.80 5.00 -2.13 0.92
9 GRID UNAVAILABLE FROM 8:50AM TO 9:12AM DUE TO BREAKER TRIPPED AT LAHAN S/S.
10 10.05 11.00 11.02 280.97 294.54 275.13 5.03 -1.96 0.93
11 11.05 11.00 11.02 278.65 294.09 274.36 5.02 -1.92 0.93
12 11.06 11.01 11.03 286.10 300.28 280.48 5.09 -2.11 0.92
13 10.83 10.80 10.80 285.18 299.19 285.06 5.15 -1.72 0.95
14 10.87 10.85 10.84 297.05 310.19 290.05 5.03 -2.51 0.89
15 10.97 10.92 10.94 293.15 306.16 285.93 5.00 -2.48 0.89
16 10.96 10.91 10.93 289.57 303.07 283.29 5.08 -2.17 0.92
17 10.97 10.92 10.94 294.05 307.43 285.65 5.08 -2.35 0.91
18 10.97 10.92 10.94 299.5 309.09 286.94 5.08 -2.43 0.9
19 10.95 10.91 10.92 285.67 301.34 281.61 5.06 -2.06 0.93
20 10.95 10.91 10.92 285.18 300.56 281.69 5.07 -2.05 0.93
21 10.95 10.91 10.92 284.81 300.14 281.05 5.08 -2.03 0.93
22 10.96 10.92 10.93 288.45 303.38 282.91 5.07 -2.19 0.92
23 10.96 10.91 10.93 289.82 302.86 283.34 5.06 -2.21 0.92
24 10.95 10.91 10.93 285.28 298.56 278.52 5.07 -2 0.93

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
50.03 18366.50
50.02 18371.50
49.95 18376.60
49.99 18381.70
49.96 18386.6
50.04 18391.8
SYSTEM FAILURE.
49.98 18400.70
LAHAN S/S.
50.02 18408.30
49.95 18413.40
49.89 18418.50
49.96 18419.30
50.06 18424.30
50.05 18428.30
49.98 18433.30
49.94 18438.3
49.95 18443.3
49.93 18448.6
49.98 18453.5
50.01 18458.5
49.95 18463.7
49.97 18468.9
50.03 18473.8

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
133.00 133.03 132.99 22.64 24.15 23.75 4.95
133.14 133.11 132.54 22.82 24.32 23.92 4.96
133.28 133.24 132.65 23.04 24.57 24.08 4.95
133.99 133.32 132.77 23.16 24.68 24.16 4.96
133.32 133.23 132.71 23.1 24.6 24.05 4.95
133.57 133.5 132.92 23.39 24.99 24.42 4.95
PLANT(U#1) SHUTDOWN FROM 6:57AM TO 7:05AM DUE TO NEA GRID SYSTE
134.34 134.33 133.79 22.61 24.04 23.57 4.90
GRID UNAVAILABLE FROM 8:50AM TO 9:12AM DUE TO BREAKER TRIPPED AT LAHA
133.52 133.46 132.95 22.59 24.01 23.61 4.94
133.46 133.48 132.86 22.45 24.01 23.69 4.95
133.71 133.69 133.09 23.09 24.60 24.10 5.01
130.56 130.75 130.19 21.81 22.82 22.92 4.75
131.78 131.76 131.16 23.95 25.35 24.84 4.93
132.69 132.69 132.54 22.99 24.51 23.96 4.90
132.64 132.56 132.03 23.29 24.91 24.34 4.98
132.79 132.7 132.12 23.56 25.19 24.56 4.99
132.89 132.8 132.24 23.68 25.32 24.73 4.97
132.44 132.44 131.81 23.04 24.52 24.19 4.97
132.4 132.44 131.83 22.85 24.49 24.18 4.97
132.36 132.39 131.77 22.92 24.41 24.11 4.98
132.59 132.55 131.95 23.2 24.77 24.28 4.97
132.59 132.53 132 23.32 24.8 24.21 4.97
132.4 132.31 131.77 22.91 24.39 23.88 4.98

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.16 0.92 50.03 19788
-2.27 0.91 50.03 19793
-2.39 0.90 49.95 19798
-2.48 0.89 49.98 19803
-2.42 0.9 49.93 19807
-2.64 0.88 50.03 19813
AM DUE TO NEA GRID SYSTEM FAILURE. U#1 sync. At 7:10AM.
-2.36 0.90 49.98 19821.00
BREAKER TRIPPED AT LAHAN S/S. U#1 sync. At 9:18AM.
-2.18 0.91 50.04 19829.00
-2.14 0.92 49.95 19834.00
-2.36 0.90 49.88 19839.00 U#1 sync. At 12:58PM.
-1.87 0.93 49.95 19840.00
-2.73 0.87 50.06 19844.00 U#1 sync. At 14:33PM.
-2.40 0.90 50.05 19849.00
-2.44 0.90 49.99 19853.00
-2.6 0.89 49.94 19858
-2.68 0.88 49.96 19863
-2.28 0.91 49.92 19868
-2.29 0.91 49.97 19873
-2.24 0.91 49.99 19878
-2.4 0.9 49.98 19883
-2.43 0.9 49.98 19888
-2.22 0.91 50.04 19893
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 12


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 10.96 10.91 10.91 289 302.06 281.86 5.07 -2.17 0.92
2 10.96 10.92 10.94 293.11 305.68 285.30 5.07 -2.35 0.91
3 10.97 10.92 10.95 298.34 310.58 288.64 5.06 -2.54 0.89
4 10.97 10.92 10.92 299.88 312.52 290.18 5.06 -2.59 0.89
5 10.95 10.93 10.95 299.24 312.19 290.18 5.05 -2.61 0.89
6 10.98 10.93 10.95 302.39 316.05 292.5 5.05 -2.73 0.88
7 10.97 10.97 10.92 297.79 310.48 289.07 5.07 -2.55 0.89
8 10.97 10.9 10.94 296.86 311.27 288.52 5.06 -2.55 0.89
9 10.98 10.93 10.94 298.96 313.03 291.74 5.06 -2.62 0.89
10 10.96 10.92 10.93 288.54 302.38 284.69 5.07 -2.21 0.92
11 10.96 10.91 10.93 290.37 304.12 284.54 5.07 -2.32 0.91
12 10.96 10.92 10.93 290.28 303.55 283.07 5.04 -2.04 0.91
13
14 10.96 10.93 10.93 273.81 288.13 274.43 5.01 -1.66 0.95
15 10.99 10.94 10.96 291.25 303.52 284.62 5.03 -2.37 0.90
16 10.99 10.94 10.95 288.58 302.54 283.15 5.03 -2.32 0.91
17 11 10.95 10.97 296.86 309.14 288.53 5.04 -2.58 0.89
18 10.99 10.95 10.97 295.5 306.89 285.47 5.03 -2.51 0.89
19 10.98 10.94 10.96 286.77 300.13 283.11 5.03 -2.24 0.91
20 10.98 10.94 10.95 283.58 297.68 279.65 5.03 -2.09 0.92
21 10.99 10.94 10.96 286.01 300.52 282.72 5.03 -2.24 0.91
22 10.98 10.94 10.96 286.25 300.25 280.98 5.01 -2.23 0.91
23 10.99 10.94 10.96 288.25 301.73 282.26 5.01 -2.3 0.91
24 10.99 10.94 10.96 287.23 300.83 280.52 5.02 -2.25 0.91

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
50.02 18478.90
50.01 18484.20
49.90 18489.00
49.85 18494.00
50.01 18499.1
49.99 18504.2
50.01 18509.3
49.91 18514.3
49.9 18519.3
50.01 18524.4
49.99 18529.4
49.94 18534.60
NEA GRID SYSTEM FAILURE
50.01 18541.40
49.99 18546.20
49.94 18551.30
50.01 18556.2
49.99 18561.2
49.92 18566.3
49.87 18571.4
49.96 18576.3
50.04 18581.4
50.01 18586.3
50.01 18591.4

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
132.58 132.49 131.97 23.19 24.72 24.15 4.96
132.80 132.71 132.19 23.52 25.09 24.42 4.95
133.07 132.91 132.40 23.90 25.51 24.72 4.96
133.07 132.94 132.40 23.93 25.60 24.80 4.95
133.13 133.02 132.46 24 25.65 24.9 4.94
133.27 133.15 132.53 24.2 25.96 25.21 4.96
133.02 132.93 132.36 22.88 35.5 24.82 4.95
133.02 132.97 132.34 23.78 25.47 24.87 4.96
133.07 133.01 132.41 23.95 25.6 25 4.97
132.57 132.6 132 23.22 24.73 24.38 4.96
132.56 132.54 131.97 23.22 24.7 24.22 4.96
132.61 132.60 132.03 23.37 24.83 24.37 4.96
URE
132.11 132.29 131.31 22.25 23.41 23.47 4.93
133.06 133.03 132.50 23.47 24.92 24.35 4.94
132.99 132.97 132.40 23.36 24.82 24.37 4.93
133.3 133.26 132.71 23.9 25.4 24.79 4.94
133.26 133.13 132.65 23.77 25.23 24.5 4.94
132.84 132.89 132.32 23.16 24.52 24.18 4.93
132.7 132.75 132.17 22.95 24.29 23.98 4.94
132.86 132.95 132.34 23.19 24.51 24.27 4.93
132.86 132.87 132.32 23.06 24.49 24.09 4.93
132.98 132.96 132.42 23.23 24.64 24.19 4.93
132.92 132.85 132.31 23.1 24.61 24.06 4.93

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.37 0.90 50.02 19898
-2.58 0.89 50.02 19903
-2.78 0.87 49.91 19908
-2.83 0.87 49.86 19913
-2.86 0.87 50.03 19918
-2.97 5.78 50 19923
-2.76 0.87 49.97 19928
-2.77 0.87 49.92 19933
-2.83 0.87 49.91 19938
-2.44 0.90 50.03 19943
-2.42 0.90 49.99 19947
-2.46 0.90 49.94 19952.00

-1.89 0.94 49.99 19959.00


-2.59 0.88 49.99 19964.00
-2.53 0.89 49.92 19969.00
-2.82 0.87 50 19974
-2.74 0.88 49.99 19979
-2.45 0.89 49.91 19984
-2.31 0.9 49.87 19989
-2.43 0.89 49.96 19994
-2.44 0.9 50.02 19998
-2.48 0.89 50 20003
-2.45 0.9 50.02 20008
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: Saturday


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 10.98 10.94 10.96 285.61 299.36 279.41 5.03 -2.17 0.92
2 10.98 10.94 10.96 286.27 299.32 280.40 5.02 -2.03 0.91
3 10.99 10.94 10.96 289.27 302.63 282.24 5.03 -2.34 0.91
4 10.99 10.94 10.96 290.71 302.77 281.62 5.02 -2.35 0.90
5 10.99 10.95 10.97 291.95 304.65 283.59 5.03 -2.43 0.90
6 10.98 10.94 10.95 282.24 297.42 280.21 5.01 -2.05 0.93
7 10.99 10.95 10.97 293.77 308.09 286.89 5.02 -2.54 0.89
8 10.99 10.95 10.96 290.99 305.58 284.04 5.01 -2.45 0.90
9 10.99 10.94 10.96 290.4 304.9 282.64 5.02 -2.36 0.90
10 10.99 10.95 10.96 291.24 303.66 283.77 5.01 -2.41 0.90
11 10.99 10.94 10.96 291.3 303.89 282.8 5.04 -2.36 0.91
12 10.98 10.94 10.94 284.01 299.96 280.54 5.02 -2.20 0.92
13 10.99 10.94 10.96 291.26 305.53 263.75 5.02 -2.40 0.90
14 10.99 10.94 10.96 289.08 303.90 283.92 5.04 -2.46 0.90
15 10.99 10.95 10.97 292.18 305.19 287.95 5.01 -2.47 0.89
16
17
18
19
20 11.08 11.03 11.04 274.17 292.75 275.17 5.02 -1.97 0.93
21 11.08 11.04 11.05 278.08 294.9 276.89 5.01 -2.06 0.92
22 11.08 11.04 11.05 278.43 294.15 275.39 5.01 -2.05 0.93
23 11.08 11.03 11.05 276.21 291.51 272.24 5.03 -1.92 0.93
24 11.07 11.03 11.04 272.67 288.25 269.12 5.01 -1.71 0.95

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Day: Saturday Date: 2077/05/13
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
49.91 18596.2
49.89 18601.2
49.97 18606.3
49.99 18611.5
49.93 18616.6
49.93 18621.5
49.92 18626.5
50.01 18631.6
49.87 18636.6
50.05 18641.6
49.94 18646.6
50.01 18651.6
49.93 18656.6
49.96 18661.6
49.94 18666.7
33 kv transmission line fault between jaljale and buipa

50.01 18670.3
50.01 18675.4
49.94 18680.3
50.01 18685.3
50.02 18690.1

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
132.86 132.77 132.25 25.03 24.49 23.99 4.92
132.79 132.81 132.29 23.16 24.29 23.18 4.91
133.07 132.99 132.44 23.25 24.80 24.20 4.92
133.07 132.98 132.44 23.25 24.83 24.15 4.92
133.19 133.08 132.51 23.4 24.95 24.31 4.93
132.67 132.78 132.11 22.79 24.06 23.92 4.91
133.29 133.28 132.66 23.66 25.26 24.73 4.92
133.19 133.15 132.32 23.48 25.04 24.57 4.93
133.17 133.06 132.44 23.36 25.04 24.02 4.92
133.07 132.99 132.49 23.42 24.94 24.3 4.93
133.16 133.03 132.48 23.1 24.57 23.88 4.92
132.85 132.90 132.22 22.98 24.48 24.16 4.92
133.14 133.05 132.47 23.38 24.99 24.40 4.93
133.10 133.10 132.45 23.32 24.88 24.46 4.92
133.21 133.18 132.61 23.61 25.12 24.56 4.93

133.7 133.9 133.12 22.25 23.64 23.72 4.92


133.9 134.02 133.32 22.54 23.92 23.8 4.92
133.9 133.94 133.29 22.5 23.93 23.69 4.92
133.8 133.79 133.19 22.36 23.8 23.49 4.92
133.56 133.54 132.97 21.99 23.43 23.11 4.91

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.37 0.90 49.93 20013
-2.02 0.90 49.91 20018
-2.57 0.89 49.97 20023
-2.56 0.89 49.99 20028
-2.61 0.88 49.95 20033
-2.26 0.91 49.92 20038
-2.78 0.87 49.92 20043
-2.7 0.88 50.03 20048
-2.62 0.88 49.9 20053
-2.59 0.88 50.04 20058
-2.4 0.9 49.94 20063
-2.41 0.90 50.01 20067
-2.61 0.88 49.90 20072
-2.61 0.88 49.96 20077
-2.70 0.88 49.92 20082

-2.13 0.92 4.92 20086


-2.28 0.91 50 20091
-2.27 0.91 49.95 20096
-2.14 0.92 50.02 20100
-1.92 0.93 49.99 20105
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day:


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.08 11.03 11.04 273.5 286.30 272.42 5.02 -1.73 0.96
2
3
4
5
6
7
8
9
10 11.15 11.13 11.13 264.68 280.53 262.21 5.07 -1.17 0.97
11 11 10.96 10.98 273.84 289.41 269.88 5.08 -1.46 0.96
12 11.02 10.97 10.99 280.37 296.93 275.54 5.09 -1.87 0.94
13 11.03 10.98 11.00 283.20 299.29 278.52 5.08 -2.01 0.93
14 11.02 10.97 10.99 279.08 296.10 275.09 5.08 -1.83 0.94
15 GRID UN
16 11.01 10.96 10.97 282.16 299.22 277.29 5.04 -2.09 0.92
17 11.02 10.97 10.99 288.96 304.56 284.46 5.03 -2.32 0.9
18 11.02 10.97 10.99 292.19 308.82 287.3 5.04 -2.5 0.9
19 11.01 10.97 10.97 282.71 298.88 281.343 5.03 -2.15 0.92
20 11.01 10.97 10.98 283.68 300.84 282.1 5.04 -2.21 0.92
21 11.01 10.96 10.97 281.14 298.47 279.25 5.04 -2.07 0.93
22 11.01 10.97 10.98 285.08 301.05 282.52 5.03 -2.23 0.91
23 11.02 10.97 10.98 287.99 302.16 282.64 5.04 -2.31 0.91
24 11 10.96 10.97 282.31 297.44 277.76 5.03 -1.99 0.93

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
49.93 18695.00

GRID UNAVAILABLE FROM (1:28 TO 9:43) DUE TO 33KV TRANSMISSION FAULT IN BETWEEN BUIP

50.13 18698.1
50.04 18702.7
50.00 18707.80
49.90 18712.80
50.11 18717.90
GRID UNAVAILABLE FROM 14:55 PM TO 15:45 PM DUE TO SHUT DOWN TAKEN FROM OKHALDHUNGA FOR CUTTIN
50.00 18723.30
49.97 18728.3
49.97 18733.1
49.95 18738.5
50.06 18743.4
50.06 18748.4
50.03 18753.4
50 18758.4
50.01 18763.5

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
133.60 133.02 133.32 21.92 23.50 23.30 4.91

SION FAULT IN BETWEEN BUIPA AND JALJALE

134.24 134.9 133.62 21.2 22.68 22.6 4.96


132.64 132.58 132.02 21.94 23.48 23.21 4.68
133.13 133.09 132.47 22.49 24.07 23.69 4.98
133.26 133.34 132.62 22.73 24.32 23.95 4.99
133.10 133.06 132.38 22.40 24.06 23.76 5.00
M OKHALDHUNGA FOR CUTTING TREES NEAR TRANSMISSION LINE
133.05 133.06 132.39 22.70 24.33 23.97 4.93
133.35 133.43 132.77 23.33 24.82 24.43 4.94
133.58 133.53 132.84 23.54 25.26 24.66 4.95
133.05 133.24 132.52 23 24.33 24.28 4.93
133.2 133.32 132.59 22.94 24.44 24.27 4.93
133.04 133.13 132.43 22.68 24.17 23.97 4.94
133.2 133.3 132.64 23.03 24.45 24.21 4.91
133.32 133.34 132.71 23.15 24.66 24.25 4.91
133.01 133.01 132.4 22.69 24.17 23.8 4.95

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.10 -1.98 50.00 20110

-1.39 0.96 50.11 20113 U#1 sync at 10:00


-1.64 0.96 50.03 20117
-2.07 0.92 49.98 20122.00
-2.25 0.91 49.91 20127.00
-2.03 0.93 50.13 20132.00

-2.30 0.91 50.02 20138.00 U#1 sync at 15:52


-2.51 0.88 49.98 20143
-2.73 0.88 49.79 20147
-2.41 0.9 49.97 20153
-2.45 0.9 50.05 20157
-2.29 0.91 50.06 20162
-2.48 0.89 50.07 20167
-2.54 0.89 50.02 20172
-2.23 0.91 50.02 20177
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 15 (MON)


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.01 10.97 10.98 286.31 301.94 282.23 5.02 -2.27 0.91
2 11.01 10.97 10.98 284.72 299.74 280.78 5.04 -2.18 0.92
3 11.01 10.97 10.98 287.64 302.10 281.61 5.03 -2.26 0.91
4 11.01 10.97 10.98 286.36 300.87 281.08 5.03 -2.24 0.91
5 11.02 10.97 10.99 291.07 305.58 285.17 5.02 -2.46 0.91
6 11.01 10.96 10.98 284.79 299.15 277.92 5.03 -2.14 0.92
7 11 10.95 10.97 278.89 293.93 273.69 5.04 -1.85 0.94
8 11 10.96 10.97 280.69 296.8 277.39 5.01 -2 0.93
9 11 10.95 10.97 277.68 293.16 273.95 5.02 -1.82 0.94
10 11 10.95 10.97 279.43 293.71 274.22 5.03 -1.9 0.94
11 11.01 10.96 10.98 282.65 297.82 276.12 5.03 -2.01 0.93
12 11.00 10.96 10.97 282.00 297.82 276.96 5.02 -2.04 0.93
13 11.00 10.95 10.97 277.07 292.91 272.19 5.02 -1.80 0.94
14 11.01 10.96 10.98 286.54 301.42 279.23 5.02 -2.21 0.91
15 10.99 10.95 10.96 275.56 289.24 271.83 5.02 -1.68 0.95
16 11.00 10.95 10.97 278.04 293.17 274.65 5.03 -1.86 0.94
17 11.01 10.97 10.98 283.42 297.23 279.54 5.03 -2.14 0.92
18 11.14 11.1 11.11 279.51 293.39 273.85 5.03 -2.05 0.93
19
20 GRID UNAVAILABLE FROM 18:16 TO 24
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Day: 15 (MON)
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
50.06 18768.60
49.94 18773.60
50.02 18778.50
49.97 18783.70
50.03 18788.6
50.03 18793.6
49.97 18798.6
50.03 18803.7
50.06 18808.8
50.04 18813.7
49.92 18818.8
50.01 18823.80
50.04 18828.90
49.88 18833.90
49.92 18838.80
49.93 18843.90
50 18848.9
49.89 18853

AVAILABLE FROM 18:16 TO 24:00 DUE TO EARTH FAULT BETWEEN SOLU SUBSTATION AND OKHALDUNGA SUBSTATION

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
133.28 133.29 132.67 23.13 24.65 24.17 4.92
133.18 133.18 132.58 22.95 24.44 24.04 4.93
133.10 133.28 132.68 23.10 24.66 24.14 4.94
133.23 133.22 132.63 23.01 24.56 24.07 4.94
133.52 133.2 132.92 23.47 25.02 24.52 4.92
133.19 133.11 132.25 22.84 24.45 23.88 4.94
132.87 132.79 132.22 22.45 23.99 23.66 4.94
132.93 132.97 132.34 22.66 24.1 23.88 4.93
132.78 132.79 132.16 22.35 23.84 23.54 4.95
132.87 132.85 132.24 22.42 23.97 23.53 4.92
133.02 132.37 132.38 22.67 24.32 23.81 4.91
133.08 133.02 132.39 22.64 24.27 23.80 4.94
132.80 132.75 132.15 22.31 23.87 23.47 4.93
133.50 133.40 132.73 23.20 24.91 24.28 4.93
132.61 132.61 132.08 22.24 23.62 23.27 4.94
132.82 132.84 132.23 22.43 23.86 23.65 4.91
133.1 133.15 132.55 22.84 24.28 23.93 4.93
134.66 134.61 134.03 22.48 24.02 23.56 4.94

UBSTATION

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.48 0.89 50.03 20182
-2.39 0.92 49.94 20187
-2.48 0.89 49.99 20192
-2.45 0.90 50.01 20197
-2.69 0.98 50.03 20202
-2.36 0.9 50.02 20207
-2.06 0.91 49.98 20212
-2.25 0.91 50.02 20217
-2.04 0.92 50.06 20221
-2.12 0.92 50.03 20226
-2.27 0.91 49.92 20231
-2.24 0.91 50.09 20236.00
-2.02 0.93 50.04 20241.00
-2.59 0.88 49.89 20246.00
-1.89 0.93 49.94 20251.00
-2.09 0.92 49.97 20256.00
-2.36 0.9 50 20261
-2.27 0.91 49.88 20265 U#1 sync at 17:40
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 16 (TUE)


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16 11.06 11.01 11.03 286.86 301.67 281.40 5.15 -2.01 0.93
17 11.07 11.02 11.04 289.04 305.03 284.47 5.16 -2.16 0.92
18 11.06 11.02 11.03 286.65 300.65 281.79 5.14 -2.03 0.93
19 11.07 11.02 11.03 283.72 301.7 281.39 5.16 -1.98 0.93
20 11.07 11.04 11.04 290.61 305.9 289.51 5.16 -2.47 0.91
21 11.07 11.02 11.03 288.53 304.1 284.74 5.15 -2.18 0.92
22 11.07 11.03 11.04 292.23 307.04 287.74 5.14 -2.36 0.91
23 11.09 11.04 11.06 299.91 314.57 293.41 5.15 -2.65 0.81
24 11.09 11.04 11.06 304.07 317.36 295.22 5.15 -2.78 0.88

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Day: 16 (TUE)
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

GRID UNAVAILABLE FROM 24:00 TO 15:09 DUE TO EARTH FAULT BETWEEN SOLU SUBSTATION AND OK

49.98 18858.10
49.84 18863.2
49.99 18868.3
49.92 18873.6
49.97 18878.7
50.03 18883.6
50.05 18888.9
49.85 18893.8
50.02 18899.2

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

N SOLU SUBSTATION AND OKHALDUNGA SUBSTATION

133.62 133.56 132.98 23.05 24.61 24.19


133.81 133.82 133.18 23.27 24.64 24.49
133.69 133.71 133.13 23.08 24.53 24.16
133.6 133.7 132.94 22.82 24.35 24.23
133.79 133.91 133.21 23.15 24.66 24.49
133.87 133.94 133.24 23.22 24.72 24.49
134.06 134.09 133.47 23.62 25.06 24.7
134.39 134.38 133.75 24.36 25.94 25.39
134.61 134.53 133.93 24.54 26.19 25.47

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark

5.05 -2.17 0.92 49.99 20270


5.05 -2.37 0.9 49.87 20275
5.03 -2.26 0.91 50 20280
5.05 -2.15 0.92 49.91 20285
5.05 -2.35 0.91 49.94 20290
5.05 -2.4 0.9 49.99 20295
5.05 -2.59 0.89 50.02 20300
5.04 -2.99 0.86 49.83 20305
5.04 -3.02 0.86 50.01 20310
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 17(WED)


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.09 11.05 11.07 305.33 318.42 296.20 5.14 -2.83 0.88
2 11.10 11.05 11.07 307.93 320.89 298.09 5.15 -2.93 0.87
3 11.10 11.05 11.07 308.50 320.71 297.97 5.16 -2.94 0.87
4 11.10 11.05 11.07 307.64 320.50 291.93 5.14 -2.94 0.87
5 11.16 11.11 11.13 291.13 303.66 281.06 5.04 -2.51 0.89
6 11.23 11.17 11.2 294.77 307.2 282.47 5.15 -2.46 0.9
7 11.01 11.05 11.07 296.41 311.57 288.77 5.17 -2.37 0.91
8 11.09 11.04 11.06 286.85 301.99 281.31 5.12 -2.2 0.92
9 11.1 11.05 11.07 292.08 308.07 285.67 5.11 -2.43 0.9
10 11.1 11.05 11.07 302 316.48 292.82 5.15 -1.73 0.88
11 11.21 11.16 11.18 284.76 299.26 277.78 5.09 -2.22 0.92
12
13 11.20 11.15 11.16 284.57 302.95 281.07 5.15 -2.19 0.92
14 11.2 11.14 11.16 282.72 300.29 278.78 5.16 -2.06 0.93
15 11.21 11.15 11.17 286.88 304.98 283.42 5.16 -2.30 0.91
16 11.21 11.15 11.17 293.30 312.47 289.01 5.13 -2.64 0.89
17 11.2 11.15 11.17 289.99 304.93 284.08 5.13 -2.38 0.91
18 11.2 11.15 11.17 291.3 305.18 283.67 5.14 -2.4 0.9
19 11.18 11.13 11.14 279.01 296.71 278.98 5.14 -1.99 0.93
20 11.18 11.14 11.15 280.15 297.5 279.72 5.12 -2.04 0.93
21 11.18 11.14 11.15 279.41 296.88 278.63 5.14 -2.01 0.93
22 11.18 11.14 11.15 282.89 298.68 280.3 5.13 -2.12 0.93
23 11.19 11.14 11.16 284.02 300.37 280.81 5.13 -2.19 0.92
24 11.18 11.14 11.16 284.75 300.01 279.18 5.13 -2.15 0.92

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Day: 17(WED)
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
50.02 18904.40
50.03 18909.50
49.96 18914.90
50.03 18920.30
49.99 18924.1
49.94 18928.2
49.97 18933.3
49.96 18938.4
49.97 18943.6
49.89 18946.6
50.09 18950.6
GRID UNAVAILABLE FROM (11:35 TO 12:14) DUE TO SHUT DOWN TAKEN FROM OKHALDHUNGA
49.99 18956.90
50.04 18962.00
49.98 18967.10
50.02 18971.20
50.01 18976.4
49.92 18981.4
49.98 18986.5
49.88 18991.7
49.97 18996.9
50.02 19002.1
50.01 19007
49.91 19012.3

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
134.66 134.57 133.98 24.48 26.15 25.40 5.04
134.76 134.64 134.06 24.73 26.39 25.59 5.04
134.81 134.69 134.11 24.75 26.45 25.59 5.04
140.94 141.08 141.67 22.59 22.43 22.36 5.03
135.3 135.12 134.38 23.29 23.01 24.21 4.94
136.06 135.81 135.3 23.52 25.4 24.46 5.07
134.42 134.42 133.67 23.64 25.29 24.73 5.09
134.14 134.9 133.46 23.09 24.8 24.34 5.03
134.4 134.38 133.72 23.48 25.19 24.68 5.03
134.55 134.49 133.8 24.11 25.78 25.18 5.06
135.64 135.6 134.97 22.96 24.63 24.12 5.01
AKEN FROM OKHALDHUNGA S/S FOR MAINTENANCE AT PATALE
135.44 135.44 134.71 22.92 24.64 24.31 5.07
135.29 135.32 134.59 22.75 24.41 24.13 5.07
135.56 135.64 134.86 23.15 24.84 24.57 5.06
135.84 135.89 135.07 23.61 25.49 25.09 5.03
135.51 135.5 134.87 23.31 24.93 24.46 5.04
135.59 135.52 134.88 23.46 25.1 24.55 5.05
134.99 135.17 134.43 22.6 24.02 23.97 5.03
135.04 135.18 134.46 22.68 24.01 24.02 5.04
135.03 135.16 134.45 22.67 24.07 23.98 5.03
135.19 135.28 134.62 22.84 24.3 24.07 5.02
135.27 135.31 134.65 22.9 24.44 24.1 5.01
135.26 135.23 134.61 22.88 24.49 24.05 5.02

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq
Total MWH Remark
-3.08 0.85 50.02 20315
-3.17 0.85 50.03 20320
-3.19 0.84 49.97 20325
-1.59 0.94 50.02 20330
-2.75 0.87 50 20335
-2.7 0.88 49.92 20339 U1 sync at 5:47
-2.59 0.89 49.99 20344
-2.4 0.9 49.96 20349
-2.63 0.88 49.99 20354 U1 sync at 9:40 AM
-2.82 0.87 49.9 20357
-2.45 0.9 50.04 20361 U1 sync at 10:39

-2.45 0.98 49.98 20367 U1 sync at 12:21


-2.30 0.91 50.06 20372.00
-2.55 0.89 49.97 20377.00
-2.88 0.87 50.05 20381.00 U1 sync at 15:21
-2.62 0.89 50.01 20386
-2.68 0.88 49.92 20391
-2.22 0.91 49.82 20396
-2.28 0.91 49.88 20401
-2.24 0.91 49.98 20406
-2.35 0.9 50.02 20411
-2.42 0.9 50.01 20416
-2.39 0.9 49.94 20421
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 18(THU)


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.19 11.14 11.16 285.63 301.25 279.25 5.12 -2.22 0.92
2 11.19 11.14 11.16 287.02 302.07 281.09 5.12 -2.30 0.91
3 11.19 11.14 11.16 286.69 301.53 280.04 5.12 -2.22 0.92
4 11.19 11.14 11.16 287.37 301.81 280.62 5.12 -2.27 0.91
5 11.19 11.14 11.16 289.58 303.97 282.05 5.13 -2.35 0.91
6 11.2 11.15 11.17 292.43 307.55 284.57 5.12 -2.54 0.9
7 11.03 10.98 11 294.38 310.52 287.62 5.17 -2.31 0.91
8 11.03 10.98 10.99 291.96 308.53 287.29 5.17 -2.23 0.92
9 11.03 10.99 11 297.64 312.74 291.31 5.17 -2.44 0.9
10
11 11.03 10.98 11 285.84 302.91 281.81 5.15 -1.98 0.93
12
13
14
15 GRID UNAVAILABLE FROM 11
16
17
18 11.16 11.11 11.13 290.88 305.9 284.9 5.12 -2.43 0.9
19 11.28 11.24 11.25 266.33 282.93 266.66 5.06 -1.56 0.95
20 11.29 11.24 11.25 266.76 284.05 265.4 5.05 -1.58 0.95
21 11.29 11.25 11.26 276.62 293.14 273.77 5.21 -1.7 0.95
22 11.3 11.26 11.27 275.14 190.52 270.66 5.11 -1.93 0.95
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Day: 18(THU)
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
49.99 19017.40
50.03 19022.50
50.02 19027.50
49.98 19032.80
50 19037.9
50.07 19043
50 190481
50.05 19053.4
50.01 19058.2
NEA SYSTEM FAILURE FROM (9:59 TO 10:03)
50.04 19068.9

GRID UNAVAILABLE FROM 11:15 AM TO 17:08 PM DUE TO 33KV TRANSMISSION LINE FAULT BETWEEN BUIPA S/S AND OKHALDHUNGA

49.97 19072.3
49.84 19075.7
49.92 190808
49.93 19085.9
49.96 19090.8
Grid unavailable from 10:22 to ….... Due to fault in Jaljale

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
135.37 135.30 134.70 22.95 24.63 24.89 5.03
135.40 135.35 134.77 23.05 24.64 24.13 5.02
135.41 135.32 134.73 23.04 24.13 24.06 5.02
135.46 135.37 134.78 23.08 24.72 24.24 5.02
135.53 135.46 134.66 23.23 24.92 24.28 5.02
135.76 135.66 135 23.54 25.3 24.65 5.02
133.57 133.48 132.83 23.6 25.35 24.82 5.09
133.45 133.47 132.79 23.54 25.17 25.16 5.07
133.67 133.61 132.99 23.94 25.56 25.05 5.08
M (9:59 TO 10:03)
133.3 133.26 132.66 23.03 24.63 24.25 5.07

UIPA S/S AND OKHALDHUNGA S/S

135.15 135.14 134.53 23.49 25.11 24.62 5.04


135.94 136.08 135.42 21.61 22.89 22.93 4.98
136.03 136.09 135.44 21.48 22.99 22.87 4.97
136.17 136.21 135.56 21.7 23.09 22.92 4.98
136.47 136.45 135.84 22.18 23.7 23.35 5.01
fault in Jaljale

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.46 0.90 49.98 20426
-2.49 0.90 50.90 20431
-2.45 0.90 50.03 20436
-2.53 0.89 50.01 20441
-2.58 0.89 50.02 20446
-2.77 0.88 50.05 20451
-2.55 0.89 50.03 20456
-2.48 0.9 50.06 20461
-2.66 0.89 50.01 20466

-2.19 0.92 50.03 20476

U#1 sync at 17:18


-2.65 0.88 50.01 20480 U#1 sync at 17:51
-1.76 0.94 49.81 20483
-1.78 0.94 49.97 20488
-1.87 0.94 49.93 20493
-2.15 0.92 49.98 20498
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 19


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3
4
5
6
7
8
9
10
11
12
13
14 11.08 11.03 11.05 297.49 296.24 274.77 5.13 -1.74 0.95
15
16
17 11.17 11.12 11.14 280.08 296.21 275.86 5.1 -1.99 0.93
18
19 11.03 10.98 10.98 268.66 289.28 272.35 5.17 -1.05 0.98
20 11.06 11.01 11.02 289.28 304.16 285.37 5.17 -2.09 0.93
21 11.05 11.01 11.01 272.35 300.31 284.09 5.12 -2.14 0.92
22
23
24 11.01 10.96 10.98 281.04 295.71 275.55 5.01 -2.01 0.93

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

Grid unavailable from 2077/05/18 22:22 to 12:52 due to earth fault at Ja

50.00 19095.30
NEA Grid system failure
49.97 19102.6
NEA Grid system Failure
49.04 19107.9
50 19113.1
49.93 19117.2
NEA Grid system Failure from 21:59 to 22:42
49.97 19124.2

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

o 12:52 due to earth fault at Jaljale

133.69 133.63 132.98 22.39 24.04 23.73 5.04


m failure
134.94 134.89 134.24 22.46 24.11 23.75 5.01
re
132.52 132.62 131.8 21.72 23.16 23.57 5.08
133.7 133.84 133.08 23.12 24.67 24.49 5.06
133.45 133.58 132.92 23.08 24.36 24.27 5.02
o 22:42
133.1 133.03 132.45 22.61 24.18 23.75 4.92

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark

-1.95 0.93 49.99 20502 U1 sync at 13:48

-2.19 0.91 49.99 20510 U1 sync at 16:52

-1.24 0.97 49.92 20515 U1 sync at 18:09


-2.32 0.91 49.97 20520
-2.31 0.91 49.96 20524 U1 sync at 20:59

-2.25 0.91 49.98 20531 U1 sync at 23:28


Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 20 (SAT)


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.05 10.96 10.98 280.45 265.35 275.77 5.01 -2.00 0.93
2 11.00 10.98 11.00 289.42 303.35 280.39 5.00 -2.39 0.90
3 11.02 10.97 10.99 285.30 299.28 276.69 5.00 -2.17 0.92
4 11.02 10.97 11.98 286.48 299.23 277.21 5.00 -2.25 0.91
5 11.02 10.97 11.98 289.13 301.07 278.37 5 -2.53 0.91
6
7 11.07 11.01 11.04 285.86 300.72 300.78 5.02 -2.23 0.91
8
9
10
11
12
13
14
15
16 11.13 11.09 11.11 278.18 292.19 271.88 5.03 -1.93 0.93
17 11.14 11.1 11.11 281.93 295.82 276.51 5.04 -2.16 0.92
18 11.15 11.1 11.11 280.15 295.76 277.21 5.05 -2.15 0.92
19 11.14 11.09 11.11 277.79 294.57 273.95 5.04 -2.01 0.93
20 11.15 11.1 11.15 279.62 296.31 277.97 5.04 -2.16 0.92
21 11.15 11.11 11.12 282.22 298.87 278.98 5.05 -2.26 0.91
22 11.15 11.11 11.12 282.59 299.11 278.32 5.04 -2.31 0.91
23 11.1 11.11 11.13 285.72 300.14 278.9 5.03 -2.35 0.91
24 11.16 11.11 11.13 286.05 299.95 278.47 5.04 -2.37 0.9

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Day: 20 (SAT)
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
50.01 19129.30
50.02 19134.20
50.03 13139.40
50.01 19144.30
50.04 19149.3
NEA SYATEM FAILURE
49.94 19156.4

GRID UNAVAILABLE FROM (7:05 - 14:04) DUE TO SHUTDOWN TAKEN BY LAHAN S/S FOR MAINTEN

49.90 19158.10
50 19162.9
50.01 19167.9
49.93 19173.1
50.08 19178.1
49.98 19183.1
50 19188.1
50.01 19193.1
50.02 19198.2

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
133.06 132.95 132.38 22.47 24.10 23.62 4.92
133.56 133.43 132.83 23.22 24.98 24.27 4.90
133.40 133.23 132.72 22.87 24.54 23.80 4.90
133.42 133.24 132.72 22.92 24.59 23.87 4.90
133.55 133.24 132.86 23.13 24.81 24.02 4.91

133.93 133.77 133.18 22.84 24.63 23.96 4.94

N BY LAHAN S/S FOR MAINTENANCE

134.49 134.44 133.87 22.31 23.87 23.44 4.95


134.75 134.73 134.17 22.76 24.22 23.84 4.96
134.75 134.86 134.2 22.69 24.06 23.87 4.95
134.62 134.64 133.96 22.38 24.18 23.8 4.96
134.73 134.87 134.14 22.68 24.02 23.92 4.94
134.88 134.97 134.29 22.84 24.35 24.11 4.96
134.98 134.92 134.3 22.88 24.46 24 4.94
135.04 134.97 134.38 22.99 24.62 24 4.94
135.06 134.98 134.39 23.02 24.64 24.06 4.94

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.17 0.91 49.98 20536
-2.59 0.88 50.04 20541
-2.39 0.91 50.01 20546
-2.45 0.89 50.03 20551
-2.53 0.89 50.01 20556
U1 sync at 6:23
-2.45 0.9 49.94 20562

U1 sync at 15:47
-2.14 0.92 49.93 20564
-2.37 0.9 50 20569
-2.39 0.9 49.97 20574
-2.25 0.92 49.94 20579
-2.39 0.9 50.08 20584
-2.49 0.89 50.02 20589
-2.53 0.89 50 20594
-2.56 0.89 49.99 20598
-2.57 0.89 50.03 20603
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra 11.16


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1 11.16 11.11 11.13 288.62 302.72 281.47 5.04 -2.47 0.90
2 11.17 11.12 11.14 293.20 306.81 284.16 5.04 -2.65 0.88
3 11.15 11.10 11.12 285.22 298.74 275.51 5.04 -2.27 0.91
4 11.16 11.11 11.13 288.10 302.27 279.10 5.03 -2.42 0.90
5 11.16 11.11 11.13 288.29 302.13 279.92 5.03 -2.44 0.90
6 11.16 11.1 11.13 288.07 301.49 278.44 5.03 -2.39 0.90
7 11.14 11.09 11.11 279.44 294.93 271.3 5.03 -2.02 0.93
8 11.16 11.11 11.12 289.42 304.73 282.52 5.15 -2.33 0.91
9 11.15 11.1 11.12 287.98 303.7 282.88 5.14 -2.26 0.92
10 11.15 11.11 11.12 286.92 302.57 283.29 5.15 -2.22 0.92
11 11.14 11.1 11.12 286.99 301.49 281.94 5.15 -2.18 0.92
12 11.15 11.10 11.11 286.96 301.71 282.65 5.15 -2.18 0.92
13 11.15 11.10 11.12 288.14 303.05 281.59 5.14 -2.23 0.92
14
15 UNIT 1 O
16
17 11.15 11.1 11.12 287.88 302.37 282.35 5.14 -2.2 0.92
18 11.15 11.11 11.12 288.94 303.02 282.17 5.16 -2.21 0.92
19 11.15 11.1 11.11 282.89 299.95 279.23 5.17 -2.97 0.93
20 11.15 11.1 11.11 283.33 299.45 279.57 5.16 -2 0.93
21 11.15 11.1 11.11 283.29 300.07 280.31 5.16 -2.04 0.93
22 11.17 11.12 11.13 295.17 310.09 289.45 5.16 -2.55 0.9
23 11.06 11.02 11.02 290.97 307.75 290.63 5.16 -2.31 0.91
24 11.04 11.02 11.04 299.71 314.55 292.95 5.18 -2.59 0.89

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr
49.95 19203.30
50.03 19208.20
50.05 19213.30
50.01 19218.10
49.98 19223.3
49.98 19228.3
50 192334
50.09 192338
50.04 19243.6
50 19249
49.9 19254
49.96 19259.00
49.90 19264.40

UNIT 1 OUTAGE DUE TO GENERATOR MAINTENANCE BY ANDRITZ (GRID UNAVAILABLE FROM 14:41 TO 15

50.01 19268.6
49.96 19273.5
49.99 19278.9
50.05 19283.9
50.04 19289.1
50.03 19294.4
50.06 19297.3
50.04 19302.3

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3
135.17 135.12 134.69 23.17 24.81 24.24 4.94
135.39 135.30 134.69 23.46 25.15 24.47 4.94
135.02 134.84 134.30 22.76 24.52 23.84 4.95
135.18 135.03 134.47 23.00 24.81 24.08 4.95
135.17 134.5 134.46 23.11 24.8 24.12 4.95
135.14 135 134.41 22.97 24.8 24.03 4.95
134.8 134.61 134.61 22.31 24.2 23.62 4.95
135.02 134.97 134.35 23.41 25.08 24.57 5.06
134.94 134.93 134.28 23.27 24.85 24.46 5.05
134.77 134.83 134.19 23.17 24.61 24.36 5.06
134.8 134.78 134.18 23.15 24.68 24.26 5.06
134.81 134.85 134.19 23.18 24.60 24.34 5.07
134.91 134.85 134.33 23.20 24.82 24.33 5.06

AILABLE FROM 14:41 TO 15:33 TRIP FROM LAHAN)

134.86 134.81 134.22 23.16 24.69 24.27 5.06


134.91 134.81 134.22 23.17 24.83 24.29 5.07
134.66 134.66 133.98 22.76 24.39 24.1 5.07
134.62 134.64 134 22.85 24.37 24.09 5.09
134.71 134.74 134.06 22.94 24.46 24.2 5.07
135.28 135.27 134.63 23.82 25.4 24.93 5.07
133.77 133.95 133.23 23.61 25.02 24.97 5.07
134.1 134.17 133.52 24.13 25.75 25.23 5.07

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
-2.70 0.88 49.98 20608
-2.86 0.87 50.02 20613
-2.49 0.85 50.04 20618
-2.64 0.88 50.02 20625
-2.65 0.88 49.99 20628
-2.61 0.88 49.99 20633
-2.25 0.91 50.02 20638
-2.55 0.89 50.09 20643
-2.62 0.89 50.05 20648
-2.44 0.9 50.01 20653
-2.3 0.91 49.9 20658
-2.40 0.90 49.96 20663
-2.46 0.90 50.06 20668

U1 sync at 16:56
-2.41 0.90 49.98 20673
-2.42 0.90 49.97 20677
-2.22 0.92 49.99 20683
-2.19 0.92 50.04 20688
-2.26 0.91 50.05 20693
-2.77 0.88 49.99 20698
-2.55 0.89 50.04 20701
-2.78 0.87 50.07 20706
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day: 22 (MON)


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3 11.07 11.02 11.05 297.25 310.87 287.89 5.13 -2.53 0.90
4 11.08 11.03 11.05 300.35 313.32 289.86 5.12 -2.63 0.89
5 11.08 11.03 11.05 300.91 314.06 291.06 5.12 -2.69 0.88
6 11.08 11.05 11.05 301.32 314.62 294.09 5.13 -2.72 0.88
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Day: 22 (MON)
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

50.07 19315.30
50.06 19320.00
50.04 19325.4
50.03 19330.6

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

134.23 134.09 133.51 23.82 25.53 24.84 5.03


134.39 134.23 133.66 24.02 25.78 24.97 5.04
134.47 134.31 133.74 24.18 25.94 25.14 5.04
134.47 134.37 133.77 24.19 25.9 25.19 5.04

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark

-2.75 0.88 50.05 20718


-2.84 0.87 50.03 20723
-2.93 0.86 50.04 20728
-2.94 0.86 50.01 20734
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day:


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day:


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day:


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day:


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day:


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day:


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day:


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day:


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark
Upper Solu Hydro Electric Company Limited
Solu Hydro electric Project
Head office : Hattisar, Kathmandu

Fiscal Year:2077/078 Month : Bhadra Day:


Unit 1
Generator Voltage(V) Generator Current(A) Generator Output
Time (Hour) R-Y Y-B B-R I1 I2 I3 MW MVAr Cosɸ
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Note: +kVAR is exporting - kVAR is Importing

Shift A Shift B
Shift Incharge: Shift Incharge:
Signature: Signature:
Unit 2
or Output Energy Generator Voltage(V) Generator Current(A) Generator Output
Hz MWH R-Y Y-B B-R I1 I2 I3 MW MVAr

Shift C
Shift Incharge:
Signature:
132 kV line Voltage(kV) 132 kV line Current(A) Total MW
Generator Output Energy
Cosɸ Hz MWH R-Y Y-B B-R I1 I2 I3

Submitted for and on behalf of Company By:


Signature:
Name:
Designation:
Office Seal
Total PF Cosɸ
MVAr Freq Total
MWH Remark

You might also like