You are on page 1of 14

DEE VEE PROJECT LIMITED

AMBIKAPUR MEDICAL COLLEGE


ABSTRACT SHEET RA BILL-006 FOR GIRLS HOSTEL -2

Qty Amount
ITEM
Sr.Nos. Item Description Unit Rate This Bill Cumulative Cumulative
CODE Previous Qty Previous Amt This Bill Amt
Qty Qty Amt

Clearing jungle including uprooting of rank vegetation,


grass, brush wood, trees and saplings of girth upto 30
1 SOR/1.4 cm measured at a height of 1 m above ground level SQM 3.70 0.00 0.000 0.00 0.00 0.00
and removal of rubbish upto a distance of 50 m outside
the periphery of the area cleared.

Excavation for all types and sizes of foundations,


trenches and drains or for any other purpose including
disposal of excavated stuff upto 1.5 m lift and lead upto
2 1.1.1 CUM 150.00 3141.50 3141.500 471225.00 0.00 471225.00
50m (at least 5m away from the excavated area),
including dressing and leveling of pits.
In all types of soils

Extra for every additional lift of 1.5 m or part thereof.


3 1.6.1 CUM 14.00 1417.99 1417.990 19851.86 0.00 19851.86
All types of soils

4 1.26.1 Carriage by mechanical transport upto 5 km lead:Earth CUM 10.00 3882.65 3882.645 38826.45 0.00 38826.45

Providing and filling in plinth with sand/ Crusher dust


and hard moorum under floor in layers eacht exceeding
5 1.18 20cm in depth consolidating each deposited layer by CUM 409.00 4381.720 4381.720 1792123.48 0.00 1792123.48
ramming and watering, including dressing etc.
complete.

Filling from available excavated stuff (Excluding rock)


in trenches, plinth, sides of foundation etc. in layers
6 1.17 eacht exceeding 20cm in depth consolidating each CUM 100.00 741.141 741.141 74114.10 0.00 74114.10
deposited layer by ramming and watering with a lead
upto 50 M. and lift upto 1.5 M.

1:3:6 (1 cement : 3 coarse sand : 6 graded stone


7 3.1.3 CUM 3600.00 125.27 125.266 450957.60 0.00 450957.60
aggregate 40mm eachminal size).

8 3.3.2 M-25 Grade CUM 5514.00 1215.970 251.407 1467.377 6704858.55 1386256.18 8091114.73

Extra for laying PCC/RCC of any grade in


superstructure above plinth level for every floor or part
7 3.3+3.4 CUM 500.00 251.407 251.407 251406.63 0.00 251406.63
thereof in addition to rate for foundation and_x000D_
plinth: GF

Extra for laying PCC/RCC of any grade in


superstructure above plinth level for every floor or part
8 3.3+3.4 CUM 500.00 251.407 251.407 251406.63 0.00 251406.63
thereof in addition to rate for foundation and_x000D_
plinth: 1st

Extra for laying PCC/RCC of any grade in


superstructure above plinth level for every floor or part
9 3.3+3.4 CUM 500.00 0.000 251.407 251.407 0.00 125703.50 125703.50
thereof in addition to rate for foundation and_x000D_
plinth: 2nd

Extra for laying PCC/RCC of any grade in


superstructure above plinth level for every floor or part
10 3.3+3.4 CUM 500.00 0.000 0.000 0.00 0.00 0.00
thereof in addition to rate for foundation and_x000D_
plinth: 3rd

Providing and fixing form work including centring,


shuttering, strutting, staging, propping bracing etc.
complete and including its removal at all levels,
9 2.1.1 SQM 350.00 3537.432 3537.432 1238101.27 0.00 1238101.27
forFoundations, footings, bases of columns plinth
beam, curtain wall in any shape and size and all type of
wall below plinth level.
Columns, Pillars, Piers and likes- rectangular or square
10 2.1.5 SQM 350.00 1065.180 532.590 1597.770 372813.00 186406.50 559219.50
in shape
Suspended floors, roofs, access platform, balconies
11 2.1.7 SQM 400.00 1272.825 636.412 1909.237 509129.92 254564.96 763694.88
(plain surfaces) and shelves (cast in situ)
12 2.1.8 Beams, lintels, cantilevers & walls SQM 350.00 1321.956 660.978 1982.934 462684.60 231342.30 694026.90

13 2.1.13 Weather shade, chhajja, Cornices and mouldings SQM 500.00 67.618 33.809 101.427 33808.90 16904.45 50713.35

Stair cases of all types excluding spiral and folded


14 2.1.15 SQM 380.00 33.576 16.788 50.364 12758.88 6379.44 19138.32
plate type, including risers and landings

Extra for providing fixing and removing of propping


from lower floor upwards for the concreting. Propping
should be provided two floors below.The props of lower
15 2.3 SQM 5.00 954.619 636.412 1591.031 5401.61 3182.06 8583.67
floor must be 50% of the props of the floor above
including wedging etc. complete. In case propping is
done in one floor below, only half the rate shall be paid

Providing and placing in position reinforcement for


R.C.C. work including straightening, cutting, bending,
binding etc. complete as per drawings
16 3.12.1 Kg 71.00 188114.447 45085.698 233200.145 13356125.75 3201084.53 16557210.28
including cost of binding wire in foundation and plinth
all complete Thermo-Mechanically treated bars FE 415

Total Amount 26045594.24 5411823.92 31457418.16

PWD DVPL
BAR BENDING SCHEDULE (Girls Hostel-2 GF)

36/3.12.1 (Providing and placing in position reinforcement for


Cutting No. No. R.C.C. work including straightening, cutting, bending, binding etc.
SL.NO DESCRIPTION Dia complete as per drawings including cost of binding wire in
length structure of bar
foundation and plinth all complete Thermo-Mechanically treated
bars FE 415 )

8mm 10mm 12mm 16mm 20mm


COLUMN CG1 T16 4.200 12 14 705.60
RING T8 1.820 12 39 851.76
RING T8 1.380 12 39 645.84
RING T8 1.090 12 39 510.12
HOOCK T8 0.560 12 39 262.08
COLUMN CG2 T12 4.250 2 12 102.00
COLUMN CG2 T16 4.250 2 4 34.00
RING T8 1.820 2 53 192.92
RING T8 1.380 2 53 146.28
RING T8 1.090 2 53 115.54
HOOCK T8 0.560 2 53 59.36
COLUMN CG3 T20 4.250 51 12 2601.00
COLUMN CG3 T16 4.250 51 2 433.50
RING T8 1.820 51 39 3619.98
RING T8 1.380 51 39 2744.82
RING T8 1.090 51 39 2168.01
HOOCK T8 0.560 51 39 1113.84
COLUMN CG4 T20 4.250 2 4 34.00
COLUMN CG4 T16 4.250 2 10 85.00
RING T8 1.820 2 39 141.96
RING T8 1.380 2 39 107.64
RING T8 1.090 2 39 85.02
HOOCK T8 0.560 2 39 43.68

COLUMN CG5 T16 4.250 4 14 238.00

RING T8 1.820 4 39 283.92


RING T8 1.380 4 39 215.28
RING T8 1.090 4 39 170.04
HOOCK T8 0.560 4 39 87.36
COLUMN CG6 T20 4.250 13 4 221.00
COLUMN CG6 T16 4.250 13 10 552.50
RING T8 1.820 13 53 1253.98
RING T8 1.380 13 53 950.82
RING T8 1.090 13 53 751.01
HOOCK T8 0.560 13 53 385.84
COLUMN CG7 T20 4.250 2 12 102.00

Page 2 of 14
8mm 10mm 12mm 16mm 20mm
COLUMN CG7 T16 4.250 2 2 17.00
RING T8 1.820 2 39 141.96
RING T8 1.380 2 39 107.64
RING T8 1.090 2 39 85.02
HOOCK T8 0.560 2 39 43.68
2nd FLOOR SLAB

AH-1/8 SB26/27

BOTTOM BAR T16 28.440 2 4 227.52


BOTTOM BAR T12 28.450 2 2 113.80
TOP BAR T20 28.390 2 3 170.34
TOP BAR T16 28.440 2 4 227.52
TOP EXTRA T20 1.970 2 4 15.76
TOP EXTRA T20 2.950 2 12 70.80
TOP EXTRA T20 2.030 2 6 24.36
TOP EXTRA T20 1.970 2 3 11.82
SPACER BAR T20 0.250 2 24 12.00
FACE BAR T12 27.400 2 2 109.60
LAP T12 0.600 2 8 9.60
LAP T16 0.800 2 16 25.60
LAP T20 1.000 2 6 12.00
RING(300*600) T10 1.780 2 24 85.44
RING(300*600) T12 1.760 2 284 999.68
AH-9/11 SB29 0.000

BOTTOM BAR T16 4.790 2 4 38.32


TOP BAR T16 4.790 2 4 38.32
TOP EXTRA T12 1.230 2 4 9.84
TOP EXTRA T12 1.200 2 2 4.80
RING(300*600) T8 1.740 2 33 114.84
FACE BAR T12 3.750 2 2 15.00
SPACER BAR T20 0.250 2 4 2.00
BG/CF-1/11 0.000
-SB3/4/14/31/16/28
BOTTOM BAR T16 33.240 4 4 531.84
TOP BAR T16 33.240 4 4 531.84
TOP BAR T16 33.240 6 4 0.00 797.76 0.00
FACE BAR T12 32.200 4 2 257.60
LAP T16 0.800 4 16 51.20
LAP T12 0.600 4 4 9.60
SB14 TOP EXTRA T12 2.000 4 4 32.00
SB14 TOP EXTRA T12 2.000 4 2 16.00
SB3 TOP EXTRA T12 2.000 4 16 128.00
SB3 TOP EXTRA T12 2.700 4 12 129.60

Page 3 of 14
8mm 10mm 12mm 16mm 20mm
SB4 TOP EXTRA T12 1.130 4 12 54.24
SPACER BAR T20 0.250 4 32 32.00
RING(300*600) T8 1.740 4 349 2429.04
4L RING T8 1.490 4 165 983.40
DE-1/8 SB16/25/31 0.000

BOTTOM BAR T16 28.440 2 4 227.52


BOTTOM BAR T12 3.250 2 2 13.00
TOP BAR T16 28.440 2 4 227.52
FACE BAR T12 27.400 2 2 109.60
LAP T16 0.800 2 16 25.60
LAP T12 0.600 2 4 4.80
TOP EXTRA T16 1.990 2 4 15.92
TOP EXTRA T16 2.950 2 8 47.20
TOP EXTRA T16 2.030 2 4 16.24
TOP EXTRA T16 1.990 2 4 15.92
SPACER BAR T20 0.250 2 24 12.00
RING(300*600) T8 1.740 2 284 988.32
DE-9/11 SB29 0.000

BOTTOM BAR T16 4.790 2 4 38.32


TOP BAR T16 4.790 2 4 38.32
TOP EXTRA T12 1.230 2 4 9.84
TOP EXTRA T12 1.200 2 2 4.80
RING(300*600) T8 1.740 2 33 114.84
FACE BAR T12 3.750 2 2 15.00
SPACER BAR T20 0.250 2 4 2.00
AD/EH-9/10/11- 0.000
SB3/4/6/7/8
BOTTOM BAR T16 11.640 6 4 279.36
TOP BAR T16 11.640 6 4 279.36
FACE BAR T12 10.600 6 2 127.20
SB3 TOP EXTRA T12 2.700 4 16 172.80
SB4 TOP EXTRA T12 1.030 4 4 16.48
SB6/8 TOP EXTRA T12 2.700 2 16 86.40
SB7 TOP EXTRA T12 1.030 2 8 16.48
SPACER BAR T16 0.250 6 6 9.00
RING(300*600) T8 1.740 6 96 1002.24
AD/EH-8/7- 0.000
SB4/10/12/14/15
BOTTOM BAR T16 11.640 4 4 186.24
TOP BAR T16 11.640 4 4 186.24
FACE BAR T12 10.600 4 2 84.80
TOP EXTRA T12 1.780 4 4 28.48
TOP EXTRA T12 1.750 4 4 28.00

Page 4 of 14
8mm 10mm 12mm 16mm 20mm
SPACER BAR T20 0.250 4 6 6.00
RING(300*600) T8 1.740 4 98 682.08
AD/EH-6-SB16/17/18 0.000

BOTTOM BAR T16 11.640 2 4 93.12


BOTTOM BAR T12 3.250 2 2 13.00 0.00
TOP BAR T16 11.640 2 4 93.12
FACE BAR T12 10.600 2 2 42.40
TOP EXTRA T12 1.780 2 8 28.48
TOP EXTRA T12 1.750 2 8 28.00
SPACER BAR T20 0.250 2 6 3.00
RING(300*600) T8 1.740 2 98 341.04
4L RING T8 1.540 2 98 301.84
AD/EH-1/2/3 0.000
SB22/23/16/20
BOTTOM BAR T16 11.640 6 4 279.36
BOTTOM BAR T12 11.650 4 4 186.40
TOP BAR T16 11.640 6 4 279.36
FACE BAR T12 10.600 6 2 127.20
TOP EXTRA T12 1.780 6 8 85.44
TOP EXTRA T12 1.750 6 8 84.00
SPACER BAR T20 0.250 6 6 9.00
RING(300*600) T8 1.740 6 98 1023.12
4L RING T8 1.540 6 98 905.52
AD/EH-4/5 0.000
-SB13/18/20
BOTTOM BAR T16 25.840 2 4 206.72
TOP BAR T16 25.840 2 4 206.72
TOP BAR T16 5.040 2 2 20.16
FACE BAR T12 24.800 2 2 99.20
LAP T16 0.800 2 16 25.60
LAP T12 0.600 2 4 4.80
TOP EXTRA T12 1.780 2 8 28.48
TOP EXTRA T12 1.750 2 12 42.00
SPACER BAR T20 0.250 2 6 3.00
RING(300*600) T8 1.740 2 206 716.88
4L RING T8 1.540 2 206 634.48
SB11 0.000

BOTTOM BAR T16 1.740 17 2 59.16


TOP BAR T16 1.740 17 2 59.16
TOP BAR T12 1.750 17 2 59.50
RING (200*400) T8 1.140 17 6 116.28
SB2 0.000

BOTTOM BAR T16 1.590 11 2 34.98

Page 5 of 14
8mm 10mm 12mm 16mm 20mm
TOP BAR T16 1.590 11 2 34.98
TOP BAR T12 1.600 11 2 35.20 0.00
RING (200*400) T8 1.140 11 7 87.78
SB5 0.000

BOTTOM BAR T20 1.240 8 2 19.84


TOP BAR T20 1.240 8 2 19.84
RING (200*400) T8 1.140 8 4 36.48
SB1 0.000

BOTTOM BAR T12 4.000 14 2 112.00


TOP BAR T12 4.000 14 2 112.00
RING (200*400) T8 1.140 14 25 399.00
SUNSET 0.000

CHAJJA T8 2.930 2 76 445.36


CHAJJA T8 9.500 2 4 76.00
CHAJJA T8 2.930 2 183 1072.38
CHAJJA T8 22.500 2 4 180.00
LAP T8 0.400 2 4 3.20
CHAJJA T8 2.930 4 12 140.64
CHAJJA T8 1.400 4 4 22.40
STAIRCASE 0.000

STAIRCASE T8 1.700 2 12 40.80


BINDER T8 1.150 2 7 16.10
STAIRCASE T12 4.600 2 12 110.40
STAIRCASE T12 2.320 2 12 55.68
STAIRCASE T12 2.060 2 12 49.44
BINDER T8 1.150 2 20 46.00
LANDIND T8 1.150 2 24 55.20
STAIRCASE T12 3.900 2 12 93.60
SLAB 0.000

S1(3800*3900) T10 4.210 8 12 404.16


LONGER T10 4.780 8 13 497.12
SHORTER T10 4.310 8 13 448.24
SHORTER T10 5.280 8 14 591.36
EXTRA BAR T8 0.820 8 12 78.72
EXTRA BAR T8 0.900 8 12 86.40
BINDER T8 3.800 8 23 699.20
S2 (3900*1900) 0.000
LONGER T8 3.500 4 26 364.00
SHORTER T8 4.200 4 6 100.80
SHORTER T8 3.350 4 7 93.80
EXTRA BAR T8 0.600 4 12 28.80
EXTRA BAR T8 0.800 4 6 19.20
BINDER T8 3.800 4 11 167.20
BINDER T8 1.900 4 8 60.80

Page 6 of 14
8mm 10mm 12mm 16mm 20mm
S1(3800*3900) T10 5.570 10 25 1392.50
SHORTER T10 4.310 10 13 560.30
SHORTER T10 5.280 10 14 739.20
EXTRA BAR T8 0.900 10 27 243.00

BINDER T8 3.800 10 23 874.00

S2 (3900*1900) 0.000

LONGER T8 3.500 8 26 728.00

SHORTER T8 5.430 8 13 564.72

EXTRA BAR T8 0.600 8 12 57.60

BINDER T8 3.800 8 11 334.40

BINDER T8 1.900 8 8 121.60

S1(3800*3900) T10 5.570 8 12 534.72

LONGER T10 5.350 8 13 556.40

SHORTER T10 4.310 8 13 448.24

SHORTER T10 5.280 8 14 591.36

EXTRA BAR T8 0.900 8 27 194.40

BINDER T8 3.800 8 23 699.20

S2 (3900*1900) 0.000

LONGER T8 3.300 11 13 471.90

LONGER T8 3.500 11 14 539.00

SHORTER T8 5.430 11 13 776.49

SHORTER T10 5.280 11 14 813.12

EXTRA BAR T8 0.600 11 12 79.20

BINDER T8 3.800 11 11 459.80

BINDER T8 1.900 11 8 167.20

S3 SUNK 0.000

LONGER T12 4.250 8 11 374.00

SHORTER T12 1.860 8 33 491.04

EXTRA BAR T10 0.650 8 11 57.20

EXTRA BAR T10 0.250 8 33 66.00

BINDER T10 4.100 8 8 262.40

BINDER T10 1.700 8 6 81.60

S3 SUNK 0.000

Page 7 of 14
8mm 10mm 12mm 16mm 20mm
LONGER T12 2.320 2 11 51.04

SHORTER T12 1.860 2 18 66.96

EXTRA BAR T10 0.350 2 11 7.70

EXTRA BAR T10 0.250 2 18 9.00

BINDER T10 2.170 2 4 17.36

BINDER T10 1.700 2 4 13.60

S4 SLAB 0.000

LONGER T8 3.100 12 6 223.20

SHORTER T8 1.100 12 20 264.00

TOTAL CUTTING LENGTH (A) 38757.29 8177.02 5089.30 7520.72 3383.76


UNIT WEIGHT / MTR 0.395 0.617 0.888 1.578 2.466
TOTAL QTY Kg 15309.13 5045.22 4519.30 11867.70 8344.35

TOTAL QTY Kg 45085.70

Page 8 of 14
GIRLS HOSTEL-2 1st FLOOR
2.1 Providing and fixing form work including centring, shuttering, strutting,staging, propping bracing etc. complete
and including its removal at alllevels,

2.1.5 (Columns, Pillars, Piers and likes- rectangular or square in shape


SR.NO. DESCRIPTION NOS. l H QTY
12 2 0.600 3.075 44.280
2 CG1
12 2 0.400 3.075 29.520
2 2 0.600 3.075 7.380
3 CG2
2 2 0.500 3.075 6.150
51 2 0.600 3.075 188.190
4 CG3
51 2 0.400 3.075 125.460
2 2 0.600 3.075 7.380
5 CG4
2 2 0.500 3.075 6.150
4 2 0.600 3.075 14.760
6 CG5
4 2 0.400 3.075 9.840
13 2 0.600 3.075 47.970
7 CG6
13 2 0.400 3.075 31.980
2 2 0.600 3.075 7.380
8 CG7
2 2 0.500 3.075 6.150
Total Qty (Sqm) 532.590

3.3 .2 Providing and laying design mix reinforced cement concrete with crushed graded
stone aggregate 20mm nominal size using batching plant, transit mixer and concrete pump,
in all works upto plinth level excluding cost of form work. M-25 GRADE

SR.NO. DESCRIPTION NOS. L W H QTY


2 CG1 12 0.600 0.400 3.200 9.220
3 CG2 2 0.600 0.500 3.200 1.920
4 CG3 51 0.600 0.400 3.200 39.170
5 CG4 2 0.600 0.500 3.200 1.920
6 CG5 4 0.600 0.400 3.200 3.080
7 CG6 13 0.600 0.400 3.200 9.990
8 CG7 2 0.600 0.500 3.200 1.920
Total Qty (Cum) (A) 67.220

2.1 Providing and fixing form work including centring, shuttering, strutting,staging, propping bracing etc. complete
and including its removal at alllevels,

2.1.8 Beams, lintels, cantilevers & walls


SR. NO. DESCRIPTION NOS L W H QTY REMARKS
2 2 8.970 0.600 21.528
XX-AXIS GRID 1-AD/EH
SB23/20/16
1 2 1 8.970 0.300 5.382
GRID 2/3/6/7/8/9/11-AD/EH 14 2 8.270 0.600 138.936
SB22/2316/17/18/14/4/151
2 0/12/3/4 14 1 8.270 0.300 34.734

2 2 3.500 0.600 8.400


GRID 3'/5'-D/E SB 19
3 2 1 3.500 0.300 2.100

1 2 20.040 0.600 24.048


GRID 5-A/H SB18/20/13
4 1 1 20.040 0.300 6.012

1 2 20.840 0.600 25.008


GRID 6-A/H SB18/20/13
5 1 1 20.840 0.300 6.252

2 2 8.570 0.350 11.998


GRID 10-AD/AH SB6/7/8
6 2 1 8.570 0.300 5.142

4 2 24.070 0.600 115.536


YY-AXIS GRID A/B/F/H-1/8
SB26/27/3/4/14
7 4 1 24.070 0.300 28.884

2 2 23.870 0.600 57.288


GRID C/D/E/F-1/8
SB16/28/25/31/32
8 2 1 23.870 0.300 14.322

4 2 2.015 0.600 9.672


GRID B/C,F/H-8/9 SB4/28
9 4 1 2.015 0.300 2.418

4 2 2.600 0.600 12.480


GRID A/D/E/H- 9/11 SB 29
10 4 1 2.600 0.300 3.120

2 2 2.500 0.600 6.000


GRID B/G-9/11 SB4/31
11 2 1 2.500 0.300 1.500

2 2 2.900 0.600 6.960


GRID C/F-9/11 SB28
12 2 1 2.900 0.300 1.740

1 2 1.065 0.600 1.278


GRID D'-3/4 SB33
13 1 1 1.065 0.300 0.320

1 2 2.320 0.600 2.784


GRID D'-5/6 SB33
14 1 1 2.320 0.300 0.696

2 2 28.135 0.400 45.016


CHHAJJA LEFT/RIGHT GRID
A/H -1/8 SB 1
15 2 1 28.135 0.200 11.254

24 2 0.800 0.400 15.360


SB11/2
16 24 1 0.800 0.200 3.840

6 2 0.475 0.400 2.280


SB11/5/2
17 6 1 0.475 0.200 0.570

2 2 6.695 0.400 10.712


GRID A/H-9/11 SB1/5/2
18 2 1 6.695 0.200 2.678

1 2 14.730 0.400 11.784


TOP/BOTTOM
19 1 1 14.730 0.200 2.946

TOTAL QTY SQM 660.978

2.1.7 Suspended floors, roofs, access platform, balconies (plain surfaces) and shelves (cast in situ)

SR. NO. DESCRIPTION NOS L W H QTY REMARKS


1 SLAB
2 GRID 1/7-A/D,E/H S1 12 3.800 3.800 173.280
3 GRID 2/3/5/6- A/D,E/H S1 16 3.800 3.900 237.120
4 GRID 4-A/D,E/H S2 4 3.800 1.870 28.424
5 GRID B/F -1/8 S2 4 1.870 3.800 28.424
6 GRID B/F -2/4/5/6 S2 8 1.870 3.800 56.848
7 GRID B/F - 4 S2 2 1.870 1.870 6.994
8 GRID D' 3 S2 1 1.065 2.700 2.876
9 GRID D' 4 S2 1 1.870 3.500 6.545
10 GRID D' 5 S2 1 2.320 2.300 5.336
11 GRID B/F -8 S2 2 1.870 2.015 7.536
12 GRID A/C/E/G-9 S3 4 1.500 3.800 22.800
13 GRID B/F-9 S3 2 1.500 1.870 5.610
14 GRID A/C/E/G-10 S3 4 1.400 3.800 21.280
15 GRID B/F-10 S3 2 1.400 1.870 5.236
16 OUTER SUNK SLAB S4 BOTH SIDE 2 0.800 2.800 4.480
17 S4 4 0.800 2.900 9.280
18 S4 2 0.800 3.000 4.800
19 S4 2 0.800 3.100 4.960
20 S4 2 0.800 2.865 4.584
TOTAL QTY SQM 636.412

2.1.13 Weather shade, chhajja, Cornices and mouldings


SR. NO. DESCRIPTION NOS L W H QTY REMARKS
1 SUNSET 1 19.922 0.600 11.953
2 OUTER 1 21.122 0.100 2.112
3 SUNSET 4 1.500 0.600 3.600
4 OUTER 4 2.700 0.100 1.080
5 SUNSET 2 1.050 0.600 1.260
6 OUTER 2 2.250 0.100 0.450
7 SUNSET 1 18.905 0.600 11.343
8 OUTER 1 20.105 0.100 2.011
TOTAL QTY (SQM) 33.809
2.1.15 Stair cases of all types excluding spiral and folded plate type, including risers and landings
SR. NO. DESCRIPTION NOS L W H QTY REMARKS
1 SLOPE 1 2.9500 1.2000 3.5400
2 SLOPE 1 1.9500 1.2000 2.3400
3 SLOPE 1 2.9500 1.2000 3.5400
4 STEP 24 1.2000 0.1600 4.6080
5 LANDING SLAB 2 1.1500 1.2000 2.7600
TOTAL QTY (SQM) 16.788
2.3 Extra for providing fixing and removing of propping from lower floor upwards for the concreting. Propping
should be provided two floors below.The props of lower floor must be 50% of the props of the floor above including
wedging etc. complete. In case propping is done in one floor below, only half the rate shall be paid

SR. NO. DESCRIPTION NOS L W H QTY REMARKS


TOTAL QTY SQM A 636.412
TOTAL QTY SQM A+B 636.412

3.3 .2 Providing and laying design mix reinforced cement concrete with crushed graded stone aggregate 20mm
nominal size using batching plant, transit mixer and concrete pump, in all works upto plinth level excluding cost of
form work. M-25 GRADE

SR.NO. DESCRIPTION NOS. L W H QTY


XX-AXIS GRID 1-AD/EH
1 SB23/20/16
2 8.970 0.300 0.600 3.229 COL.500*1,400*1

GRID 2/3/6/7/8/9/11-AD/EH
2 SB22/2316/17/18/14/4/1510/12/ 14 8.270 0.300 0.600 20.840 COL.600*2
3/4

3 GRID 3'/5'-D/E SB 19 2 3.500 0.300 0.600 1.260

4 GRID 5-A/H SB18/20/13 1 20.040 0.300 0.600 3.607 COL.600*6

5 GRID 6-A/H SB18/20/13 1 20.840 0.300 0.600 3.751 COL.600*2,.400*2

6 GRID 10-AD/AH SB6/7/8 2 8.570 0.300 0.350 1.800 COL.600*1,.300*1

YY-AXIS GRID A/B/F/H-1/8


7 SB26/27/3/4/14
4 24.070 0.300 0.600 17.330 COL.400*6

GRID C/D/E/F-1/8
8 SB16/28/25/31/32
2 23.870 0.300 0.600 8.593 COL.600*1,.400*5

9 GRID B/C,F/H-8/9 SB4/28 4 2.015 0.300 0.600 1.451

10 GRID A/D/E/H- 9/11 SB 29 4 2.600 0.300 0.600 1.872 COL.400*1

11 GRID B/G-9/11 SB4/31 2 2.500 0.300 0.600 0.900 COL.400*1

12 GRID C/F-9/11 SB28 2 2.900 0.300 0.600 1.044

13 GRID D'-3/4 SB33 1 1.065 0.300 0.600 0.192

14 GRID D'-5/6 SB33 1 2.320 0.300 0.600 0.418

CHHAJJA LEFT/RIGHT GRID


15 A/H -1/8 SB 1
2 28.135 0.200 0.400 4.502

16 SB11/2 24 0.800 0.200 0.400 1.536

17 SB11/5/2 6 0.475 0.200 0.400 0.228

18 GRID A/H-9/11 SB1/5/2 2 6.695 0.200 0.400 1.071

19 TOP/BOTTOM 1 14.730 0.200 0.400 1.178

20 SLAB 0.000

21 GRID 1/7-A/D,E/H S1 12 3.800 0.140 3.800 24.259

22 GRID 2/3/5/6- A/D,E/H S1 16 3.800 0.140 3.900 33.197

23 GRID 4-A/D,E/H S2 4 3.800 0.135 1.870 3.837

24 GRID B/F -1/8 S2 4 1.870 0.135 3.800 3.837

25 GRID B/F -2/4/5/6 S2 8 1.870 0.135 3.800 7.674

26 GRID B/F - 4 S2 2 1.870 0.135 1.870 0.944

27 GRID D' 3 S2 1 1.065 0.135 2.700 0.388


28 GRID D' 4 S2 1 1.870 0.135 3.500 0.884

29 GRID D' 5 S2 1 2.320 0.135 2.300 0.720

30 GRID B/F -8 S2 2 1.870 0.135 2.015 1.017

31 GRID A/C/E/G-9 S3 4 1.500 0.175 3.800 3.990

32 GRID B/F-9 S3 2 1.500 0.175 1.870 0.982

33 GRID A/C/E/G-10 S3 4 1.400 0.175 3.800 3.724

34 GRID B/F-10 S3 2 1.400 0.175 1.870 0.916

OUTER SUNK SLAB S4 BOTH


35 SIDE
2 0.800 0.135 2.800 0.605

36 S4 4 0.800 0.135 2.900 1.253


37 S4 2 0.800 0.135 3.000 0.648
38 S4 2 0.800 0.135 3.100 0.670
39 S4 2 0.800 0.135 2.865 0.619
40 SUNSET 1 19.922 0.600 0.100 1.195

41 SUNSET 4 1.500 0.600 0.100 0.360

42 SUNSET 2 1.050 0.600 0.100 0.126

43 SUNSET 1 18.905 0.600 0.100 1.134

44 SLOPE 1 2.9500 1.2000 0.175 0.620

45 SLOPE 1 1.9500 1.2000 0.175 0.410

46 SLOPE 1 2.9500 1.2000 0.175 0.620

47 STEP 24 1.2000 0.1600 0.300 1.382

48 LANDING SLAB 2 1.1500 1.2000 0.175 0.483

TOTAL QTY CUM (B) 184.187

TOTAL QTY CUM (A+B) 251.407

3.3+3.4/ Extra for laying PCC/RCC of any grade in superstructure above plinth level for every floor or part thereof
in addition to rate for foundation and plinth:

SR.NO. DESCRIPTION NOS. L W H QTY


TOTAL QTY CUM 251.407