Professional Documents
Culture Documents
By integrating an aero-based turbine engine, a permanent magnet generator, advanced power electronics,
with patented air bearing technology, Capstone microturbines are the ideal solution for today’s distributed
energy needs.
FEATURES BENEFITS
Only one moving part Longer service intervals, low operating cost
Only One Moving Part Recuperated Turbine Core Air Bearing Technology
Minimal maintenance with Increases fuel efficiency No lubricants or coolants
only one moving part are needed to operate
the incorporation of two or three
C200 –
The Capstone
separate technologies. microturbine is –
C1000
of increasing energy utilization
Chilled Water (Tons)and
cogeneration Output: trigenerat
Hot Wa
MEETING DEMAND IN THE COMMERCIAL C65 – 25 & INDUSTRIAL C65 or
–4
AND BIOGAS INDUSTRIES the incorporation of two
C200 – 85 C200 –
C1000
Utilizing Capstone microturbines can save you time and money
separate
while– lowering
technologies.
425+ your carbon footprint. C1000 –
Chilled
Hot Water (Btu/hr) Water (Tons)
Output: SteamO(
C65 – 408,000 C65 – 25 C65 – 4
C200 – 85
C200 – 1,000,000 C200 –
C1000 – 425+ C1000 –
C1000 – 5,000,000
Electricity Hot Water Chilled Water Steam
Steam (Lbs/hr) Hot Output: Water (Btu/hr) withOu
Du
Combined Heat & Power (CHP) and Combined Cooling, C65 –Heating
450 & Power C65(CCHP)
– 408,000 C65 – u
CHP is the production of both electricity and heat from a single fuel source. By using the waste heat from onsite electricity
production for heating, CHP increases fuel efficiency and decreases C200 – 795
energy costs. C200
For increased – 1,000,000
energy utilization, CCHP
C200 –
incorporates a third technology, absorption chilling, to offset energyC1000
expenses by–utilizing
3,870 the waste heat for cooling.
C1000 – 5,000,000 C1000 –
Biogas
Capstone microturbines cleanly burn waste gases from landfills, sewagewith Ductplants,
treatment Burner Steam
livestock farms, and(Lbs/hr)
food waste Output
processing facilities to create renewable power and heat. This featureC65 replaces
– upthe traditional
to 3,000solution of fl aring those gases,
C65 – 450
or even worse, letting them vent into the air – a practice that is wasteful, polluting, and contributes regularly to climate change.
C200 – up to 6,650
C200 – 795
C1000 – up to C1000
32,000– 3,870
Power to be Independent
E-FINITY DISTRIBUTED GENERATION – WHAT WE DO
Support Teams
E-Finity’s Sales Support Team will help customers with a
conceptual design of their project which includes system
sizing, energy savings calculations, and project life-cycle
cost analysis. In addition, the Application Engineering
Team provides design and project management
assistance to customers during the design and
implementation of their project.
POWER OUTPUT
MT2 202ºF
TO BUILDING
SYSTEM STATE
LOAD
INLET
180ºF HOT WATER
FLOW
for customers to view in real time their system energy
savings and performance. Historical information can be
POWER OUTPUT RETURN 80 GPM
180ºF
65KW
FROM BUILDING
Headquarters
161 Pennsylvania Avenue
Wayne, PA 19087
Sales Offices
Clarksburg, WV • Jacksonville, FL • Washington D.C.