You are on page 1of 24

ITEM DESCRIPTION

ELECTRICAL

1 First private pole/Transformer

Generator Package

Gensets

2 Synchronizing panel
Generator Day tank
Generator Fuel Storage system
Generator fuel and Fuel Storage system

3 Switchgear, High/Medium Voltage

4 Switchgear, Low Voltage

Main Feeder

5 Roughing-ins

Wirings
Sub Main Feeder

Roughing-ins

Wirings

General Lighting System


Roughing-ins
Wirings

7 General Lighting Fixtures

Special Lighting Fixtures

Dimming System

Landscape / Site / Perimeter Lighting System


8
8 Roughing-ins
Wirings
Small Power System
Roughing-ins
9
Wirings
Wiring Devices

10 Panelboards, MTS, ECB (MDP/DP)

11 ATS

Lightning Protection System


12 Wirings
Lightning Protection Device
13 Grounding System
FDAS

System

Sounder base
Strobe lights

14
Roughing-ins
Wirings

Monitor / Control Module

Interfacing to other systems


Telephone / Data System
System

Roughing-ins

15
Wirings

IDF, MDF

Wi-Fi

CATV System
Ductbank

16
16 Roughing-ins

Wirings

PA/BGM System

Roughing-ins
17
Wirings
Speaker in common areas
CCTV System
System

18 Roughing-ins

Wirings
CCTV Camera
POS System
19 Roughing-ins
Wirings
20 Audio / Video System
Door Monitoring / Access Control System

Roughing-ins
21

Door monitoring / Access Control equipments


PRE-CONSTRUCTION
BASE ASSUMPTIONS MANDARIN HOTEL
(based on previous work session) (ATG)

▪ Metro Manila Projects:


1MVA below by Meralco
▪ Check local utility company for outside Metro Manila

N+1 with synchronizing panel for City Hotels


N with multiple gensets with synchronizing panel for Provincial
compartmentalized
Skid-mounted; 8 hours
minimum of 16 hours
Excluded after T&C, to be provided by operation
▪ Metro Manila Projects:
1MVA below by Meralco
▪ Check local utility company for outside Metro Manila
Redundancy for the accessibility to maintain the switchboard; include sub-
metering

▪ Use PVC for concrete-encased


▪ IMC or EMT for ceiling concealed
▪ EMT for risers
THHN

▪ PVC for concrete-encased


▪ EMT on risers and ceiling concealed

▪ Use THHN/THWN for other sub-feeder


▪ For Busduct going to tower, use fire-rated cables for life safety (Fireman's
elevator, fire pump)
▪ Use fire-resistant cables for FDAS power supply
▪ For flagship projects, provide full redundant or zoned busducts
▪ For provincial/non-flagship projects, provide only space for redundant riser
(UL listed)
▪ FRC for feeder of fire pump
▪ IP dust proof/ protected min if runs parallel with water lines (IP65)

add PVC, less FMC for drop from slab to ceiling


THHN/THWN

▪ CFL for guestrooms, meeting rooms & gym


▪ LED for hallway, lobby, all day dining, lounges, exit signs, emergency light

decorative lighting/ID areas


▪ standard add-ons
▪ for function and ballroom rooms
Considered as add-ons (provisional sum given the area)
Considered as add-ons (provisional sum given the area)

PVC
THHN/THWN
Partnering with Bticino

for kitchen and elevator panels with shunt trip prov for fire alarm interface

▪ With By-Pass for main (for lvsg mains ats is breaker type)
▪ Without by-pass for fire pump ATS (UL listed)
▪ UL 1008

Bare Copper Tape


Air Terminals (Faraday's Cage) - minimum code requirement
Electrical and telecom separate risers

▪ Guestrooms - Fully addressable and BOH


▪ Hallways - Semi addressable
Included in sleeping areas (guestrooms)
Included in sleeping areas (guestrooms)
▪ PVC for concrete-encased
▪ EMT on risers and ceiling concealed
Fire resistant cable

TS/FS, FP, elevator recall & shutdown, kitchen equipment power shutdown,
egress release for fire exit doors, remote annunciator for telephone
operator
PA/BGM for cut off only; not to be used as EVAC

Conventional

▪ Cable Tray for riser


▪ PVC (concealed in concrete)
▪ EMT on risers and ceiling concealed going to units, rooms, and other
occupancies
▪ Note: Telecom floor penetration shall be IMC sleeve

▪ Cat5e horizontal (voice/data)


▪ For vertical (backbone) more than 90m is FOC
▪ Cat6 for less than 90m (data), multipair cable Cat5e min 25prs (voice)

▪ IDF and MDF patch panel Cat5e including data cabinet wall mtd 3ft (v/d)
▪ Termination blocks for voice type 110/210

roughing-ins and wirings included in horizontal (public areas, inside rooms


1:2)
▪ Cable Tray for riser
▪ PVC (concealed in concrete)
▪ EMT on risers and ceiling concealed going to units, rooms, and other
occupancies

▪ RG-6 for horizontal (by cable TV provider)


▪ RG-58 - 90% braided, vertical/riser (by cable TV provider)

▪ PVC for concrete-encased


▪ EMT on risers and ceiling concealed
included (zoning for bgm)
For common areas, elevator, common rest rooms

IP
▪ PVC concrete concealed
▪ EMT on risers and ceiling concealed
same with data system

same with data system


same with data system
part of Add-ons

▪ PVC for concrete-encased


▪ EMT on risers and ceiling concealed
▪ all fire exits, FCC and sec room are all monitored doors
▪ roofdeck doors are controlled and monitored
PRE-CONSTRUCTION CONSTRUCTION
SEDA ASEANA SEDA ARCA SEDA
SEDA GLORIETTA (WENCESLAO) SOUTH BACOLOD SEDA BGC 2 SEDA CIRCUIT
CONSTRUCTION

SEDA CITY GATE SEDA CITP SEDA LIO SEDA VERTIS


PRE-CONSTRUCTION
MANDARIN HOTEL
ITEM DESCRIPTION (ATG) SEDA GLORIETTA

1 CFA (m²)
2 GFA
3 GPA
4 ROOMS
5 FOH
6 BOH
ELECTRICAL
5 GENSET CAPACITY
6 DIVERSITY FACTOR (Genset)
7 SYNCHRONIZING PANEL (Y/N)

TRANSFORMER
8
- confirm if Dry/Oil-based;

9 BUSDUCT SPECS

10 LVSG

11 HVSG

12 FUEL STORAGE TANK

13 ATS (response time)


14 FDAS (Semi-addressable or fully addressable)

MECHANICAL

1 AIR-CONDITIONING SYSTEM (Type)

2 TOTAL TR
3 GAA/TR (Gross Air-conditioned Area)
4 TOTAL AIR-CONDITIONED AREA
5 GFA/TR
6 DESIGN EFFICIENCY KW/TR
7 FUEL DAY TANK
8 FUEL STORAGE TANK

9 FUEL TANK

10 HEAT EXCHANGER

PLUMBING
1 MAIN WATER LINE DISTRIBUTION
2 DUAL PIPING DISTRIBUTION
3 WATER TANK (Stainless or compartmentalize)
4 WATER DEMAND (Gallons/day)
5
6
FIRE PROTECTION
1 PIPE CONNECTION (welded or victaulic)
2 SQM./SPRINKLER
3 FIRE STORAGE TANK
4
5
6
TRUCTION CONSTR
SEDA ASEANA SEDA ARCA
(WENCESLAO) SOUTH SEDA BACOLOD SEDA BGC 2
CONSTRUCTION

SEDA CIRCUIT SEDA CITY GATE

20,497.08 31278.19
17,498.97 26,138.47
3,344.00 3,430.42
255 293

(2) 500KVA, 3PH, 400/230V DIESEL DRIVEN (2) 1200kW/1500KVA, 3PH, 400/230V, 60Hz

YES YES

1000KVA, 3PH, 34.5kV/ 400/230V SEC. PAD 3000KVA, 3ø, 4W, 60Hz, 34.5kV-400Y/230V
MOUNTED TRANSFORMER Liquid-filled Pad Mounted transformer

(1) 1000A,3P,415V,COPPER BUSDUCT,100KAIC (1) 2-3000A Aluminum busduct, 400V, 4W+G,


(2) 1000A, 3P, 415V, ALUMINUM BUSDUCT, 85KAIC (for confirmation)
100KAIC (FOR FUTURE USE)

(1) CHILLED WATER PUMP - 37.9LSP, 75%


minimum pump efficiency, 1.15 service
factor, 1750RPM, 37.3KW, 380V, 3Ph, 60Hz
DCS
(2) STAND-BY UNIT - 33.3LPS, 75%, 1.15
Service Factor, 1750RPM, 37.3KW, 380V, 3Ph,
60Hz

25 sqm./TR 21 sqm./TR
12,720L, Skid base
Cylindrical Type
1 DUTY, 1 STAND-BY, SELF-PRIMING; 0.6L/SEC.,
1.6KW, 380V, 3PH, 60Hz, 1800RPM
(2) PLATE HEAT EXCHANGE - 37.85LPS
(1) PLATE HEAT EXCHANGE - 33.31LPS
SEDA CITP SEDA LIO SEDA VERTIS

You might also like