Professional Documents
Culture Documents
FRONT VIEW FRONT VIEW (DOOR REMOVED) SECTION VIEW SIDE VIEW
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
200
175
PE
TP-T1.1
TRIP
TP-T1.2
TRIP
LP-T1.1
TRIP
LP-T1.2
TRIP
LP-T1.3
TRIP
WATER TANK
LOW
WATER TANK
LOW
CP-1
TRIP
CP-2
TRIP
CP-3
TRIP
N N
EAST COAST CENTER 2
YL1-YL8 YL9 YL11
S U R A B A Y A
OFF OFF OFF OFF OFF HIGH HIGH OFF OFF OFF
RL1-RL8
PT.PAKUWON JATI Tbk.
DAILY TANK DAILY TANK GENSET TRAFO
X,...
X,...
CP-4 CP/DT CP/DT BPR-T1-1 BPR-T1-2 (FUEL) (FUEL) FAILED
MVMSB CONDO-1 EAST COAST CENTER LT. 5
X1,...
TRIP TRIP TRIP TRIP TRIP LOW LOW FAILED TRIP
OVERHEAT
PAKUWON CITY
MITRA
ON ON ON ON ON ON
RL9-RL14
TRAFO
CONDO-2
LVMSB-T1-1
(CONDO)
LVMSB-T1-1
(CONDO)
LVMSB-T1-1
(CONDO)
LVMSB-T1-1
(CONDO)
MCP-1-L31
SPF-L31-1
MCP-1-L31
SPF-L31-1 MCP-1-P2-1 SAF-P2-1 SAF-P2-2
KONSTRUKSI
OVERHEAT
TRIP TRIP TRIP TRIP TRIP TRIP TRIP TRIP TRIP
R41 ~ R55
YL25-YL34
COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
1850
GL15-GL23
CONTRACTORS ELECTRICAL
RL15-RL23
MEP CONTRACTORS
1800
1800
R56 ~ R70
JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
200
No REVISION :
1600
DATE
EAF-P2-1 EAF-P2-2 TEF-P2-1 TEF-P2-2 SPF-A-1 LPF-A-1 EAF-A-1 SPF-A-1 LPF-A-1 EAF-A-1
TRIP TRIP TRIP TRIP TRIP TRIP TRIP TRIP TRIP TRIP
OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
GL24-GL33
ON ON ON ON ON ON ON ON ON ON
RL24-RL33
APPROVED BY
IP-T1-1 IP-T1-2 WATER TANK WATER TANK PS-T1-1 PS-T1-1 FERY LOW HIGH BP-T1-1 BP-T1-2
R86 ~ R100
TRIP TRIP LOW LOW TRIP TRIP LOW LOW TRIP TRIP
X,...
R101 ~ R115
BP-T1-3 FERY LOW HIGH FP-1 FP-2 FERY LOW HIGH APPROVED
RL40-RL42
STR
NOTE :
ME.M
SIGN DATE
50
50
CHECKED : SOBIRIN 23/04/2019
CHECKED : BUDY S 23/04/2019
STR
20 20
ARS
TOP & BOTTOM VIEW MEP
PANEL MONITORING
175
CAD REFF : LAY OUT DRAWING
330
900 1
JO-028/CBD/2018 1 : 18
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
NAME PLATE
JEMBATAN
ECC 1
N
PROJECT NAME
CONTRACTORS
CONTRACTORS ELECTRICAL
TP-T1.1 TP-T1.2 LP-T1.1 LP-T1.2 LP-T1.3 WATER TANK WATER TANK CP-1 CP-2 CP-3 JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
No REVISION : DATE
APPROVED
APPROVED AS NOTED
CONDO-2 (CONDO) (CONDO) (CONDO) (CONDO) SPF-L31-1 SPF-L31-1 RETURN FOR CORRECTION ARS
DISAPPROVED
STR
NOTE :
ME.M
EAF-P2-1 EAF-P2-2 TEF-P2-1 TEF-P2-2 SPF-A-1 LPF-A-1 EAF-A-1 SPF-A-1 LPF-A-1 EAF-A-1
SIGN DATE
CHECKED BY MITRA :
STR
ARS
PANEL MONITORING
2
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
LY4 11 MITRA
220VAC KONSTRUKSI
COPYRIGHT :
Q2
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
PERMISION OF MITRA KONSTRUKSI
MCB 2P 20A R42 R44 R46 R48 R50 R52 R54 R56 R58 R60 R62 R64 R66 R68 R70 R72 R74 R76 R78 R80 R82 R84 R86 R88
CONTRACTORS ELECTRICAL
SOCKET
L2 10B 3 11 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 PT. JAYA TEKNIK INDONESIA
MEP CONTRACTORS
FROM SUPPLY.2
N2 1NB 4 12 JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
BACK UP
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
No REVISION : DATE
12
11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
R90 R92 R94 R96 R98 R100 R102 R104 R106 R108 R110 R112 R114 R116 R118 R120 R122 R124 RA RB RC
APPROVED BY
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
APPROVED
CM
APPROVED AS NOTED
C 9 10
RESET DISAPPROVED
STR
ALARM R1 R1
NOTE :
PUSH
NO 5 2 UNTUK DI KOORDINASIKAN DENGAN SHOP DRAWING
PEKERJAAN LAIN. PERSETUJUAN INI TIDAK
ME.EL
ME.M
SIGN DATE
CHECKED BY MITRA :
13
BZ1 2
STR
BABY
R1 TR1 ARS
SIRENE
7 MEP
14 220VAC
CHIEF ENG. : HERRIS
220VAC 220VAC
PANEL MONITORING
3
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
CONTRACTORS
8
MITRA
TR1
KONSTRUKSI
COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
5 OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
PERMISION OF MITRA KONSTRUKSI
CONTRACTORS ELECTRICAL
15
PT. JAYA TEKNIK INDONESIA
MEP CONTRACTORS
JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
No REVISION : DATE
APPROVED BY
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
PT.PAKUWON JATI Tbk.
DATE
APPROVED
CM
APPROVED AS NOTED
DISAPPROVED
STR
NOTE :
ME.M
SIGN DATE
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
TO TRIP LAMP
CHECKED : SOBIRIN
CHECKED : BUDY S 23/04/2019
CHECKED BY MITRA :
STR
ARS
MEP
PANEL MONITORING
4
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
C
PT.PAKUWON JATI Tbk.
1SA1 EAST COAST CENTER LT. 5
PAKUWON CITY
TEST LAMP JL. KEJAWEN PUTIH MUTIARA NO. 17
SURABAYA 60112, INDONESIA
PUSH BUTTON Telp. (62-31) 5820 8788
NO
CONTRACTORS
MITRA
KONSTRUKSI
COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
PERMISION OF MITRA KONSTRUKSI
CONTRACTORS ELECTRICAL
16
No REVISION : DATE
APPROVED BY
13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13
R2 R3 R4 R5 R6 R7 R8 R9 R10 R11 R12 R13 R14 R15 R16 R17 R18 R19 R20 R21 PT.PAKUWON JATI Tbk.
DATE
14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
APPROVED
MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 MY4 CM
220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC 220VAC APPROVED AS NOTED
DISAPPROVED
STR
NOTE :
ME.M
SIGN DATE
R22 R23 R24 R25 R26 R27 R28 R29 R30 R31 R32 R33 R34 R35 R36 R37 R38 R39 R40 STR
ARS
14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14
MEP
PANEL MONITORING
5
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
WIRING MONITORING
N
PROJECT NAME
MITRA
15 15 15 KONSTRUKSI
X1 X3 X5 X7 X9 X11 COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
9 9 9 OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
STATUS ON/OFF
STATUS ON/OFF
STATUS ON/OFF
PERMISION OF MITRA KONSTRUKSI
STATUS TRIP
STATUS TRIP
STATUS TRIP
R42 R44 R46 CONTRACTORS ELECTRICAL
5 1 7 5 1 7 5 1 7
APPROVED BY
APPROVED
9 9 9 9 9 9 9 9 9
CM
APPROVED AS NOTED
R2 R2 R2 R2 R3 R3 R3 R3 R4
RETURN FOR CORRECTION ARS
5 5 5 5 5 5 5 5 5
DISAPPROVED
STR
NOTE :
ME.M
SIGN DATE
MEP
6
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
WIRING MONITORING
PROJECT NAME
10 10
EAST COAST CENTER 2
S U R A B A Y A
MITRA
KONSTRUKSI
15 15
COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
X13 X15 X17 X19 X21 X23 OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
9 9
STATUS ON/OFF
STATUS TRIP
STATUS TRIP
CONTRACTORS ELECTRICAL
R48 R50
PT. JAYA TEKNIK INDONESIA
5 5 MEP CONTRACTORS
JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
36 42
X14 X16 X18 X20 X22 X24 No REVISION : DATE
9 11 9 11
5 1 7 5 1 7
APPROVED BY
35 37 38 39 40 10 41 43 44 45 46 10 47 48
SHOP DRAWING SIGN
APPROVED
9 9 9 9 9 9 9 9 CM
APPROVED AS NOTED
R4 R4 R4 R5 R5 R5 R5 R6
RETURN FOR CORRECTION ARS
5 5 5 5 5 5 5 5 DISAPPROVED
STR
NOTE :
ME.M
SIGN DATE
7
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
10 10
OWNER / PROJECT MANAGEMENT
15 15
CONTRACTORS ELECTRICAL
X25 X27 X29 X31 X33 X35
9 9 PT. JAYA TEKNIK INDONESIA
WATER TANK HIGH
WATER TANK LOW
STATUS ON/OFF
STATUS ON/OFF
STATUS TRIP
STATUS TRIP
MEP CONTRACTORS
R52 R54 JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
5 5
No REVISION : DATE
52 58
X26 X28 X30 X32 X34 X36
9 11 9 11
5 1 5 1 APPROVED BY
7 7
49 50 51 53 54 55 56 10 57 59 60 61 62 10
APPROVED
CM
APPROVED AS NOTED
9 9 9 9 9 9 9 9
DISAPPROVED
R6 R6 R6 R7 R7 R7 R7 R8 STR
NOTE :
ME.M
SIGN DATE
CHECKED BY MITRA :
13 13 13 13 STR
YELLOW YELLOW RED GREEN YELLOW RED GREEN YELLOW CHIEF ENG. : HERRIS
14 14 14 14
8
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
WIRING MONITORING
PROJECT NAME
MITRA
KONSTRUKSI
15 15 15 COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
X37 X39 X41 X43 X45 X47 PERMISION OF MITRA KONSTRUKSI
9 9 9
STATUS ON/OFF
STATUS ON/OFF
STATUS ON/OFF
CONTRACTORS ELECTRICAL
STATUS TRIP
STATUS TRIP
STATUS TRIP
R56 R58 R60
PT. JAYA TEKNIK INDONESIA
MEP CONTRACTORS
5 5 5
JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
64 70 76 No REVISION : DATE
X38 X40 X42 X44 X46 X48
9 11 9 11 9 11
5 1 7 5 1 7 5 1 7
APPROVED BY
63 65 66 67 68 10 69 71 72 73 74 10 75 77 78 79 80 10
SHOP DRAWING SIGN
APPROVED
CM
9 9 9 9 9 9 9 9 9 APPROVED AS NOTED
DISAPPROVED
5 5 5 5 5 5 5 5 5 STR
NOTE :
ME.M
SIGN DATE
1N 1N 1N
SHOP DRAWING : MEP
MY2 MY4 MY2 MY4 MY2 MY4
JUDUL GAMBAR :
220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
9
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
WIRING MONITORING
PROJECT NAME
10 10
EAST COAST CENTER 2
S U R A B A Y A
MITRA
KONSTRUKSI
15 15 15
COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
X49 X51 X53 X55 X57 X59 OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
PERMISION OF MITRA KONSTRUKSI
9 9 9
STATUS ON/OFF
STATUS ON/OFF
STATUS ON/OFF
STATUS TRIP
STATUS TRIP
STATUS TRIP
CONTRACTORS ELECTRICAL
R62 R64 R66
PT. JAYA TEKNIK INDONESIA
5 5 5 MEP CONTRACTORS
JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
82 88 94
No REVISION :
X50 X52 X54 X56 X58 X60 DATE
9 11 9 11 9 11
5 1 7 5 1 7 5 1 7
APPROVED BY
81 83 84 85 86 10 87 89 90 91 92 10 93 95 96 97 98 10
SHOP DRAWING SIGN
APPROVED
CM
9 9 9 9 9 9 9 9 9
APPROVED AS NOTED
R10 R10 R11 R11 R11 R11 R12 R12 R12 RETURN FOR CORRECTION ARS
DISAPPROVED
5 5 5 5 5 5 5 5 5 STR
NOTE :
ME.M
SIGN DATE
ARS
RED GREEN YELLOW RED GREEN YELLOW RED GREEN YELLOW
14 14 14 14 14 14
MEP
10
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
WIRING MONITORING
PROJECT NAME
STATUS ON/OFF
PT. JAYA TEKNIK INDONESIA
FUEL TANK LOW
GENSET FAILED
STATUS TRIP
R68 MEP CONTRACTORS
JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
5
No REVISION : DATE
105
X62 X64 X66 X68 X70 X72 X74
9 11
R67 R68
5 1 7
APPROVED BY
APPROVED
CM
APPROVED AS NOTED
STR
NOTE :
5 5 5 5 5 5 5 5
UNTUK DI KOORDINASIKAN DENGAN SHOP DRAWING ME.EL
PEKERJAAN LAIN. PERSETUJUAN INI TIDAK
MEMBEBASKAN TANGGUNG JAWAB KONTRAKTOR ATAS
PEMENUHAN PERSYARATAN DALAM DOKUMEN KONTRAK.
ME.M
SIGN DATE
CHECKED BY MITRA :
13 13 13
STR
LOW EMPTY LOW EMPTY FAILED ON OFF TRIP
ARS
RA R67 R68
MEP
YELLOW YELLOW YELLOW YELLOW YELLOW RED GREEN YELLOW
14 14 14
CHIEF ENG. : HERRIS
11
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
PROJECT NAME
10 10
EAST COAST CENTER 2
S U R A B A Y A
CONTRACTORS
15 15 15 15
MITRA
KONSTRUKSI
X75 X77 X79 X81 X83 X85
9 9 COPYRIGHT :
STATUS ON/OFF
STATUS ON/OFF
TRAFO CONDO-2
TRAFO CONDO-1
STATUS TRIP
STATUS TRIP
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
PERMISION OF MITRA KONSTRUKSI
R70 R72
CONTRACTORS ELECTRICAL
5 5
PT. JAYA TEKNIK INDONESIA
MEP CONTRACTORS
JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
113 119 KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
5 1 7 5 1 7
APPROVED BY
9 9 9 9 9 9 9 9
APPROVED
CM
R14 R15 R15 R15 R15 R16 R16 R16 APPROVED AS NOTED
STR
NOTE :
ME.M
SIGN DATE
MEP
1N 1N 1N
CHIEF ENG. : HERRIS
MY2 MY2 MY2 MY4 MY2 MY4
220VAC 220VAC 220VAC 220VAC 220VAC 220VAC SHOP DRAWING : MEP
JUDUL GAMBAR :
TRAFO CONDO-1 TRAFO CONDO-2 LVMSB-T1-1 LVMSB-T1-1
PANEL MONITORING
12
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
PROJECT NAME
10 10
CONTRACTORS
15 15 15 MITRA
X87 X89 X91 X93 X95 X97 KONSTRUKSI
9 9 9
STATUS ON/OFF
STATUS ON/OFF
STATUS ON/OFF
COPYRIGHT :
STATUS TRIP
STATUS TRIP
STATUS TRIP
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
R74 R76 R78 PERMISION OF MITRA KONSTRUKSI
CONTRACTORS ELECTRICAL
5 5 5
9 11 9 11 9 11
No REVISION : DATE
5 1 7 5 1 7 5 1 7
APPROVED BY
124 126 127 128 129 10 130 132 133 134 135 10 136 138 139 140 141 10 PT.PAKUWON JATI Tbk.
DATE
9 9 9 9 9 9 9 9 9
APPROVED
APPROVED AS NOTED
DISAPPROVED
STR
NOTE :
ME.M
SIGN DATE
ARS
1N 1N 1N MEP
SPF-L31-1
PANEL MONITORING
13
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
PROJECT NAME
10 10
EAST COAST CENTER 2
S U R A B A Y A
FLICKER TRIP LAMP FLICKER TRIP LAMP FLICKER TRIP LAMP JL. KEJAWEN PUTIH MUTIARA NO. 17
SURABAYA 60112, INDONESIA
DIAGRAM DIAGRAM DIAGRAM Telp. (62-31) 5820 8788
CONTRACTORS
MITRA
15 15 15
KONSTRUKSI
X99 X101 X103 X105 X107 X109 COPYRIGHT :
9 9 9 NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
STATUS ON/OFF
STATUS ON/OFF
STATUS ON/OFF
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
STATUS TRIP
STATUS TRIP
STATUS TRIP
PERMISION OF MITRA KONSTRUKSI
5 1 7 5 1 7 5 1 7
APPROVED BY
9 9 9 9 9 9 9 9 9 APPROVED
CM
R19 R19 R19 R19 R20 R20 R20 R20 R21 APPROVED AS NOTED
5 5 5 5 5 5 5 5 5
DISAPPROVED
STR
NOTE :
ME.M
SIGN DATE
MEP
1N 1N 1N
CHIEF ENG. : HERRIS
MY2 MY4 MY2 MY4 MY2 MY4
220VAC 220VAC 220VAC 220VAC 220VAC 220VAC
SHOP DRAWING : MEP
JUDUL GAMBAR :
MCP-1-L31 MCP-1-P2-1 SAF-P2-1
SPF-L31-1 PANEL MONITORING
14
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
WIRING MONITORING
ECC 1
N
PROJECT NAME
CONTRACTORS
MITRA
15 15 15 KONSTRUKSI
X111 X113 X115 X117 X119 X121 COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
9 9 9
STATUS ON/OFF
STATUS ON/OFF
STATUS ON/OFF
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
PERMISION OF MITRA KONSTRUKSI
STATUS TRIP
STATUS TRIP
STATUS TRIP
R86 R88 R90 CONTRACTORS ELECTRICAL
5 1 7 5 1 7 5 1 7
APPROVED BY
APPROVED
9 9 9 9 9 9 9 9 9
CM
APPROVED AS NOTED
R21 R21 R21 R22 R22 R22 R22 R23 R23
RETURN FOR CORRECTION ARS
5 5 5 5 5 5 5 5 5
DISAPPROVED
STR
NOTE :
ME.M
SIGN DATE
MEP
15
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
WIRING MONITORING
PROJECT NAME
10 10
EAST COAST CENTER 2
S U R A B A Y A
MITRA
KONSTRUKSI
15 15 15 COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
X123 X125 X127 X129 X131 X133 OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
PERMISION OF MITRA KONSTRUKSI
9 9 9
STATUS ON/OFF
STATUS ON/OFF
STATUS ON/OFF
STATUS TRIP
STATUS TRIP
STATUS TRIP
CONTRACTORS ELECTRICAL
R92 R94 R96
PT. JAYA TEKNIK INDONESIA
5 5 5 MEP CONTRACTORS
JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
9 11 9 11 9 11
5 1 7 5 1 7 5 1 7
APPROVED BY
178 180 181 182 183 10 184 186 187 188 189 10 190 192 193 194 195 10
SHOP DRAWING SIGN
APPROVED
CM
9 9 9 9 9 9 9 9 9
APPROVED AS NOTED
R23 R23 R24 R24 R24 R24 R25 R25 R25 RETURN FOR CORRECTION ARS
DISAPPROVED
5 5 5 5 5 5 5 5 5 STR
NOTE :
ME.M
SIGN DATE
ARS
RED GREEN YELLOW RED GREEN YELLOW RED GREEN YELLOW
14 14 14 14 14 14
MEP
16
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
WIRING MONITORING
PROJECT NAME
MITRA
KONSTRUKSI
15 15 15 COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
X135 X137 X139 X141 X143 X145 PERMISION OF MITRA KONSTRUKSI
9 9 9
STATUS ON/OFF
STATUS ON/OFF
STATUS ON/OFF
STATUS TRIP
STATUS TRIP
STATUS TRIP
CONTRACTORS ELECTRICAL
R98 R100 R102
PT. JAYA TEKNIK INDONESIA
MEP CONTRACTORS
5 5 5
JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
5 1 7 5 1 7 5 1 7
APPROVED BY
196 198 199 200 201 10 202 204 205 206 207 10 208 210 211 212 213 10
SHOP DRAWING SIGN
APPROVED
CM
9 9 9 9 9 9 9 9 9 APPROVED AS NOTED
R25 R26 R26 R26 R26 R27 R27 R27 R27 RETURN FOR CORRECTION ARS
DISAPPROVED
5 5 5 5 5 5 5 5 5 STR
NOTE :
ME.M
SIGN DATE
17
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
WIRING MONITORING
PROJECT NAME
MITRA
DIAGRAM DIAGRAM DIAGRAM
KONSTRUKSI
15 15 15 COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
9 9 9
STATUS ON/OFF
STATUS ON/OFF
STATUS ON/OFF
CONTRACTORS ELECTRICAL
STATUS TRIP
STATUS TRIP
STATUS TRIP
R104 R106 R108 PT. JAYA TEKNIK INDONESIA
MEP CONTRACTORS
5 5 5 JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
5 1 7 5 1 7 5 1 7
APPROVED BY
214 216 217 218 219 10 220 222 223 224 225 10 226 228 229 230 231 10 SHOP DRAWING SIGN
APPROVED
CM
APPROVED AS NOTED
9 9 9 9 9 9 9 9 9
STR
5 5 5 5 5 5 5 5 5
NOTE :
ME.M
SIGN DATE
13 13 13 13 13 13 CHECKED BY MITRA :
RED GREEN YELLOW RED GREEN YELLOW RED GREEN YELLOW MEP
14 14 14 14 14 14
18
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
WIRING MONITORING
PROJECT NAME
MITRA
DIAGRAM DIAGRAM
KONSTRUKSI
15 15 COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
X159 X161 X163 X165 X167 X169 X171 X173 PERMISION OF MITRA KONSTRUKSI
9 9
STATUS ON/OFF
CONTRACTORS ELECTRICAL
STATUS TRIP
STATUS TRIP
R110 R112 PT. JAYA TEKNIK INDONESIA
MEP CONTRACTORS
5 5 JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
5 1 7 5 1 7
APPROVED BY
232 234 235 236 237 10 238 239 240 241 242 244 245 246 247 10
SHOP DRAWING SIGN
APPROVED
CM
9 9 9 9 9 9 9 9 9 9 APPROVED AS NOTED
STR
5 5 5 5 5 5 5 5 5 5
NOTE :
ME.M
SIGN DATE
13 13 13 13 CHECKED BY MITRA :
1N 1N
SHOP DRAWING : MEP
MY2 MY4 MY2 MY4 JUDUL GAMBAR :
220VAC 220VAC 220VAC 220VAC
19
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
WIRING MONITORING
PROJECT NAME
DIAGRAM DIAGRAM
MITRA
KONSTRUKSI
COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
15 15 OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
PERMISION OF MITRA KONSTRUKSI
X175 X177 X179 X181 X183 X185 X187 X189 CONTRACTORS ELECTRICAL
9 9
STATUS ON/OFF
PT. JAYA TEKNIK INDONESIA
STATUS TRIP
STATUS TRIP
R114 R116 MEP CONTRACTORS
JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
5 5
No REVISION : DATE
249 259
X176 X178 X180 X182 X184 X186 X188 X190
9 11 9 11
5 1 7 5 1 7
APPROVED BY
APPROVED
CM
APPROVED AS NOTED
R32 R33 R33 R33 R33 R34 R34 R34 R34 R35 DISAPPROVED
STR
NOTE :
5 5 5 5 5 5 5 5 5 5
UNTUK DI KOORDINASIKAN DENGAN SHOP DRAWING ME.EL
PEKERJAAN LAIN. PERSETUJUAN INI TIDAK
MEMBEBASKAN TANGGUNG JAWAB KONTRAKTOR ATAS
PEMENUHAN PERSYARATAN DALAM DOKUMEN KONTRAK.
ME.M
SIGN DATE
CHECKED BY MITRA :
13 13 13 13
STR
ON OFF TRIP LOW HIGH LOW HIGH ON OFF TRIP
ARS
R113 R114 R115 R116
MEP
RED GREEN YELLOW YELLOW YELLOW YELLOW YELLOW RED GREEN YELLOW
14 14 14 14
CHIEF ENG. : HERRIS
20
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
WIRING MONITORING
PROJECT NAME
10 10
EAST COAST CENTER 2
S U R A B A Y A
MITRA
KONSTRUKSI
15 15 COPYRIGHT :
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
X191 X193 X195 X197 X199 X201 X203 X205 OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
PERMISION OF MITRA KONSTRUKSI
9 9
STATUS ON/OFF
STATUS TRIP
STATUS TRIP
CONTRACTORS ELECTRICAL
R118 R120
PT. JAYA TEKNIK INDONESIA
MEP CONTRACTORS
5 5
JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
265 271
No REVISION : DATE
X192 X194 X196 X198 X200 X202 X204 X206
9 11 9 11
5 1 7 5 1 7
APPROVED BY
264 266 267 268 269 10 270 272 273 274 275 10 276 277 278 279
SHOP DRAWING SIGN
APPROVED
CM
9 9 9 9 9 9 9 9 9 9
APPROVED AS NOTED
R35 R35 R35 R36 R36 R36 R36 R37 R37 R37 RETURN FOR CORRECTION ARS
DISAPPROVED
5 5 5 5 5 5 5 5 5 5 STR
NOTE :
ME.M
SIGN DATE
ARS
RED GREEN YELLOW RED GREEN YELLOW YELLOW YELLOW YELLOW YELLOW
14 14 14 14
MEP
21
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
PROJECT NAME
10 10
CONTRACTORS
15 15 MITRA
X207 X209 X211 X213 X215 X217 X219 X221 KONSTRUKSI
9 9
STATUS ON/OFF
COPYRIGHT :
STATUS TRIP
STATUS TRIP
NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
CONTRACTORS ELECTRICAL
5 5
PT. JAYA TEKNIK INDONESIA
MEP CONTRACTORS
281 287 JL. JOHAR NO.10, RT.18/RW.6, KB. SIRIH, MENTENG,
X208 X210 X212 X214 X216 X218 X220 X222 KOTA JAKARTA PUSAT, DAERAH KHUSUS IBUKOTA JAKARTA 10340
9 11 9 11
No REVISION : DATE
5 1 7 5 1 7
APPROVED BY
280 282 283 284 285 10 286 288 289 290 291 10 292 293 294 295 PT.PAKUWON JATI Tbk.
DATE
9 9 9 9 9 9 9 9 9 9
APPROVED
R37 R38 R38 R38 R38 R39 R39 R39 R39 R40 CM
APPROVED AS NOTED
DISAPPROVED
STR
NOTE :
ME.M
SIGN DATE
ON OFF TRIP ON OFF TRIP LOW HIGH LOW HIGH CHECKED : BUDY S 23/04/2019
R121 R122 R123 R124
CHECKED BY MITRA :
RED GREEN YELLOW RED GREEN YELLOW YELLOW YELLOW YELLOW YELLOW
14 14 14 14 STR
ARS
MEP
1N 1N
MY2 MY4 MY2 MY4 CHIEF ENG. : HERRIS
PANEL MONITORING
22
JO-028/CBD/2018 NTS
JTI-106 23
PHASE 2
TOWER 1
PHASE 1
JEMBATAN
ECC 1
N
PROJECT NAME
NO CODE SPESIFICATION TYPE BRAND QTY UNIT REMARK PT.PAKUWON JATI Tbk.
EAST COAST CENTER LT. 5
PAKUWON CITY
JL. KEJAWEN PUTIH MUTIARA NO. 17
CONTRACTORS
1 Q1,Q2 MCB 2P. 20A 10KA S202M-C ABB 2 PCS
2 UPS1
MITRA
UPS 1 KVA, Input/Output 220VAC, Backup 10Min -
ICA/Eq 1 PC KONSTRUKSI
COPYRIGHT :
3 BZ1 ELECTRONIC BUZZER 220VAC (FLUSH) CBZ-20 HOWIG 1 PC NO PART OF THIS DOCUMENT MAY BE REPRODUCED, TRANSMITTED
OR RECORED IN ANY FORM OR OTHERWISE WITHOUT THE PRIOR WRITTEN
PERMISION OF MITRA KONSTRUKSI
4 RL1-RL54 PILOT LIGHT 220VAC, (RED) XA2EVM4LC SCHNEIDER 42 PCS CONTRACTORS ELECTRICAL
7 SB1 PUSH BUTTON SPRING RETURN, FLUSH (YELLOW) 1 N/O TEST LAMP XA2EA51 SCHNEIDER 1 PC
8 SB2 PUSH BUTTON SPRING RETURN, FLUSH (YELLOW) 1 N/O ALARM RESET XA2EA51 SCHNEIDER 1 PC
9 SB3 PUSH BUTTON SPRING RETURN, FLUSH (YELLOW) 1 N/C FAULT RESET XA2EA51+ZA2EE102 SCHNEIDER 1 PC
APPROVED BY
10 TR1 FLICKER RELAY c/w SOCKET 8 Pin, 220VAC H3CR-F8+PF083A OMRON 1 PC
PT.PAKUWON JATI Tbk.
11 R1 ~ R105 RELAY 220VAC + SOCKET MY-4 OMRON 81 PCS DATE
12 R1 ~ R105 RELAY 220VAC + SOCKET MY-2 OMRON 46 PCS SHOP DRAWING SIGN
CM
APPROVED AS NOTED
STR
NOTE :
16 - WIRING & ACCESSORIES PM LOCAL 1 LOT UNTUK DI KOORDINASIKAN DENGAN SHOP DRAWING ME.EL
PEKERJAAN LAIN. PERSETUJUAN INI TIDAK
MEMBEBASKAN TANGGUNG JAWAB KONTRAKTOR ATAS
PEMENUHAN PERSYARATAN DALAM DOKUMEN KONTRAK.
SIGN DATE
18 - BOX PANEL UK: 1800(H) X 900(W) X 300(D)mm² WALL MOUNTING PM 1 UNIT DRAWN BY : M SOLEH 23/04/2019
CHECKED BY MITRA :
20
STR
ARS
MEP
PANEL MONITORING
23
JO-028/CBD/2018 NTS
JTI-106 23