You are on page 1of 27

MAGAZINE FoR HYDROPOWER

HYDRO POWER TECHNOLOGY


TECHNOLOGY

Hypower
HyPower
#1 | 2012
#25 | Autumn 2014

ADAPTING pumped storage technology FOR THE FUTURE

multi-talented
FROM THE ARCHIVES

VOITH HYDRO’S PUMPED STORAGE HISTORY


AMET cursus mauris sit amet

Lorem ipsum
Global expertise

SERVICE CAPABILITY from VOITH hydro


for customers worldwide

mauris sit amet

consequat vitae

AMET cursus

Vivamus elementum semper SIT


Imprint

Publisher:
Voith Hydro Holding GmbH & Co. KG
Alexanderstr. 11
89522 Heidenheim, Germany
www.voith.com

Responsible for the publisher:


Ute Böhringer-Mai
Editor-in-chief: Lukas Nemela
Tel: +49 7321 37 0
Fax: +49 7321 37-7828
E-mail: info.voithhydro@voith.com

In cooperation with:
Burda Creative Group GmbH
www.burdacreative.com

Paper:
HyPower is printed on R4 Chorus Silk. This paper
was produced on a Voith paper machine.

Copyright:
No part of this publication may be copied,
reproduced or otherwise disseminated,
nor may any of the content in it be used in
part or in whole in other works in any
form whatsoever, without express written
permission of the editor.

Your Feedback: If you have any


comments or questions on this issue of
HyPower, please contact us: hypower@voith.com

Photographs:
Cover: Rüdiger Nehmzow; p. 4-5: Dawin Meckel (2), p. 6: Adriano Gambarini/Duke Energy Brasil
collection; Fotolia/Anton Balazh (3), p. 8-9: Rüdiger Nehmzow; p. 11: Dawin Meckel; p. 12-13:
Illustration: Hokolo 3D (2); p. 15: Naturstromspeicher Ulm GmbH (2); p. 16-17: Dawin Meckel (3);
p. 19: Telmo Banha; p. 20-21: Eskom Ingula; p. 22-23: Shutterstock/2265524729, Rather be Flying!;
p. 26-27: EnBW; p. 32: Dawin Meckel; p. 37: Manitoba Hydro; p. 38-40: Antonio Carreiro (2);
p. 41-42: Antonio Carreiro (6); p. 44-45: Herbert Nitsch (3); p. 46: Dawin Meckel; p. 47: Fotolia/Anton
Balazh (3)
Join us on Twitter:
https://twitter.com/voith_hydro
All other photos are from Voith Hydro.
editorial

Multi-purpose,
multi-talent

Pumped storage hydropower has proven itself worldwide


to be the only technology that can store energy on an industrial
scale, with a very high level of efficiency. Indeed, 99% of the
world’s existing energy storage capacity consists of pumped
storage. But pumped storage is not only sizable and efficient:
It can also help to better stabilize the energy grid, and prevent
wasting surplus energy from volatile renewable energy sources
like wind and solar.
Voith is further developing this important storage technology
and providing tailor-made solutions to our customers that un-
derlay the central advantages of pumped storage: namely,
fast reaction times and high flexibility. Innovations such as re-
versible machine sets and variable speed technology can rap-
idly and flexibly respond to changes in supply and demand
from the grid, and provide quick-reacting coverage in cases of
power shortage.
For more than a century, pumped storage technology has
been storing energy for communities and industries world-
wide. In fact, Voith’s Brunnenmühle pumped storage hydro-
power plant, completed in 1908, was the first of its kind in
Germany. Today, the Brunnenmühle is the heart of Voith’s
global hydropower R&D network.
These days, the minds of policy-makers around the world
are turning more and more towards renewable energy produc-
tion. Teaming up volatile renewables like wind and solar with
stable renewables like hydropower and pumped storage will
provide the necessary stability for reliable renewable energy
production on an industrial scale.
This issue of HyPower will provide further insights into the
multi-purpose, multi-talent that is pumped storage.
Enjoy the read!

Yours sincerely,

Ute Böhringer-Mai
Head of Communications

HyPower 2014 | 3
contents contents

08 16 30 32

Discover more Agenda setting 20 A GLOBAL PROJECT 28 small hydro 38 powering latin america
about Voith International collaboration on multi-talents Leadership with a vision at Voith in
through its
other insightful 8 PUMP FOR THE FUTURE pumped storage in South Africa Quality and reliability in new and South America
publications. Pumped storage hydropower is a old small hydro projects
trusted, established technology – 22 adapting and evolving 41 living the project
with a lot of future promise Extending the lifetime of a pumped Engagement and experience: a
storage plant in the United States FROM THE ARCHIVES day “on site” in Brazil

green energy mix 30 pioneering technology


FULL-LINE SUPPLIER Germany’s first ever pumped
15 wind and hydro: storage plant
JOINING FORCES 24 AMONG THE WORLD’S
Hydro and wind power connect LARGEST
in an innovative new project Supporting China’s hydropower GLOBAL EXPERTISE
infrastructure – moving toward
REGULARS 16 THE INVISIBLE POWER renewables 32 a bright future
STATION 20 years of success for Voith
2 imprint This underground pumped storage Hydro in Shanghai
3 editorial plant comes with high efficiency SUCCESSFUL PARTNERSHIPS
6 what’s new and increased capacity 35 keeping the wheels PROJECT DIRECTORY
7 ON TOPIC 26 SAVING IFFEZHEIM turning
43 world of voith 18 A BOLD LEAP FORWARD Speed and thoroughness for a Voith service and modernization 47 around the world
44 guest perspective Variable speed technology gives power plant in need excellence across Canada An easy-to-check reference of the Voith Hydro
46 coffee break new potential to pumped storage projects mentioned in this edition of HyPower

4 | HyPower 2014 HyPower 2014 | 5


what’s new
Section on topic

Modernization in
Brazil
Comparing storage technologies
Sizable, economical, durable, ecological: when looking at the potential of pumped
BRAZIL Reliable energy generation continues
storage as a major player in our energy systems, the numbers speak for themselves.
on the Paranapanema River in Brazil as Voith
has completed rehabilitation of the first gener-
ating unit at the Chavantes hydropower plant. 1 Major share 5 Large scale
Voith will modernize another three units at the
plant, which has a total installed capacity of 99% of the world’s energy storage capacity is provided by pumped storage The potential capacity of pumped storage is remarkably higher than
hydropower – with the remaining 1% supplied by batteries, compressed air the potential capacity of other forms of energy storage.
414 MW, and has been in operation since energy storage, and other storage technologies.
1970. Managed by Duke Energy, Chavantes is Pumped storage: 100-1,000 MWh
going through a complete modernization pro-
Compressed-air energy storage: 10-100 MWh
cess, covering the renewal of three generating
Hydrogen storage/power-to-gas: 1-100 MWh
units, including turbines, generators and asso-
ciated electro-mechanical systems. //
99% 1% Redox-flow batteries: 1-100 MWh

Flywheel: 0.01-1 MWh

Lithium-ion batteries: 0.001-1 MWh


Southeast AsiaN Small, smart, efficient
Pumped storage ITALY / JAPAN With the Micro Tubular Turbine and Generator, Voith offers a
smart, efficient product in the small hydro segment: a compact system that 2 142,000 MW is the combined generating capacity of 6 Extremely durable
all the world’s pumped storage hydropower stations.
THAILAND A promising market has shown can be integrated in existing piping systems with minimum effort. Factories, The lifetime duration of a pumped storage hydropower plant by far
another positive step forward, with the re- waterworks, sewage treatment plants and irrigation canals are possible ap- exceeds the life cycle of many other energy storage options.

cent order for the extension of the Lam Ta plication fields for the Micro Tubular Turbine that comes with belt-driven gen-
Khong pumped storage power plant in erator and a Kaplan turbine with adjustable runner blades mounted in a tube 3 Highly efficient
Thailand. Lam Ta Khong is the first pumped to control flow. The standardized product delivers cost-efficiency and fast in- Pumped storage is around twice as efficient as hydrogen storage.
storage plant in Southeast Asia to be stallation, requiring minimal engineering and
equipped by Voith Hydro: a great develop- civil works during the execution phase. It Pumped storage 78-82%
ment for Voith’s presence in this emerging meets demand for an economical mini small Lithium-ion battery Pumped storage plant
Compressed air storage max. 70%
hydropower region. Ordered by the Electric- hydro solution, without compromising on Voith circa 2,000 cycles >50,000 cycles
ity Generating Authority of Thailand (EGAT), standards. It comes in three sizes: S, M, or L,
Hydrogen storage circa 40%
the project includes complete electrome- arranged serially or in parallel to meet required
chanical equipment for the plant: two verti- heads and flows, and has a typical range from 7 Technological maturity
cal pump-turbines of 255  MW each, two 2 to 20 m head, 3 to 250 kW per single turbine.
motor-generators, automation systems, Developed by Voith Fuji Hydro Japan, it has
4 Cost effective Readiness-for-market of various storage technologies. Pumped storage is
already commercialized, well established – and continuously innovating.
electrical and mechanical balance-of-plant been adapted by Voith Hydro Italy to meet Additional costs for energy storage per kWh for different 30

systems, civil works, and site installation. local requirements, and is already attracting forms of short-term storage (referring to 2010 ). 25
Flow batteries

Capital requirement x technology risk


Micro Tubular: a smart solu- 20
The completed extension will increase the tion in small hydro attention on the market. // 15
Flywheel (high speed)
e
typ
capacity of the Lam Ta Khong pumped stor- ra ge 10
Lithium-based batteries
Sto 5 Supercapacitor
age hydropower plant to 1,000  MW – al- Flywheel (low speed)
0
most doubling its current capacity. //
High quality against the clock 30
Hydrogen
Adiabatic CAES
Synthetic natural gas
Compressed air
energy storage (CAES)
25
india When the stator at India’s largest pumped storage power unit needed 20

€ct/kWh
Redox battery
#HYDROPICTUREOFTHEWEEK replacing, operator Tata Power called on Voith Hydro in Noida, India. The or- 15
(25.5 cents)
10 Pumped storage
Scan the QR code below or visit der for the Bhira Pumped Storage project, now underway, comprises design, Compressed air hydropower
5
twitter.com/Voith_Hydro to keep up upgrade, manufacturing, supply, erecting and commissioning of the new sta- 0
energy storage
(8.1 cents) Research Demonstration Commercialization
with Voith Hydro news on Twitter. Be tor for the 200 MVA motor-generator. The new stator is due at the customer Pumped storage and development and deployment
(5.1 cents)
sure to check out our feed within 11 months. The shutdown period cannot exceed 45 days, as the plant Current maturity level
every Friday when we supplies power to the megacity Mumbai. Tata Power, India’s largest integrat-
share our hydropower ed power company, called on Voith due to over a century of successful col- Sources: 1 2 IEA analysis and EPRI (Electronic Power Research Institute), Electrical Energy Storage Technology Options, Report, EPRI 2010; own research 3 5 and 6 SRU 2011,
Bünger et al. 2009, Oertel 2008; supplemented by own data 4 DLR/Fraunhofer IWES/IFNE, Long-term scenarios and strategies for the deployment of renewable energies in Germa-
picture of the week! laboration between the two companies: Voith first supplied the Tata Power ny in view of European and global developments (BMU-Leitstudie), 2010. 7 Decourt, B., and R. Debarre, Electricity storage Factbook, Schlumberger Business Consulting Energy In-
Khopoli powerhouse with four units of 13 megawatts each back in 1911. // stitute, Paris, France and Paksoy, H., 2013; “Thermal Energy Storage Today” in IEA Technology Roadmap Energy Storage, p. 16., 2014.

6 | HyPower 2014 HyPower 2014 | 7


Agenda SECTION
Setting

Pump
for the
future
More than just a short-term energy repository,
pumped storage plants provide fast,
flexible and efficient support for our
electricity grids. As we integrate more
renewables, their importance is set to grow.

T
his isn’t the first energy transi-
tion that we have witnessed
during the last century in Ger-
many, but it is the first one that will
have a profound effect on the system
architecture of our electricity power
supply,” says Klaus Krüger, Head of
R&D at Voith Hydro. Using Germa-
ny as an example, he explains how
coal was replaced by oil during the
1960s and 1970s, which was in turn
replaced by nuclear power over the
following 30 years. “These transi-
tions shared a common factor in that
only the primary energy carrier
changed – while the system architec-
ture of the German electricity power
supply stayed the same.”

8 | HyPower 2014 HyPower 2014 | 9


Agenda Setting Agenda Setting

As Krüger explains, energy storage sys-


tems did not have an important func-
tionality in the previous service land-
scape, as there has always been a
sufficiently high and permanently avail-
able power reserve through coal and nu-
clear power plants. So far, energy stor-
age has been undertaken via use of the
Germany and the
primary raw materials coal, gas, urani-
um and oil. Power generation followed energy transition
1
afterwards, as needed: “The order has
been first storage and after that genera- 2 Germany has set itself ambitious targets:
tion,” he says. The generation of renew-
able energies from wind and photovol-
“A few years ago, it would take by 2022 it plans to phase out nuclear power,
taic sources, however, mostly occurs in between two and three minutes and by 2050, 80% of its power is expected to
an uncontrolled way, without respect for
to get power on the grid. Now come from renewable sources.
demand. It is in this way that the latest
energy transition has changed the order we can provide maximum power A recent study from RWTH Aachen University, commissioned by Voith
of storage and generation. In this con- Hydro, showed that the use of pumped storage could enable up to 5 TWh
text, pumped storage power plants can
within 60 seconds.” of additional renewable electricity to be utilized by 2050. But as Stephan
help to significantly reduce renewable Jiri Koutnik, Head of Expert Support for power units, Voith Hydro Kohler, Chief Executive of the German Energy Agency (dena), explains,
energy curtailment, and can substitute Germany still has work to do if this is to be realized. “The current eco-
fossil energy generation by releasing nomic framework means that important investments in pumped storage
stored energy from renewables. are not being made. The advantages that pumped storage can bring to
the grid are inadequately remunerated – there must be more of an incen-
In use since the early 20th century, tive to store energy efficiently.” Together with Voith and other prominent
pumped storage has traditionally been industry partners, dena has launched the platform “Pumped Storage
thought of purely as a means of storing Plants – Partners of the Energy Transition” to address this and other is-
energy for peak load compensation. sues. It’s important to remember that investment in pumped storage is a
However, with solar and wind power long-term one, he adds, with planning and construction periods of 10 to
playing an increasingly important role 20 years, and amortization periods of up to 60 years. With this in mind,
in many countries around the world, shore wind generation, it is around one mand for more electricity and increased 1 Tai’An, China: Voith in China, Japan and changes must be made quickly if Germany is to realize its considerable
Germany supplied equipment for this
pumped storage is beginning to show its percent,” Krüger explains. In 2013, for flexibility rises, pumped storage plant pumped storage plant.
pumped storage potential. If it does, then “it can play a leading role when
full potential as a flexible, dynamic con- example, there was a sudden 8 GW technology has evolved. “Now, we pump 2 Reisseck-II, Austria: Inspecting one of other countries increase their use of renewable energies,” Kohler says. //
tributor to ensure stability of our elec- power gap in the power supply in east- seven or eight times a day, for shorter the two runners supplied for the project
in the Alps.
trical grids. ern Germany due to unexpected mist time periods. The machinery has to be Further links to pumped storage hydropower online
Wind and solar energy may be more and fog affecting photovoltaic electricity faster and more durable,” says Jiri Kout-
environmentally friendly than coal and generation. “At times like this, you need nik, Voith Hydro’s Head of Expert Sup- www.pumpspeicher.info
nuclear power, but they are also less re- a plan B, something fast and flexible that port for power units. Referring to ter- The dena platform: Pumped storage – partner of the
energy transition (German only).
liable, influenced purely by nature can help make up energy shortfalls, or nary sets, Koutnik says this: “A few years
alone, and not at all adjustable. There compensate for excessive production. ago, it would take between two and
will be periods when these sources gen- Without it, the grid can become unsta- three minutes to get power on the grid. power blackout. “A hydroelectric sta-
www.wasserkraft.info
erate large amounts of energy, but there ble and power outages can occur.” Now we can provide maximum power tion needs very little initial power to How pumped storage can be used to support renewable
will also be periods where they don’t. In the past, pumped storage power within 60 seconds.” start – just enough to open the gates or energy through the energy transition – and into the future.
“A grid needs reliable available ca- plants operated on a clear “on” and “off” valves and to ensure the magnetization
pacity. The problem with photovoltaic schedule and only needed to switch be- Speed is at the heart of a further ad- of the generator rotor,” says Krueger.
www.voith.com/psp
generation is that even if you have giga- tween pump and turbine mode a couple vantage offered by pumped storage “It can then put a large block of power An overview of Voith Hydro’s pumped
watts of installed capacity, the reliable of times per day to balance the grid. But power plants, as it is able to provide a online very quickly to help restart fossil- storage products and services.
available capacity is almost zero. For on- as infrastructure has changed and de- “black start” to the grid in the case of a fueled or nuclear stations.”

10 | HyPower 2014 HyPower 2014 | 11


Agenda Setting
The anatomy of a pumped storage
hydropower plant

Here, an exemplary look at the inner life of


a plant and all its parts:

1 Intake gates
1 2 Penstock
While pumped storage is a mature tech- 3 Shut-off valve
nology, it continues to evolve, and one 4 Turbine/pump turbine
recent key development at Voith has 5 Generator
10 6 Control room
been the enhancement of variable-speed 7 Low-voltage switchgear
technology. In Portugal, where fluctuat- 8 Transformer
ing wind energy plays an important role 9 High-voltage switchgear
10 Transmission line
in the country’s power supply, Voith is
currently installing two variable-speed
units at the Frades II plant (see page 18).
“Classic pump turbines can only run at
one speed, but with doubly fed asyn- 2 6
chronous motor-generators, the pump 9 8
speed can be varied. This allows greater
A closer look at the generator and turbine
control and regulation of the electricity
taken from the grid, and it gives higher 7 5
operating flexibility and improved plant
efficiency,” explains Thomas Hildinger, Slipring assembly
Vice President Generator Technology at
Voith Hydro.
4
At Kops II in Austria, another example Generator
casing 3
of Voith Hydro’s innovative expertise
can be seen. Operating a ternary system,
made up of a motor-generator and sepa- Stator
rate turbine and pump set, the Kops II
pumped storage plant uses a hydraulic
torque convertor – a unique Voith de-
velopment – to switch between turbine Rotor
and pump operation in a matter of sec-
onds. “You can also run both at the same
time, creating a hydraulic short circuit,” Guide bearing
says Koutnik. “This allows you to con-
trol the power of the pump, even with a
fixed-speed generator, which signifi-
cantly improves efficiency and flexibili- Control device
ty, much like a variable-speed machine.” and wicket
gates
To express it in numbers, Kops II can
deliver up to 525 MW of peak energy to Main shaft with function as either a pump or a turbine: a says, and countries use pumped storage for the Lam Ta Khong pumped storage
the power network within seconds, or pump turbine space-saving and economically attrac- for different reasons. China’s large num- plant. While the greater use of wind and
take up to 450 MW of surplus energy tive solution. The most special feature, ber of coal and nuclear power plants solar energy is bringing the topic of fu-
from the network into storage. however, is the plant’s wide head range mean that pumped storage is important ture grid stability increasingly into focus
Also in Austria, at Limberg II, you Bottom ring,
application. At Limberg II, the head for to provide faster reaction times to in Europe and the US, Krüger believes
can find an example for reversible fixed- discharge ring turbine or pump operation varies be- changes in demand, while in India, more pumped storage is required.
speed pump turbines with an ultra-wide and upper draft tween 288 and 436 meters depending on where blackouts are common, Voith is “Quite simply, you cannot continue to
operation range. The two 240 MW re- tube cone the water level of the plant’s huge stor- upgrading technology at the Bhira plant increase the number of volatile energy
versible pump turbines supplied for the age lakes, which have a capacity of more to provide much-needed extra stability sources and assume that you don’t need
Limberg II plant in the Austrian Alps than 80 million cubic meters. to the grid. And even in Thailand, Voith more storage, and rely only on power
Spiral case
can work in both directions and, de- Not all operators require such regu- has just received the order to supply the cut-offs for consumers in industry and
pending on the rotational direction, can lated control over their grids, Koutnik complete electromechanical equipment private households in the future.” //

12 | HyPower 2014 HyPower 2014 | 13


Wind turbine 1

Agenda Setting Green Energy mix

Gaildorf Wind turbine 2

1 Gaildorf integrates pumped storage


directly into on-site wind turbines.

on pumped
And what about batteries – another form of storing energy? 2 Inside the pumped storage plant.

Batteries are much more expensive than pumped storage today For more information (in German),
Münster Wind turbine 3
and will remain so in the future. The cost of a lithium-ion bat- visit: www.naturstromspeicher.de

storage
tery amounts to at least €600 per kWh, while the storage part
of a pumped storage plant accounts for €50 per kWh at the
maximum – or even less, depending on the location. In addi- Penstock

tion, batteries allow for significantly fewer charging cycles in


Heike Bergmann on the powerful comparison with pumped storage.
Lower Pumped storage Wind turbine 4
reservoir powerhouse  
potential of pumped storage. will generate 20% more power than a
Voith Hydro in Germany has initiated a study by RWTH Uni- standard wind turbine, says Alexander
versity in Aachen examining the contribution of pumped stor- Schechner, director of Naturstrom­
Heike Bergmann, Member of the Management Transformation substation
age plants to the German “Energiewende.” In a nutshell, what 1 speicher. Due to the volatile nature of
Board of Voith Hydro Heidenheim, has been work-
ing for many years in the energy industry. Based are the main results? 2 renewable energy, the need for flexible
on her experience, she is convinced that pumped The study shows that pumped storage plants make an essential and more efficient energy storage has
storage plants, being multi-functional talents, can
contribution to the success of the German “Energiewende” – been garnering growing interest in re-
deliver an essential contribution to the conversion
of energy systems to renewable supply. or, rather: the conversion of an energy system to renewable cent years.
sources. The study proves that in Germany from 2030 on,
about 70 percent of the surplus energy from wind and solar can The chief restrictions in renewable en-
be used if combined with pumped storage. Based on this as- ergy come from nature and physical
sumed expansion, the entire pumped storage fleet could pre- space, says Schechner. That is why it’s
What role do you envision for pumped storage plants in the vent the throttling down of 6 TWh of renewable energy by important to make intelligent use of lim-
changing energy systems of the future? 2030, or 17.6 TWh of renewable energy by 2050. The use of ited land – hence the integration of a
As the portion of fluctuating renewable energies like wind and pumped storage plants is efficient and economically reason- water reservoir into in the wind turbine’s
solar is constantly increasing in the energy mix of many re- able: the waste of renewable energy is reduced. We will need structure. Another concern in the ener-
gions in the world, energy systems will require more pumped fewer gas-fired power plants, as pumped storage power plants gy industry is the ecological footprint.
storage plants. They are real multi-talents as they combine can take over their role of bringing flexibility into our energy The next technological step, Schechner
storage, reliable performance and flexibility, all rolled into one system. Fuel costs can be lowered, and existing conventional says, is to construct penstocks out of
type of power plant. With these characteristics, they can pre- plants can be better utilized. Besides that, the volatility of en- flexible polyethylene plastic and imple-
vent renewable energy from being wasted: they can store ex- ergy prices will also decrease. // ment them in existing pathways. “A for-
cess energy from wind and solar when energy surpluses occur. est has its own streets and infrastruc-
Even when all thermal plants are shut down, pumped storage ture,” he explains. “A typical pipe runs
plants can still take the energy surpluses and provide “negative
power.” Hours later, they can release this “green” electricity to
Reduction of electricity production costs in million euros/year Wind and Hydro: straight across and you have to cut
trees to make way for them. By curling
the grid, within a very short time – and exactly at the time
when it is needed. As a result, wind and solar plants do not
Saving of investment in gas-fired power plants
Saving of variable electricity production costs from storage cycles Joining forces the pipes along the existing structure,
we can optimize environmental impact.”
Investment in pumped storage power plants
need to be throttled down – and stability is added to the grid.
Economic benefits An exciting renewable energy innovation puts Schechner hopes that Gaildorf’s im-
What is the cost of a pumped storage plant compared with a In m € / y pumped storage right where it’s needed. plementation will encourage a more di-
954.8
thermal power plant? 1000 verse, flexible approach to renewable
It is hard to compare plants that are powered by fossil energy 600 477.4
energy. Smaller power plants have the
directly with pumped storage plants, as they pursue different benefit of easier installation, better con-
200
roles, and pumped storage does not generate expenses for fuel In a first-of-its-kind project, pumped construction, will combine wind energy trol and more flexibility. Large projects
-5.1
or certificates. However, one can say that the cost for each kW -200
-102.5 -179.2 -184.4
storage and wind energy have joined generation and pumped storage – with are more cost-effective by maximizing
from pumped storage is equal to approximately €1,350 on av- -600
-380 forces at a new power plant in Baden- a difference. At Gaildorf, a natural lower the amount of possible energy produc-
erage. For a coal-fired plant, the investment cost amounts to Württemberg, Germany. reservoir feeds four small upper reser- tion. Geography can best determine
€1,300 per kW. But it must not be forgotten: pumped storage -1000 -960 Voith will supply equipment for the voirs, built directly into the base of four what type of project to apply. By widen-
plants have a life span of 60 to 80 years, or even longer, with a scenario: 2030 / 60% renewables scenario: 2050 / 80% renewables highly innovative Gaildorf pilot project wind turbine towers. The complete tow- ing the variety, the hydropower industry
conventional plant lasting only 30 to 40 years. Thus, the in- Einsparung von Investitionen in Gaskraftwerke
184,4 by Naturstromspeicher, a German com- ers will reach 178 m in hub height and can increase renewable energy produc-
Einsparung
Source: Institute of variabler
Power Systems andStromgestehungskosten durch
Power Economics, RWTH Speicherzyklen
Aachen University:
vestment cost for a fuel-fired plant would have to be doubled Investitionskosten
“Supporting the Energy Transition in Pumpspeicherkraftwerke
Germany through Pumped Storage: Potential for
pany that specializes in natural power each have a 5 MW capacity. Due to the tion and therefore run more efficiently,
to compare. Volkswirtschaftlicher
Improvement of Economic Viability andNutzen
Supply Reliability” storage. The project, currently under increased hub height, the dual system Schechner says. //

14 | HyPower 2014 HyPower 2013 | 15


Green energy mix
1

The
Invisible
Power
Station
New pumped storage plant
Reisseck II functions as an
environmentally friendly
battery in the Alps. 2 3

1 Installation works on the control device of one of the machine units. Watch a video about Reisseck here (in
2 Voith engineers inside the cavern, discussing next steps. German):
3 The Rottau power station and Rottau Reservoir are connected to the www.verbund.com/pp/de/
Reisseck-Malta system. pumpspeicherkraftwerk/reisseck-2

D
eep inside a mountain overlook- the launch of Reisseck II into service of stainless steel, use an operating ring generator, to store excess power or to
ing the picturesque valley of this year, the Austrian energy provider and have a stay ring made from a single generate electricity as needed. Modern
Mölltal in the south of Austria, VERBUND has brought these two net- forged part. They were completely as- systems need to be able to react quickly
up to 250 highly skilled specialists are works into the 21st century. “The new sembled at the workshop of Voith to changes in the grid. “Because of this,
hard at work. A network of underground plant will connect two previously inde- Hydro in Sankt Pölten and delivered as quick response to load changes in the
tunnels and caverns has already been dug pendent power plant groups,” says Mar- a single compact unit. “For this project grid was a major parameter for the
and blasted out of the rock, and these are tin Nussmüller, Project Manager at we were able to draw on the knowledge plant. It can store and release energy
now being fitted with state-of-the-art Voith Hydro. “This means it is not nec- and lessons learned from a large num- equivalent to that from a 200-turbine
hydropower equipment. In the main essary to build new reservoirs and dams, ber of pumped storage projects com- wind farm, reacting almost instantly.”
cavern, 25 m wide, 58 m long and 43 m and a part of the penstock of the existing pleted by Voith in Austria over the last This increased stability will benefit en-
high, engineers are working under flood- power plants can be used. By connecting few years.” ergy consumers not just in Austria, but
lights to install the machine units. But these two groups, the overall capacity also the neighboring countries.
what at first glance might look like a mil- can be increased by more than 40% with The move to renewable energy sources As Reisseck II will be connected to
itary bunker or the fantastic underground a relatively small amount of effort.” is a major topic all across Europe. How- the grid in 2015, the cavern is sealed and
lair of a James Bond villain is in fact one In order to maximize the new facil- ever, it is not as simple as just building the construction works cleared away.
of the most modern and powerful hydro- ity’s output, VERBUND needed to in- more solar facilities and wind farms, as With no new reservoir and no new dam,
electric facilities in Europe, where engi- stall the most-efficient high-perfor- output from green energy sources can only an access road to the site remains as
neers from Voith are currently installing mance turbines on the market. “One of be very irregular, and alone would lead evidence of the invisible power station
two reversible pump turbines, each with the reasons for the contract award to to a highly unstable grid. Pumped stor- that has turned the Reisseck-Malta sys-
an output of 215 MW. Voith Hydro was the outstanding high age facilities like Reisseck II are a major tem into one of the most powerful hy-
efficiency we could demonstrate during part of the solution. “The concept of dropower facilities in Europe. //
Mölltal has a long history of hydro- the model acceptance test,” says Nuss- this power plant is to regulate the grid,
power, with the Reisseck-Kreuzeck sys- müller. “The turbines have a very high and compensate for the energy peaks
tem built from 1948 to 1961, and the power density on the runner – that and troughs from wind and solar plants
Malta network completed in 1978, each means a small runner with an extremely as well as from changing daily demand,” Hydropower in AUSTRIA
with its own reservoirs, generators and high power output.” The units are built says Nussmüller. Each of the two tur- Hydropower makes up almost 63% of
all renewable energy capacity in Austria.
self-contained hydraulic systems. With with spiral cases that are made entirely bines is reversible, acting as a pump or a

16 | HyPower 2014 HyPower 2014 | 17


Green energy mix Green energy mix

A bold leap forward


stators,” says Mattern. “But unlike the tem. “The new converter is much faster Support, Power Unit. “It then has to be
stationary windings in the stators, the than traditional models,” says Thomas removed from the grid and resynchro-
windings on the rotor turn at approxi- Hildinger, Vice-President of Voith Hydro nized before it can be reconnected.
mately 375 rpm and are exposed Engineering Center. “The new protec- This can take up to a minute. The tur-
Voith gives a new edge to a trusted technology at Frades II in Portugal. to high centrifugal forces.” In addition tion thus has to be adapted to meet bines in Frades II can retain stability for
to this, compared with conventional these increased demands.” up to 600 milliseconds.” This might not
synchronous machines, the rotor is sound like a huge improvement, but it is
charged with much higher voltage and The end result of this technical inno- significant. “It can mean the difference
current from a powerful frequency con- vation is a facility that brings additional between normal continued operation
verter. This converter is 25 times more reliability and stability to the grid. And in and, in extreme cases, a widespread,
powerful than for a fixed-speed facility the search for improved performance, large-area blackout,” says Hildinger. //
Pumped storage hydropower has speed, reversible pump-turbine units at “The key element of this plant is a of this output, and is of course larger small changes can have a big impact.
been a vital part of our energy networks the Frades II facility in northwestern Por- special asynchronous motor-generator: and heavier. “All that impacts highly on “In cases of reduced voltage, when the
for more than a century. In recent years, tugal. This immense pumped storage the DFIM, or doubly fed induction ma- the design of the rotor, so it’s a com- voltage drops to 5% of normal, a classi-
such plants have taken on an even hydropower plant will not stand alone: it chine,” says Wieland Mattern, Project pletely new product development for cal, fixed-speed turbine can remain Hydropower in PORTUGAL
greater importance, with a crucial sup- will be an important addition to an exist- Manager for Voith Hydro in Heidenheim. this project.” Voith Hydro also had to stable for around 150 milliseconds,” ex- Close to 42% of Portugal’s renewable
energy capacity comes from hydropower.
porting role in the move to renewable ing eight-plant cascade system, Cáva- “In contrast to a conventional synchro- develop a new electrical protection sys- plains Dr. Jiri Koutnik, Head of Expert
sources of energy. However, the tech- do-Rabagão-Homem. nous machine that always turns at a
nology that is involved has not changed Frades II is the third facility of this fixed speed in time with the 50 Hz grid
fundamentally – aside from continuous kind to be built in Europe, and when it is frequency, in the new DFIM machines
improvements in efficiency and perfor- connected to the grid in 2015, it will be the mechanical rotation speed is de-
mance. All of this could be about to the largest variable-speed pumped stor- coupled from the grid frequency, and
change. Voith Hydro engineers are cur- age station in the continent. The future is can vary.” This has two main advantag-
rently installing two 390 MW variable- variable speed. es. First: the new systems allow a fast
and flexible response to active and re-
active demand from the power grid.
Whereas a traditional facility is either on
or off in both motor and generator
mode, the new units can be run at any
speed within a given speed range, to
match the current demands on the net-
work. This was a major factor in the
bidding process, and will be increas-
ingly important in other markets, too.
Second: variable-speed facilities offer
additional stability in cases of voltage
drop, reducing the likelihood of a black-
out and enabling the system to come
back into operation much faster follow-
ing such an event, as compared with
traditional, fixed-speed turbines.

Building a variable speed motor-gen-


erator of this size came with its own
challenges. The rotor is a completely
new design. “Instead of salient poles
mounted to the rotor rim as for syn-
chronous motor-generators, the Frades
rotor has three-phase bar windings
Variable speed for increased flexibility: a 3-D model of the Frades II machine. similar to the kind normally found in The rotor hub with the newly developed, semi-automatic stacking platform at the pre-assembly spot, shortly before lamination bundling starts.

18 | HyPower 2014 HyPower 2014 | 19


Green Energy mix

1 2

A global project
1 An aerial view of the beautiful landscape around the Ingula pumped storage power plant. just isn’t the same impact environmen-
2 Work on the plant has been a collaborative effort among several Voith locations worldwide.
tally when compared with a plant fully
above ground.” He is, however, appre-
ciative of the general environmental
International collaboration on one of Africa’s biggest-ever impact of such a major project, and is
pumped storage facilities. pleased that various wildlife institu-
tions, such as Birdlife South Africa and
full-time environmentalists, have come
together to form partnerships in order
biggest we have ever supplied.” Besides ford Reservoir, and releases water to the to check that environmental legal re-

W
hen Voith experts from all er, as the project nears completion, it is China – each in its own way ensuring cooperation in the project, Müller and lower Bramhoek Dam reservoir to sup- quirements are adhered to.
corners of the world collabo- set to provide 1,368 MW of power per the project will be a success. Voith Hirata also know each other from par- ply energy to the grid when needed. As it nears completion, the Ingula
rate, their achievements can hour. As Akihisa Hirata, Deputy Project Hydro in Heidenheim, for example, has ticipating in the Voith Hydro Manage- Through this tried-and-true technolo- plant has been more than 30 years in
be impressive. One such achievement Manager of Voith Fuji Hydro notes, the been responsible for carrying out the ment Trainee Program, procuring skills gy, the Ingula plant will be strongly the planning and preparation. With
can be found in the sweeping rural land- pumped storage plant will considerably main work on the four pump turbines, they can apply to their current project – contributing to grid stability in eastern the expertise of a multitude of Voith
scape of the KwaZulu-Natal region, in aid in the “provision of a constant sup- main inlet valves, the SCADA system, and future projects. The program is an- South Africa. employees from various disciplines
eastern South Africa, near a town called ply of energy across South Africa.” and electrical and mechanical balance- other example of Voith’s global setup drawn from across the globe, this
Ladysmith. Here, partially submerged of-plant equipment. As Müller says, and mindset. Ingula is located in fantastic natural pumped storage power plant is set to
under the sun-baked earth, is the im- Müller’s and Hirata’s contributions in- “This has entailed subcontracting work Another proud Ingula participant surroundings, and the construction and make a major contribution to South
mense Ingula pumped storage hydro- dicate the crucial international dimen- out to many other Voith branches has been group affiliate Voith Paper in planning of the plant has kept this in Africa’s rapidly expanding 21st-century
power plant – set to be one of Africa’s sion and cooperation that has been so across the world.” Hence, he describes Bayreuth, Germany, which in 2011 was mind. The rural scenery and beautiful energy demands. //
largest ever. central to this project. Indeed, Voith’s it as “a truly global project.” commissioned to provide heating, venti- mountain vista have been minimally af-
Planning for this enormous project role in the Ingula pumped storage pow- Another central partner has been lation and air-conditioning systems. fected due to concealment of much of
started back in the 1980s, explains er plant is extensive. It has involved Hirata’s branch, Voith Fuji Hydro in Ja- On a technical level, the way this the works underground.
Markus Müller, Project Manager for pulling together resources from four pan. This company in Voith Hydro’s kind of pumped storage power plant Aside from the power station, the Hydropower in SOUTH AFRICA
Voith Hydro Heidenheim. “Around 20 big company locations: Heidenheim in global network is responsible for build- works is not new, but it delivers: it integration of much of the apparatus In South Africa, hydropower makes up
locations were considered before Ingula Germany, York in the United States, ing the four 373 MVA motor genera- stores excess energy during the night, and equipment beneath the surface is almost 70% of renewable energy capacity.

was chosen,” he says. Three decades lat- São Paulo in Brazil and Shanghai in tors, which he says are “some of the or from renewables, in the upper Bed- hugely significant, says Müller. “There

20 | HyPower 2014 HyPower 2014 | 21


GREEN ENERGY MIX

surface acres of water when they reached Voith has played an important part in
Adapting and evolving their normal “full” water level in 1966.
As well as providing electricity for the
the development of all aspects of
pumped storage hydropower in the US
Giving the gift of an extended life to a long-serving region, the lakes and waterways have be- since its inception, both directly and
come a focal point for residents and vis- through acquisitions over the years,
pumped storage hydropower plant in the United States.
iting tourists alike. particularly Allis-Chalmers, S. Morgan
Smith, Westinghouse, and the joint ven-
long-serving, Multi-purpose ture with Siemens. The specific knowl-
The Smith Mountain Project was devel- edge base of these strong firms all
oped as one of the first supporting helped Voith build a deep understand-

W
hat better way to mark a sig- pumped storage facilities to comple- ing of all facets of the American hydro-
nificant birthday than with ment an emerging nuclear power indus- power market, as well as incorporating
the gift of longer life? That’s try in the US. To afford an additional their OEM know-how and expertise.
the present Voith has helped deliver to safety margin, nuclear plants are typical- The half-century-old Smith Moun-
American Electric Power’s (AEP) Smith ly prohibited from load following, ex- tain Project has three pump-turbines
Mountain Project, which celebrates its plains Greg Snyder, Service Sales and two conventional generators – a mix
50th anniversary next year. Operated by Manager at Voith Hydro in York, US. of conventional and pumped storage
AEP subsidiary Appalachian Power, Originally, Smith Mountain’s primary units that also exists at other US hydro-
Smith Mountain is a strategically im- purpose was that of a traditional pumped power stations. One of the life-extend-
portant pumped storage power plant on storage plant. Today, the facility ing projects that Voith Hydro in York
the Roanoke River in Virginia, US. complements AEP’s nuclear, gas and (VHY) has undertaken on the plant’s
Completed in 1964, the project’s two coal base load plants in this traditional motor-generators has involved the re-
2
dams and reservoirs created about 600 way, and also helps enhance the value winding of the two conventional gener-
miles of new shoreline and about 25,000 of renewables such as solar and wind. ator stator coils – a task carried out by
Voith Hydro in Mississauga, Canada.
Further recent works by VHY involved
1 a rotor rim shrink on unit three – the additional costs involved and they en- 1 One of two dams at Smith Mountain.
2 The waterways which feed into Smith
largest unit at the plant – involving re- sured that the sense of urgency we felt
Mountain form a playground for locals.
alignment to extend the life of the unit. about getting the job finished was trans-
mitted throughout their own team and
Trust and thoroughness to their subcontractors. Their reputa-
“These successful works have resulted tion for quality was fully justified by
in the development of considerable trust their work for us at Smith Mountain.”
Voith employees work in
the interior of the Erzhausen and respect between the plant’s owners And what of the three pump units?
pumped storage plant. and operators and Voith,” says Snyder. Thrasher also says, with a hint of pride,
Both the breadth of Voith’s expertise that these units are still original and have
and their willingness to go the extra not been upgraded – something most
mile to ensure customer satisfaction unusual for a pumped storage hydro-
have been appreciated by AEP. power plant of this age. “People ask us
AEP Energy Maintenance Superin- when we intend to do it, and we tell
tendent Jim Thrasher speaks enthusias- them we’ll upgrade when we have seri-
tically about the way that Voith resolved ous problems. To date we haven’t had
challenges that emerged at the initial any,” he says. These units were all made
testing stage. “What Voith offered us by the Voith-acquired firm Allis-Chalm-
was above and beyond anything we had ers. It just goes to show: quality really
expected, and they ultimately exceeded does stand the test of time. //
both the contract specifications and our
expectations,” he says.
“On the second unit, we found the Hydropower in the US
original poles were significantly dam- The US ranks third in the world for
aged on the rotor. Voith was completely installed hydropower capacity – second
only to Brazil in the Americas region.
open and transparent with us about the

22 | HyPower 2014 HyPower 2014 | 23


Full-Line Supplier

Hong Ping project


team with the first of
the bifurcation pipes
destined for the plant.

requirements. Using computer-based erator optimizations: innovations that proving the ventilation of the unit with
simulations and carrying out detailed will certainly find their way into other self-ventilation, instead of forced venti-
model tests to find the best possible pumped storage plants for other Voith lation with fans. Pan Zhibin, the project
technical solutions for the project, the customers in the future. manager at Voith Hydro in Shanghai,
design and engineering of the equip- The State Grid Corporation re- says he was proud both of the new de-
ment began to take shape. quested very stable start-up behavior for signs that Voith has created as part of
the turbines, which required custom en- the project and of solving each new
The model acceptance test was com- gineering for the runner profiles, Anci- complex challenge turning up in the
pleted successfully in July 2013, mark- ger says. At the same time, the customer Hong Ping project. “Pumped storage
ing a major milestone in the project: re- wanted very high hydraulic efficiency to plants are very complex projects. It has
sults proved that efficiency rates get the most possible electricity from its been quite a challenge to manage the
exceeded the guaranteed values. To storage capacity. project with the new designs and mate-
reach this point, Voith carried out more “Achieving stable start-up usually rials. I am particularly impressed by the
than 100 optimizations, based on com- means giving up a bit of hydraulic effi- way engineering, purchasing and proj-
putational fluid dynamic analysis. ciency, but the customer wanted both. ect management in Germany and China
“Our advances in materials and de- We provided this by redesigning the worked together as one team to make
sign for Hong Ping, along with develop- turbines using precise measurement this happen.”
ments in other projects, like the asyn- equipment and a fast design process

Among the
chronous generator for large-scale loop in which we fed back measurement Voith took an interdisciplinary ap-
pumped storage in the Frades II project results into the model design,” says proach to solving technical challenges at
2
in Portugal [see page 18 for more], Anciger. Another innovative approach Hong Ping by holding a project conven-
strengthen Voith Hydro’s position as a for the turbine was achieving an optimal tion and an expert review meeting early

world’s largest
leading pumped storage plant supplier level for balancing pump and turbine on. Voith experts from various divisions
worldwide,” says Danijel Anciger, Hy- operational modes. around the world met in Shanghai and
draulic Design Engineer for Pump Tur- worked together in groups dedicated to
bine Development in the Voith Hydro Voith made optimizations to the gen- the areas of turbine, generator and auto-
Voith is delivering hydropower equipment to Engineering Center, and involved in the erator by adapting its shaft to increase mation, as well as balance of plant, pur-
increase China’s mix of renewable energy. model development for Hong Ping. the accuracy of the guide bearing from chasing, manufacturing and field servic-
Voith is supplying four complete 0.03 to 0.015 millimeter. This was es, logistics and coordination.
pumped storage units for Hong Ping, achieved by designing a single long Moino says, “With our innovative
including four synchronous generators, welded shaft, instead of using two short solutions at Hong Ping, Voith is playing

C
hina has launched itself on an stalled capacity in China to reach 54 initial development phase, due for com- reversible Francis pump turbines, gov- shafts connected by bolts, says Helio an important role in stabilizing the grid
ambitious course to significant- GW by the year 2020. Today, the coun- pletion in 2015, Hong Ping will supply ernors, inlet valves, excitation, automa- Moino, the Executive Vice President and providing clean energy in China,
ly increase its mix of renewable try’s total installed energy capacity is ap- 1,200 MW of power. Once fully com- tion and power plant auxiliary systems. and Chief Production Officer at Voith one of the world’s biggest engines of
energy. Pumped storage will play an in- proximately 19 GW. missioned, it will generate 2,400 MW of Each unit will have a capacity of 300 Hydro in Shanghai. Moino is responsi- economic growth.” //
tegral part in these plans, assisting the As just one step toward this renew- power – making it one of the largest MW. Voith received the order from the ble for manufacturing and quality activi-
nation in reaching its goal of generating able energy goal, a new pumped storage pumped storage plants in the world. State Grid Corporation of China – the ties, including the production of the
20% of its energy from renewable hydropower plant, with equipment sup- Hong Ping’s scale is one of the chal- largest energy provider in China. Hong Ping parts. Hydropower in CHINA
sources by 2020. According to the Inter- plied by Voith, is under construction in lenges of the project, along with balanc- Voith also redesigned the pole with China is the number one hydropower
national Energy Agency, China’s State Hong Ping, Jiangxi province, some 750 ing hydraulic performance and opera- The advances made for the Hong Ping new material and an air guide. The new market in the world, with around a quarter
3 of all hydropower capacity.
Grid expects total pumped storage in- kilometers southwest of Shanghai. In its tional stability to meet customer project include several turbine and gen- pole helps cool the generator by im-

24 | HyPower 2014 HyPower 2014 | 25


Section
successful partnerships successful partnerships
SECTION

1 Outside view of the Iffezheim Barrage on the Rhine River. 2


2 The discharge ring being serviced in the Voith workshop.
3 A look inside the machine unit being serviced by Voith.

Saving Iffezheim was really from one day to the next,” says Alois Taglieber,
Sales Manager at Voith Hydro Heidenheim. “A small amount
issues on the thrust bearings and the discharge ring as well
as on the shaft itself,” Taglieber explains. As a result, the main
of damage to one of the seals around the runner can lead to shaft then needed to be removed for surface refurbishment –
Voith Hydro provides services for a a huge leakage.” Following meetings with the customer, Voith no mean feat for a piece of equipment weighing over 30 tons.
plant in need – preventing further engineers got to work last December, with the task of refur- “We had to build scaffolding and load-bearing structures to
damage and ensuring rapid repairs. bishing the non-moving parts of the affected runner. remove the shaft – the site looked like a forest of iron beams,”
Working conditions at the Iffezheim facility are challeng- adds Taglieber. 3
ing. Access is limited due to the plant’s design, and the indi- Thanks to quick and flexible intervention by Voith Hydro’s
vidual machine parts are huge: the discharge ring alone is 5.9 team of experts, in close communication and collaboration
The Iffezheim Barrage is located in the Alsace region in meters in diameter. There are safety concerns as well, as with the customer, repairs are now well underway, with the
France, on the section of the Rhine that forms the border be- many machine components are sealed with an anti-corrosive generator due to go back on line by March 2015. Iffezheim is
tween Germany and France. It was constructed in the late paint that contains asbestos. “We have a very good, close a perfect example of Voith’s after-market business section’s
1970s to enable better control of flow on the river, and simul- working relationship with the customer to ensure the highest successful work in preventing further damage and a possible
taneously to allow the generation of electricity from a run-of- safety standards,” says Taglieber. On top of this, the true shutdown, and bringing a facility back to full operational ca-
river hydroelectric facility built into the barrage itself. In 1976, scale of the job to do only became clear when the engineers pacity within a short time frame. //
Voith supplied parts of the plant’s four turbines, each with a began to disassemble the enormous components of the run-
power of 28.3 MW. Today, it is one of the largest hydroelectric ner. “As part of our work, we disassembled the bearings and Hydropower in GERMANY
facilities of its kind in Germany. performed routine non-destructive testing – not because we Germany has set a target of generating
In October 2013, engineers on site noticed a large thought there was a problem, but to guarantee smooth 35% of its energy from renewable sources
by 2020 – including hydropower.
amount of water had leaked into one of the four runners. “It running for the next 40 years. This testing revealed corrosion

26 | HyPower 2014 HyPower 2014 | 27


Successful Partnerships Successful Partnerships

Small hydro
multi-talents
With innovative solutions For insights into the high quality that 1 The new small hydro plant
at Tröpolach is fed by the
Voith subsidiary Kössler guarantees,
and a reputation for two recent projects are a good exam-
Oselitzenbach Torrent.
2 New shine: the Kössler-
reliability, Kössler is a ple, showing the company’s excellence restored four-blade runner
from Hochstadt.
market leader in small in after-market business (AMB) and new
builds: an upgrade of a turbine and belt
hydropower. drive in Hochstadt, Germany, and a
new hydropower plant at Tröpolach,
1
Austria.
Ensuring customer satisfaction via 2
an intelligent AMB culture is central to
the way Kössler functions, with the
Hochstadt upgrade as a fine example. by inserting maintenance-free guide beautiful nature, where the look and feel
Back in 1985, Kössler played a leading van-shaft bushes. Added to the effect of the mountain vista is so important,
role in the establishment of a small hy- of rebuilding the main turbine guide there is always concern for the environ-
dropower plant at Hochstadt. A high bearing, says Schiep, “the output of the ment. Ensconced in a winter sports
level of performance over three de- plant has been significantly increased.” area, “with its energy-intensive ski fa-
cades meant that the firm was called in The age of the technology involved cilities, the plant is good for the region,”
again to carry out an upgrade in early was just one concern for the operator, says Wieder. Indeed, the operator
2014, notably of a Kaplan A-Bulb tur- with sustainability also key to the cus- Kraftwerksgesellschaft Tröpolach
bine and belt drive. tomer’s corporate philosophy, explains GmbH calculates that the Tröpolach hy-
“At the heart of the plant is a four- Schiep. “Now we’re finished, the plant dropower plant “saves the environment
blade runner made of bronze,” explains won’t need another upgrade for 30 6,811 tons of CO2 emissions and 11.9
Kurt Schiep, Head of AMB at Kössler. years.” This is great news for the re- kilograms of radioactive waste, reduc-
“Due to abrasion, it was no longer able gion’s energy supply – particularly for ing Austria’s carbon footprint”.
to achieve the maximum efficiency for the town of Hochstadt, he adds. Kössler’s reputation has been built
the power station.” The turn-around for Tröpolach’s climate and surrounding bination: two models of the company’s on eight decades of carrying out suc-
the project was short, and a start in Across the Alps in Austria’s Carinthia environment made it an ideal location turbines (the PV6i/1080/330) and gen- cessful small hydropower projects, as
January meant the plant was up and region, bordering Italy, is picturesque choice for a new small hydro plant: spe- erators (the PV4c/650/160), which, the upgrade at Hochstadt and the new
running again by the middle of April. Tröpolach. This is ski country, with the cifically, “its very high rainfall and the though not new, “are used here for the plant at Tröpolach evidently show. And
Kössler experts repair-welded the highly regarded Nassfeld slopes attract- Oselitzenbach Torrent.” first time in tandem,” Wieder says. The with small hydropower solutions very
blades at the outer diameter and lev- ing many thousands of visitors every To complement the optimal natural result is the provision of 16.5 GWh of much in demand, the Voith Hydro com-
eled the runner chamber, while, for ex- season. As Karl Wieder, Head of Sales environment, Kössler designers came eco-electricity – enough to power pany looks set to continue going from
ample, also overhauling the wicket gate and Planning at Kössler, explains, up with the perfect technological com- around 4,700 households. In such strength to strength. //

28 | HyPower 2014 HyPower 2014 | 29


from the Archives from the Archives

Pioneering pumps, with water from a nearby well.


The electrical energy required for these
pumps came from a high-voltage line
neering role in the development of this
technology, in particular this very first
facility” – securing Voith’s significant

technology
installed by Voith, originating from an- part in the history of pumped storage.
other Voith hydroelectric and testing fa-
cility in Hermaringen, about 15 kilome- Voith may not have known in 1908
ters away. The principle was simple and that the plant’s operating principle
ingenious – and it still is to this day. would still be relevant over a century
With inexpensive, excess energy (avail- later. But pumped storage technology
able mostly at night and on Sundays), has now proven itself around the world
Together with Voith Hydro’s to ensure a reliable power supply and a water was pumped up the mountain to be the most cost-effective, highly ef-
Brunnenmühle reservoir
Brunnenmühle R&D center stable grid. into the reservoir. During the day, it was ficient, large-scale energy storage solu-
Diameter: 36 m
When the facility was being built, the Depth: 8m allowed to rush down to the Brunnen- tion available. And, as it increasingly
in Heidenheim, Germany’s focus was on the practical, more imme- Capacity: 8,000 m3 mühle station to drive the power-gener- supplies power grids worldwide with
first pumped storage diate benefits it would bring. Here, in- ating turbines installed there, thus sup- energy from the fluctuating output of re-
plant was established over novation went hand in hand with the plying the test facilities with the water newable power generation sources, the
pressing need for a technical solution – and pressure they needed. The day the role of pumped storage takes on a new
a century ago. a principle that still applies to Voith to- hydraulic machines began operating as – and greater – relevance. //
day. The objective of the plant was to a pumped storage plant, Brunnenmühle
supply the Brunnenmühle water mill, became Voith Hydro’s first testing facil-
It is said that only when inventions acquired the previous year, with elec- ity – a significant milestone in the com-
and ideas see the light of day can one tricity and the water pressure necessary pany’s history. To date, it remains the
refer to them as being trendsetting and for it to function as a development and technological core of the company,
innovative. Often, they are the com- test laboratory for high-pressure tur- and, with the support of centers of
bined result of a pioneering spirit and bines. Construction was also motivated competence in Shanghai, York, Noida,
foresight, as well as an actual, practical by a newly signed contract to deliver São Paulo and Västerås, it is the heart
need. This is true of Germany’s first 12 Francis turbines to the Niagara Falls of Voith Hydro’s worldwide R&D work.
ever pumped storage power plant, lo- hydroelectric plant – turbines which had
cated at Voith Hydro’s Heidenheim cor- to be designed with the utmost preci- The reservoir of Germany’s first
porate headquarters. When Friedrich sion for maximum performance and ro- pumped storage power plant still exists
Voith launched construction of the plant tational speed. today. Together with its turbines, gen-
in 1908, he played a crucial part in es- erators, pumps and other equipment, 1
tablishing a technology that has now In the summer of 1908, a reservoir the site is registered as an historic land- 2
become essential for efficient electricity was built on top of the Schlossberg in mark. The description in the registry of
storage. He could never have anticipat- Heidenheim, about 100 meters above historic places states that “all pumped
ed then how pumped storage would the Brunnenmühle. The reservoir was storage facilities in Württemberg [where
become so important in the switch to filled using multistage centrifugal Heidenheim is located] played a pio-
renewable power generation a century
later: allowing large amounts of sustain-
ably generated power to be stored effi-
ciently, and distributed flexibly, helping

1 Construction of the eight-meter-deep


reservoir gets underway.
2 The completed, filled reservoir on top of
the hills around Heidenheim.

30 | HyPower 2014 HyPower 2014 | 31


Global Expertise At work on Global Expertise
a turbine in
the Shanghai
workshop.

1910
Construction of
Shilongba, China’s

A bright
first hydropower
plant, with turbines
and generators
from Voith.

A
s Voith Hydro Shanghai (VHS) in all business areas – like design, en­

future
prepares to celebrate its 20th an­ gineering, manufacturing, project man­
niversary this November, the agement and field service – has enabled
time comes to reflect on Voith’s pioneer­ VHS to become even more competitive
ing role in the development of hydro­ on the Chinese and South-East Asian
power and renewable energy in China. markets. Geographical and cultural
The wheels first started turning in 1910 proximity helps a lot.”
when the company provided turbines for
Voith Hydro Shanghai marks the company's 20th the Middle Kingdom’s first hydropower VHS gains from and fosters techno­
anniversary, with an eye on a promising hydropower future. station, Shilongba, in Yunnan Province.
After more than a century of part­
1994 logical expertise through its local branch
of the Voith Hydro Engineering Center
nership with China, Voith can count Foundation of the Shanghai Hydropower International – a network comprising
Equipment Company (SHEC)
among its achievements the supply of – a joint venture of Voith, Siemens and centers of excellence around the globe.
top quality equipment and services to Shanghai Electric Corporation. The Shanghai branch provides system­
landmark projects such as Gangnan in atic training and development courses
Voith provides four 300 MW capacity tur-
Hebei in 1967, the country’s first bines and motor-generators to Guangzhou for employees and worldwide job rota­
pumped storage project, and Lubuge in II, one of the world’s largest pumped tion opportunities.
Yunnan, the first Chinese hydropower storage plants. As part of an internationalization
project open to foreign contractors, fi­ drive, VHS develops products for chal­
nanced by the World Bank, in 1983. lenging new markets. VHS excels in
main inlet valves and performs system
Business proceeds apace since VHS engineering locally. That’s in addition to
was established in 1994 with Shanghai meeting the demands of Asian and also
Electric Corporation as a partner. VHS African markets, and supplying equip­
has supplied the Chinese hydropower ment for further global projects. This
industry with localized design, en­ strategy owes its success to good perfor­
gineering and manufacturing, thus con­ mance in the Chinese hydropower mar­
tributing to the strength of the com­ ket and strong support from headquar­
pany’s overall activities. It has since ters, says Tang Xu, Chief Marketing
become a major supplier to projects
such as the Three Gorges Dam – among 2004 Officer and Executive Vice President:
“We have a diligent, loyal local team

2007
many other large-scale works. With a Voith delivers the
with good hydropower engineering
workforce of 600 employees, 99% of first of six 700 MW backgrounds, which developed quickly
whom are native Chinese, VHS is Voith machine sets – from previous projects.”
then the largest of Voith was awarded
Hydro's second-largest manufacturing their kind – to the supply of eight VHS’ strong position as a full-line
base worldwide. Localization is key to Three Gorges Dam, 610 MW Francis supplier gives it an edge over competi­
the company’s success, says Martin the world’s largest turbines to Jinping tors. Skilled, quality engineering and
hydropower plant. II – the highest
Andrä, President of the VHS Board of head mega turbine manufacturing lend it repute as a reli­
Management. “Our localization efforts in China. able, international supplier. The compa­

32 | HyPower 2014 HyPower 2014 | 33


Global Expertise Global Expertise

2008
Voith was awarded the supply of
three generator-turbine-sets – the most
powerful ever built at Voith – for Xiluodu,
the third-largest hydropower plant
in the world.

ny strictly applies standards and coop- likelihood of potentially devastating


eration common to Voith Hydro entities floods – from approximately once every
worldwide, in terms of design, produc- 10 years to once a century – will protect
tion, quality and performance. Regular
project conventions conducted with ex-
2012 lives and livelihoods.
China already has an installed hy-
perts from throughout the Voith Hydro Voith was awarded dropower capacity of 280 GW (by
network help to assure the optimum
performance of projects, Andrä says.
the contract for
four 300 MW ca-
pacity pumped
2014 2013) – that’s almost 25% of all global
installed hydropower, giving it by far
storage units and Voith to supply
the biggest share of all nations. And it
auxiliary facilities three 470 MW
The benefits of hydropower for China to Hong Ping (see Francis turbines has vast further hydropower potential:
and its people aren’t limited to power p. 24). and generators, au- around 400 to 500 GW. The Chinese
tomation systems,
supply. When the Voith-assisted Three government’s five-year plan emphasizes Improved original: Voith-restored 1920s components at Pointe du Bois.
and BOP E&M for
Gorges Dam project was completed, the expansion of renewable energies, with the goal of
adjusted river flows meant improved Tarbela, Pakistan – achieving a 45% CO2 emissions reduc-
following other in-
flood control on the Yangtze River, es- tion by 2020. Developing hydropower
ternational con-
pecially the flat, flood-prone Jingjiang tracts in as the most powerful of these is key to
section. The resulting reduction in the South-East Asia. achieving that goal, Andrä concludes. //

KEEPING THE WHEELS TURNING


Three Gorges Dam on the Yangtze River: the world’s largest hydropower plant.
Through services and modernizations, Voith helps get
the best out of long-established Canadian plants.

The world’s fourth largest producer of hydroelectricity, Canadian Hydropower Service Center for AMB, which is also
Canada is also one of few countries that generates the major- the company’s center of excellence for multi-turn coils, is lo-
ity of its electricity this way. With approximately 500 hydro- cated at a modern plant in Mississauga, Ontario, while the
power installations and 1,500 individual units, with an average subsidiary Vortex Hydro in Granby, Québec, has added to
age of about 60 years, it is also a highly mature market – and Voith’s strength in such areas as auxiliary mechanical sys-
this leads to a high demand for services and modernization as tems, specialized hydropower products and consulting.
equipment ages. In the case of the Pointe du Bois run-of-river hydropower
Present in every Canadian province and territory for over plant in Manitoba, Voith’s AMB services were in demand.
a decade, Voith Hydro enjoys a strong reputation in the field of Completed in 1926, Pointe du Bois is the oldest power plant
after market business (AMB) services. Headquartered in Bros- still in operation on the Winnipeg River. The operator, Manito-
sard, Québec, Voith Hydro Canada focuses on engineering, ba Hydro, engaged Voith in 2010 under a time and materials
customer service, business development, project manage- contract to undertake service work on five units – some close
ment and project administration for large hydropower, small to 100 years old. However, as the work progressed, a wide
hydropower, automation and the service businesses. Voith’s range of ‘out-of-scope’ conditions emerged. Each as-found

34 | HyPower 2014 HyPower 2014 | 35


Global Expertise Global Expertise

1 The reservoir at
GM Shrum Gener-
ating Station.
2 Installing a new
head cover at GM
Shrum.
3 The dam at Pointe
2
du Bois, Manitoba.
3

equipment manufacturers, such as Westinghouse generators


and Allis Chalmers turbines and generators. In tackling the
challenges of AMB or refurbishment, therefore, Voith brings a
unique and very broad level of insight and knowledge to
­almost every project.
Expecting the unexpected is also important. During refur-
bishment of the GM Shrum Generating Station in British
­Columbia (see images 1 and 2), it emerged that repair welding
1 over the years had impaired the efficiency of the original tur-
bine runners. New runners and hydraulic profiles, however,
have improved efficiency substantially, improving reliability
and cutting maintenance costs in the process.
Helping customers review options to achieve a good bal-
condition different from expected was carefully documented our clients shoes, that has established and helped to reinforce MODERNIZATION: INTO A NEW AGE ance between higher future revenues, lower maintenance
within a Field Problem Report specifically developed for the a strong working relationship between Voith Hydro and Apart from the growing importance of the services business, costs and the immediate capital cost is a major but highly re-
project, and a costed solution proposed by Voith. Innovation Manitoba Hydro,” says Cumming. “Facing situations that
­ the increasing number of hydropower plants in Canada that warding challenge, says Laurent Bulota, Head of Proposals at
was also needed in technical areas. Sophisticated scanning haven’t been dealt with previously in an open manner has have been running for several decades now also leads to a Voith Hydro Canada. “The future design life of modernizations
techniques were used by Voith engineers to create a 3D cloud helped to create solutions that are best for both parties.” growing trend towards modernizations and refurbishments. we are handing over now could be 50 to 80 years, but the
of data points to accurately model an upstream runner crown, Manitoba Hydro continues working together with Voith at Those typically also involve new designs to improve efficiency, return on investment has to be under 10 years – and ideally
band and blades, making it possible to accurately replicate Pointe du Bois and has recently extended the previously increase output, improve reliability or reduce maintenance achievable within five,” says Bulota. He notes that in Canada,
the Pointe du Bois’ original 1920s components. awarded AMB work scope still to be performed for the mod- costs, and Voith Hydro comes with broad experience in this the world’s fourth-largest hydropower producer, knowledge-
“Some of the units had not been in operation for many ernization of units 12, 13 and 14 at the plant. field providing optimum solutions for existing hydropower able buyers of hydropower services demand high quality, reli-
years”, says Neal Cumming of Voith Hydro’s AMB center plants, and with a number of successful reference projects, able, long lasting, state-of-the-art solutions and equipment:
based in Mississauga, “and it gave us tremendous satisfac- “It’s an exciting side of the business,” says Michael Secord particularly in Canada. Technical advances mean that signifi- qualities reflected in Voith Hydro’s own core values. //
tion to know that by providing economically viable solutions of Voith’s AMB work. Secord has recently been appointed cant, sometimes exceptional improvements in performance,
we have been able to bring some of the machines at the plant Head of AMB for Voith Hydro in Canada. “We’re building a output and reliability are possible. Voith typically achieves in-
back to life.” highly responsive service. We want to respond to our clients’ creases in turbine efficiency of more than three percent, and
The Pointe du Bois project has highlighted another as- maintenance and improvement needs quickly, and we also output gains of between 15 and 25 percent are not uncom- Visit voith.com/hyservice for
pect of project planning: appropriate staffing. Having deter- want to make it as easy as possible for them to avail of our mon. At Hydro-Quebec’s La Tuque power plant on the Saint- more on Voith Hydro’s service
business.
mined Manitoba Hydro’s needs, Voith suggested using a hy- services.” Secord is also exploring ways that ‘big data’ might Maurice River in Quebec, for example, Voith increased the
brid crew comprised of both Voith employees and local be used to enhance maintenance support. His intention is to output of three units by more than 50%, notes Pierre Séguin,
unionized labor. Directed by a Voith Site Manager, this team develop a new ‘reliability centered maintenance unit’ in Canada, Head of Business Development at Voith Hydro Canada. “Our
includes two Manitoba Hydro technicians, who will gain valu- which will use the constantly growing banks of operational successful partnerships with our customers are proof of ex- Hydropower in CANADA
able experience in execution of in-situ turbine rehabilitation. data to accurately predict wear rates, for example, and their cellence in rehabilitation,” observes Séguin. Voith now owns Close to 90% of all renewable energy
capacity in Canada comes from hydropower.
“It is this kind of thinking outside the box, putting ourselves in effect on output performance. the technologies developed by many of well-known original

36 | HyPower 2014 HyPower 2014 | 37


GLOBAL EXPERTISE

Powering Latin
Marcos Blumer
The President and CEO of Voith Hydro in Latin America
sees the company as an “upside-down parliament”: with
the customer on top of the parliament and the CEO at
the base. Having been with Voith for 25 years, much of
that time in the Paper division, he joined Voith Hydro in

America
2010 as Chief Production Officer, taking care of the
production facilities in São Paulo and Manaus.
Impressed by hydropower already as a child, he was
convinced to join Voith thanks to a presentation given by
German engineers to his university class in Brazil.

A conversation with Voith Hydro in Latin America’s President and


CEO Marcos Blumer and Chief Marketing Officer Alfredo de Matos.
it comes in multiple dimensions: proj-
ects in Latin America are financed from
China, for example, while Brazilian
companies are at the same time invest-
ing in projects in Africa. Global financing
will be a trend we need to take part in.
Having assumed the new positions What is the current status of these vast experience and can offer compre- With our global presence and coopera-
as CEO and CMO of Voith Hydro in localization efforts in Latin America? hensive service solutions for their hy- tion, Voith Hydro is well prepared for
Latin America, what are your main De Matos: First of all: we are already dropower plants. To further improve our that, as we can offer local expertise to
targets for the company? used to the local markets. We are here, service offering, we are streamlining line supplier in recent years. Many cus- And how about other Latin American customers from around the world.
Blumer: My understanding of being experienced, and we have a strong her- processes so that we can respond to tomers are aware that we are supplying markets? De Matos: Here, key account manage-
CEO is to serve the company, to be- itage. Celebrating the 50th anniversary customers even faster. the whole package: automation, bal- De Matos: Typical projects have a ment comes into play: Voith Hydro is a
come better every day and to do every- of Voith this year means 50 years in Blumer: Closely connected to integrat- ance-of-plant, integrated services, con- range of 80 to 150 MW, and projects true global company, and we will in-
thing to develop the best solutions for Latin America – not just Brazil. In the ed services is the field of automation. struction. This approach correlates are contracted differently by market: in crease working together with our oper-
our customers. There may be various past few years, we have already suc- We are offering stand-alone solutions in closely with the market trend, especially Chile, for example, private companies ating units in other markets to serve our
objectives and initiatives, but all have cessfully established offices in Colom- automation and have increased our for large and mega projects. We sup- predominate, while we see a semi- globally active customers, in both direc-
one superior goal: to serve our custom- bia, Peru, Ecuador and Chile. Mexico market share significantly. Besides new port our customers in a “water to wire” private market in Peru and Colombia, tions: for Latin American customers
ers and to make Voith Hydro their pre- and Argentina are our next steps. installations, we’re also digitizing old solution: a technically integrated solu- with some government auctions be- and their global business, as well as, for
ferred choice. This is based on three hydropower plants with our modern tion from water inlet to grid connection. sides the participation of both state- example, big utilities from Europe that
pillars: our entire organization needs to What role does the Manaus facility HyCon automations systems, and sup- And we offer our customers a one- owned as well as private companies. are active on the American continent.
be customer-oriented – the customer play in this context? plying governors and excitation sys- stop-shop experience, with fewer inter- Blumer: We have a complex mix of
always comes first. Secondly, we aim Blumer: Our newly established manu- tems when existing hydropower plants faces and less risk for them. customers, so we need to be flexible Back to the Latin American market:
to be a lean, fast and efficient company. facturing facility in Manaus is located are being modernized. and adapt to meet their different de- What are your estimations on the
And we want to establish a great-place- very close to what I call “the next hydro- De Matos: As Mr. Blumer correctly How would you characterize the hy- mands. As an example, projects in Bra- future development of this region?
to-work environment, in order to have power frontier” in Brazil. The potential pointed out, automation is also a good dropower markets and customer zil offered in auctions will be won by the Blumer: In general, Latin America is
the best people. for hydropower plants in this area is example of our continuous innovation structure in Latin America? lowest price per MWh. A different ap- and continues to be a good region for
De Matos: In this spirit, we also aim at close to 90 GW, with only 14% already drive: to adapt to the markets, and in- De Matos: First and foremost, one has proach is design-to-cost solutions: ex- hydropower development due to its
further expanding our local presence in explored. Manaus is also capable of troduce new – and constantly update to realize that each Latin American mar- pertise from the customer, the civil con- vast natural water resources. We will
the markets. We want to strengthen our covering production needs for other existing – products and services. Our ket is different. This is one of the rea- tractor, and from Voith Hydro is blended see an increasing market share of
network in the regions, establish more countries in northern Latin America. automation lab is one of the best- sons for our local approach. The large to find the best solution for the custom- countries outside Brazil. This is not
regional offices with local people to equipped across Voith Hydro globally, hydro segment in Brazil is characterized er, gain optimum efficiency for the proj- because the market will decrease in
deepen our understanding of market Beyond localization, are there any where we are customizing solutions to by very large projects from 200 up to ect and bring it on line faster. This is Brazil, but because other countries
needs, rules and processes. This does business segments you particularly our customers, which can later be used 8,000 MW, which are usually tendered feasible through our strong technical will increase their hydropower share.
not mean, however, that we will move want to promote? on a global scale. by the government, with large private expertise. I see it as a growing trend. Colombia, Peru, Venezuela and Argen-
away from global Voith standards – De Matos: One of our targets is to pro- electrical companies, or special-pur- tina have good hydropower potential
technical leadership, high quality and mote and expand our service business, Is Voith Hydro well known for its pose companies together with invest- Is international funding increasingly and are very promising markets, too.
the optimum solution are principles that especially with regard to integrated ser- products and services in the Latin ment funds as our customers. State- a factor? De Matos: Besides new units, large
continue to apply everywhere around vices and asset management. We want American markets? owned companies also play an Blumer: Yes, funding will increasingly and small, we place a lot of emphasis
the globe. our customers to know that we have Blumer: We have become a real full- important role as part of consortia. become a key topic in the future – and on the services business: both integrat-

38 | HyPower 2014 HyPower 2014 | 39


GLOBAL EXPERTISE

ed services and modernizations. Our matrices and long-term policies are of


expectations are high since the hydro- high importance, but as of today there
power fleet across the entire region is are too many uncertainties. Also, with
aging – many plants are 25 years old or regard to permission processes and
more. Customers are keen on retrieving environmental licensing, we need clear-
any possible extra megawatt from their er rules and more efficient paths. In-
assets, and want to keep them up to centives for investment in moderniza-
6:00 9:00
date by upgrading them with the most tions are another, more specific, but
modern HyCon solutions in automation important issue, which governments
and asset management. Voith Hydro is could easily use to stimulate the supply 6:00  Eric Junior; his wife, Andreia;
and their son, Gabriel, enjoying
very experienced in such services and of additional gigawatts to the grid. breakfast together before Eric
modernization projects, which are al- Blumer: Clearer regulations and heads to Água Vermelha to begin
ways very customized jobs. You can improved processes will also lead to a his workday.
Alfredo de Matos 9:00  Eric values communication with
The Chief Marketing Officer of Voith Hydro in see our successes in this area across greater acceptance of megaprojects his team highly. “There are al-
Latin America has 22 years of experience in the the region: projects like Passo Fundo or like Belo Monte. Hydropower has so ways people who want to say
B2B industry, many of those in executive AES Água Vermelha. much to offer. It strongly contributes to something … and I am here to
positions in the energy sector. Having done listen to them,” he says.
business on five continents, he joined Voith Blumer: At the same time, the market the development of our economy and 11:00  Consulting a team member at
Hydro in 2013. He aims at moving the company environment has become more compet- society, and enables people to evolve work on the modernization of
forward based on his motto “winning and itive, particularly in small hydro, as for- from deep poverty to middle class: local equipment at Água Vermelha.
leading” – that is, winning long-term customer 14:00  Hard hats on: discussing safety
eign players enter the business, and development based on hydropower 11:00 14:00
relations and leading the hydropower market for at the plant with a team member.
another 150 years. government regulations have forced provides access to education and med-
small hydro to compete with wind and ical care and, ultimately, greater future
biomass – which is hard when you only opportunities.
look at the costs per MWh and do not
take into account the other benefits of What is your personal connection to
hydro, like contributing to grid stability or hydropower – and to Voith Hydro?

LIVING THE PROJECT


long life cycles. We need a supporting De Matos: What I like most about
legal framework here, which in some hydropower is the complexity of the
countries also means a change toward technology, the variety and flexibility of
more simple and reliable regulations. solutions, the fact that everything is
De Matos: As you can see from all that customized, coupled with its tremen- On the job with a Voith Hydro Site Manager at Água Vermelha – illustrating
we have just stated, I am quite confi- dous renewable aspect. Voith, to me, is personal engagement and technical experience of Voith’s people “on site.”
dent Voith Hydro has a lot to offer. We strongly characterized by its clear set of
need to focus on our broad experience values, its significant heritage and history,

T
and heritage, our technical leadership and the committed people with their real he time is 6 a.m., and Eric Junior ple here are very helpful and polite,” re- IV, Furnas, Baguari and Santo Antônio,”
and our deep know-how. We want to focus on never letting a customer down. is eating breakfast with his wife, marks Andreia. Along with Gabriel and Eric recalls.
assertively show that as a real full-line Blumer: To me, hydropower is an excit- Andreia, and their son, Gabriel. the family dog, Max, Andreia has been The family has now been based in
supplier we are capable of serving the ing and passionate world. It is amazing Here begins a routine that repeats itself Eric’s companion at each project he has Fernandópolis, in the southeast of Bra-
ever-changing needs of the market: how a technology launched a long time every day, in myriad forms, in markets carried out for Voith. But things haven’t zil, for nine months. Água Vermelha,
from single components to turnkey so- ago has developed in such a way that it served by Voith Hydro across the world. always been so easy. In a country as large where Eric works as Field Services Co-
lutions, from new automation solutions is still an unbeatable source of clean, and multicultural as Brazil (with more ordinator, is located on the Grande Riv-
to future trends like the use and end reliable energy. Voith is one of the few Eric is a long-serving Voithian who co- than 200 million inhabitants spread over er, which traces the border between the
benefits of big data within plants. companies where employees give ordinates a successful team in providing 8.5 million square kilometers), Eric and states of São Paulo and Minas Gerais.
themselves a nickname that stems from field services on Voith Hydro projects. his family have encountered an enor- The plant has been in service since
You mentioned the regulatory frame- the company name: Voithians. I think Currently, he is Site Manager for the mous variety of people, climates and en- 1978, and its six generating units have a
work: is it in favor of hydropower, or that the principles, values and culture Água Vermelha hydropower plant near vironments at the sites of the many dif- total output of 1,396 MW. Eric, once a
do you hope for improvements? that have made Voith strong during the Fernandópolis in Brazil – the latest in a ferent hydropower projects he has Voith customer, has worked for the
De Matos: Across the various Latin last almost 150 years will also guide us series of service roles he’s held at Voith. worked on. Among these are “Cana Bra- company since 2002, when he came
American governments, clear energy into a strong future. // “Living in Fernandópolis is great. Peo- va, Quebra Queixo, Jumirim, Corumbá across an opportunity to join the “Field

40 | HyPower 2014 HyPower 2014 | 41


Global expertise World of voith

3 4

From
16:00 17:00 screen to
16:00  Checking up on a Voith automation panel inside the power plant. fabric
17:00 Eric Junior inside the powerhouse of the Água Vermelha hydropower plant.
Voith Paper engineers have
A cool solution
used computer simulation to Voith Industrial services has helped the Shanghai-based branch of a German au-
develop new, highly effective tomotive manufacturer make significant cost and emissions savings with a transforma-
Services family,” as the Field Services ployees trust. “The Field Services team fying our customer’s needs – as well as dryer fabrics for the paper- tion plan involving pumps, compressor stations and air conditioning systems in the cus-
team is affectionately known. needs to know that someone is listening other opportunities to develop our making industry. In papermak- tomer’s Shanghai plant. In a logical yet innovative approach, water required to cool the
Eric began working for Voith as a to them, and they should be comfortable products, regardless of whether we are ing, the drying process de- plant’s machinery during operation is now chilled overnight and stored for production
Commissioning Engineer. By his own giving us their feedback. That is why I focusing on speedier construction pro- pends on these fabrics, which during the day: with energy prices at their lowest during the night time, this has led to
account, this afforded him great techni- make a point to spend a great part of my cesses or solutions to render operation transport the wet paper significant savings. Furthermore, transforming frequency conversion control to the
cal and life experience. “In the Cana day roaming around the site. There are and maintenance easier.” through the dryer section. plant’s facilities at times of peak and off-peak demand has optimized energy and elec-
Brava project, I was incredibly excited always people who want to say some- In studying the drying pro- tricity allocation. Energy consumption data at the plant is monitored, and using this in-
when I got the chance to participate in thing or who have questions, and I’m “Working in the field is to truly live the cess via computer simulation, put, Voith can further help achieve optimal energy efficiency. Subsequently, the cus-
the commissioning of a Voith machine here to listen to them.” However, when project, combining technical expertise Voith Paper engineers have de- tomer will save 2,843.6 tons of coal and about €200,000 in electricity costs annually. //
for the first time.” The team, according he first started in his role, Eric noticed and relationship skills to find solutions veloped Evaporite and Evapo-
to Eric, was small and got along very some colleagues were a bit uneasy. for challenges that arise,” says Eric. riteHigh, two better-performing
well. “The most challenging places elicit “They thought: ‘How can such a young “What we experience in the field makes dryer fabrics. These are more
the best memories,” he remarks.
Eric arrives at Água Vermelha to
person, with so few gray hairs, be taking
up a coordination role?’” he jokes. But
us understand that you never start a
project knowing all that is going to hap-
durable, with higher air perme-
ability, resulting in more effec-
Quick, reliable, efficient
begin his working day. A large Voith things have changed: Eric now has a few pen. In the same way, we never finish a tive drying. Minimum thread Voith Turbo is delivering equipment for availability: should one of the function-
logo looms to the left. That’s the place more gray hairs, as well as his team’s project knowing everything about it. crossing points make the fab- a hydropower plant in a cross-division co- relevant components fail, another compo-
where some 170 employees and suppli- trust and admiration. “Both relation- There’s just too much to absorb. It’s an ric less likely to develop tiny operation. At Scottish pumped storage nent can take over the function without
ers work in various shifts in the areas of ships with customers and with col- incomparable experience in life!” holes and subsequently trap power plant Foyers, the two pump tur- having to shut the system down. The hy-
planning, quality, occupational safety, leagues are based on trust. And for us, at At 6 p.m., the sun is setting as Eric microscopic dirt particles – bines have to run up to full power in less draulic power packs are also highly ener-
site management and technical services. Voith, trust is an attribute we never sac- says good-bye to his “family” at the site. which can lead to decreased than 30 seconds: the only way to react gy efficient, need little installation space
They are responsible for the moderniza- rifice. I usually say that the customer’s “Here we are a team, playing for both air permeability. flexibly and promptly to grid fluctuations and require very low cooling outputs. The
tion of generators, turbines, hydrome- trust is a consequence of the outcome the customer and Voith to come out as The first dryer fabrics from and secure grid stability in Scotland. The operator thus benefits from low operating
chanical components and their respec- they get. Voith really delivers on its part, winners. We are responsible for under- Voith Paper’s new CleanWeave water supply of each pump turbine is costs. //
tive mechanical and electrical balance of because we strive to meet that goal ev- standing and addressing the customer’s product range have been de- controlled by a spherical valve that must
plant systems. ery single day.” expectations, as well as for ensuring that veloped for the production of open at extremely short notice to ensure
Eric aligns his work with the wider our projects yield the best possible re- paper packaging. CleanWeave a quick change of operational mode. Two
As the saying goes in Portuguese, Voith customer strategy. “We want to be turn. In order to do that, we have to technology has already proven hydraulic cylinders drive the spherical
some people are like “a log of wood in a the number one option for the custom- work together as a group, and that is in practice to significantly im- valve as fluctuating power demands.
flood.” This expression is used to de- er. In our field activities, we are abso- why our success is a shared reward,” prove drying and machine effi- Hydraulic power packs from Voith Turbo
scribe those people who constantly stop lutely focused on the project’s goals, as concludes Eric. ciency compared with conven- H + L Hydraulic supply the two hydraulic
by to chat with everyone they pass. And well as on our commitment to deliver- With that, Eric excuses himself for tional dryer fabrics. Expansion cylinders quickly, and – most of all – reli-
that is a precise definition of Eric’s ing a final product with the reliability just a few more minutes to discuss ser- of the range is planned, with ably, with the required oil power. The hy-
workday. As Voith’s Site Manager, he is for which the Voith name stands. We vice business with another colleague fabrics for the production of all draulic power packs have redundant de-
both a role model and a person his em- are always attentive in correctly identi- who has stopped him to chat. // paper types in development. // sign and thus ensure extremely high

42 | HyPower 2014 HyPower 2014 | 43


guest perspective Guest Perspective

Pushing Nitsch is now back to freediving, which


he says “feels like finally being back
in the real world” again. To another at-

the limits tempt at his 1,000-foot goal, Nitsch


takes a “never say never” approach –
which implies that he will try again.
Freediver Herbert Nitsch
dives to great depths – In the moment when he is plunging
1 2
down, his lungs demanding oxygen and
without an oxygen tank. 1 Herbert Nitsch descends into the blue, aided by a all his human instincts inclined to agree,
guiding wire – and his supporters on the surface. Nitsch needs to take control and har-
2 When freediving, preparation is everything.
ness all his energy for the dive. “I focus
Breathe in deeply. Hold it. See if you on the important things of the moment,
can continue to hold it for nine minutes. and I try not to think about anything
For most, not breathing for this amount else. I tune out any bodily sensations
of time would simply be impossible. But “The mind is amazing in and use my energy solely to concen-
for Herbert Nitsch, it’s entirely achiev-
able. Nine minutes (and four seconds,
stimulating the body to trate on the essentials.”
Fittingly, preserving resources is
to be precise) is his personal record for go beyond limits you first second nature to Nitsch. Without his
static apnea – that is, holding a single
breath underwater.
believed were impossible.” extraordinary ability to do so, he
couldn’t perform in his sport the way he
Herbert Nitsch, freediver
But this breathtaking personal best does. This belief extends beyond his
is a modest achievement compared own physical resources: Nitsch is a
with the other feats of which Nitsch has proud ocean conservationist, holding
proven himself capable. More than a liters. Compare this with the lung ca- Since 2010, Nitsch has focused solely an advisory role with the Sea Shepherd
decade of involvement in the sport of pacity of the average adult male, which on the extreme “No Limit” freediving Conservation Society. This environmen-
freediving has seen the former pilot is six liters. This technique, paired with discipline. In No Limit dives, freedivers tal consciousness carries over into his
hold over 30 world records in all eight special training to stretch the dia- use a weighted sled to descend as far everyday life in landlocked Austria: “I
recognized freediving disciplines. phragm and lungs, helps to make the as they possibly can on a single breath. decided to get rid of the car, and I bike
lungs more flexible so they can expand An air-filled balloon aids their return to everywhere in my home town of Vienna.
Freediving is the sport – perhaps art to hold more air, and compress more the surface. Nitsch holds the current No And, I am currently in the process of
– of diving underwater for extended pe- from pressure at depth, thus enabling Limit world record: an astonishing 214 designing a fast ocean-going eco-sail-
riods of time without a breathing appa- his incredible breath-holding times. meters, for which he was dubbed “The ing boat that uses wind and solar pow-
ratus, sustained only by the last breath For someone who has earned such Deepest Man on Earth.” His focus on er only, without a combustion engine.”
you took before descending into the accolades in an ocean-based sport, it’s No Limit diving illuminates a single- It’s another remarkable pursuit from
deep blue. surprising to learn that Nitsch is self- minded determination: his ultimate goal a man who refuses to treat apparent
However, it’s not as simple as tak- trained, and hails from a landlocked of diving to 1,000 feet (304.8 meters). limits as insurmountable. “Freediving
ing a huge, gasping breath and plung- country: Austria. To suit his circum- On 14 June 2012, when attempting taught me that as long as you keep be-
ing below the surface. Nitsch explains stances, says Nitsch, “I figured I need- to reach this goal, Nitsch almost didn’t lieving things are possible, they are. The
how he prepares to go underwater: “It ed a different and more efficient ap- emerge from the blue. A blackout in the body is amazing in what it can do, and
helps to try to relax every muscle, and proach to training. Where some other depths led to his suffering a severe form the mind is amazing in stimulating the
be in a very calm, almost sleep-like elite freedivers had the advantage of of decompression sickness, known as body to go beyond limits you first be-
state,” he says. “I try to take more air in training regularly in the ocean, I came Type II DCS. That day, Nitsch reached lieved were impossible.” //
my lungs by ‘packing.’ This is a tech- 3 up with a combination of breath-hold 253.2 meters (830.8 feet). However,
nique whereby the epiglottis acts as a training on the couch at home, com- because the accident forced him to
piston to push more air in the lungs.” bined with cardio and muscular train- abort the dive, his record attempt was
With this technique, Nitsch can expand ing.” When competing, Nitsch arrives not officially recognized. His existing re-
For videos and more on
his own lung capacity from an already early and goes “spearfishing and fun cord still stands, yet to be equaled or freediver Herbert Nitsch, visit
amazing 10 liters to an impressive 15 freediving” in the sea to prepare. broken. Following a hard-won recovery, www.herbertnitsch.com

44 | HyPower 2014 HyPower 2014 | 45


Coffee break

Balanced energy Based on that: does pumped storage play a major role in
the expansion of renewable energies?
Pumped storage plants can essentially contribute to convert-
Responsive, flexible, capable: Voith Hydro ing the power supply network. They achieve this both with the
CEO Dr. Roland Münch on the power and services they offer to the energy system, and via their basic
function: high-efficiency energy storage facilities storing ex-
potential of pumped storage. cess electricity from renewable energies and feeding it back
into the grid when needed. Pumped storage technology is the
only cost-effective method that has proven itself over the long
term to store energy on a large scale and make it available on
short notice. And to top it off, it has a very high efficiency
Dr. Münch, have you ever gotten stuck in an elevator dur- level of 80% or more.
ing a blackout?
Traveling frequently to visit our Operating Units worldwide, Is there sufficient potential for new pumped storage
I’ve experienced a few power outages, but fortunately never power plants?
in an elevator. However, that’s an interesting point: blackouts Yes. Potential implementation exists worldwide. A study initi-
are occurring increasingly – and most commonly – in those ated by Voith focusing on Germany’s “Energiewende” (the
countries where energy generation and consumption are not transition to renewable energy sources) shows that in this
consistent, and especially where peak demand is not being country alone, all planned pumped storage projects can ex-
covered permanently. Hydropower – and pumped storage in pand capacity by about 8,000 MW – thereby
particular – is very capable of contributing to a solution to almost doubling current capacity. Chi-
these problems, as it can stabilize the grid and cushion peak na has concrete expansion plans
demands. and immense potential. Here, too,
we’re talking about possibly dou-
How can hydropower stabilize power grids or even pre- bling capacity by 2030. Voith is
vent blackouts? also involved in new constructions
Hydropower is the only renewable energy that meets base and upgrades of pumped storage
load requirements, so it plays a key role in providing a stable power plants in the US, Southeast
and reliable power supply. Pumped storage plants make a Asia, South Africa, and Portugal. With
particularly important contribution: they can cover peak de- our many years of experience stem-
mand by providing large amounts of energy, reacting very ming from more than 200 pumped
flexibly and within a short time. And they offer a variety of an- storage projects and a broad
cillary services to the grid to support reliable supply. This is technological portfolio, we
especially important for power grids that are increasingly fed want to continue to be a key
with electricity from fluctuating renewable sources like wind player in the expansion and
and solar. future development of
pumped storage technol-
Can you describe these services in more detail? ogy. That way, no one
Ancillary services support the transmission of capacity and will have to get stuck in
energy from generation resources to consumers and maintain an elevator again. //
the reliable operation of the transmission system. This in-
cludes regulation services like balancing grid frequency, as
well as voltage support. Pumped storage plants can provide
all types of balanced energy for frequency-maintaining pur-
poses. They are exceptionally well suited to providing reactive
power in a flexible way, to keep voltage at a proper level, and
they are black-start capable. That means that after a black-
out, they can be restarted without having to rely on the power
grid – thus restoring the power supply. If I ever do get stuck in
an elevator, I will count on pumped storage power to get that
elevator moving again.

46 | HyPower 2014
Project All projects mentioned in this issue of
HyPower and Voith’s scope of supply
Directory

 10

11
 11

1-4

5
 8
 7

 9

12,13

Europe and Africa Asia Pacific The Americas


Hydropower potential in Europe: 873 GW Hydropower potential in Hydropower potential in North America: 388 GW
Installed capacity: 247 GW (30%) Asia Pacific: 1,754 GW Installed capacity: 155 GW (40%)
Hydropower potential in Africa: 435 GW Installed capacity: 420 GW (24%)
Hydropower potential in South America: 904 GW
Installed capacity: 26 GW (6%) Installed capacity: 162 GW (18%)

1 Iffezheim, Germany: Service contract output of 215 MW, and governors. automation systems, electrical and 9 Lam Ta Khong, Thailand: Supply of two 12 Água Vermelha, Brazil: Modernization
for maintenance and repair, including the 4 Tröpolach, Austria: Supply of two small mechanical balance-of-plant equipment. 255 MW vertical pump-turbines, motor- of six units with a total capacity of 1,396
refurbishment of all non-moving parts of hydro turbines working in tandem with a 7 Hong Ping, China: Four complete generators, automation systems, electrical MW, including a complete overhaul of
one of the four 28.3 MW bulb turbines. combined capacity of 7.9 MW. 300 MW pumped storage units, including and mechanical balance-of-plant equipment. generators and turbines, associated elec-
2 Hochstadt, Germany: AMB contract for 5 Frades II, Portugal: Complete electro- generators and reversible Francis pump- 10 Pointe du Bois, Canada: Service tromechanical systems and the renewal
Kaplan-A bulb turbine overhaul, including mechanical equipment, including two turbines, governors, inlet valves, and exci- contract for maintenance and repair works of many components.
repair-welding of blades, leveling of runner 390 MW variable-speed reversible pump tation, automation and auxiliary systems. on several turbines in the 75 MW plant. 13 Chavantes, Brazil: Modernization of
chamber, wicket gate overhaul and re- turbines and two asynchronous motor- 8 Bhira, India: Service project covering 11 Smith Mountain, USA: Rehabilitation three generating units, including turbines,
building of main turbine guide bearing. generators. design, upgrade, manufacturing, supply, project for generators at the plant, includ- generators and associated electromechan-
3 Reisseck II, Austria: Supply of two 6 Ingula, South Africa: Four motor- erecting and commissioning of a new ing rewinding works, stator coil supply and ical systems in the 414 MW plant.
reversible pump-turbines, each with an generators and 342 MW pump-turbines, stator for the 200 MVA motor-generator. rotor rim shrink.

Figures on hydropower potential based on Hydropower & Dams Yearbook 2013.


Published by:
Voith Hydro Holding GmbH & Co. KG
Alexanderstr. 11
89522 Heidenheim, Germany
Tel: +49 7321 37 0
Fax: +49 7321 37-7828
www.voith.com

A Voith and Siemens Company

You might also like