You are on page 1of 2

Project: __________________________________________

Theoretical maximum SG Checklist

No. Tasks Indicator Comments

all apparatus and matterials are prepared and present at


1    
work station

2 sample is dried at a constant mass of 105 ± 5˚C    

particles of the paving mixtures are separated by hand


3    
according to standard procedures

sample is placed into tared bowl or volumetric flask and


4    
weighed

5 sample is submerged in water in the container and covered    

container with the sample and water is placed on


6 mechanical agitation device and secured/anchored to    
surface of device
the device is operated in accordance with astm standards
7    
(3.5 ± 0.3KPa / 27.5 ± 2.5mm hg)

8 weighing is done according to standard procedures    

9 documentation of exercise    

Prepared By: _________________________________ Date: ______/_______/________

Table 1: Indicator Key

Practises that fully conform to Technical Practises that fully conform to Technical
Specifications that are being carried out fully Specification that are not being carried out fully
Approved practises that are not being fully Approved practises that are being fully followed
followed
Not Applicable

Quality Assurance Checklist


Quality Assurance Checklist

You might also like