1
Project Set Up
DSD Contract DC/2006/10
Contract Sum : HK$ 78 million (approx)
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
57m
~ -7.1mPD
43m
~ -5.9mPD
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
2
43m
~ +4.0mPD
Retaining Wall
~ -5.9mPD
~ -7.1mPD
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Design Objectives:
• Approximate max. 10m deep excavation
• Effective control of settlement due to excavation
and groundwater drawdown
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
3
Approx. Location of Site
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Victoria Harbour
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
4
Pre-Contract Ground investigation
• 2 series in 2002 & 2006 (32 holes)
• Common sampling, field and laboratory tests
• In situ vane & pressuremeter tests
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Sand Fill
Marine Deposits
Alluvium
CDG
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
5
Existing Salt
Water PS
Fill
Marine Deposits
Alluvium
CDG
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
6
Small sink hole at sea wall
Seawall Cope Line
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
7
15m3 sink hole
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
10/10/06
21/8/06
31/8/06
10/9/06
20/9/06
30/9/06
0.000
-0.100
Settlement (m)
-0.300
10/10/06
21/8/06
31/8/06
10/9/06
20/9/06
30/9/06
0.000
GS20
GS21
GS24
GS25
-0.100
Settlement (m)
-0.200
8
Design Considerations
Reclamation Site
Sensitive Structures nearby, i.e. WSD Pumping Station
High water table, i.e. 1.2m below existing ground level
(+3.0mPD)
Presence of thick layer of variable FILL
& soft MARINE DEPOSITS
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Design Methodology
Drained and Undrained Conditions
Lateral Stability
Global Slope Stability
Base Stability
Hydraulic Stability
Dewatering
Ground Deformation / Settlement
Structural Capacities
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
9
Plot of SPT-N against Elevation
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
10
Walings & Struts
FSP IV Sheet Pile (3 levels)
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
11
Longitudinal Cross Section nearest Seawall
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
12
Penetration
(T.A.M.) Grout Jet Grout
Sheetpile
(not shown for clarity)
Elevation of Wall D
(Showing Grouting Ground Improvement)
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Fill
Marine Deposit Grout A
Alluvium
CDG Grout B
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
13
δmax = 115mm
δmax = 60mm
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
δmax = 18mm
δmax = 82mm
West Wall
East Wall
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
14
δmax = 102mm
δmax = 88mm
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
δmax = 53mm
δmax = 75mm
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
15
Seawater
Fill (Sand)
Seawall
Tilt = 1/650
Deformation of Seawall
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
16
Principal Instrumentation :
- Ground settlement markers (SS, GS, SA)
- Inclinometers (IN, INX)
- Standpipe Piezometer (SP, PZ, PP)
- Building Tilt Marker
North Wall
West Wall
East Wall
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
17
Settlem ent agains t Tim e
0.050
H-Piling, Sheetpiling, Ground Improvement Grouting
0.000
Excavation
-0.050
Pile Cap
-0.100
Settlement (m)
-0.150
-0.200
-0.350
ay-07
01-Nov-06
ar-07
01-Nov-07
01-Aug-06
01-Jan-07
01-Apr-07
01-Jun-07
01-Aug-07
01-Jan-08
01-Jul-07
01-Sep-06
01-Oct-06
01-Dec-06
01-Feb-07
01-Sep-07
01-Oct-07
01-Dec-07
01-M
01-M
D ate
0.000
-0.100
-0.200
Settlement (m)
-0.300
-0.400
-0.600
ay-07
01-Nov-06
ar-07
01-Nov-07
01-Aug-06
01-Jan-07
01-Apr-07
01-Jun-07
01-Jul-07
01-Aug-07
01-Jan-08
01-Sep-06
ct-06
01-Dec-06
01-Feb-07
01-Sep-07
ct-07
01-Dec-07
01-M
01-O
01-O
01-M
D ate
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
0.000
H-Piling, Sheetpiling, Ground Improvement Grouting
-0.050
Excavation
-0.150
Settlement (m )
-0.200
-0.250
-0.300
-0.350
-0.400
-0.500
01-May-07
01-Nov-06
01-M ar-07
01-Nov-07
01-Aug-06
01-Jan-07
01-Apr-07
01-Jun-07
01-Jul-07
01-Aug-07
01-Jan-08
01-Sep-06
01-Oct-06
01-Dec-06
01-Feb-07
01-Sep-07
01-Oct-07
01-Dec-07
Date
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
18
GS28 (6.2m) GS31 (9.6m) GS34 (15.6m)
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
0.010
0.000
-0.010
-0.020
Settlement (m)
-0.030
-0.050
-0.060
SS13 SS9 SS10 SS14
-0.070
10-Oct-06
24-Oct-06
07-Nov-06
21-Nov-06
05-Dec-06
19-Dec-06
02-Jan-07
16-Jan-07
30-Jan-07
13-Feb-07
27-Feb-07
13-Mar-07
27-Mar-07
08-May-07
22-May-07
05-Jun-07
19-Jun-07
03-Jul-07
17-Jul-07
31-Jul-07
09-Oct-07
23-Oct-07
06-Nov-07
20-Nov-07
04-Dec-07
18-Dec-07
01-Jan-08
12-Sep-06
26-Sep-06
11-Sep-07
25-Sep-07
01-Aug-06
15-Aug-06
29-Aug-06
10-Apr-07
24-Apr-07
14-Aug-07
28-Aug-07
Date
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
19
Displacement (mm)
0 5 10 15
4.0
2.0
0.0
-2.0
-4.0
-10.0
-12.0
-14.0
-16.0
Inclinometer IN5 (1m)
-18.0
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Jet grouting
• Jet grout cuts insitu soft clay and mixes that with
injected cement
• Disturbed clay is displaced to surface in slurry
form
• Jet nozzle is typically 1.4mm to 3mm dia.
• Applicable to more cohesive soils where T.A.M.
grouting may not work
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
20
Temporary casing for
drilling through fill.
Withdrawn prior to jetting.
(optional)
Soil Overburden
Ref. : CNCEC
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
21
Jet grout parameters
• Jet grout parameters adopted at SWSPS
Target grouted dia. = 1500 – 2000 mm
Grout pressure = 300 – 400 bars
Air pressure = 8 - 12 bars
Withdraw rate = 13 to 15 min/m
Rotation rate = 6 – 7 rev/step
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
22
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
23
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
24
Hole S5 Hole S2
(UCS: typically 7-10 MPa, sometimes >40 MPa)
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
25
T.A.M. Grout Core Sample
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
26
Sheetpiling by push-in method
At SWSPS
• Giken rig with special tool to
overcome obstruction (up to 1m)
• Maximum 24m long sheet pile
• Limited to Type IV sheetpile
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
27
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
28
Drilling through Obstructions
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
29
Alignment out-of-line when
encountering obstructions
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
30
Excavation in progress
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Disposal by barge
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
31
Installing waling and strut
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Excavation completed
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
32
Concreting in progress
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Concreting in progress
(3 concrete pumps & 13 concrete trucks)
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
33
Foundation Completed
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
海濱
園林景觀工程設計
長廊
散石徑/
散石徑/太極區
小型廣場
綠化天台
海
濱
方形花園
長
廊
觀賞園林
遮雨蓬
長椅
散石徑
裝飾性街燈
Asia HKIE Technical Talk – ELS Design forRef.
SWSPS
: DSD– 18 June 2008
34
Before Commencement After Completion
Ref. : DSD
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Summary
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
35
Acknowledgement
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
Thank You !
Asia HKIE Technical Talk – ELS Design for SWSPS – 18 June 2008
36