Conveying systems offer submittal
Marine container terminal project, San Pedro Ivory Coast
Disclaimer: the elevator and cabin design in this picture does not necessarily reflect the design of the proposed equipment in this offer. For
the exact details please refer to the catalog of the related series
Project name: AFCONS
Offer No: SQ0055
Offer date: 23 June, 2020
Dear Sir
JMG is pleased to have the opportunity to tender for the equipment of the subject project. Please find
enclosed our tender submission including our technical specification for your evaluation. In the scope of
works is our price for design, manufacture, supply and installatoin of the equipment as per the
specification and details hereafter.
Our offer is for products manufactured under strict ISO quality standards in thyssenkrupp factories. The
proposed equipment meets the European standard of EN81-20/50.
1- Technical Specification
2- Commercial Terms
3- List of deviations - Works Included/Excluded
Sincerely
Jihad Nasr
1- Technical Specifications
a- Elevators L1, L2
Quantity 2 (Duplex)
Model SYNERGY 200
Load 630 kg - 8 persons
Applicable code EN81-20/50
Speed 1 m/s
Control VVVF
Machine room (system) Machine Room less with permanent magnet gearless traction machine
Travel 12.75 m
Stops/Opening 4S/4O
Accesses Single access
Operations/hour 180 O/H
Controller model: CMC4+
Group control: Duplex
Control System
Operation: Full collective
Control cabinet finish: Stainless Steel Gr220D
Power supply 380 V - 50 Hz
Client Signature
Client Signature
Alarm button
Emergency lighting 1 hour
By-pass when overload of car
Door close and open button
Fan with Fan Controller Automatic Stand-by
Overload Holding Stop with buzzer
Reopen with hall button
Door load detector
Safety curtain
Automatic Rescue Device in case of power failure
Standard features
Door nudging
Automatic switch off of cabin light to reduce energy consumption
Overload indicator in the elevator car
Collective fault signal
Halogen-free shaft wiring
Parking level in main landing
Button for emergency call
Main floor green round frame EN 81 -70
Doors fire protection safety standard E120/EW60 ; 2 hours according to
EN 81-58
Intercom 3-ways
Fireman Service
Optional requested
Cancellation of car calls by means of double-click in the COP
features
Verbal announcement (Voice synthesizer)
Preparation for Card Reader in COP
The dimensions listed in this offer can be modified depending on the actual site conditions and will be finalized
based on the shop drawings issued by JMG. The finishes listed are only preliminary and can be amended by the
client prior to order placement (modifications in dimensions and/or finishes can be subject to price variations)
Client Signature
2- Commercial Terms
a- Bill of quantities
Item
Qty Description Unit price (CFA) Ext. price (CFA)
Ref.
L1, L2 2.00 ThyssenKrupp Synergy 200 elevators 630KG – 1,0 m/s – 4 stops 35,074,449.06 70,148,898.12
Subtotal 70,148,898.12
Discount 20% 14,029,779.62
Subtotal After Discount 56,119,118.50
TVA 18% 10,101,441.33
Subtotal After Discount 66,220,559.83
The above price includes the supply, installation, and commissioning of the
aforementioned equipment with warranty 1 year for maintenance & Spare
parts.
Client Supplier
Company name AFCONS JMG
Name Mr. Yadav Poojary Jihad Nasr
Address Abidjan , Ivory Coast
Telephone Nb. +971 508531643 +225 07 55 50 50
Date and Signature
Client Signature
This offer is valid for a period of 60 days and up to 6 months from contract signature. JMG reserves the
right to change the offer partially or entirely after this date. This offer becomes a contract upon both
parties’ signature and after the settlement of the first payment detailed below by the client.
c- Free maintenance
A free maintenance of 12 months with a call back service from Monday to Friday (8:00AM to 5:00PM) is
included in this offer effective the date of handing over of the material.
d- Payment terms
- Advance payment: 60% of contract amount
- Upon issuance of B/L documents: 20% of contract amount
- Upon material arrival to site: 10% of contract amount
- Upon completion of installation: 10% of contract amount
e- Payment delays
- Delay in “contract signature” payment beyond 15 days from the signature of the contract will
render the contract void and will allow JMG to charge 10% of the contract value on the client for
administrative fees
- Delay in “before order placement” payment beyond the date set in “project plan” section below,
will allow JMG to charge any increases in material prices on the client and will not proceed with
the manufacturing of the material
- Delay in “upon material delivery to site” payment beyond 15 days from the date of material
arrival to site will allow JMG to stop all installation and related works on the project
- Free maintenance will be suspended until outstanding payments have been made on due date
as agreed in the sales contract
f- Exchange rates
Prices are subject to change based on prevailing exchange rates.
.
Client Signature
g- Project plan
The following dates are part of the contract plan and shall be followed to meet stated dates:
- Step 1: Contract signature
- Step 2: Three weeks from step 1: Approval on shop drawings and finishes selection
- Step 3: 25 weeks from step 2: material arrival to site
- In case the equipment is ready to be delivered to site and its delivery is delayed by the client,
he will incur additional charges of 600US$ / unit / month for the storage and the insurance of
the equipment. The Client agrees that the Supplier does not commence the installation process
at the site before the safety inspection is satisfactory and the required safety conditions are
met, which shall be certified in writing by the latter.
- Step 4: 6 months after material arrival to site: equipment handing over
- The handing over will be considered effective one month after the completion of installation
works without need of any notice.
h- Transfer of risks
Upon the delivery of the material to site, the material becomes under the full responsivity of the client.
i- Cancellation Charge
If a party decides to cancel the contract before the approval of the shop drawings, he will incur a
cancellation charge of 10% of the total amount of the contract. After that date and once shop drawings
are approved, the client will become liable to JMG for the total amount of the contract.
Client Signature
List of deviations
The dimensions listed in this offer can be modified depending on the actual site conditions, and will be
finalized based on the shop drawings issued by JMG. The finishes listed are only preliminary and can
be amended by the client prior to order placement (modifications in dimensions and/or finishes can be
subject to price variations)
Excluded
Included
Provision and installation of the electrical wiring and conduits for bi-directional communication
X
between car and elevator control panel
Provision and installation of the electrical wiring and conduits for bi-directional communication
X
between elevator control panel and building lobby/security room
Provision of wiring for Fire signal, CCTV, BMS, access control between control room and
X
elevator control panel
Shaft lighting of the elevator and switches in the pit: The shaft possesses electric lighting that
guarantees a minimum level of 50 lux, 1 m above the car ceiling and of the pit shaft, exactly
X
when all the doors are closed. The pit is equipped with a switch. This illumination will be
commanded both at the pit and in the machine space
Provision of an uninterruptable electrical power supply of 20A/230V per elevator during working
X
hours
Provision of power receiving panel with three phase power supply for elevators operation and
X
single-phase power supply for car and shaft lighting
Supply of hooks in order to support the elevation of equipment at the roof of the shaft X
Provision of a clear shaft plumb from top to bottom with a maximum vertical deviation of 30mm X
Ensuring an inside shaft temperature ranging between +5 and +40 degrees Celsius X
Provision of separating beams to support brackets on shafts with more than one elevator X
Provision of holes for LOP wiring according to shop drawings X
Elevator shaft to be clear from any equipment not related to elevators, and pit to be free from
X
debris, water….
Provision of finished floor markings at all floors prior to installation commencement X
Closing around doors further to doors installation X
Client Signature
Excluded
Included
Provision and installation of a pit ladder to access to the pit shaft. X
Provision and installation of Scaffolding inside the shaft according to JMG installation team
X
instructions.
Provision and installation of marble, stone or any other car flooring type. The cabins are
X
prepared to receive a flooring with a maximum thickness of 20mm
Provision of covered and locked space for the storage of equipment and tools on site X
Provision of barricade at all shaft openings for fall protection X
Client Signature