You are on page 1of 1

Ø1 Top bar , 23- 28 mm dia

750 80
0

Mesh Size 8 mm @75mm c/c,


20 mm and 100 mm from Top

670
1400

9000 4L- 16 mm dia @115 mm c/c

Pier Cap Reinforcement details along Section of pier cap -


Section A-A
20 mm dia @ 175 mm c/c
Fig:- Plan - Pier Cap

both ways Primary reinforcement 23-28 mm Mesh Size 8 mm @75mm c/c, 20 mm


Dia. along whole width and 100 mm from Top

1000
1239.02m (HFL)
A A

500
6L- 12 mm dia vertical stirrup
@ 95 mm c/c

7200
Side face Reinforcement
16mm@ 200mm c/c on both sides

B B
42 Nos-25 mm dia
L-Reinforcement

7200 12 mm Dia stirrup @

7000
Bottom Reinforcement details of Pier 42-25 mm Ø bars 200mm c/c
Foundation

20 mm dia @ 200
1234.70m (BED LEVEL)
Ø1

mm c/c both ways


8
00

12 mm dia @ 200 c/c


20 mm dia. @ 200 mm c/c 1232.18m (SCOUR LEVEL)
SECTION OF PIER both direction
7200

1250 950
1230.42m (FOUNDATION LEVEL)
C C
20 mm dia. @ 200 mm c/c
both direction
7200

7200 Reinforcement details along


FIG: Reinforcement details along Section of pier

Top Reinforcement details of Pier Foundation Section of pier


FIG: Reinforcement details along Section of pier

PROJECT TITLE: DRAWN BY: SHEET


TRIBHUVAN UNIVERSITY DESIGN OF RCC BRIDGE AT SHANKHAMUL AJAY, ASHMIN, BHAGWAN, KUSHAL NO:
HIMALAYA COLLEGE OF ENGINEERING CHECKED BY: 11
DRAWING TITLE:
CHYASAL, LALITPUR RCC DETAILING OF PIER AND PIER CAP

You might also like