25000 50 25000 50 25000 50 25000

1400 1400 1400


5000 5000
APPROACH APPROACH
SLAB SLAB

BRIDGE PLAN

50 50 50
25000 25000 25000 25000
BACKFILL OF SOIL BACKFILL OF SOIL
1243 1243

1241 RIGHT BANK 1241


LEFT BANK
HFL 1239.02m HFL 1239.02m HFL 1239.02m
1239 GL :1237.4m GL :1237.1m 1239

1200
1200

1237 EL :1234.6m 1237


EL :1234.6m
1235 1232.18(SCOUR LEVEL) 1235
5000 5000
1233 EL 1230.42m 1233
1250

1250

1250
1231 1231

1229 7200 7200 7200 1229

1227 1227

1225 1225
1242.625

1239.502

1240.645

1238.125

1237.294

1237.038

1236.735

1236.000

1235.500

1235.000

1234.500

1234.006

1234.500

1235.555

1237.635

1237.893

1238.000

1238.197

1242.500

1242.830
EXISTING
LEVEL (m)
0+000.00

0+004.17

0+008.36

0+014.09

0+020.00

0+024.45

0+028.19

0+033.07

0+039.41

0+046.30

0+053.19

0+060.00

0+064.78

0+070.42

0+080.00

0+088.19

0+096.59

0+112.13

0+122.87

0+132.56
CHAINAGE (km)

CHAINAGE : 0+000.00 - 0+132.56

BRIDGE ELEVATION

PROJECT TITLE: DRAWN BY:


TRIBHUVAN UNIVERSITY DESIGN OF RCC BRIDGE AT SHANKHAMUL AJAY, ASHMIN, BHAGWAN, KUSHAL SHEET NO:
HIMALAYA COLLEGE OF ENGINEERING
CHYASAL, LALITPUR
DRAWING TITLE:
PLAN AND ELEVETION OF BRIDGE SCALE: 1:400
CHECKED BY: 03