Grade of

S.NO ITEM No's L W H No's L W H


Concrete

1 PCC M10 1 2.6 2.6 0.1 1 3.3 2.9 0.1


2 RAFT M25 1 2.4 2.4 0.2 1 3.1 2.7 0.2
3 1 ST LIFT Long Wall(Outer to Outer) M25 2 2.2 0.2 1.2 2 2.9 0.2 1.2
1 ST lift Short Long Wall(Inner to Inner) M25 2 1.8 0.2 1.2 2 2.1 0.2 1.2
4 2 nd LIFT Long Wall(Outer to Outer) M25 2 2.2 0.2 1.2 2 2.9 0.2 1.2
2 nd lift Short Long Wall(Inner to Inner) M25 2 1.8 0.2 1.2 2 2.1 0.2 1.2
5 3 rd LIFT Long Wall(Outer to Outer) M25 2 2.2 0.2 1.5 2 2.9 0.2 1.6
3 rd lift Short Long Wall(Inner to Inner) M25 2 1.8 0.2 1.5 2 2.1 0.2 1.6
Total Total

1 PCC M10 1 2.9 2.9 0.1 1 3.5 3.1 0.1


2 RAFT M25 1 2.7 2.7 0.2 1 3.3 2.9 0.2
3 1 ST LIFT Long Wall(Outer to Outer) M25 2 2.4 0.2 1.2 2 3.1 0.2 1.2
1 ST lift Short Long Wall(Inner to Inner) M25 2 2 0.2 1.2 2 2.3 0.2 1.2
4 2 nd LIFT Long Wall(Outer to Outer) M25 2 2.4 0.2 1.2 2 3.1 0.2 1.2
2 nd lift Short Long Wall(Inner to Inner) M25 2 2 0.2 1.2 2 2.3 0.2 1.2
5 3 rd LIFT Long Wall(Outer to Outer) M25 2 2.4 0.2 1.4 2 3.1 0.2 1.6
3 rd lift Short Long Wall(Inner to Inner) M25 2 2 0.2 1.4 2 2.3 0.2 1.6