ITEM NO. DESCRIPTION OF ITEM NO LENGTH IN (M) BREADTH IN (m) HEIGHT IN (M) QUANTITIY IN (M3) UNIT COST COST
1 EARTH WORK 1 5 2.5 1.8 22.5
2 BRICK WORK AT BOTTOM 1 5 2.5 0.1 1.25
3 150 THK P.C.C. OVER BRICK FLAT SOLING 1 5 2.5 0.15 1.875
4 BRICK WORK OF SUPER STRUCTURE
1. LONG WALL 2 5 0.5 2.95 14.75
2. SHORT WALL 2 1.5 0.5 2.95 4.425
5 RCC SLAB 1 5 2.5 0.1 1.25
6 MAIN HOLE 1 3.14 0.45 0.1 0.01589625
7 PLASTERING
1. PLASTERING INSIDE THE TANK
(I) LONG WALL 2 4 2.95 23.6
(II) SHORT WALL 2 1.5 2.95 8.85
2. PLASTERING OUTSIDE THE WALL
(i) LONG WALL 2 5 1.4 14
(II) SHORT WALL 2 2.5 1.4 7
2. INSPECTION CHAMBER
(I) LONG WALL 2 1.65 0.25 1.575 1.299375
(ii) SHORT WALL 2 1.4 0.25 1.575 1.1025
3. CHLORINATION CHAMBER
(i) LONG WALL 2 1.4 0.25 1.575 1.1025
(ii) SHORT WALL 2 1.4 0.2 1.575 0.882
5 RCC SLAB
1. CHAMBER SECTION 1 7.3 2.5 0.1 1.825
2. INSPECTION CHAMBER 1 1.65 1.9 0.1 0.3135
3. CHLORINATION CHAMBER 1 1.4 1.9 0.1 0.266