You are on page 1of 2

Category Item Unit Unit Cost total cost length

1 Earthwork in excavation of foundation


footing 15 340.4 29614.8 2
In between columns
side and inter walls 5 340.4 322.31625 2.525
front wall 1 3 340.4 756.32625 9.875
front wall2 2 340.4 84.249 1.65
fron wall with verendah 1 340.4 22.977 0.9
add on width of front wall 2 340.4 85 1.62
total 39990
2 RCC work
(a) Footing
part1 15 2658 31896 2
part2(trapezoidal) 15 2658 13157.1 0.2/6(4+0.16+4*1.2
part3 15 2658 2551.68 0.4
part4 15 2658 1614.74 0.3
sub total 49220
(b) columns 15 2658 8970.75 0.25
tie beam
side and inter walls 5 2658 5897.4375 5.925
front wall 1 3 2658 5816.03625 9.725
front wall 2 2 2658 1275.84 3.2
front wall with verendah 1 2658 528.2775 2.65
add on width of front wall 2 2658 99.675 0.25
sub total 13617.26625
© rcc in first floor level beam 13617.27
(d) rcc in first floor slab 1 2658 24497.457 14.125
3 plain cement concrete
foundation 15 2658 19935 2
4 mild steel including bending in reinforcement(quintal)
footing 15 2291.4 16650 0.5%of total concret vo
columns 15 2291.4 9108 1.5%of total concrete vo
tie beam 1 2291.4 9211 1%of total cocrete vol
rcc in first floor beam 1 2291.4 9211 1% of total concrete vo
rcc in first sloor slab 1 2291.4 13263 0.8% of total concrete vo
subtotal 57443
breadth height Quantity

2 1.45 5.8

0.25 0.3 0.189375


0.25 0.3 0.740625
0.25 0.3 0.12375
0.25 0.3 0.0675
0.25 0.3 0.1215

2 0.2 0.8
0.2/6(4+0.16+4*1.2²) 0.33
0.4 0.4 0.064
0.3 0.45 0.0405

0.3 3 0.225

0.25 0.3 0.44375


0.25 0.3 0.729375
0.25 0.3 0.24
0.25 0.3 0.19875
0.25 0.3 0.01875

6.525 0.1 9.2165

2 0.125 0.5

0.5%of total concret volume 0.4845


1.5%of total concrete volume 0.265
1%of total cocrete volume 4.02
1% of total concrete volume 4.02
0.8% of total concrete volume 5.788