CNC Cutting Progress Date: 03/01/2020

SL NO Production Drawing List H-81 H-82 H-84 H-86 H-87 H-88

1 W273_W285 AFT END TRANSVERSE CONSTRUCTION (FR.07-FR.TRANSOM)

2 W254_W263 AFT END LONGITUDINAL CONSTRUCTION (FR.07-FR.TRANSOM)

3 W233_W253 ENGINE ROOM TRANSVERSE CONSTRUCTION (FR.07-FR.21) Rev

4 W229_W232 ENGINE ROOM TRANSVERSE CONSTRUCTION (FR.22) 100% 100%

5 W210_W228 ENGINE ROOM LONGITUDINAL CONSTRUCTION (FR.07-FR.22) ### 50%

6 W-111_W-144 Updated FORE END FRAME CONSTRUCTION(FR-99_ FORE EXTREME) REV-1

7 W178_W193 FRAME CONSTRUCTION (FR-84_ FR-98)

8 W166_W177 FRAME CONSTRUCTION (FR-28_ FR-23)

9 W-145_W-165 FRAME CONSTRUCTION (FR-29_ FR-83) 100% 100%

10 W-103_W-105 SIDE FRAME CONSTRUCTION (FR-28_ FR-23)

11 W-23~W-25 SIDE FRAME CONSTRUCTION(FR-29_FR-83)

12 W-106_W-110 SIDE FRAME CONSTRUCTION (FR-84_ FR-98)

13 W-60~W-64 AFT TOP SIDE TANK CONSTRUCTION

14 W-65~W-78 MIDDLE TOP SIDE TANK CONSTRUCTION- rev

15 W-79_W-83 FORWARD TOP SIDE TANK CONSTRUCTION

16 W-45_W-59 DOUBLE BOTTOM CONSTRUCTION(FR-23 _ FR-28) 100% 100%

17 W-01_W-22-updated DOUBLE BOTTOM CONSTRUCTION (FR-29_ FR-82) 100% 20% 100% 20% 30%

18 W-26_W-44 DOUBLE BOTTOM CONSTRUCTION(FR-84 _ FR-98) 100% 100%

19 W-84_W-102 FORE END BOTTOM CONSTRUCTION(FR-99_ FORE EXTREME) 80% 100%

20 W-194_W-209 FORECASTLE DECK CONSTRUCTION(FR-99_ FORE EXTREME)


___________________________
___________________________
Md. Ashifur Rahaman
Md .Nurul Islam
Assistant Engineer, MSDL
DGM, MSDL
e: 03/01/2020

H-89

100%

50%

100%

100%

100%