DETAILED ESTIMATE

NAME OF WORK : TGP - PROVIDING LINING FOR P.T.S CHANNEL FROM KM 0.600 TO KM 11.200
FOR THE REACH From KM 0.600 TO KM 11.200
(Constituting Hydraulic Reaches) From KM 0.600 TO KM 8.850
KM 8.850 TO KM 11.200
KM 0.000 TO KM 0.000
KM 0.000 TO KM 0.000
KM 0.000 TO KM 0.000
UNIT
S. MEASUREMENTS QUANTITY
DESCRIPTION OF ITEM NO'S S
NO. L B D Or Say
1 Clearing light jungle on both side
slopes and berms etc.
From Km 0.600 To Km 8.850 1 x 1 8250 18.424 - 151998.00
From Km 8.850 To Km 11.200 1 x 1 2350 18.424 - 43296.40
From Km 0.000 To Km 0.000 1 x 1 0 18.424 - 0.00
From Km 0.000 To Km 0.000 1 x 1 0 18.424 - 0.00
From Km 0.000 To Km 0.000 1 x 1 0 18.424 - 0.00
195294.40

195294.40 195300 sqm


3 EWE in All Soils,HDR,FR & HR
I. In F&F Rock and Hard Rock
(a) For housing lining
(i) - In bed
From Km 0.600 To Km 8.850 1 x 1 8250 ( 9.14 + 9.44 ) / 2 0.10 7664.25
From Km 8.850 To Km 11.200 1 x 1 2350 ( 7.60 + 7.90 ) / 2 0.10 1821.25
(ii) for profile walls
From Km 0.600 To Km 8.850 1 x 459 9.14 0.30 0.20 251.72
From Km 8.850 To Km 11.200 1 x 131 7.60 0.30 0.20 59.74
9796.95

Quantity of FR (considering 50 % of the total quantity) 4898.48 4900 cum


Quantity of HR (considering 50 % of the total quantity) 4898.48 4900 cum

II. In All Soils,HDR,FR & HR


(a) For housing lining
(i) - In side slopes 1 x 2 8250 1.803 x 2.15 0.10 6396.14
From Km 0.600 To Km 8.850 1 x 2 2350 1.803 x 2.15 0.10 1821.93
From Km 0.000 To Km 0.000
(ii) - for lugs 1 x 2 8250 ( 0.325 + 0.700 ) / 2 0.25 2114.06
From Km 0.600 To Km 8.850 1 x 2 2350 ( 0.325 + 0.700 ) / 2 0.25 602.19
From Km 0.000 To Km 0.000
(b) In side slopes
(i) for profile walls
From Km 0.600 To Km 8.850 2 x 459 1.803 x 2.15 0.30 0.20 213.52
From Km 8.850 To Km 11.200 2 x 131 1.803 x 2.15 0.30 0.20 60.94
11208.78

Quantity of all soils (considering 20 % of the total quantity)-- 2241.76 2250 cum
Quantity of HDR (considering 20 % of the total quantity) 2241.76 2250 cum
Quantity of FR (considering 20 % of the total quantity) 2241.76 2250 cum
Quantity of HR (considering 40 % of the total quantity) 4483.51 4490 cum
5 Formation of banking with semi
pervious and pervious soils
canal sides and bed banking (Saparete sheet enclosed)
For formation of canal banks 1 x 2 8250 4.00 1.00 66000.00
66000.00 66000 cum

Page 1 of 6
UNIT
S. MEASUREMENTS QUANTITY
DESCRIPTION OF ITEM NO'S S
NO. L B D Or Say
7 C.C. of M-15 with 20 MSA for Profile
walls, Lug and Curve Fillet
(a) for Profile walls
(i) -In bed
From Km 0.600 To Km 8.850 1 x 459 9.14 0.30 0.20 251.72
From Km 8.850 To Km 11.200 1 x 131 7.60 0.30 0.20 59.74
(b) for Curve fillet
From Km 0.600 To Km 8.850 1 x 2 8250 0.050 - 825.00
From Km 8.850 To Km 11.200 1 x 2 2350 0.050 - 235.00
(c) for Lug
From Km 0.600 To Km 8.850 1 x 2 8250 ( 0.370 + 0.520 ) / 2 0.10 734.25
From Km 8.850 To Km 11.200 1 x 2 2350 ( 0.370 + 0.520 ) / 2 0.10 209.15

(i) For Profile walls in side slopes


From Km 0.600 To Km 8.850 2 x 459 1.803 x 2.15 0.30 0.20 213.52
From Km 8.850 To Km 11.200 2 x 131 1.803 x 2.15 0.30 0.20 60.94
2589.31 2590 Cum

11(a) Providing poruous blocks 1 No. for


100 sqm. area in bed
From Km 0.600 To Km 8.850 1 x 755 - - - 755
From Km 8.850 To Km 11.200 1 x 179 - - - 179
(b) Providing poruous blocks 1 No. for
40sqm. area in sides
From Km 0.600 To Km 8.850 2 x 800 - - - 1600
From Km 8.850 To Km 11.200 2 x 228 - - - 456
2990 2990 No.
12(a) Longitudinal drain with filter material
in bed of canal at 10m apart along
the canal.

From Km 0.600 To Km 8.850 1 x 2 8250 - - 16500.00


From Km 8.850 To Km 11.200 1 x 2 2350 - - 4700.00

(b) Transverse drain with filter material


in bed and side slope of canal at
10m c/c
(i) ---- in bed
From Km 0.600 To Km 8.850 1 x 826 9.14 - - 7549.64
From Km 8.850 To Km 11.200 1 x 236 7.60 - - 1793.60
(ii) ---- in side slopes
From Km 0.600 To Km 8.850 2 x 826 3.88 - - 6403.90
From Km 8.850 To Km 11.200 2 x 236 3.88 - - 1829.68
38776.82 38780 m

Page 2 of 6
UNIT
S. MEASUREMENTS QUANTITY
DESCRIPTION OF ITEM NO'S S
NO. L B D Or Say
13(a) Providing contraction joint @ 3 m c/c
in longitudinal and transeverse
directions in bed of canal :
(i) contraction joints - transverse
From Km 0.600 To Km 8.850 1 x 180 9.14 - - 1645.20
From Km 8.850 To Km 11.200 1 x 120 7.60 - - 912.00
(ii) - longitudinal
From Km 0.600 To Km 8.850 1 x 5 8250 - - 41250.00
From Km 8.850 To Km 11.200 1 x 5 2350 - - 11750.00
(b) Providing contraction joint @ 3m c/c in
transverse directions in side slopes
of canal

(i) contraction joints - transverse


From Km 0.600 To Km 8.850 2 x 2750 8.56 - - 47080.00
From Km 8.850 To Km 11.200 2 x 784 8.56 - - 13422.08
(ii) contraction joints - Longitudinal
From Km 0.600 To Km 8.850 2 x 2 8250 - - 33000.00
From Km 8.850 To Km 11.200 2 x 2 2350 - - 9400.00
158459.28 158460 m
( C ) Providing Construction joint @ 45 M
c/c or at the closure of day's work in
bed and sides of canal :
From Km 0.600 To Km 8.850 1 x 12 32.12 - - 385.44
From Km 8.850 To Km 11.200 1 x 8 32.12 - - 256.96
Along the canal 1 X 2 0.00
642.40 650 m

14 Providing Expansion joint at the


junction of structures both in bed
and sides of canal :
From Km 0.600 To Km 8.850 2 x 10 32.12 - - 642.40
From Km 8.850 To Km 11.200 2 x 4 32.12 - - 256.96
899.36 900 m

15 Canal bed and side lining excluding Lugs in CC M15 Mix with
Paver
From Km 0.600 To Km 8.850 1 x 1 8250 31.989 - 263909.25
From Km 8.850 To Km 11.200 1 x 1 2350 15.293 - 35938.32
299847.57 299850 Sqm
16 Filling of canal bed with CC M15 with 20mm MSA under lining to
fill pits in rocky reaches whereever necessary .(Qty. at 15 % of
the bed lining area)

From Km 0.600 To Km 8.850 1 x 540 15.00 - - 8100.00


From Km 8.850 To Km 11.200 1 x 360 15.00 - - 5400.00
13500.00
Bed filling of canal at 15% of the lining area at 100 mm thick 13500.00 x 15% 0.10 202.50 210 Cum
17 Side filling with CC M15with 20 MSA under lining in rocky
reaches, reaches with slipping soils and stone matrix to fill up
looss pockets to get a firm base at whereever necessery (Qty.at
50 % of the side lining area)

From Km 0.600 To Km 8.850 2 x 540 8.56 - - 9244.80


From Km 8.850 To Km 11.200 2 x 360 8.56 - - 6163.20
15408.00
Side filling of canal at 60% of the lining area at 100 mm thick 60% ### x 15408.00 x 50% 0.15 693.36 700 Cum
assuming 50% as rocky reaches
18 Laying VCC with M15 grade using
20 mm HBOG machine crushed
metal for Providing steps at 500m c/c
on both sides of canal points.

(a) Sloped Bed for steps


From Km 0.600 To Km 8.850 2 x 18 2.00 10.82 0.15 116.86
From Km 8.850 To Km 11.200 2 x 6 2.00 10.82 0.15 38.95
(b) For Steps
From Km 0.600 To Km 8.850 2 x 18 x 40 1.50 0.27 / 2 0.15 43.74
From Km 8.850 To Km 11.200 2 x 6 x 40 1.50 0.27 / 2 0.15 14.58
(c) For Side walls
From Km 0.600 To Km 8.850 2 x 18 x 2 10.82 0.23 0.50 89.59
From Km 8.850 To Km 11.200 2 x 6 x 2 10.82 0.23 0.50 29.86
333.58 340 Cum
19 Fabrication of steel grills of 8 mm
dia @ 300mm c/c on both ways of
the canal side slopes.

In side slopes
(a) length wise
From Km 0.600 To Km 8.850 2 x 14 8250 - - 231000.00
From Km 8.850 To Km 11.200 2 x 14 2350 - - 65800.00
(b) width wise
From Km 0.600 To Km 8.850 2 x 27501 3.876 - - 213212.50
From Km 8.850 To Km 11.200 2 x 7834 3.876 - - 60736.22

Page 3 of 6
UNIT
S. MEASUREMENTS QUANTITY
DESCRIPTION OF ITEM NO'S S
NO. L B D Or Say
570748.72 570750 RM
unit weight of 8mm dia bars = 0.395 Kg/m
weght of steel grills = 225446.25
Add 5% towards wastage = 11272.3125
TOTAL = 236718.5625 236720 KGS.
18 Kilometer stone 1 x 1 5
5 Nos
19 Hectameter stone 4 x 5 20
20 Nos

Page 4 of 6
LINING OF CANAL

TGP MAIN CANAL

SLOPE
REACH COMPONENTS CURVE Lining Thickness
Canal
Side CURVE FILLET
SL. No FROM TO Slope ø RADIUS TANGENT LENGTH AREA Bed Slopes BW FSD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1 0.600 8.850 1.5 : 1 1.803 1.202 33.6901 1.65 0.500 0.970 0.050 0.100 0.100 9.140 1.650

2 8.850 11.200 1.5 : 1 1.803 1.202 33.6901 1.65 0.500 0.970 0.050 0.100 0.100 7.600 1.650
FB
17

0.500

0.500