Professional Documents
Culture Documents
Duties
122.868574
6.71372654
18.5364021
24.2552719
4.798464
5.82048
61.6
244.592919
Total Cost
incl of Tax+Duty
347.89
49.88
406.00
46.40
79,042.40
75,400.00
75,400.00
383.24
187.91
138.12
245.77
809.68
775.92
386.67
64.96
92.80
64.96
70.18
60.09
55.80
53.48
41.53
44.08
54.64
38.74
58.00
3,480.00
15,312.00
204.16
148.02
348.00
348.00
1,852.06
8,102.60
10,080.40
8,102.60
10,080.40
8,102.60
4,060.00
8,102.60
8,102.60
23,780.00
45,240.00
75,110.00
101,500.00
255,200.00
551.29
597.98
140.00
175.00
281.01
281.01
281.01
338.02
13,347.60
2,820.00
5,481.00
8,967.00
64.38
53.65
-
16,000.00
27,782.00
17,980.00
1,250.19
162.40
23.20
2,224,158.10
2,168,670.84
6,775,769.42
548,849.52
457,751.04
1,525,485.46
3,577,083.46
3,169,173.07
1,787.85
847.38
368.39
464.00
127,989.60
931.19
1,179.37
1,359.17
1,839.99
291.16
363.43
450.95
546.24
1,194.80
17,400.00
15,900.00
9,384.28
1,357.20
3,646.94
3,411.66
3,176.37
2,941.08
2,352.87
0.90
2.43
2.27
2.12
1.96
174.00
Plant Category Hourly Rate (KES)
Artisans 45.00
Batching Plant Technician 70.00
Blaster 68.00
Casual Labourer 35.00
Crushing Plant Technician 70.00
Driver 40.00
Formwork Specialist 50.00
General Concrete Technician 70.00
General Foreman 50.00
General Machine Technician 70.00
Heavy Plant Operator 70.00
Light Plant Operator 50.00
Road Marking Foreman 45.00
Painter 145.00
Steel Fabricator 60.00
Watchman 40.00
Cost USD
Item Description
CIF Duty VAT
1 Motor Grader 140H 235,800.00 - 2,829,600.00
2 Motor Grader 120H 192,000.00 - 2,304,000.00
3 Track Dozer D6R 228,600.00 - 2,743,200.00
4 Track Dozer D8R 414,171.00 - 4,970,052.00
5 Mack Dump Truck 12m3 121,500.00 3,189,375.00 1,968,300.00
6 Motor Scraper, 621E 630,300.00 - 7,563,600.00
7 Cat 330GL Excavator 244,503.00 - 2,934,036.00
8 Excavator - Backhoe 428E 90,000.00 - 1,080,000.00
Smooth Drum Vibratory
9
Compactor, CS-533E(10.5)tonne) 202,880.00 - 2,434,560.00
Smooth Drum Vibratory
10
Compactor, CS-533E (14tonne) 270,506.00 - 3,246,072.00
11 Wheel loader model 936F 166,900.00 - 2,002,800.00
12 Crawler Loader 250,000.00 - 3,000,000.00
Pneumatic Tyre Asphalt
13
Roller, PS 200B 70,830.00 796,837.50 977,454.00
14 Asphalt Paver, AP-800 249,000.00 - 2,988,000.00
Pulvi-Mixer(Soil Stabiliser)
15
SS-250 355,000.00 - 4,260,000.00
16 Motorised ChipSpreader 137,000.00 1,541,250.00 1,890,600.00
Asphalt Premix Plant
17
(90 ton/hr) 737,000.00 8,291,250.00 10,170,600.00
18 Bitumen Distributor(cut backs) 71,700.00 - 860,400.00
19 Bitumen Distributor(emulsions) 71,700.00 - 860,400.00
20 Concrete Mixer (0.3m3)(Kilosker) - -
Concrete Vibrator with
21
Poker, Diesel Model 4,700.00 52,875.00 64,860.00
22 Water Bowser,9000l 100,000.00 1,125,000.00 1,380,000.00
23 Fuel Bowser 110,000.00 1,237,500.00 1,518,000.00
Bitumen Heater &
24
Decanter (13,600 litres) 32,000.00 - 384,000.00
Parker Crushing Plant(80 ton/hr)
25
( with 350KVA Generator) 588,000.00 4,410,000.00 7,761,600.00
Electric Arc welding
26
Set, 250 Amps 433.20 - 5,198.40
Water Pump, 75mm
27
Delivery duct 1,100.00 8,250.00 14,520.00
Air Compressor, 32l/sec
28
with jack hammer and accessories 40,000.00 450,000.00 552,000.00
29
Cold Emulsion Sprayer (Hand -Operated) - -
Cold Emulsion Sprayer (Machine-
30
Operated) 4,690.00 - 56,280.00
4500l Cold Emulsion Sprayer
31 on 4x2 BMC Chasis with 2.3m
bar 2,720.00 30,600.00 37,536.00
32 Road marking Machine 73,400.00 1,376,250.00 1,101,000.00
33 Cold Milling Machine RR-250 16,338.00 - 196,056.00
34 CB-624 Double Drum Vib Compactor 370,060.00 2,775,450.00 4,884,792.00
35 Flat bed 7ton Lorry 80,000.00 600,000.00 1,056,000.00
36 3 ton Utility Van 45,000.00 337,500.00 594,000.00
37 Saloon Toyota (1800cc) 24,666.67 185,000.00 325,600.00
38 2400cc 4WD D/Cabin 32,440.00 243,300.00 428,208.00
39 2400cc 4WD S/Cabin 25,320.00 189,900.00 334,224.00
40 4WD Station Wagon diesel 43,733.33 328,000.00 577,280.00
41 Tractor + Broom 35,000.00 262,500.00 462,000.00
42 Tractor + Trailer 40,000.00 300,000.00 528,000.00
43 Wheeled Crane 300,000.00 2,250,000.00 3,960,000.00
44 Tracked Crane 270,000.00 2,025,000.00 3,564,000.00
Plate Compactor 4,000.00 45,000.00 55,200.00
Pedestrian Roller 10,000.00 112,500.00 138,000.00
D
Economic life No of Hrs Residual Hourly recoverly Opportunity cost Insurance
yrs (n) per year value % KSh KSh KSh
Total
20,514,600.00 10.00 1,350 0.20 1,215.68 1,002.94 501.47
16,704,000.00 10.00 1,350 0.20 989.87 816.64 408.32
19,888,200.00 10.00 1,750 0.20 909.17 750.07 375.03
36,032,877.00 10.00 1,750 0.20 1,647.22 1,358.95 679.48
14,270,175.00 10.00 1,750 0.20 652.35 538.19 269.09
54,836,100.00 10.00 1,450 0.20 3,025.44 2,495.99 1,247.99
21,271,761.00 5.00 1,750 0.20 1,944.85 875.18 437.59
7,830,000.00 5.00 1,750 0.20 715.89 322.15 161.07
148.99 45.00 36
1,184.46 40.00 299
1,243.75 40.00 317
142.80 45.00 25
20.25 45.00 -
455.67 45.00 81
2,586.31 45.00 477
530.85 45.00 125
2,662.28 70.00 480
4,641.89 70.00 831
1,040.79 45.00 232
832.57 45.00 174
342.55 40.00 110 17 2 12 0.5 2 156,235
427.23 40.00 141 19 2 14 0.5 2 195,988
379.13 40.00 118 19 2 14 0.5 2 166,232
503.51 40.00 177 19 2 14 0.5 2 243,186
421.63 40.00 104
452.02 40.00 114
2,962.43 70.00 798
2,856.04 70.00 744
238.92 70.00 43
459.06 70.00 91
ITEM No. DESCRIPTION UNIT QTY RATE
FOB (£) Foreign (KSh) I&F (KSh)
OFFICE EQUIPMENT
Intel pentium duo core laptop
computer No. 1 690.00 79,350.00 13,609
Intel pentium duo core Desktop
computer No. 2 510.00 58,650.00 10,058
-
86 1,099 879 6,380 17,244 25,520 3,518 4,397
13,609 109,990.00
20,117 162,600.00
2,978 30,090.00
9,585 96,840.00
1,499 15,145.00
2,682 27,100.00
158 1,600.00
158 1,600.00
1,026 10,370.00
3,984 40,250.00
1,183 12,000.00
118 1,200.00
1,026 10,370.00
178 1,795.00
5,956 60,175.00
710 7,180.00
8,441 85,285.00
124,370 1,256,505.00
14,496 146,460.00
15,324 154,830.00
227,597.65 2,231,385.00
-
13,135 132,705.00
158 1,600.00
39 400.00
355 3,600.00
2,091 21,125.00
5,759 58,185.00
59 600.00
39 400.00
178 1,795.00
5,759 58,185.00
5,838 58,980.00
493 4,985.00
552 5,580.00
148,708 1,502,380.00
3,550 35,900.00
473 4,800.00
986 9,975.00
3,787 38,260.00
3,511 35,470.00
197 2,000.00
986 10,000.00
592 5,980.00
197 2,000.00
316 3,190.00
118 1,200.00
12,405 125,335.00
947 9,565.00
211,227.98 2,134,195.00
-
1,479 14,955.00
1,538 15,570.00
2,130 21,540.00
1,183 11,970.00
1,065 10,770.00
3,274 33,080.00
1,736 17,540.00
5,207 52,610.00
986 9,970.00
7,573 76,520.00
2,524 25,520.00
2,682 27,100.00
2,130 21,520.00
710 7,200.00
3,550 35,880.00
3,156 31,900.00
1,893 19,140.00
394 4,000.00
2,603 26,305.00
1,104 11,160.00
355 3,590.00
17,080 172,560.00
1,972 20,000.00
8,638 87,275.00
118 1,200.00
237 2,400.00
769 7,785.00
158 1,600.00
671 6,780.00
868 8,780.00
237 2,400.00
1,026 10,380.00
769 7,785.00
1,006 10,170.00
394 4,000.00
10,058 101,625.00
10,749 108,600.00
355 3,600.00
355 3,600.00
296 3,000.00
592 6,000.00
158 1,600.00
237 2,400.00
1,479 14,955.00
4,102 41,460.00
4,418 44,640.00
65,853 665,315.00
3,018 30,495.00
947 9,570.00
20,669 208,820.00
1,814 18,340.00
2,091 21,130.00
8,954 90,470.00
4,161 42,045.00
4,300 43,440.00
45,362 458,500.00
25,639 259,250.00
20,709 209,250.00
51,279 518,250.00
3,254 32,925.00
8,875 89,700.00
1,262 12,760.00
907 9,170.00
2,879 29,100.00
3,156 31,900.00
8,205 82,890.00
1,282 12,955.00
11,439 115,570.00
3,550 35,900.00
473 4,800.00
118 1,200.00
552 5,580.00
11,439 115,570.00
2,879 29,100.00
1,026 10,370.00
1,026 10,370.00
1,104 11,160.00
907 9,170.00
1,104 11,160.00
1,104 11,160.00
1,104 11,160.00
1,104 11,160.00
1,104 11,160.00
1,104 11,160.00
592 5,980.00
552 5,580.00
631 6,380.00
631 6,380.00
631 6,380.00
631 6,380.00
631 6,380.00
631 6,380.00
631 6,380.00
355 3,590.00
276 2,790.00
18,677 188,695.00
355 3,590.00
789 7,980.00
789 7,980.00
789 7,980.00
789 7,980.00
789 7,980.00
316 3,190.00
394 3,990.00
907 9,170.00
907 9,170.00
907 9,170.00
907 9,170.00
789 7,980.00
631 6,380.00
513 5,190.00
1,736 17,540.00
1,736 17,540.00
1,538 15,550.00
1,736 17,540.00
3,846 38,925.00
1,302 13,155.00
1,262 12,755.00
986 9,965.00
473 4,790.00
158 1,600.00
158 1,600.00
355 3,590.00
21,695 219,200.00
13,924 140,680.00
237 2,400.00
49,405 499,135.00
237 2,395.00
473 4,785.00
552 5,580.00
769 7,775.00
828 8,370.00
3,629 36,665.00
3,432 34,675.00
3,747 37,860.00
79 800.00
21,695 219,500.00
316 3,190.00
572 5,780.00
473 4,785.00
454 4,585.00
414 4,185.00
454 4,585.00
493 4,985.00
493 4,985.00
513 5,185.00
1,420 14,360.00
3,234 32,680.00
1,183 12,000.00
15,778 160,000.00
39,445 400,000.00
39,445 400,000.00
2,367 24,000.00
28,795 291,000.00
2,367 24,000.00
394 4,000.00
2,169 21,950.00
2,564 25,925.00
355 3,600.00
237 2,400.00
79 800.00
118 1,200.00
237 2,400.00
2,209 22,320.00
828 8,370.00
2,209 22,320.00
2,840 28,720.00
1,183 11,960.00
158 1,600.00
237 2,400.00
237 2,400.00
631 6,380.00
710 7,200.00
316 3,200.00
2,367 24,000.00
710 7,200.00
592 6,000.00
611 6,180.00
690 6,975.00
690 6,975.00
2,682 27,100.00
2,682 27,100.00
2,761 27,900.00
1,144 11,560.00
552 5,580.00
355 3,600.00
296 3,000.00
296 3,000.00
592 6,000.00
2,958 30,000.00
7,771 78,510.00
7,771 78,510.00
16,725 168,970.00
1,814 18,335.00
2,603 26,305.00
4,970 50,215.00
434 4,390.00
197 2,000.00
59 600.00
848 8,570.00
671 6,780.00
7,889 79,750.00
3,156 31,890.00
552 5,580.00
394 4,000.00
237 2,400.00
394 4,000.00
237 2,400.00
158 1,600.00
2,051 20,740.00
4,023 40,650.00
4,576 46,230.00
1,972 20,000.00
5,167 52,210.00
789 8,000.00
6,469 65,360.00
118 1,200.00
118 1,200.00
1,814 18,335.00
1,814 18,335.00
1,814 18,335.00
1,814 18,335.00
2,584 26,105.00
1,814 18,335.00
2,584 26,105.00
2,584 26,105.00
1,814 18,335.00
1,814 18,335.00
3,728 37,660.00
1,814 18,335.00
1,814 18,335.00
2,268 22,915.00
2,584 26,105.00
1,814 18,335.00
1,558 15,745.00
1,814 18,335.00
1,814 18,335.00
1,814 18,335.00
2,584 26,105.00
3,333 33,675.00
4,260 43,040.00
3,826 38,660.00
3,511 35,470.00
3,609 36,465.00
1,370,694 9,421,550
19,387,332
HOUSING, OFFICE AND LABORATORY
OFFICE FURNITURE
Unit Qty Rate
3 Drawer steel filling cabinet No 3 14,894
Office desk 6 drawer and arm chair No 8 13,653
Office cupboard No 1 26,065
Typist desk and stool No 1 11,295
Office chair No 4 4,995
Office table No 1 15,515
Book case 3 shelves 1.0 m No 4 8,500
6 draw plan chest No 1
Drawing table and stools No 4
Drawing table and stools No 6
Water filter - 2 candle No 1 1,690
Pendant wall light No 12
Dust bins No 3 750
LABORATORY FURNITURE
Writing desk with lockable drawers No. 2 14,000
Desk chairs No. 2 5,000
Lockable cupboard 2m3 No. 1 27,000
Laboratory stool No. 6 2,000
Book case No. 1 8,500
Chairs No. 6 2,500
TOTAL
515,985.19
2,599,449.51
11,475,447.90
Total
29,000.00
22,000.00
48,000.00
17,000.00
28,000.00
15,000.00
Amount
51,831
126,700
30,235
13,102
23,177
17,997
39,440
-
-
-
1,960
-
2,610
-
32,480
11,600
31,320
13,920
9,860
17,400
Description
Operator
Material
Slot Dozing
Side By Side Dozing
Visibilty
Job Effeciency
Grade Correction
30,423.22
PRODUCTION `
Approx' Rolling To Rolling To
Hilly Terrain Hilly Terrain
Maximum Level Terrain Level Terrain
(Hard Material) (Soft Material)
Production (Hard Material) (Soft Material)
240.00 66.62 137.04 84.59 152.27 5,546.18
0.25 0.18 0.23 0.20 0.25 5,546.18
1986.05 630.03 1134.05 700.03 1260.05 5,466.38
1243.69 394.53 710.16 438.37 789.06 5,466.38
72.50 52.20 65.25 58.00 72.50 5,466.38
170.00 122.40 153.00 136.00 170.00 5,466.38
60.00 43.20 54.00 48.00 60.00 4,162.44
45.00 32.40 40.50 36.00 45.00 4,162.44
400.00 288.00 360.00 320.00 400.00 6,729.11
300.00 108.19 222.57 137.39 247.30 10,031.92
250.00 69.39 142.75 88.12 158.61 5,916.92
129.00 92.88 116.10 103.20 129.00 5,916.92
60.00 43.20 54.00 48.00 60.00 5,916.92
89.00 64.08 80.10 71.20 89.00 5,916.92
53.00 38.16 47.70 42.40 53.00 5,916.92
258.00 185.76 232.20 206.40 258.00 5,916.92
121.00 87.12 108.90 96.80 121.00 5,916.92
258.00 83.64 172.05 106.21 191.17 5,068.58
100.00 72.00 90.00 80.00 100.00 4,267.49
400.00 360.00 360.00 400.00 400.00 6,729.11
500.00 360.00 450.00 400.00 500.00 2,701.85
75.00 54.00 67.50 60.00 75.00 2,701.85
Provide,fuel,insure and maintain with driver, 1 No. new 4WD station Monthly rate
1.12 wagon vehicle Diesel propelled, with engine capacity of not less v. mth
than 3000cc for the exclusive use by the Resident Engineer
Extra overofitem
inclusive 1.124000km
the first for mileage over 4000km
per vehicle monthper vehicle month Mileage
1.17 km
Provide,fuel,insure and maintain with driver 4WD double cabin, with Monthly rate
1.15 engine capacity of not less than 2500cc for the exclusive use by the v. mth
Resident Engineer inclusive of the first 4000km per vehicle month
Extra over item 1.15 for mileage over 4000km per vehicle month Mileage
1.18 km
As Item 1.15 but 4WD Single cabin pick-up diesel engine - 2500 c.c Monthly rate
1.16 v. mth
Extra over item 1.16 for mileage over 4000km per vehicle month Mileage
1.19 km
Prime cost sum for acquisition of land required for the works, etc. in
1.23 P.C. Sum
accordance with Specifications.
Extra over Item 1.23 for Contractor's profit and overheads
1.24 %
1.27 Payment of overtime for the Engineer's junior staff P.C. Sum
Extra over Item 1.27 for Contractor's profit and overheads
1.28 %
Allow for attendance to the Resident Engineer's support staff for the
1.45
duration of the Contract as directed by the Engineer
1.45 - Administrative assistant m. mth
1.46 - Secretary m. mth
1.47 - Office attendants m. mth
1.48 - CAD technicaians m. mth
1.51 - Chainmen m. mth
1.52 - Laboratory technicians m. mth
1.53 - Casual Workers m. mth
1.56 Allow for environmental mitigation plan measures P.C. Sum
Extra over item 1.56 for Contractor's profit and overheads
1.57 %
1.66 Allow a provisional sum for HIV AIDS compaign Prov. Sum
Extra over item 1.66 for Contractor's profit and overheads
1.67 %
Clear site including removal of hedges, bushes, trees (except those Dozer
4.01 designated to remain by the engineer) and other vegetation and ha.
objectionable materials in accordance with the specifications
Foreman
Removal of topsoil not exceeding 200mm depth to stockpile for re- Dozer
4.02 m3
use as directed by the Engineer
Tipper
Wheel Loader
Foreman
As Item 4.02 but to spoil as directed by the Engineer Dozer
4.03 m3
Tipper
Wheel Loader
Foreman
Removal of all other existing drainage structures of all sizes such as Excavator
4.04 no.
drifts, box culverts, bridges etc
Tipper
Foreman
Allow for removal of any structures and obstructions as directed by
4.05 the Engineer. Payment to be on dayworks basis Prov. Sum
Casual
Foreman
Remove existing concrete paving blocks to stockpile or spoil as Excavator
4.12 m2
directed by the Engineer
Wheel Loader
Tipper
Foreman
Remove existing kerbstones/channels to stockpile or spoil as Excavator
4.13 m
directed by the Engineer
Wheel Loader
Tipper
Foreman
NOTE: No overhaul will be paid for these items as they shall be
5.01 deemed to have been included in the Contractor's rates.
Fill in soft material and compact to at least 95% MDD (AASHTO Dozer
5.02 m3
T.99)
Haulage (Km) 15 Wheel loader
40 Km/h Tipper
Grader
Water tank
Roller
Foreman
Haualge
5.02 As Item 5.02 but in hard material m3 Air compressor
Haulage (Km) 15 Wheel loader
40 Km/h Tipper
Dozer
Roller
Foreman
Casual Labour
Skilled Labour
Explosive
Ammonium Nitrate
Detonator
Haualge
5.03 Spoil in soft material m3 Dozer
Haulage (Km) 15 Wheel loader
40 Km/h Tipper
Foreman
Haualge
5.04 As Item 5.03 but in hard material m3 Air compressor
Haulage (Km) 15 Wheel loader
40 Km/h Tipper
Dozer
Foreman
Casual Labour
Skilled Labour
Explosive
Ammonium Nitrate
Detonator
Haualge
5.05 Provide, transport, spread and compact to at least 100% MDD m3 Dozer
AASHTO T99 improved subgrade materials as instructed by the
Haulage (Km)
Engineer. 30 Wheel loader
40 Km/h Tipper
20% Grader
Water tank
Roller
Foreman
Borrow pit
Haualge
5.06 Overhaul of fill or spoil materials in excess of free-haul distance of m3km
1km
Compaction of existing ground below fills to at least 95% MDD Grader
(AASHTO T.99) including all necessary scarifying and water to a
5.07 depth of 150mm below ground level. m3
Water tank
Roller
Foreman
Compaction of the 300mm below formation level in cutting to 100% Dozer
5.08 m3
MDD (AASHTO T99)
Wheel loader
Tipper
Grader
Water tank
Roller
Foreman
Extra over Item 5.02 for compaction of top 300mm to 100% MDD Roller
5.09 m3
(AASHTO T99)
Foreman
Excavation to spoil in swamps in accordance with Specifications. Excavator
5.10 m3
Tipper
Foreman
Provide, place and compact rockfill as per Clause 507 of the Air compressor
5.11 m3
Specifications
Haulage (Km) 15 Wheel loader
40 Km/h Tipper
Roller
Foreman
Casual Labour
Skilled Labour
Explosive
Ammonium Nitrate
Detonator
Haulage
Provide, transport and install filter fabric (300g/m2) under, over or
around rockfill as directed by the Engineer.
5.12 m2
Tipper
Foreman
Labour
Grassing - Planting of sprigs of approved indigenous grass types; to Flat bed lorry
5.14 embankments, cuttings or where directed by the Engineer in m2
accordance with the Specifications,
Water tank
Foreman
Labour
5.15 Side slope fill in soft material m3 Dozer
Haulage (Km) 2 Wheel loader
Km/h Tipper
Grader
Foreman
Haualge
Allow for heavy grading of the existing carriageway. The rate to Grader
Include for processing materials, compacting and trimming roadway
5.16 to design profile, camber and crossfall and excess material to spoil km
as diretected by the Engineer
30 Wheel loader
40 Km/h Tipper
20% Grader
Water tank
Foreman
Land
Haulage
Prepare ground as necessary, provide all materials and construct Air compressor
7.07 225mm thick stone pitching to side slopes of channels, natural m2
ground faces, inlets and outlets of culverts including carting away
any excess material to spoil as directed by the Engineer 15 Wheel loader
0.225 Tipper
Foreman
Casual Labour
Skilled Labour
Explosive
Ammonium Nitrate
Detonator
Haulage
7.08 Extra over Item 7.07 for grout m2 Concrete mixer
0.0675 Water tank
0.5 Sand
30 Cement
10 Foreman
Artisan
Casual Labour
7.09 Excavate for gabions in soft material m3 Excavator
Tipper
Foreman
7.10 Extra over Item 7.09 for excavation in hard material m3 Air compressor
Excavator
Tipper
Foreman
7.11 Provide and place gabion mesh m2 Mesh
11 Foreman
Artisan
Casual labour
7.12 As item 7.11 but mattresses 0.3m thick m2 Mesh
31.8 Foreman
Artisan
Casual labour
7.13 Provide and place rockfill to gabions m3 Air compressor
5 Excavator
Tipper
Foreman
Haulage
7.14 Provide and place filter fabric under and/or behind gabions m2 Fabric
(250g/m2)
Labour
Foreman
7.15 Provide and place dumped rip-rap m3 Air compressor
Excavator
Tipper
Foreman
7.16 Provide and place closed jointed rip-rap m3 Air compressor
15 Wheel loader
0.225 Tipper
Foreman
Casual Labour
Skilled Labour
Explosive
Ammonium Nitrate
Detonator
Haulage
7.17 Provide, place and compact rock fill below structures m3 Air compressor
15 Wheel loader
0.225 Tipper
Foreman
Casual Labour
Skilled Labour
Explosive
Ammonium Nitrate
Detonator
Haulage
Break off a strip around existing structure to expose reinforcement Air compressor
7.18 to enable extension m3
0.0442 Gravel
0.086 Channel
1.053 Fabric A193
Foreman
Artisan
Casual Labour
Provide and place 600mmx355mmx75mm thick precast invert block Excavator
8.30 drain inclusive of murram bedding . m
0.151 Gravel
0.097 IBD
1.203 Fabric A193
Foreman
Artisan
Casual Labour
8.31 Provide and place 450mmx225mmx75mm thick precast invert block m Excavator
drain inclusive of murram bedding .
0.1359 Gravel
0.0857 Concrete
1.053 Fabric A193
Foreman
Artisan
Casual Labour
Excavate in all materials and to any depth and construct gulley Grating
8.35 no.
chambers inclusive of frame and grating as detailed in the drawings.
Frame
Excavate
Concrete
Formwork
Foreman
Artisan
Casual Labour
8.36 Provide and fix new frame and gulley grating as per the drawing no.
Excavate in all materials and to any depth, provide, lay and joint Excavate
8.37 450mm diameter concrete pipe to gulley pots and chambers, m
include for concrete bedding, haunching, surround and connections
Pipe
0.407392 Surround class 15/20
9.01 Improvement of the existing road km Grader
9.05 Excavate gravel wearing course material, transport, spread and m3 Gravel
compact to at least 95% MDD AASHTO T 180 as surfacing to
9.06 Overhauls of gravel
existing roads wearing(Method
or deviations course material
B). in excess of 1.5km free m3km
haul distance.
Construct, maintain and reinstate access roads to borrow pits Grader
9.07 km
measured in accordance with 'Method B'
Gravel
Reinstatement of deviations to the condition prevailing prior to Scarifying
9.08 commencement of construction works km
Light grading
2500 Tipper
Wheel loader
Accomodating traffic construction and maintenenace of deviations. 30%
9.09 km
11.00 NOTE: No overhaul will be paid for these items as they shall be
deemed to have been included in the Contractor's rates.
Provide lay and compact to100% MDD (AASHTO T.180) natural Dozer
sub-base material in accordance with the drawings and Section 12
11.01 of the Standard Specifications (Method B) m3
30 Wheel loader
40 Km/h Tipper
20% Grader
Water tank
Foreman
Land
Haulage
11.02 Overhaul of natural subbase or base materials in excess of free- m3km
haul distance of 1.5km
Provide, transport and spread cement stabilizer at the specified
11.03 t
rates of 50 - 80 Kg/m3.
11.04 Mix in cement stabilizer (mix - in - place method). m3
11.05 Protection and curing cement treated material m2
Provide and spray bituminous binder type MC70 at a rate of 1.0
11.06 l
l/m2
Provide, transport and spray MC3000 for first seal coat at a rate of
11.07 l
1.4l/m2
Provide, transport and spray MC3000 for second seal coat at a rate
11.08 l
of 1.0l/m2
Provide, lay and roll precoated 6/10 mm size chippings at a rate of
11.09 m3
70 - 90 m2/m3.
Provide, lay and roll precoated 3/6 mm size chippings at a rate of 90
11.10 m3
- 120 m2/m3.
Provide and place 600mmx125mmx100mm precast concrete
11.11 m
edging.
12.00 NOTE: No overhaul will be paid for these items as they shall be
deemed to have been included in the Contractor's rates.
Provide, lay and compact natural material for base for pavement (95 Dozer
12.01 % Modifed AASHTO T180) m3
30 Wheel loader
40 Km/h Tipper
20% Grader
Water tank
Foreman
Land
Haulage
12.02 Provide, lay and compact natural material for subbase for pavement m3 Dozer
(95 % Modified AASHTO T180)
30 Wheel loader
40 Km/h Tipper
35% Grader
Water tank
Foreman
Land
Haulage
In situ processing of existing pavement layers (including surfaces) Grader mixing
12.03 as new subbase with additional gravel (measured separately) and m3
compact to specified density (95 % Mod. AASHTO T180) and
thickness 175mm. 0.175 Grader scarifying
Water tank
Foreman
12.04 #REF! m3
Excavate, transport within a free haul distance of 1.5km natural Dozer
material for base including watering, mixing and compaction as per
12.05 specifications. m3
30 Wheel loader
40 Km/h Tipper
35% Grader
Water tank
Foreman
Land
Haulage
12.06 Overhaul of natural subbase and base material in excess of 1.5 km m3km
freehaul.
13.00 NOTE: No overhaul will be paid for these items as they shall be
deemed to have been included in the Contractor's rates.
13.01 Provide graded crushed stone for base. m3 Air compressor
100 Wheel loader
40 Km/h Tipper
Crushing plant
Foreman
Casual Labour
Skilled Labour
Explosive
Ammonium Nitrate
Detonator
Haualge
Scarify existing graded crushed stone on pavement and/or Grader mixing
13.02 shoulder, mix with new graded crushed stone, spread and compact m3
as directed by the Engineer
0.15 Grader scarifying
Water tank
Foreman
13.03 Cold milling the existing pavement, transport the milled material to m3 Milling machine
stockpile or to spoil as directed by the Engineer.
0.05 Tipper
40 Km/h Foreman
10 Haulage
Obtain from the stockpile of material removed from the milling of Crushing plant
13.04 existing bituminous surfacing/base layers, mix with new GCS, m3
crush, grade, mix, haul, spread and compact as graded crushed
stone layer to pavement Tipper
Wheel loader
Paving plant
Mixing plant
Provide, transport and spread cement stabilizer at the specified Cement
14.01 rates t
7 Lorry
Foreman
Casual Labour
14.02 Mix in cement stabilizer (mix - in - place method). m3 Pulvimixer
35% Water tank
Foreman
14.03 Protection and curing of cement treated material m2 Water tank
Provide, transport and spread lime stabilizer at the specified rates Lime
14.04 t
7 Lorry
Foreman
Casual Labour
14.05 Mix in lime stabilizer (mix - in - place method). m3 Pulvimixer
35% Water tank
Foreman
14.06 Protection and curing of lime treated material m2 Water tank
NOTE: No overhaul will be paid for bitumen and chippings as these
shall be deemed to have been included in the rates.
15.01
Provide and spray bituminous binder type MC30 (prime coat) at a Distributor
15.02 litre
rate of 0.8-1.2 l/m2.
Bitumen
800.00 Foreman
Provide and spray bituminous binder type MC70 (prime coat) at a Distributor
15.03 litre
rate of 1.0 l/m2
Bitumen
700.00 Foreman
Provide and spray bituminous binder type K1-70 tack coat at a rate Distributor
15.04 litre
of 0.5 l/m2.
Bitumen
800.00 Foreman
Prepare surface of base, provide, heat and spray bituminous binder Distributor
15.05 litre
type 80/100 as tack coat (0.5 l/m2)
Bitumen
800.00 Foreman
Prepare surface of base, provide, heat and spray bituminous binder Distributor
15.06 type MC3000 for first tack coat (1.0-1.4 l/m2) litre
Bitumen
800.00 Foreman
15.07 Provide, heat, transport and spray 80/100 bitumen for first seal coat litre Distributor
at a rate of 1.0-1.4 l/m2
Bitumen
800.00 Foreman
As Item 15.07 but for second seal coat at a rate of 0.6l/m2 Distributor
15.08 litre
Bitumen
800.00 Foreman
Provide, transport and spray MC3000 for first coat at a rate of 1.0- Distributor
15.09 litre
1.4l/m2
Bitumen
800.00 Foreman
As Item 15.09 but for second seal at a rate of 0.8-1.2l/m2 Distributor
15.10 litre
Bitumen
800.00 Foreman
As Item 15.09 but for third seal at a the rate of 0.6-1.0 l/m2 Distributor
15.11 litre
Bitumen
800.00 Foreman
15.12 MC3000 for sand seal litre Distributor
Bitumen
800.00 Foreman
Provide, lay and roll 14/20 mm size chippings at a rate of 60-90 Chippings
15.13 m3
m2/m3.
Chip Spreader
800.00 Foreman
Casual Labour
Provide, lay and roll precoated 10/14 mm size chippings at a Chippings
15.14 nominal rate of 90 m2/m3. m3
10.00 Bitumen
Asphalt premix mach
Pneumatic roller
Smooth roller
800.00 Foreman
Casual Labour
Provide, lay and roll precoated 6/10 mm size chippings at a rate of Chippings
15.15 70-120 m2/m3. m3
10.00 Bitumen
Asphalt premix mach
Pneumatic roller
Smooth roller
800.00 Foreman
Casual Labour
Provide, lay and roll precoated 3/6 mm size chippings at a rate of Chippings
15.16 m3
130-160 m2/m3.
10.00 Bitumen
Asphalt premix mach
Pneumatic roller
Smooth roller
800.00 Foreman
Casual Labour
Curing and blinding of prime coat in accordance with Clause 1505
24.16 (b) of the Specifications. m2
100
40 Km/h Haulage
26.16 As Item 25.16 but 6/10 mm size chippings. m3 Chippings
100
50 Km/h Haulage
29.16 Provide and mix kerosene with 80/100 litre Bitumen
5% Kerosene
15.23 Variation of binder content (MC-3000) litre
15.24 Variation of binder content (MC-30) litre
15.25 Variation of binder content (K1-70) litre
15.26 Variation of binder content (80/100) litre
15.27 Variation of spread rate (14/20mm chippings) m3 Chippings
15.28 Variation of spread rate (6/10mm chippings) m3 Chippings
NOTE: No haulage will be paid for aggregates, bitumen or the
premix. The cost for haulage shall be included in the rates. Rates to
16.00 be inclusive of fines.
Strip existing asphalt road surfacing and cart away to spoil or reuse Scarify using grader
16.01 including free haul up to 1 km where specifically directed by the m3
engineer
0.05 Tipper
40 Km/h Foreman
1 Haulage
Cold milling the existing asphalt concrete (AC), transport the milled Milling machine
16.02 material to stockpile or to spoil as directed by the Engineer. m3
0.05 Tipper
40 Km/h Foreman
10 Haulage
Obtain from the stockpile of material removed from the milling of Crushing plant
existing surfacing/base layers, mix with new material and bitumen,
crush, grade, mix, haul, spread and compact modified AC surfacing
16.03 or as DBM base layer to pavement m3
17.03 Tipper
18.03 Paver
19.03 Pneumatic roller
20.03 Smooth roller
21.03 Additional Material
22.03 Foreman
23.03
24.03 Provide,lay and compact foamed bitumen mix base course m3
comprising 4.8% nominal bitumen content and 0/30mm aggregates
Clean and apply rubberised bituminous sealant to cracks on the
25.03 m2
carriageway and shoulders as per Specifications
On prepared surface of base layer, provide, lay and compact
modified AC with 5 % nominal bitumen content and 0/14 mm
26.03 m3
aggregates.
Vibrating poker
sand
cement
Aggregates
Foreman
Artisan
Casual Labour
Provide all materials, mix, place and compact concrete Class 25/20 Concrete mixer
17.03 m3
Vibrating poker
sand
cement
Aggregates
Foreman
Artisan
Casual Labour
Provide all materials, mix, place and compact concrete class 30/20 Concrete mixer
17.04 m3
Vibrating poker
sand
cement
Aggregates
Foreman
Artisan
Casual Labour
17.05 Blinding concrete Class 15/40 m3 Concrete mixer
Vibrating poker
sand
cement
Aggregates
Foreman
Artisan
Casual Labour
17.06 Blinding concrete Class 15/20 m3 Concrete mixer
Vibrating poker
sand
cement
Aggregates
Foreman
Artisan
Casual Labour
17.08 Unformed surface finish - Class UF2 m2 Artisan
17.09 Unformed surface finish - Class UF3 m2 Artisan
Formworks for formed surface finishes (Rate to include for
17.13 25x25mm chamfer to all exposed areas 0
17.20 Formworks to edges of slabs (less than 300mm high) m Formwork Specialist
Timber
0.1 Nails
1 Props
17.21 Provide, install and joint Waterstops as per specifications m
17.22 Mortar used ahead of concrete placing, etc m3 Cement
Sand
Concrete mixer
Artisan
Casual labour
17.23 Admixtures, workability and hardening agents litre
High tensile steel reinforcement bars. - diameter less than or equal Reinforcement
17.24 t
to 16 mm.
Reinforcement specialist
As Item 17.24 but diameter greater than 16 mm. Reinforcement
17.25 t
Reinforcement specialist
Reinforcement in mild steel (MS) - diameter less than or equal to 16 Reinforcement
17.26 t
mm.
Reinforcement specialist
As Item 17.26 but diameter greater than 16 mm Reinforcement
17.27 t
Reinforcement specialist
17.28 Fabric reinforcement A193 for access culverts m2 Fabric
Steel Fabricator
Foreman
17.29 Fabric reinforcement A142 m2 Fabric
Steel Fabricator
Foreman
17.30 Fabric reinforcement A252 m2 Fabric
Steel Fabricator
Foreman
17.31 Fabric reinforcement A393 m2 Fabric
Steel Fabricator
Foreman
20.31 Precast units no.
21.31 Prestressing tendons no.
22.31 Load test no.
23.31 Structural steel t
24.31 Steel girder for bridge ton
19.01 Steel girder 1400 x 475/350 for bridge ton
19.02 Channel section 305 x 102 x 46 kg/m ton
19.03 Channel section 152 x 76 x 18 kg/m ton
Remove existing road signs and stockpile as directed by the
20.01 Engineer. No.
0.0192 Concrete
Artisan
Casual labour
20.08 Provide and erect reinforced concrete kilometer marker posts no. Artisan
Casual labour
0.027 Concrete for post
0.03375 Backfilling concrete
0.0050247811 Reinforcement
20.09 Warning signs - 1200mm size no.
20.10 Warning signs - 750mm size no
20.10 As Item 20.1 but 600mm size no
20.11 Priority signs - 1200mm size no.
20.12 Priority signs - 1000mm size no.
20.12 As Item 20.12 but 750mm size no.
20.13 Prohibitory signs - 1000mm size no.
20.13 Prohibitory signs - 600mm size no.
20.14 Mandatory signs - 1000mm no.
20.14 Mandatory signs - 600mm no.
20.14 Mandatory signs - 300mm no.
20.15 Standard informatory signs - 400mmx300mm size no.
20.16 As Item 20.15 but 500mmx600mm size no.
20.17 As Item 20.15 but 600mmx600mm size no.
20.18 Non-Standard informatory signs less than 1m2 no.
As Item 20.18 but equal or more than 1m2 but less than 2 m2
20.19 no.
As Item 20.18 but equal or more than 2m2 but less than 5 m2
20.20 no.
Artisan
Provide and erect flex beam guardrails including end pieces
20.31 m
20.41 Provide and erect reinforced concrete culvert marker posts no.
20.42 As item 20.41 but plastic marker posts no.
20.43 Provide and erect precast concrete bollards. no.
20.44 Provide materials and construct rumble strips on shoulders. m
20.45 Provide materials and construct speed bumps m
Provide, plant and maintain approved trees in accordance with
20.46 Specifications or as directed by the Engineer no.
20.47 Allow for street lighting installation on the first 5km L.S.
Provide and lay 600mm x 600mm x 50mm precast concrete paving
20.48 slabs on 50mm thick compacted sand bedding. m2
21.26 Provide and install 100 mm diameter 400mm long to abutments and no.
wing walls drain pipes
21.27 Repair cracks in existing bridge as specified m
Provide and install 75mm dia. 400mm long UPVC Drain pipes on
21.28 bridge deck or box culvert as per the drawings no.
Provide all materials and place clas 20/20 concrete infill around
21.33 service ducts m3
22.03 As item 22.01 but 186kw - 250kw rated flywheel power. hr.
22.04 Motor Grader - 80kw -110kw rated flywheel power hr.
22.05 As item 22.04 but 111kw - 120kw rated flywheel power. hr.
22.06 As item 22.04 but 121kw - 160kw rated flywheel power. hr.
22.24 As item 22.23 but 2.01 - 3.4 m3 SAE rated capacity. hr.
22.25 As item 22.23 but 3.41 - 5.35 m3 SAE rated capacity hr.
22.26 Crawler loader - 0.8 -1.3m3 SAE rated capacity hr.
22.27 As item 22.26 but 1.31 - 1.90 m3 SAE rated capacity. hr.
22.28 As item 22.26 but 1.91 - 2.50 m3 SAE rated capacity. hr.
Cranes, mobile rubber tyred, rough terrain type of 23.0 - 40.0t max.
22.29 hr.
working load.
Cranes; excavator cranes, tracked wheels - 20-28t working load
22.30 hr.
22.48 Van, pickup or similar utility vehicle - Up to 1.0t carrying capacity. hr.
22.54 As item 22.53 but 4500 litres to 8000 litres capacity. hr.
22.55 Mechanical broom. hr.
22.56 4WD saloon vehicle or station wagon. hr.
22.57 Bitumen hand sprayer of 200 litres carrying capacity. hr.
22.58 Self propelled fuel tanker. hr.
22.59 Hand compactor, whacker or equivalent. hr.
22.60 Chip spreader. hr.
22.61 Pulvimixer. hr.
LABOUR: Rates inserted shall include all costs of labour such as
22.00 insurance, accommodation, travelling time etc.
277.78
17.65 54.56 1.05 8.94 298
35.00
50.00
22.45 41.63 0.63 9.28 114
7.00
10.00
4.56 7.37 0.16 1.44 41
0.30
21.22 34.29 0.75 6.69 199
3.50
5.00
178.88 559.93 16.89 122.87 1,341
22.62 35.76 0.80 7.13
23.78 83.68 1.23 18.54
0.70
40.25 125.99 3.80 27.65 866
4.03 7.72 0.19 1.51
4.01 14.12 0.21 3.13
0.11
1.58
3.06
6.75 4.80
8.19 5.82
86.63 61.60
282
40.25 125.99 3.80 27.65 866
4.03 7.72 0.19 1.51
4.01 14.12 0.21 3.13
0.11
1.58
3.06
6.75 4.80
8.19 5.82
86.63 61.60
282
178.88 559.93 16.89 122.87 1,098
50.00
45.00
35.00
23.06 13,836.38 151.60 2,216.10 16,227
30.75 48.62 1.09 9.69 566
163
50.00
45.00
35.00
63 78
48 7.70
0.06
2.90 13.45 0.09 2.49 92
47 7.54
0.07
1.21 5.60 0.04 1.04 58
33 5.34
0.06
1.21 5.60 0.04 1.04 65
38 6.08
0.06
3.39 15.69 0.10 2.90 95
46 7.38
0.06
3.39 15.69 0.10 2.90 83
38 6.08
0.06
1.45 6.73 0.04 1.24 67 As Item
38 6.08
0.06
3.39 15.69 0.10 2.90 95
46 7.38
0.06
2.90 13.45 0.09 2.49 91 As Item
46 7.38
0.06
2.42 11.21 0.07 2.07 87 As Item
46 7.38
0.06
2.42 11.21 0.07 2.07 87
46 7.38
0.06
353.30 1,876.37 305.74 405.67 3,782
11.79 30.37 0.93 6.02
0.06
35.00
381.57 2,026.48 330.20 438.12 5,951
481.00 76.96
515.75 183.70 255.03 2.78
2.25 9.18 0.15 1.78
4.97 13.37 0.20 2.43
0.06
35.00
409.83 2,176.59 354.66 470.57 6,245
481.00 76.96
515.75 183.70 255.03 2.78
2.25 9.18 0.15 1.78
4.97 13.37 0.20 2.43
0.06
35.00
438.10 2,326.70 379.12 503.03 6,539
481.00 76.96
515.75 183.70 255.03 2.78
2.25 9.18 0.15 1.78
4.97 13.37 0.20 2.43
0.06
35.00
209
409.83 2,176.59 354.66 470.57 4,473 As Item
167
38 6 59
3 0
46 7 67
48 8 70
33 5 48
38 6 55
353.30 1,876.37 305.74 405.67 3,676
409.83 2,176.59 354.66 470.57 4,265
229.08 554.23 11.44 87.01 1,264
0.50
10,499
- 4,375.70 - 700.11
183.70 255.03 2.78 71.46
23.78 83.68 1.23 18.54
15.96 36.31 0.69 5.62
10,717
- 4,375.70 - 700.11
183.70 255.03 2.78 71.46
23.78 83.68 1.23 18.54
15.96 36.31 0.69 5.62
10,688
- 4,375.70 - 700.11
183.70 255.03 2.78 71.46
23.78 83.68 1.23 18.54
15.96 36.31 0.69 5.62
- 38.00 - 6.08 55
- 13,706.90 - 2,193.10 19,875
- 780.00 - 124.80 1,131
409.83 2,176.59 354.66 470.57 4,265 As Item
35.00
3.41 171.47 5.20 28.21
12.85 208.37 6.50 44.30
- 326.61 - 52.26
22246 3559 32,257
8690 1390 12,601 As Item
6985 1118 10,128 As Item
22246 3559 32,257
15449 2472 22,401
8690 1390 12,601 As Item
15449 2472 22,401
6985 1118 10,128
15449 2472 22,401
6985 1118 10,128
1746 279 2,532
3500 560 5,075
6985 1118 10,128 As Item
6985 1118 10,128 As Item
20500 3280 29,725
39000 6240 56,550 As Item
9.00
As Item
As Item
As Item
As Item
As Item
As item
As item
As item
As item
As Item
As Item
As Item
As Item
As item
As item
As item
As item
858.00 2,703.36 - 434.78 4,995
35.00 44
45.00 56
68.00 85
40.00 50
-
-
3,368.06 67 1546 6,230
1,751.39 35 804 3,240
2,425.01 49 1113 4,490
2,694.45 54 1237 4,990
2,425.01 49 1113 4,490
22,363.94 447 10265 41,350
2,963.90 59 1360 5,480
17,783.37 356 8163 32,880
3,368.06 67 1546 6,230
12,933.36 259 5936 23,920
134.72 3 62 250
- 0 0 -
8,756.96 175 4019 16,190
134.72 3 62 250
1,481.95 30 680 2,740
but Type II
but Type III
but Type IV
but Type V
but secretary
but 2 office attendants
but 2 CAD Technicians
but 3 chainmen
but 4 laboratory attendants
but 8 casual workers
but F2 finish
but F3 finish
but F3 finish
but F3 finish
but 50 x 50 x 3 mm RHS
-
Provide, furnish, maintain and repair Engineer's
1.00 1.01 Staff houses in accordance with Specifications
-
1.00 1.01 - Type I no. 10,526,299
1.00 1.02 - Type II no. 6,375,135
1.00 1.03 - Type III no. 3,906,762
1.00 1.04 - Type IV no. 2,630,362
1.00 1.05 - Type V no. 1,475,549
Renting, furnishing, maintenance, operation and
1.00 1.01 repair of Engineer's Staff houses 1 No.Type I in Hs/mth
accordance with Specifications 87,719
1.00 1.02 As item 1.01 but 1 No. Type II Hs/mth 53,126
1.00 1.03 As item 1.01 but 3 No. Type III Hs/mth 32,556
1.00 1.04 As item 1.01 but 5 No. Type IV Hs/mth 21,920
1.00 1.05 As item 1.01 but 2 No. Type V Hs/mth 12,296
Provide, furnish, maintain and repair Engineer's
1.00 1.06 office in accordance with Specifications no.
8,953,190
Renting, maintenance, operation and repair of
1.00 1.06 Engineer's office in accordance with Specifications Hs/mth
74,610
Provide, furnish, maintain and repair Engineer's
1.00 1.07 laboratory in accordance with Specifications. no.
6,336,500
Provide, furnish and maintain Engineer's mobile
1.00 1.07 laboratory in accordance with Specifications . no.
-
Renting, maintenance, operation and repair of
1.00 1.08 Engineer's laboratory in accordance with Hs/mth
Specifications. 52,804
Furniture for the Engineer's office and laboratory
1.00 1.09 Lump Sum
(Appendix to Special Specifications) 644,981
Extra over item 1.00 for Contractor's profit and
1.00 1.10 no.
overheads 25
Summary of Appendix A: Provide and maintain
1.00 1.11 survey, miscelleneous, Engineer's office and Lump Sum
laboratory equipment as per the Specifications 24,234,165
Extra over item 1.00 for Contractor's profit and
1.00 1.12 no.
overheads 25
Provide,fuel,insure and maintain with driver, 1 No.
new 4WD station wagon vehicle Diesel propelled,
with engine capacity of not less than 3000cc for the
1.00 1.12 exclusive use by the Resident Engineer inclusive of v. mth
the first 4000km per vehicle month
294,383
Extra over item 1.00 for mileage over 4000km per
1.00 1.17 km
vehicle month 24
Provide,fuel,insure and maintain with driver 4WD
double cabin, with engine capacity of not less than
1.00 1.15 2500cc for the exclusive use by the Resident v. mth
Engineer inclusive of the first 4000km per vehicle
month
235,386
Extra over item 1.00 for mileage over 4000km per
1.00 1.18 km
vehicle month 24
As Item 1.00 but 4WD Single cabin pick-up diesel
1.00 1.16 v. mth
engine - 2500 c.c 198,190
Extra over item 1.00 for mileage over 4000km per
1.00 1.19 km
vehicle month 24
1.00 1.13 As Item 1.00 but saloon- 1800c.c. v. mth 185,693
Extra over item 1.00 for mileage over 4000km per
1.00 1.13 km
vehicle month 21
As Item 1.00 but 4WD Double cabin pick-up diesel
1.00 1.20 km
engine 2,500,000
Removal and alteration of services inclusive of
1.00 1.21 liaison with the appropriate bodies in accordance P.C. Sum
with Specifications 2,500,000
Extra over item 1.00 for Contractor's profit and
1.00 1.22 %
overheads 31
Prime cost sum for acquisition of land required for
1.00 1.23 the works, etc. in accordance with Specifications. P.C. Sum
12,500,000
Extra over Item 1.00 for Contractor's profit and
1.00 1.24 %
overheads 31
Miscellaneous accounts for Resident Engineer to
1.00 1.25 reimburse the Contractor in accordance with P.C. Sum
Specifications 5,000,000
Extra over Item 1.00 for Contractor's profit and
1.00 1.26 %
overheads 31
Payment of overtime for the Engineer's junior staff
1.00 1.27 P.C. Sum
2,500,000
Extra over Item 1.00 for Contractor's profit and
1.00 1.28 %
overheads 25
Provide, erect and maintain project sign boards in
1.00 1.30 no.
accordance with Specifications 319,000
Provide, install and maintain telephone services to
1.00 1.31 P.C. Sum
Engineer's office/houses -
Extra over Item 1.00 for Contractor's profit and
1.00 1.32 %
overheads 25
Provide, furnish and maintain Engineer's mobile
1.00 1.33 office in accordance with Specifications (provisional no.
item) -
1.00 1.34 Digital camera no. 53,007
Allow a Prime Cost Sum for purchase of mobile
phones and airtime in accordance with
1.00 1.39 Specifications for the exclusive use of the Engineer P.C. Sum
1,250,000
Extra over Item 1.00 for Contractor's profit and
1.00 1.40 %
overheads 25
Provide and maintain survey equipment in
1.00 1.41 P.C. Sum
accordance with Specification 3,008,000
Extra over Item 1.00 for Contractor's profit and
1.00 1.42 %
overheads 25
Provision of temporary accommodation and office
1.00 1.43 for the Engineer's staff in accordance with P.C. Sum
Specifications. 2,500,000
Extra over Item 1.00 for Contractor's profit and
1.00 1.44 %
overheads 25
Allow for attendance to the Resident Engineer's
1.00 1.45 support staff for the duration of the Contract as
directed by the Engineer -
1.00 1.45 - Administrative assistant m. mth 36,250
1.00 1.46 - Secretary m. mth 27,375
1.00 1.47 - Eight office attendants m. mth 18,125
1.00 1.48 - Two CAD technicaians m. mth 60,000
1.00 1.51 - Three Chainmen m. mth 20,125
1.00 1.52 - Four laboratory technicians m. mth 60,000
1.00 1.53 - Fourteen Casual Workers m. mth 18,125
Extra over items 1.00-1.00 for Contractor's profit
1.00 1.55 %
and overheads #REF!
Allow for environmental mitigation plan measures
1.00 1.56 P.C. Sum
2,500,000
Extra over item 1.00 for Contractor's profit and
1.00 1.57 %
overheads 25
1.00 1.58 Allow for Engineer's staff training as instructed P.C. Sum 2,500,000
Extra over item 1.00 for Contractor's profit and
1.00 1.59 %
overheads 25
Allow a Prime Cost Sum for Engineer's confirmatory
1.00 1.60 testing and purchase of consumables P.C. Sum
3,750,000
Extra over item 1.00 for Contractor's profit and
1.00 1.61 %
overheads 25
Allow a provisional sum for the construction of
1.00 1.62 Prov. Sum
roadside amenities 6,250,000
Extra over item 1.00 for Contractor's profit and
1.00 1.63 %
overheads 25
Allow a provisional sum for HIV AIDS compaign
1.00 1.66 Prov. Sum
2,500,000
Extra over item 1.00 for Contractor's profit and
1.00 1.67 %
overheads 25
Clear site including removal of hedges, bushes,
trees (except those designated to remain by the
4.00 4.01 engineer) and other vegetation and objectionable ha.
materials in accordance with the specifications
38,376
Removal of topsoil not exceeding 200mm depth to
4.00 4.02 stockpile for re-use as directed by the Engineer m3
298
As Item 4.00 but to spoil as directed by the Engineer
4.00 4.03 m3
298
Removal of all other existing drainage structures of
4.00 4.04 all sizes such as drifts, box culverts, bridges etc no.
877
Allow for removal of any structures and obstructions
4.00 4.05 as directed by the Engineer. Payment to be on Prov. Sum
dayworks basis -
Removal of existing pipe culverts to spoil or
4.00 4.06 stockpile for re-use as directed by the Engineer m
594
4.00 4.07 Removal of headwalls, wingwalls and aprons no. 661
4.00 4.08 Removal of drop inlets of all sizes no. 826
Excavate existing surfacing and road pavement to a
depth instructed by the Engineer and remove to
4.00 4.09 stockpile or spoil as directed. m3
299
Remove existing road signs and stockpile as
4.00 4.10 No.
directed by the Engineer. 260
Remove existing guardrails and handrails including
4.00 4.11 support structures and stockpile or spoil as directed m
by the Engineer. 114
Remove existing concrete paving blocks to stockpile
4.00 4.12 m2
or spoil as directed by the Engineer 41
Remove existing kerbstones/channels to stockpile
4.00 4.13 m
or spoil as directed by the Engineer 41
NOTE: No overhaul will be paid for these items as
5.00 5.01 they shall be deemed to have been included in the
Contractor's rates. -
Fill in soft material and compact to at least 95%
5.00 5.02 m3
MDD (AASHTO T.99) 541
5.00 5.02 As Item 5.00 but in hard material m3 2,193
5.00 5.03 Spoil in soft material m3 327
5.00 5.04 As Item 5.00 but in hard material m3 2,155
Provide, transport, spread and compact to at least
100% MDD AASHTO T99 improved subgrade
5.00 5.05 materials as instructed by the Engineer. m3
606
Overhaul of fill or spoil materials in excess of free-
5.00 5.06 m3km
haul distance of 1km 3
Compaction of existing ground below fills to at least
95% MDD (AASHTO T.99) including all necessary
5.00 5.07 scarifying and water to a depth of 150mm below m3
ground level. 217
Compaction of the 300mm below formation level in
5.00 5.08 m3
cutting to 100% MDD (AASHTO T99) 514
Extra over Item 5.00 for compaction of top 300mm
5.00 5.09 m3
to 100% MDD (AASHTO T99) 38
Excavation to spoil in swamps in accordance with
5.00 5.10 m3
Specifications. 199
Provide, place and compact rockfill as per Clause
5.00 5.11 m3
507 of the Specifications 2,090
Provide, transport and install filter fabric (300g/m2)
5.00 5.12 under, over or around rockfill as directed by the m2
Engineer. -
Topsoiling prior to grassing, minimum compacted
5.00 5.13 thickness of topsoil shall be 50mm; all in m2
accordance with Specifications 11
Grassing - Planting of sprigs of approved
indigenous grass types; to embankments, cuttings
5.00 5.14 or where directed by the Engineer in accordance m2
with the Specifications, 28
5.00 5.15 Side slope fill in soft material m3 386
Allow for heavy grading of the existing carriageway.
The rate to Include for processing materials,
compacting and trimming roadway to design profile,
5.00 5.16 camber and crossfall and excess material to spoil km
as diretected by the Engineer
170,975
7.00 7.01 Excavate for structures in soft material m3 232
7.00 7.02 Excavate for river training in soft material m3 232
Extra over Item 7.00 for excavation in hard material
7.00 7.03 m3
1,340
7.00 7.04 Rockfill to existing channels m3 2,090
7.00 7.05 Provide and place porous filter material m3 2,552
Provide selected granular material for backfill
7.00 7.06 m3
around structures. 568
Prepare ground as necessary, provide all materials
and construct 225mm thick stone pitching to side
slopes of channels, natural ground faces, inlets and
7.00 7.07 outlets of culverts including carting away any m2
excess material to spoil as directed by the Engineer
875
Extra over Item 7.00 for grout
7.00 7.08 m2
652
7.00 7.09 Excavate for gabions in soft material m3 225
Extra over Item 7.00 for excavation in hard material
7.00 7.10 m3
1,341
7.00 7.11 Provide and place gabion mesh m2 410
7.00 7.12 As item 7.00 but mattresses 0.3m thick m2 607
7.00 7.13 Provide and place rockfill to gabions m3 1,924
Provide and place filter fabric under and/or behind
7.00 7.14 m2
gabions (250g/m2) 80
7.00 7.15 Provide and place dumped rip-rap m3 1,341
7.00 7.16 Provide and place closed jointed rip-rap m3 866
Provide, place and compact rock fill below
7.00 7.17 m3
structures 866
Break off a strip around existing structure to expose
7.00 7.18 m3
reinforcement to enable extension 1,098
0.00 Concrete blinding to gabions m3 13,548
NOTE: No separate payment shall be made for the
haulage of surplus or unsuitable material and the
8.00 8.00 cost of such haulage for disposal shall be included
in the rates. -
Removal of existing pipe culverts to spoil or
8.00 8.01 stockpile for re-use as directed by the Engineer m
1,161
8.00 8.02 Removal of headwalls, wingwalls and aprons no. 379
8.00 8.03 Removal of drop inlets of all sizes no. 883
Excavate in soft material for pipe culverts and
subsoil drains in soft material including support of
8.00 8.04 trench sides, dewatering and carting away surplus m3
material to spoil. 300
Excavate in soft material for minor drainage
8.00 8.05 m3
structures 294
Excavate for inlet, outfall, mitre and catchwater
8.00 8.06 m3
drains in soft material 294
8.00 8.07 Excavate in soft material for channels m3 294
8.00 8.08 Excavate for cut-off drains in soft material m3 294
Extra over Items 8.00-8.00 for excavation in hard
8.00 8.09 m3
material 1,403
Construct stone pitched spillways on cut slopes
8.00 8.10 m2
2,154
Provide, place and compact to 95% MDD AASHTO
8.00 8.11 m3
T.99 selected backfill material. 572
Provide and place crushed rock in subsoil drains
8.00 8.12 m3
2,103
Provide, place and compact rockfill below culverts
8.00 8.13 m3
2,143
8.00 8.14 Provide and lay ogee jointed concrete pipes -
8.00 8.15 - 600 mm dia. m 2,548
8.00 8.16 - 450 mm dia. m 2,247
8.00 8.17 - 750 mm dia. m 3,724
8.00 8.18 - 900 mm dia. m 4,174
8.00 8.19 - 1200 mm dia. m 6,450
Provide, place and compact concrete class 15/20 to
8.00 8.20 beds,surrounds and haunches to concrete pipes m3
10,075
Provide, place and compact concrete class 20/20 to
minor drainage structures ( including formwork) as
8.00 8.21 shown on the drawings or as directed by the m3
Engineer 17,056
Provide, place and compact concrete class 25/20
inclusive of reinforcements to headwalls, wingwalls,
8.00 8.22 aprons and other minor drainage structures as m3
shown on the drawings or as directed by the
Engineer
18,378
Provide materials and construct earth dams as per
8.00 8.23 m3
drawing. -
Concrete scour checks as shown in the drawings
8.00 8.24 m3
and as directed by the Engineer 12,337
Construct Class 20/20 lined outfall channels and
side ditches, including excavation shuttering, mesh
8.00 8.25 reinforcement as per Specifications m3
13,426
Provide and install filter fabric (300g/m2) to rockfill
8.00 8.26 m2
and subsoil drains 80
Provide and place lime to backfill (provisional item)
8.00 8.27 t
16,227
Excavate in soft material, provide and joint 300mm
half round concrete channels on 75mm gravel
8.00 8.28 blinding with 150mm concrete haunch ; all in m
accordance with Specifications 566
Excavate in soft material provide and joint
450mmx150mm precast concrete rectangular
8.00 8.29 channels on 75mm gravel blinding with 150mm m
concrete haunch to parking areas. 1,365
Provide and place 600mmx355mmx75mm thick
8.00 8.30 precast invert block drain inclusive of murram m
bedding . 1,532
Provide and place 450mmx225mmx75mm thick
8.00 8.31 precast invert block drain inclusive of murram m
bedding . 1,414
Provide and place 600mmx125mmx100mm precast
8.00 8.32 m
concrete edging. 731
Provide and place 600mmx225mmx75mm thick
8.00 8.34 m2
precast concrete slab 1,066
Excavate in all materials and to any depth and
8.00 8.35 construct gulley chambers inclusive of frame and no.
grating as detailed in the drawings. 163
Provide and fix new frame and gulley grating as per
8.00 8.36 no.
the drawing -
Excavate in all materials and to any depth, provide,
lay and joint 450mm diameter concrete pipe to
8.00 8.37 gulley pots and chambers, include for concrete m
bedding, haunching, surround and connections
177,627
9.00 9.01 Improvement of the existing road km 170,975
Construct, gravel and maintain deviation in
9.00 9.02 km
maximum lengths of 5km sections. 1,029,058
Provide signs and barriers in accordance with
9.00 9.03 km
Clause 907 of the Specifications -
9.00 9.04 Maintain the passage of traffic Lump Sum -
Excavate gravel wearing course material, transport,
spread and compact to at least 95% MDD AASHTO
9.00 9.05 T 180 as surfacing to existing roads or deviations m3
(Method A). 494
Excavate gravel wearing course material, transport,
spread and compact to at least 95% MDD AASHTO
9.00 9.05 T 180 as surfacing to existing roads or deviations m3
(Method B). 572
Overhauls of gravel wearing course material in
9.00 9.06 m3km
excess of 1.5km free haul distance. 78
Construct, maintain and reinstate access roads to
9.00 9.07 borrow pits measured in accordance with 'Method B' km
171,547
Reinstatement of deviations to the condition
9.00 9.08 prevailing prior to commencement of construction km
works 1,143,143
Accomodating traffic construction and
9.00 9.09 km
maintenenace of deviations. 2,824,504
NOTE: No overhaul will be paid for as it is deemed
10.00 10.00 to have been included in the Contractor's rate.
-
Provide, mix with water and compact gravel wearing
10.00 10.01 course in accordance with Specifications m3
591
Overhaul of gravel material in excess of 1.5 km
10.00 10.02 m3km
freehaul. 78
NOTE: No overhaul will be paid for these items as
11.00 11.00 they shall be deemed to have been included in the
Contractor's rates. -
Provide lay and compact to100% MDD (AASHTO
T.180) natural sub-base material in accordance with
11.00 11.01 the drawings and Section 12 of the Standard m3
Specifications (Method B) 572
Overhaul of natural subbase or base materials in
11.00 11.02 excess of free-haul distance of 1.5km m3km
78
Provide, transport and spread cement stabilizer at
11.00 11.03 the specified rates of 50 - 80 Kg/m3. t
20,046
Mix in cement stabilizer (mix - in - place method).
11.00 11.04 m3
94
11.00 11.05 Protection and curing cement treated material m2 39
Provide and spray bituminous binder type MC70 at
11.00 11.06 l
a rate of 1.0 l/m2 92
Provide, transport and spray MC3000 for first seal
11.00 11.07 l
coat at a rate of 1.4l/m2 95
Provide, transport and spray MC3000 for second
11.00 11.08 l
seal coat at a rate of 1.0l/m2 95
Provide, lay and roll precoated 6/10 mm size
11.00 11.09 m3
chippings at a rate of 70 - 90 m2/m3. 6,245
Provide, lay and roll precoated 3/6 mm size
11.00 11.10 m3
chippings at a rate of 90 - 120 m2/m3. 6,539
Provide and place 600mmx125mmx100mm precast
11.00 11.11 m
concrete edging. 731
NOTE: No overhaul will be paid for these items as
12.00 12.00 they shall be deemed to have been included in the
Contractor's rates. -
Provide, lay and compact natural material for base
12.00 12.01 for pavement (95 % Modifed AASHTO T180) m3
572
Provide, lay and compact natural material for
12.00 12.02 subbase for pavement (95 % Modified AASHTO m3
T180) 576
In situ processing of existing pavement layers
(including surfaces) as new subbase with additional
12.00 12.03 gravel (measured separately) and compact to m3
specified density (95 % Mod. AASHTO T180) and
thickness 175mm.
163
Provide, place and mix additional gravel to Item
12.00
12.00 12.04 m3
576
Excavate, transport within a free haul distance of
1.5km natural material for base including watering,
12.00 12.05 mixing and compaction as per specifications. m3
572
Overhaul of natural subbase and base material in
12.00 12.06 m3km
excess of 1.5 km freehaul. 78
NOTE: No overhaul will be paid for these items as
13.00 13.00 they shall be deemed to have been included in the
Contractor's rates. -
13.00 13.01 Provide graded crushed stone for base. m3 2,552
Scarify existing graded crushed stone on pavement
and/or shoulder, mix with new graded crushed
13.00 13.02 stone, spread and compact as directed by the m3
Engineer 162
Cold milling the existing pavement, transport the
13.00 13.03 milled material to stockpile or to spoil as directed by m3
the Engineer. 601
Obtain from the stockpile of material removed from
the milling of existing bituminous surfacing/base
13.00 13.04 layers, mix with new GCS, crush, grade, mix, haul, m3
spread and compact as graded crushed stone layer
to pavement
1,187
Provide, transport and spread cement stabilizer at
14.00 14.01 t
the specified rates 20,046
Mix in cement stabilizer (mix - in - place method).
14.00 14.02 m3
94
Protection and curing of cement treated material
14.00 14.03 m2
39
Provide, transport and spread lime stabilizer at the
14.00 14.04 t
specified rates 20,190
14.00 14.05 Mix in lime stabilizer (mix - in - place method). m3 94
14.00 14.06 Protection and curing of lime treated material m2 39
NOTE: No overhaul will be paid for bitumen and
15.00 15.01 chippings as these shall be deemed to have been
included in the rates. -
Provide and spray bituminous binder type MC30
15.00 15.02 litre
(prime coat) at a rate of 0.8-1.2 l/m2. 93
Provide and spray bituminous binder type MC70
15.00 15.03 litre
(prime coat) at a rate of 1.0 l/m2 92
Provide and spray bituminous binder type K1-70
15.00 15.04 litre
tack coat at a rate of 0.5 l/m2. 58
Prepare surface of base, provide, heat and spray
0.00 15.05 bituminous binder type 80/100 as tack coat (0.5 litre
l/m2) 65
Prepare surface of base, provide, heat and spray
15.00 15.06 bituminous binder type MC3000 for first tack coat litre
(1.0-1.4 l/m2) 95
Provide, heat, transport and spray 80/100 bitumen
15.00 15.07 for first seal coat at a rate of 1.0-1.4 l/m2 litre
83
As Item 15.00 but for second seal coat at a rate of
15.00 15.08 litre
0.6l/m2 67
Provide, transport and spray MC3000 for first coat
15.00 15.09 litre
at a rate of 1.0-1.4l/m2 95
As Item 15.00 but for second seal at a rate of 0.8-
15.00 15.10 litre
1.2l/m2 91
As Item 15.00 but for third seal at a the rate of 0.6-
15.00 15.11 litre
1.0 l/m2 87
15.00 15.12 MC3000 for sand seal litre 87
Provide, lay and roll 14/20 mm size chippings at a
15.00 15.13 m3
rate of 60-90 m2/m3. 3,782
Provide, lay and roll precoated 10/14 mm size
15.00 15.14 m3
chippings at a nominal rate of 90 m2/m3. 5,951
Provide, lay and roll precoated 6/10 mm size
15.00 15.15 m3
chippings at a rate of 70-120 m2/m3. 6,245
Provide, lay and roll precoated 3/6 mm size
15.00 15.16 m3
chippings at a rate of 130-160 m2/m3. 6,539
Curing and blinding of prime coat in accordance
15.00 15.18 with Clause 1505 (b) of the Specifications. m2
-
Stockpile at the MORPW yard chippings for
15.00 15.19 maintenance. Rate to include transportation of the m3
material - 10/14 mm single size chippings. 4,231
15.00 15.22 Provide and mix kerosene with 80/100 litre 59
15.00 15.23 Variation of binder content (MC-3000) litre 67
15.00 15.24 Variation of binder content (MC-30) litre 70
15.00 15.25 Variation of binder content (K1-70) litre 48
15.00 15.26 Variation of binder content (80/100) litre 55
15.00 15.27 Variation of spread rate (14/20mm chippings) m3 3,676
15.00 15.28 Variation of spread rate (6/10mm chippings) m3 4,265
NOTE: No haulage will be paid for aggregates,
bitumen or the premix. The cost for haulage shall be
16.00 16.00 included in the rates. Rates to be inclusive of fines.
-
Strip existing asphalt road surfacing and cart away
to spoil or reuse including free haul up to 1 km
16.00 16.01 where specifically directed by the engineer m3
1,264
Cold milling the existing asphalt concrete (AC),
16.00 16.02 transport the milled material to stockpile or to spoil m3
as directed by the Engineer. 601
Obtain from the stockpile of material removed from
the milling of existing surfacing/base layers, mix
with new material and bitumen, crush, grade, mix,
16.00 16.03 haul, spread and compact modified AC surfacing or m3
as DBM base layer to pavement
555
Provide,lay and compact foamed bitumen mix base
16.00 16.04 course comprising 4.8% nominal bitumen content m3
and 0/30mm aggregates -
Clean and apply rubberised bituminous sealant to
16.00 16.05 cracks on the carriageway and shoulders as per m2
Specifications -
On prepared surface of base layer, provide, lay and
16.00 16.06 compact modified AC with 4.9 % nominal bitumen m3
content and 0/14 mm aggregates. 10,499
On prepared surface of binder course, spread Tack
Coat, provide, lay and compact 25 mm compacted
16.00 16.07 thickness of asphalt concrete wearing course with m3
6.5 % nominal bitumen content on 0/14 mm
aggregates Class A.
-
On prepared surface of base layer, provide, lay and
compact 50 mm compacted thickness of asphalt
16.00 16.08 concrete wearing course with approximately 5% m3
bitumen content on 0/20 mm aggregates.
10,717
Provide, lay and compact Dense Bitumen Macadam
16.00 16.09 with 4.5 % nominal bitumen content and 0/30 mm m3
aggregates. 10,688
16.00 16.10 Variation in binder content litre 55
Variation in mineral filler if directed by the Engineer.
16.00 16.11 t
19,875
16.00 16.12 Variation in sand t 1,131
16.00 16.13 As Item 16.00 but 6/11 mm size m3 4,265
Provide and install sealgrid on the shoulder as
16.00 16.14 shown on the drawing and as per Specifications m2
-
Provide all materials, mix, place and compact
17.00 17.02 m3
concrete class 20/20 9,643
Provide all materials, mix, place and compact
17.00 17.03 m3
concrete Class 25/20 11,186
Provide all materials, mix, place and compact
17.00 17.04 m3
concrete class 30/20 12,579
17.00 17.05 Blinding concrete Class 15/40 m3 9,835
17.00 17.06 Blinding concrete Class 15/20 m3 10,075
17.00 17.08 Unformed surface finish - Class UF2 m2 28
17.00 17.09 Unformed surface finish - Class UF3 m2 56
Formworks for formed surface finishes (Rate to
17.00 17.13 include for 25x25mm chamfer to all exposed areas 0
-
17.00 17.14 - F1 finish - Vertical m2 1,380
17.00 17.15 - F1 finish - sloping m2 1,442
17.00 17.16 - F2 - finish m2 1,866
17.00 17.17 - F3 - horizontal m2 1,898
17.00 17.18 - F3 - Vertical m2 1,866
17.00 17.19 - F3 - sloping m2 1,929
Formworks to edges of slabs (less than 300mm
17.00 17.20 m2
high) 320
Provide, install and joint Waterstops as per
17.00 17.21 m
specifications -
17.00 17.22 Mortar used ahead of concrete placing, etc m3 16,249
17.00 17.23 Admixtures, workability and hardening agents litre -
High tensile steel reinforcement bars. - diameter
17.00 17.24 t
less than or equal to 16 mm. 95,000
As Item 17.00 but diameter greater than 16 mm.
17.00 17.25 t
95,000
Reinforcement in mild steel (MS) - diameter less
17.00 17.26 t
than or equal to 16 mm. 95,000
As Item 17.00 but diameter greater than 16 mm
17.00 17.27 t
95,000
17.00 17.28 Fabric reinforcement A193 for access culverts m2 936
17.00 17.29 Fabric reinforcement A142 m2 701
17.00 17.30 Fabric reinforcement A252 m2 1,209
17.00 17.31 Fabric reinforcement A393 m2 1,857
17.00 17.32 Precast units no. -
18.00 18.01 Prestressing tendons no. -
18.00 18.02 Load test no. -
18.00 18.03 Structural steel t -
19.00 19.01 Steel girder for bridge ton -
19.00 19.01 Steel girder 1400 x 475/350 for bridge ton -
19.00 19.02 Channel section 305 x 102 x 46 kg/m ton -
19.00 19.03 Channel section 152 x 76 x 18 kg/m ton -
Remove existing road signs and stockpile as
20.00 20.01 No.
directed by the Engineer. -
Remove existing guardrails and handrails including
20.00 20.02 support structures and stockpile or spoil as directed m
by the Engineer. -
Provide and erect concrete road reserve boundary
20.00 20.03 no.
posts -
20.00 20.04 Fencing as shown on the drawings m -
20.00 20.05 Remove existing fencing m -
Provide and install gates as shown on the drawings
20.00 20.06 no.
-
Provide and erect edge marker posts as shown on
20.00 20.07 no.
the drawings. 478
Provide and erect reinforced concrete kilometer
20.00 20.08 no.
marker posts 1,174
20.00 20.09 Warning signs - 1200mm size no. 32,257
20.00 20.10 Warning signs - 750mm size no 12,601
20.00 20.10 As Item 20.00 but 600mm size no 10,128
20.00 20.11 Priority signs - 1200mm size no. 32,257
20.00 20.12 Priority signs - 1000mm size no. 22,401
20.00 20.12 As Item 20.00 but 750mm size no. 12,601
20.00 20.13 Prohibitory signs - 1000mm size no. 22,401
20.00 20.13 Prohibitory signs - 600mm size no. 10,128
20.00 20.14 Mandatory signs - 1000mm no. 22,401
20.00 20.14 Mandatory signs - 600mm no. 10,128
20.00 20.14 Mandatory signs - 300mm no. 2,532
Standard informatory signs - 400mmx300mm size
20.00 20.15 no.
5,075
20.00 20.16 As Item 20.00 but 500mmx600mm size no. 10,128
20.00 20.17 As Item 20.00 but 600mmx600mm size no. 10,128
Non-Standard informatory signs less than 1m2
20.00 20.18 no.
29,725
As Item 20.00 but equal or more than 1m2 but less
20.00 20.19 no.
than 2 m2 56,550
As Item 20.00 but equal or more than 2m2 but less
20.00 20.20 no.
than 5 m2 93,888
20.00 20.21 As Item 20.00 but equal to or more than 5m2 no. 126,875
Road marking in yellow paint - line 100mm wide
20.00 20.22 m2
2,808
20.00 20.23 As Item 20.00 but line 200mm wide m2 2,808
Road marking in white paint - line 100mm wide
20.00 20.24 m2
2,232
20.00 20.25 As Item 20.00 but line 200mm wide m2 2,232
20.00 20.26 As Item 20.00 but 400mm wide give way lines m2 2,232
As Item 20.00 but 500 mm wide lines at pedestrian
20.00 20.27 m2
crossings 2,232
20.00 20.28 Paint single headed arrows No. 3,068
20.00 20.29 Apply letters and symbols m2 2,232
Provide and install retro-reflective road studs (cat's
20.00 20.30 No.
eyes) 15,217
Provide and erect flex beam guardrails including
20.00 20.31 m
end pieces -
Install pipe handrails on bridge and box culverts
20.00 20.32 m
-
Provide and install reflective paint every alternate
20.00 20.33 No.
sections of existing guardrails -
Provide additional guardrail for future use by
20.00 20.34 m
Employer. -
Provide and place precast concrete channel blocks
to footpaths, busbays etc inclusive of excavation,
20.00 20.35 laying and jointing, concrete bedding and haunching m
etc. as shown in the drawings.
-
20.00 20.36 As Item 20.00 but raised straight kerbs m -
As Item 20.00 but kerbs to radii equal to or more
20.00 20.37 m
than 1.0m -
As Item 20.00 but kerbs to radii between 12m-6m
20.00 20.38 m
-
As Item 20.00 but kerbs to radii between 5m-1m
20.00 20.39 m
-
As Item 20.00 but quadrants of radius less than
20.00 20.40 no.
1.0m -
Provide and erect reinforced concrete culvert
20.00 20.41 no.
marker posts -
20.00 20.42 As item 20.00 but plastic marker posts no. -
20.00 20.43 Provide and erect precast concrete bollards. no. -
Provide materials and construct rumble strips on
20.00 20.44 m
shoulders. -
20.00 20.45 Provide materials and construct speed bumps m -
Provide, plant and maintain approved trees in
20.00 20.46 accordance with Specifications or as directed by the no.
Engineer -
Allow for street lighting installation on the first 5km
20.00 20.47 L.S.
-
Provide and lay 600mm x 600mm x 50mm precast
20.00 20.48 concrete paving slabs on 50mm thick compacted m2
sand bedding. -
Waterproofing to structures and all surfaces in
21.00 21.01 m2
contact with fill material -
21.00 21.01 Provideand place 3 layers of bituminous paint m2 -
Fixed bearing 355x250x80mm to bridge abutments
21.00 21.02 no.
-
Free bearing 355x250x78mm to bridge abutments
21.00 21.03 no.
-
21.00 21.04 Free bearing 515x375x112mm to bridge piers no -
Rubber bearing pads 450x300x13mm to fixed piers
21.00 21.05 m3
-
21.00 21.06 As item 21.00 but 375x300x13mm m3 -
21.00 21.07 Rubber bearing pads 5KX-125x13mm m -
Provide and install guardrail posts 100 x 100 x 6
21.00 21.08 no.
mm RHS of 1.0m length -
As item 21.00 but handrail posts 75x75x4mm RHS
21.00 21.09 no.
-
Provide and install longitudinal members 50 x 3.2
21.00 21.10 m
mm CHS to bridges -
21.00 21.11 As item 21.00 but 50 x 50 x 3 mm RHS no. -
Provide and fix galvanised wire mesh 50x50mm
21.00 21.12 m2
openings to parapet at bridges -
Provide and place elastometric bridge bearings
21.00 21.13 including dowel and cap as shown on drawing. no.
-
21.00 21.14 As Item 21.00 but fixed bearing. Include dowel no. -
21.00 21.15 As Item 21.00 but size 406x356x70mm no. -
Cast bearing seats of 2:1 sand/cement mortar as
21.00 21.16 no.
specified -
Provide and apply approved joint sealant (30 mm
21.00 21.17 m
deep by 25 mm wide) -
As Item 21.00 but 25 mm deep by 10 mm wide.
21.00 21.18 m
-
21.00 21.19 As Item 21.00 but 20 mm deep by 5 mm wide. m -
As for above items but to exposed ends of
21.00 21.20 m
expansion joints -
Provide and apply polystyrene filler or equivalent to
21.00 21.21 m2
expansion joints -
Provide and install guardrails on bridge or box
21.00 21.22 m
culverts -
Provide and install handrails on bridge or box
21.00 21.23 m
culverts -
21.00 21.24 Install 200 mm dia. Service ducts m -
21.00 21.25 As item 21.00 but 150mm dia. m -
Provide and install 100 mm diameter 400mm long to
21.00 21.26 no.
abutments and wing walls drain pipes -
21.00 21.27 Repair cracks in existing bridge as specified m -
Provide and install 75mm dia. 400mm long UPVC
21.00 21.28 Drain pipes on bridge deck or box culvert as per the no.
drawings -
As item 21.00 but 50mm dia. weep holes through
21.00 21.29 no.
abutmet -
21.00 21.30 Weepholes 75mm dia. no. -
21.00 21.30 Weepholes 100mm dia. no. -
Provide and fix in position 25mm dia. UPVC air
21.00 21.31 pressure relief pipe to soffit of deck slab across the no.
bridge beams. -
Provide all materials and place clas 20/20 concrete
21.00 21.32 m3
infill around service ducts -
Allow provisional sum for pedestrian footbridges
21.00 21.33 no.
-
Allow for the making of 5mm x 5mm drip traps along
21.00 21.33 the sides of the bridge deck located 75mm from the no.
edge. -
Movement joints - Providing and placing 25mm
21.00 21.34 joints and flexcell sealants or similar approved filler m2
as shown on the drawing. -
21.00 21.35 Surfacing to bridges m2 -
Class 25/20 concrete posts size 210x210x11.2mm
21.00 21.36 no.
-
21.00 21.37 200mm dia. Perforated drain pipes m -
21.00 21.38 150mm dia. Drain pipe below bridge deck m -
300mm thick Filtermaterial behind the bridge
21.00 21.39 m2
abutment. -
21.00 21.40 Elastomeric laminated Bearings no. -
21.00 21.41 Bridge identification plates no. -
Asphalt concrete surfacing 30mm thick to bridge
21.00 21.42 m3
deck -
EQUIPMENT: Rates inserted herein for equipment
shall include for all operational and maintenance
22.00 22.00 costs such as fuels, oils, water, grease, drivers,
operators and turn boys etc. -
Crawler dozer with hydraulic attachments - 100kw-
22.00 22.01 hr.
135kw rated flywheel power 4,995
As item 22.01 but 136kw - 185kw rated flywheel
22.00 22.02 hr.
power. 6,845
As item 22.01 but 186kw - 250kw rated flywheel
22.00 22.03 hr.
power. 9,250
Motor Grader - 80kw -110kw rated flywheel power
22.00 22.04 hr.
6,183
As item 22.04 but 111kw - 120kw rated flywheel
22.00 22.05 hr.
power. 6,745
As item 22.04 but 121kw - 160kw rated flywheel
22.00 22.06 hr.
power. 8,994
Rollers, towed vibratory including tractor - 6.5t-8.8t
22.00 22.07 hr.
unballasted weight 4,912
As item 22.07 but 8.9t - 11.7t unballasted weight.
22.00 22.08 hr.
6,530
Rollers deadweight (3-wheel include. Tractor) - 6.5t-
22.00 22.09 hr.
8.8t unballasted weight 4,912
As item 22.09 but 8.9t - 10.5t unballasted weight.
22.00 22.10 hr.
6,530
Pneumatic tyre rollers, self propelled - Up to 1.0t per
22.00 22.11 hr.
wheel 5,772
22.00 22.12 As item 22.11 but 1.1t - 2.0t per wheel. hr. 6,349
Rollers, vibratory single drum, rubber tyred, self
22.00 22.13 hr.
propelled - 8.3t-10.5t unballasted weight 4,843
Rollers, vibratory pedestrian twin drums, self
22.00 22.14 hr.
propelled - 651kg-1.3t unballasted weight 933
Towed grid roller of up to 10t unballasted dead
22.00 22.15 hr.
weight. 2,421
Vibratory sheep-foot roller, self propelled or towed
22.00 22.16 hr.
and up to 10t unballasted weight. 4,843
Vibrating plate compactor, 114kg - 200 kg operating
22.00 22.17 hr.
weight. 510
22.00 22.18 Motor scraper of up to 15 Cu.m capacity hr. 12,540
22.00 22.19 As item 22.18 but up to 25 Cu. m capacity hr. 20,842
Compressors, rated by normal delivery of free air
22.00 22.20 per minute at 7 kg/m2, complete with tools, hoses, hr.
steel etc. - 6.0-7.4m3/min 2,982
22.00 22.21 As item 22.20 but 7.5 - 9.7 m3/min. hr. 3,891
22.00 22.22 As item 22.20 but 9.8 - 25 m3/min. hr. 9,940
Wheel loaders, 4WD articulated - 1.5 -2.0 m3 SAE
22.00 22.23 hr.
rated capacity 6,336
As item 22.23 but 2.01 - 3.4 m3 SAE rated capacity.
22.00 22.24 hr.
10,709
As item 22.23 but 3.41 - 5.35 m3 SAE rated
22.00 22.25 hr.
capacity 16,802
22.00 22.26 Crawler loader - 0.8 -1.3m3 SAE rated capacity hr. 7,640
As item 22.26 but 1.31 - 1.90 m3 SAE rated
22.00 22.27 hr.
capacity. 11,166
As item 22.26 but 1.91 - 2.50 m3 SAE rated
22.00 22.28 hr.
capacity. 14,692
Cranes, mobile rubber tyred, rough terrain type of
22.00 22.29 hr.
23.0 - 40.0t max. working load. 7,720
Cranes; excavator cranes, tracked wheels - 20-28t
22.00 22.30 hr.
working load 7,198
22.00 22.31 As item 22.30 but 28.1t - 36.0t working load. hr. 9,254
Excavators; hydraulic crawler or wheel mounted full
22.00 22.32 circle slew - 14-17t nominal weight of the machine hr.
7,396
Excavators; hydraulic wheeled dual purpose
22.00 22.33 (backhoe/loader) - 0.6-0.8m3 rated bucket capacity hr.
4,439
As item 22.33 but 0.81 - 1.0 m3 rated bucket
22.00 22.34 hr.
capacity. 5,548
Tractors; rubber tyred including trailers - 50kw-75kw
22.00 22.35 hr.
rated flywheel power 1,153
Pumps (inclusive of all hoses) - 50-76mm delivery
22.00 22.36 hr.
304
22.00 22.37 As item 22.36 but 77 mm to 101 mm delivery. hr. 404
22.00 22.38 Concrete mixer - capacity up to 100 litres hr. 433
As item 22.38 but Capacity 101 litres to 200 litres.
22.00 22.39 hr.
866
22.00 22.40 As item 22.38 but 201 litres to 300 litres. hr. 1,300
Small dumpers - 750 kg to 1.2 tones maker's rated
22.00 22.41 hr.
payload. -
22.00 22.42 Concrete vibrator, poker type. hr. 375
lorries, ordinary - upto 7.5t gross vehicle weight
22.00 22.43 hr.
2,349
As item 22.43 but Over 7.5t gross vehicle weight.
22.00 22.44 hr.
4,698
Lorries, tipper - Up to 11.0t gross vehicles weight.
22.00 22.45 hr.
2,244
As item 22.45 but 11.1 t to 17.0t gross vehicle
22.00 22.46 hr.
weight. 3,469
As item 22.45 but 17.1t to 25.5 t gross vehicle
22.00 22.47 hr.
weight. 5,203
Van, pickup or similar utility vehicle - Up to 1.0t
22.00 22.48 hr.
carrying capacity. 1,752
22.00 22.49 As item 22.48 but 1.1t to 2.6t carrying capacity. hr. 4,556
Water tanker, self propelled - 3500 litres to 4550
22.00 22.50 hr.
litres capacity. 2,757
As item 22.50 but 4551 litres to 7000 litres capacity.
22.00 22.51 hr.
1,742
As item 22.50 but 7001 litres to 12000 litres capacity
22.00 22.52 hr.
2,757
Pressure bitumen distributor - 3500 litres to 4500
22.00 22.53 hr.
litres capacity. 1,804
As item 22.53 but 4500 litres to 8000 litres capacity.
22.00 22.54 hr.
2,706
22.00 22.55 Mechanical broom. hr. 1,059
22.00 22.56 4WD saloon vehicle or station wagon. hr. 1,583
Bitumen hand sprayer of 200 litres carrying
22.00 22.57 hr.
capacity. 847
22.00 22.58 Self propelled fuel tanker. hr. 2,915
22.00 22.59 Hand compactor, whacker or equivalent. hr. -
22.00 22.60 Chip spreader. hr. 3,377
22.00 22.61 Pulvimixer. hr. 8,411
LABOUR: Rates inserted shall include all costs of
22.00 22.00 labour such as insurance, accommodation,
travelling time etc. -
22.00 22.62 Unskilled labour. hr. 44
Mason/Artisan/Carpenter/Storeman/Pipelayer/Concr
22.00 22.63 hr.
eter (i.e. Skilled Labour) 56
22.00 22.64 Blaster hr. 85
22.00 22.65 Watchman. hr. 50
MATERIALS: Rates inserted are to include for the
22.00 22.00
delivery to the site, storage, handling etc. -
22.00 22.66 Ordinary Portland Cement. t 19,875
22.00 22.67 Hydrated lime. t 20,000
22.00 22.68 Aggregate for concrete - fine (sand) m3 1,697
As item 22.68 but coarse (nominal size 10-40 mm)
22.00 22.69 m3
3,970
22.00 22.70 Timber shuttering - for Class F1 finish m2 1,380
22.00 22.71 As item 22.70 but for Class F2 finish m2 1,866
Mild Steel Reinforcement - Up to and including
22.00 22.72 t
16mm diameter. 94,250
22.00 22.73 As item 22.72 but over 16 mm diameter. t 94,250
High Yield Steel Reinforcement - Up to and
22.00 22.74 t
including 16 mm diameter. 94,250
22.00 22.75 As item 22.74 but over 16 mm diameter. t 94,250
22.00 22.76 Chippings - Class 2, nominal size 20/14 mm m3 3,676
As item 22.76 but Class 2, nominal size 3/6 mm.
22.00 22.77 m3
4,559
Bitumen and emulsions - bitumen penetration grade
22.00 22.79 litre
80/100 55
22.00 22.80 As item 22.79 but bitumen cut-back MC3000 litre 67
22.00 22.81 As item 22.79 but bitumen cut-back MC70 litre 68
22.00 22.82 As item 22.79 but bitumen cut-back MC30 litre 70
22.00 22.83 Gabion mesh m2 395
22.00 22.84 Rockfill for gabions m3 1,924
22.00 22.85 Dynamite stick explosives kg. 435
22.00 22.86 Explosive fuse m 58
22.00 22.87 Detonators. no. 508
NOTE: Supply, install, test and commission the
24.00 24.00
following with all accessories as specified. #REF!
Lanterns with integral control gear and 250w SON-
24.00 24.01 T/XL-T lamps as Thorn Alpha 8 or equivalent. no.
#REF!
Provide new Street Lighting columns 11.2m long
with 1.8m single arm out-reach complete with
24.00 24.02 500mmx500mmx6mm thick baseplate, and no.
600mmx600mmx600mm concrete foundation in
accordance with drawing.
#REF!
Provide new Street Lighting columns 11.2m long
with 1.8m double arm out-reach complete with
500mmx500mmx6mm thick baseplate, and
24.00 24.02 600mmx600mmx600mm concrete foundation in no.
accordance with drawing.
#REF!
24.00 24.03 Provide new 5A double pole mcbs. no. #REF!
24.00 24.04 Provide new cut outs 5A Type. no. #REF!
Provide new 10mm2 X 2 core PVC SWA/PVC
24.00 24.05 m
copper cable. #REF!
24.00 24.06 As Item 24.00 but 3 core. m #REF!
Provide new 100mm dia. PVC duct to be laid at
24.00 24.07 every road crossing cable in accordance with m
Specifications. #REF!
Tiles marked "HATARI" for cable protection covers
24.00 24.08 no.
100 x 300 x 25mm. #REF!
500mm wide by 1000mm deep trenching and
24.00 24.09 m
backfilling, etc. #REF!
Provide 1.5mm2 PVC/PVC x 2 core and earth
24.00 24.10 m
conductor. #REF!
24.00 24.11 Concrete cable route marker. no. #REF!
Control pillar in accordance with drawing and
incorporating 1. K.P. and L Meter, 2. K. P. and L
cutout, 3. Isolator, 4. 60 A T.P. and N contactor, 5.
24.00 24.12 60 A ELCB , 0.5current trip and 6. 4 way T. P. and N no.
distribution board complete with sp mcbs
#REF!
24.00 24.13 Earthing at each control pillar no. #REF!
Earthing at every second street lighting column
24.00 24.14 no.
#REF!
Photocell mounted on a 5 M high powder coated
octagonal galvanised steel column complete with
24.00 24.15 wiring and all accessories to control contactor no.
mounted in the control pillar #REF!
60A 'Telemechanique' Electromagnetic contactor or
24.00 24.16 no.
equivalent. #REF!
60A 4 way SP&N consumer unit integral with 60A
24.00 24.17
SP #REF!
Column 4.6m made from Galvanized pipe for
24.00 24.18 no.
photocell. #REF!
24.00 24.19 15A SP MCBs. no. #REF!
ELCB 60A, 0.5A current trip Crab Tree or
24.00 24.20 no.
equivalent. #REF!
Reinforced concrete guard blocks as per the
24.00 24.21 no.
drawing. #REF!
24.00 24.22 Cable glands. no. #REF!
24.00 24.23 Earthing at each control pillar no. #REF!
24.00 24.24 Earthing at every second light column. no. #REF!
Allow a Prime Cost Sum as contribution to K.P.& L.
24.00 24.25 P.C. Sum
Co. #REF!
Extra over Item 24.00 for profits and overheads
24.00 24.26 %
#REF!
Test the completed works in accordance with I.E.E.
24.00 24.27 L.S.
regulations and as specified. #REF!
Remove existing Street Lighting Columns and
24.00 24.28 no.
transport to Nairobi City Council Depot #REF!
Provide all materials, mix, place and compact
23.00 23.01 m3
concrete for bus bays as per Specifications #REF!
Provide all materials, mix, place and compact no
23.00 23.02 fines concrete for climbing lanes as per m3
Specifications #REF!
23.00 23.03 Apply curing compound as per Specifications m2 #REF!
23.00 23.04 Provide and apply approved joint sealant. m #REF!
Provide and fix 32mm dia. mild steel dowels 800mm
23.00 23.05 no.
long as detailed on the Drawings. #REF!
Provide and place 12mm dia mild steel cross and
23.00 23.06 t
chair bars as per the Drawings #REF!
23.00 23.07 Provide joint filler as per Specifications m2 #REF!
Provide fabric reinforcement (A142 mesh) on the
23.00 23.08 m2
climbing lane as per Specifications #REF!
Provide underdrains for concrete climbing lanes as
23.00 23.09 m
per Drawings #REF!
Provide, lay and compact according to
Manufacturer's Specifications, interlocking heavy-
23.00 23.10 duty concrete paving blocks on completed base m2
layer. Rate to include 50 mm sand bed.
#REF!
Provide, lay and compact according to
Manufacturer's Specifications, interlocking heavy-
23.00 23.10 duty concrete paving blocks on completed base m2
layer. Rate to include 30 mm sand bed.
#REF!
Provide and install geotextile on the parking at
23.00 23.10 KTTC swamp shown on the drawing and as per m2
Specifications #REF!
Provide all materials and lay underdrain comprising
of 100mm dia. Slotted corrugated PVC pipe, Terram
23.00 23.11 filter fabric or similar and 10mm aggregates as m
shown on the drawings or as directed by the
Engineer.
#REF!
25.00 25.01 Routine maintenance for 5 years Lump Sum #REF!
25.00 25.02 Instituting an HIV/AIDS prevention campaign month #REF!
25.00 25.03 Allow a provisional sum of HIV/AIDS training P.C. Sum #REF!
Extra over item 25.00 for Contractor's profit and
25.00 25.04 %
overheads #REF!
1.000 1.000 OFFICE EQUIPMENT -
1.001 1.001 Intel pentium duo core laptop computer No. 137,490
1.002 1.002 Intel pentium duo core Desktop computer No. 101,620
1.003 1.003 Digital camera (10 megapixels) No. 37,610
1.004 1.004 Uninturruptable Power Supply 1VA No. 40,350
1.005 1.005 A4 Laserprinter No. 18,930
1.006 1.006 A3 deskjet printer No. 33,880
1.007 1.007 Stapling machine No. 500
1.008 1.008 Paper punch No. 500
1.009 1.009 Office electric heaters/fan No. 6,480
1.010 1.010 Fire extinguisher No. 25,160
1.011 1.011 Filing trays No. 1,500
1.012 1.012 Pair of scissors regular size No. 500
1.013 1.013 Electronic scientific calculators No. 6,480
1.014 1.014 Desk mounted pencil sharpeners No. 2,250
1.015 1.015 Refrigerator 220 litres capacity No. 75,220
1.016 1.016 First Aid kit No. 4,490
1.017 1.017 Photocopying machine No. 106,610
1.018 1.018 AutoCAD (Current Version) No. 523,550
1.019 1.019 Microsoft Office(Current Version) No. 61,030
1.020 Microsoft Project(Current Version)
#REF! 1.021 SURVEY EQUIPMENT #REF!
A0 size drawing board with adjustable metal stand
#REF! 1.022 No.
and parallel sliding cursor 55,300
#REF! 1.023 250mm set squares (45 and 60 deg.) No. 500
#REF! 1.024 150mm protractor (360 deg.) No. 250
Sets of fully divided scale rules of the followig
#REF! 1.025 range: 1:20,1:25,1:100,1:500,1:1250, 1:1500,1:2500 Set
750
#REF! 1.026 Set of drawing instruments Set 26,410
#REF! 1.027 Digital planimeter No. 72,730
#REF! 1.028 Pair of scissors large size No. 750
#REF! 1.029 Pair of scissors regular size No. 500
#REF! 1.030 Desk mounted pencil sharpeners No. 2,250
#REF! 1.031 Engineer's automatic level with trpod No. 72,730
#REF! 1.032 Survey umbrellas No. 18,440
Plum-bobs, weight approximately 100g with 1. cords
#REF! 1.033 No.
6,230
#REF! 1.034 5m levelling staff No. 6,980
#REF! 1.035 Total station with all accessories No. 1,877,980
#REF! 1.036 Ranging rods No. 2,250
#REF! 1.037 3m steel tapes No. 1,000
#REF! 1.038 30m linen tape No. 2,500
#REF! 1.039 50m steel tapes No. 11,960
#REF! 1.040 100m steel tapes No. 22,170
#REF! 1.041 Sledge hammer 2kg weight No. 1,250
#REF! 1.042 Pangas No. 1,250
#REF! 1.043 Spirit levels, 900mm No. 3,740
#REF! 1.044 Erasing shield No. 500
#REF! 1.045 Circular templates No. 2,000
Complete set of stencils and rapidographs(0.2-
#REF! 1.046 Set
2.0mm) 1,500
Complete set of railway curves with wooded case
#REF! 1.047 Set
156,670
Assorted ring spanners, screw drivers, adjustable
#REF! 1.048 Set
pliers and adjustable spanners 11,960
#REF! 1.049 LABORATORY EQUIPMENT -
#REF! 1.050 Electric fan No 6,230
#REF! 1.051 Scientific calculators No 3,240
#REF! 1.052 Office chairs, standard No 4,490
#REF! 1.053 Desk 2.2x0.9m with drawers No 4,990
#REF! 1.054 Complete first aid kit No 4,490
#REF! 1.055 Refrigerator min. capacity 0.2m3 No 41,350
#REF! 1.056 Table - 0.8m2 surface area No 5,480
#REF! 1.057 Steel cupboard, 0.15m3, lockable No 32,880
#REF! 1.058 Heater, 2 plate, electric No 6,230
#REF! 1.059 Fire extinguisher, CO2 type, 10 litre capacity No 23,920
Compaction Test (AASHTO T.99 and T.180, BS
#REF! 1.060 0
1377) -
Compaction mould complete with base plate and
#REF! 1.061 extension collar, 101.6mm internal diameter x No
116.43 mm high. 7,980
2.5 Kg compaction rammer, drop regulated to
#REF! 1.062 No
304.8mm 8,470
4.536Kg compaction rammer drop regulated to
#REF! 1.063 No
457.2mm 6,730
#REF! 1.064 Straight edge 300mm long with handles No 1,500
Steel tamping (BS 1377) rod-Tamping Foot&Shank
#REF! 1.065 No
11,210
Compaction mould 152.4 mm dia. x 116.43 mm high
#REF! 1.066 complete with base plate and extension collar No
9,970
Galvanized sample tray 910 mm x 910 mm x 76mm
#REF! 1.067 No
deep 3,990
#REF! 1.068 75mm brush No 500
Semi-automatic Electronic balance, 25kg capacity
#REF! 1.069 No
accurate to 10g, including weights 32,880
#REF! 1.070 20mm BS Sieve, 300mm diameter No 6,980
#REF! 1.071 Stop watch No 2,250
Electric oven, thermostatically controlled
#REF! 1.072 No
between104 and 110°C 100 lit capacity 107,850
Moisture tin, 90 mm diameter 20 mm deep,
#REF! 1.073 No
cadmium plated or aluminium alloy 250
Cone penetrometer with gauge and automatically
#REF! 1.074 No
controlled test cup 109,100
#REF! 1.075 Test gauge No 1,500
#REF! 1.076 Penetration test cup No 1,500
#REF! 1.077 Penetration test cone No 3,240
#REF! 1.078 Glass comparator No 1,000
#REF! 1.079 Glass plate No 4,240
#REF! 1.080 Evaporating dish 150 mm dia x 45 mm depth No 2,740
#REF! 1.081 Metal containers (450mm dia.) No 750
Density Test (Sand Replacement Method BS. 1377)
#REF! 1.082 0
-
Stainless steel tray, 305mm diameter 50 mm deep
#REF! 1.083 No
3,240
M-etal tray with 150mm diameter hole in the centre,
#REF! 1.084 300mm x 300mm square or equivalent area, 40mm No
deep 3,240
Metal tray with 200mm diameter hole in centre
#REF! 1.085 No
500x500mm square, 50mm deep 4,240
#REF! 1.086 Steel pegs for fixing tray in position No 250
#REF! 1.087 Sand pouring cylinder, 150mm diameter No 25,410
#REF! 1.088 Sand pouring cylinder, 200mm diameter No 27,150
#REF! 1.089 Cold steel chisel 20mm x 300mm long No 750
#REF! 1.090 Cold steel chisel 10mm x 250mm long No 750
2 No 1.5kg, 2No 3.5kg mason hammers and 2 No
#REF! 1.091 Set
1Kg rubber mallet 1,250
Scoop for removing excavated material from hole,
#REF! 1.092 No
250mm long handle 750
#REF! 1.093 100mm brush, soft No 500
#REF! 1.094 50mm brush, soft No 500
#REF! 1.095 Primus gas stove No 6,230
Calibration can 150mm diameter x 150mm deep,
#REF! 1.096 No
250 mm dia rim 12,960
Calibration can 200mm diameter x 250mm deep
#REF! 1.097 No
13,950
Density Test (Nuclear Density Method: AASHTO T.
#REF! 1.098 0
238) -
Nuclear moisture density gauge (Troxler 3411B or
#REF! 1.099 No
similar approved) 831,640
#REF! 1.100 Hole-forming device (drill rod) No 12,710
#REF! 1.101 Guide for above No 3,990
#REF! 1.102 CBR Test (B.S. 1377) 0 -
50 kN CBR Load frame complete with stabilising bar
#REF! 1.103 No
261,030
#REF! 1.104 CBR penetration piston including bracket No 11,460
Penetration gauge range 0 – 25mm travel x 0.01
#REF! 1.105 No
mm divisions 13,210
#REF! 1.106 Proving ring for above of 50 KN capacity. No 56,540
#REF! 1.107 Proving ring for above of 28KN capacity No 52,560
#REF! 1.108 Proving ring for above of 10KN capacity No 54,300
ASTM CBR mould, 152.4 mm dia. X 178 mm high,
complete with perforated base plate and extension
#REF! 1.109 collar 50.8mm high that can be fitted to either end of No
the mould. 11,460
Perforated swell plate 150 mm dia. With an
#REF! 1.110 adjustable centre post of rustproof metal provided No
with a lock-nut 6,480
#REF! 1.111 Swell tripod No 5,240
#REF! 1.112 Swell dial gauge No 12,960
#REF! 1.113 5 lb split surcharge weight No 2,740
#REF! 1.114 10 lb annular surcharge weights No 3,740
#REF! 1.115 2.8 kg Solid base plate for CBR mould No 3,990
Central extruder, complete with 20 KN hydraulic
#REF! 1.116 No
jack and accessories 11,460
#REF! 1.117 Disc lifting handle No 18,190
#REF! 1.118 Linear shrinkage mould No 3,990
Soaking tank for CBR mould sufficient to hold at
#REF! 1.119 No
least 100 moulds 51,810
#REF! 1.120 Specific Gravity of Aggregates (BS 812) 0 -
200 mm dia. Wire mesh basket with apertures not
#REF! 1.121 greater than 6.5mm large enough to contain 2.5 kg No
of aggregates 16,190
A stout watertight container in which the basket can
#REF! 1.122 No
be freely suspended 144,460
#REF! 1.123 Soft absorbent cloth (tea towel) No 2,250
#REF! 1.124 Shallow tray of area not less than 0.065m2 No 1,500
An airtight container of similar capacity to the basket
#REF! 1.125 No
750
#REF! 1.126 Pycnometer of 1 litre capacity No 1,750
Electronic automatic 5kg balance accurate to 0.1g
to be of size and type to permit the basket
#REF! 1.127 containing the sample to be suspended in water (to No
be supplied with weights). 144,460
#REF! 1.128 Sieve Analysis -
#REF! 1.129 Warm air drier (Electric) No 18,190
#REF! 1.130 BS Sieve 300mm diameter in sizes 75 mm No 6,480
#REF! 1.131 BS Sieve 300mm diameter in sizes 63 mm No 6,480
#REF! 1.132 BS Sieve 300mm diameter in sizes 50 mm No 6,980
#REF! 1.133 BS Sieve 300mm diameter in sizes 37.5 mm No 5,730
#REF! 1.134 BS Sieve 300mm diameter in sizes 28 mm No 6,980
#REF! 1.135 BS Sieve 300mm diameter in sizes 20 mm No 6,980
#REF! 1.136 BS Sieve 300mm diameter in sizes 14 mm No 6,980
#REF! 1.137 BS Sieve 300mm diameter in sizes 10 mm No 6,980
#REF! 1.138 BS Sieve 300mm diameter in sizes 6.3 mm No 6,980
#REF! 1.139 BS Sieve 300mm diameter in sizes 5 mm No 6,980
#REF! 1.140 BS Sieve 300mm diameter lid No 3,740
#REF! 1.141 BS Sieve 300mm diameter receiver No 3,490
#REF! 1.142 BS Sieve 200 mm diameter 2.00 mm No 3,990
#REF! 1.143 BS Sieve 200 mm diameter 1.00 mm No 3,990
#REF! 1.144 BS Sieve 200 mm diameter 600 mic No 3,990
#REF! 1.145 BS Sieve 200 mm diameter 500 mic No 3,990
#REF! 1.146 BS Sieve 200 mm diameter 425 mic No 3,990
#REF! 1.147 BS Sieve 200 mm diameter 300 mic No 3,990
#REF! 1.148 BS Sieve 200 mm diameter 75 mic No 3,990
#REF! 1.149 BS Sieve 200mm diameter receiver No 2,250
#REF! 1.150 BS Sieve 200mm diameter lid No 1,750
#REF! 1.151 Sieve shaker No 235,870
#REF! 1.152 BS Sieve 200mm diameter receiver No 2,250
ASTM Sieve 200 mm diameter 1.18 mm stainless
#REF! 1.153 No
steel mesh 4,990
ASTM Sieve 200 mm diameter 600 mic stainless
#REF! 1.154 No
steel mesh 4,990
ASTM Sieve 200 mm diameter 300 mic stainless
#REF! 1.155 No
steel mesh 4,990
ASTM Sieve 200 mm diameter 150 mic stainless
#REF! 1.156 No
steel mesh 4,990
ASTM Sieve 200 mm diameter 75 mic stainless
#REF! 1.157 No
steel mesh 4,990
#REF! 1.158 ASTM lid 200 mm diameter No 2,000
#REF! 1.159 ASTM receiver 200 mm diameter No 2,500
ASTM Sieve 200 mm diameter 9.50 mm stainless
#REF! 1.160 No
steel mesh 5,730
ASTM Sieve 200 mm diameter 12.5 mm stainless
#REF! 1.161 No
steel mesh 5,730
ASTM Sieve 200 mm diameter 19.0 mm stainless
#REF! 1.162 No
steel mesh 5,730
ASTM Sieve 200 mm diameter 4.75 mm stainless
#REF! 1.163 No
steel mesh 5,730
ASTM Sieve 200 mm diameter 2.0 mm stainless
#REF! 1.164 No
steel mesh 4,990
#REF! 1.165 ASTM lid 300 mm diameter No 3,990
#REF! 1.166 ASTM receiver 300 mm diameter No 3,240
ASTM Sieve 300 mm diameter 25.0 mm stainless
#REF! 1.167 No
steel mesh 10,960
ASTM Sieve 300 mm diameter 37.5 mm stainless
#REF! 1.168 No
steel mesh 10,960
ASTM Sieve 300 mm diameter 50.0 mm stainless
#REF! 1.169 No
steel mesh 9,720
ASTM Sieve 300 mm diameter 63.0 mm stainless
#REF! 1.170 No
steel mesh 10,960
1.2 m x 1.2 m x 50 mm deep galvanized metal tray
#REF! 1.171 No
3,240
#REF! 1.172 Set of riffle box with 50 mm (BS 1377) No 16,440
#REF! 1.173 Set of riffle box with 25 mm (BS 1377) No 15,950
#REF! 1.174 Set of riffle box with 7 mm (BS 1377) No 12,460
Concrete slump and Cube Manufacturer and Testing
#REF! 1.175 0
(BS 1881 and 1610) -
#REF! 1.176 Slump cone funnel Set 2,990
#REF! 1.177 Tamping rod ( for slump ) No 1,000
#REF! 1.178 Steel rule No 1,000
#REF! 1.179 Base plate No 2,250
#REF! 1.180 Cylinder moulds 150mm No 13,700
#REF! 1.181 Large curing tank (capacity 50 No. cubes) No 87,930
#REF! 1.182 Cube tamping rods and spanners for item No 1,000
Compact 1500 compression machine, to BS 1610
Grade A with 300mm gauge, rectangular platens,
#REF! 1.183 capacity 1560 kN with load pacer together with 100 No
kN flexural frame with accessories
623,920
#REF! 1.184 Set of safety guards Set 2,990
#REF! 1.185 20 mm distance piece No 5,980
#REF! 1.186 50 mm distance piece No 6,980
#REF! 1.187 80 mm distance piece No 9,720
#REF! 1.188 100 mm distance piece No 10,470
#REF! 1.189 Assembly for beam tests No 45,830
Electro-mechanical load pacer, 100mm or
#REF! 1.190 No
equivalent distance piece 43,340
Sand equivalent equipment to AASHTO T176
including a graduated plastic measuring cylinder,
rubbers stopper, irrigator tube, weighed foot
assembly, syphon assembly, 85ml tinned box
#REF! 1.191 (57mm dia), wide mouth funnel (100mm dia.), stop Set
clock, mechanical sand equivalent shaker and 10
litres working calcium chloride solution
47,330
#REF! 1.192 Beaker 250 ml No 500
#REF! 1.193 Reagent grade silica gel, 500g container No 2,740
Tamping rod 8 mm diameter x 300 mm long and
#REF! 1.194 metal measure 115 mm dia x 180 mm deep for Set
above (BS 812) 3,990
#REF! 1.195 Flakiness Test (BS 812) 0 -
Flakiness gauge (BS 812) passing 10.0 mm retain
#REF! 1.196 No
6.3 mm 7,230
Flakiness gauge (BS 812) passing 14.0 mm retain
#REF! 1.197 No
10.0 mm 5,980
Flakiness gauge (BS 812) passing 20.0 mm retain
#REF! 1.198 No
14.0 mm 5,730
Flakiness gauge (BS 812) passing 28.0 mm retain
#REF! 1.199 No
20.0 mm 5,240
Flakiness gauge (BS 812) passing 37.5 mm retain
#REF! 1.200 No
28.0 mm 5,730
Flakiness gauge (BS 812) passing 50.0 mm retain
#REF! 1.201 No
37.5 mm 6,230
Flakiness gauge (BS 812) passing 63.0 mm retain
#REF! 1.202 No
50.0 mm 6,230
#REF! 1.203 Tray Spray and Spread Rate Tests 0 -
Transverse distribution test of Bitumen spray (depot
#REF! 1.204 Set
tray test to BS 1707) equivalent 6,480
Rate of spread of coated chippings Tray and chains
#REF! 1.205 No
4,490
#REF! 1.206 Calibrated spring balance No 10,220
Steel tray 306 x 306 x 38mm (for measuring
#REF! 1.207 No
bitumen spray rates) 1,500
#REF! 1.208 Consumables 0 -
#REF! 1.209 Gunny sacks No 500
#REF! 1.210 Plastic bag 900 x 450mm x 1000 gauge No 250
#REF! 1.211 Plastic bag 450 x 300mm x 1000 gauge No 250
Filter paper 150mm dia., Whatman No. 5 (Boxes of
#REF! 1.212 No
100) 750
Filter paper 400mm dia., whatman No. 5 Boxes of
#REF! 1.213 No
100) 18,190
Filter paper 100mm dia., Whatman No.5 (Boxes of
#REF! 1.214 No
100) 1,500
#REF! 1.215 Cotton waste (or drying cloths) Kg 250
Filter paper 400mm dia. Whatman No. 54 (Box of
#REF! 1.216 No.
100) 2,740
#REF! 1.217 Miscelleneous -
#REF! 1.218 Gas cylinders 13kg No. 6,480
#REF! 1.219 Padlocks No 750
#REF! 1.220 Plastic jerry cans 20litre capacity No 500
#REF! 1.221 Paper punch No 500
#REF! 1.222 Stapler with pins No 750
#REF! 1.223 Tray Lifting Callipers No 750
#REF! 1.224 Laboratory Dust Coats - brown No 1,750
#REF! 1.225 Laboratory Dust Coats - white No 1,750
#REF! 1.226 Asbestos gloves Pairs 1,750
#REF! 1.227 Laboratory gum boots ( assorted sizes ) Pairs 2,250
#REF! 1.228 Wheel barrow No 3,740
#REF! 1.229 Dustpan plus brush No 500
#REF! 1.230 Hand shovel No 500
#REF! 1.231 Pick axe with handle No 500
Metal Scoop, large (120 x 190 x 70 mm), cast
#REF! 1.232 No
aluminium handle 2,000
Metal Scoop, large (70 x 110 x 40 mm), cast
#REF! 1.233 No
aluminium handle 1,500
#REF! 1.234 Garden trowel No 1,000
#REF! 1.235 Sample tray 306 x 306 x 38 mm No 1,500
#REF! 1.236 Spatula 200 mm blade No 1,500
#REF! 1.237 Spatula 100 mm blade No 1,250
#REF! 1.238 BS sieve 450mm diameter, 37.5mm No 7,730
#REF! 1.239 BS sieve 450mm diameter, 20mm No 8,720
#REF! 1.240 BS sieve 450mm diameter, 5mm No 8,720
#REF! 1.241 BS sieve 450mm diameter, 0.425mm No 16,940
#REF! 1.242 BS sieve 450mm diameter, 0.3mm No 16,940
#REF! 1.243 BS sieve 450mm diameter, 0.075mm No 17,440
#REF! 1.244 Set of lid and receiver for item 212 to item 217 No 14,450
BS Sieve brush double ended brass and nylon
#REF! 1.245 No
bristle 1,750
Measuring cylinders plastic with sprout 100ml
#REF! 1.246 No
capacity 1,500
Measuring cylinders cylinders plastic with sprout
#REF! 1.247 No
250ml capacity 1,250
Measuring cylinders cylinders plastic with sprout
#REF! 1.248 No
500ml capacity 1,250
#REF! 1.249 Glass jar capacity 5 litres with lid No 750
200mm x 200mm x 20mm cadmium plated or
#REF! 1.250 No
aluminium tin 750
Electronic Automatic balance, capacity 1000g,
#REF! 1.251 No
accurate to 0.01g 98,140
Electronic Automatic Balance 2100g capacity
#REF! 1.252 No
accuracy to 0.1g 98,140
Electronic Automatic Balance 20kg capacity
#REF! 1.253 No
accuracy to 0.1g 211,210
Dial-0-Gram balance 310 g capacity accuracy to
#REF! 1.254 No
0.1g 22,920
Field and laboratory scale with scoop 10000 g
#REF! 1.255 No
capacity accuracy to 1.0 g 32,880
#REF! 1.256 Distilled water still No 62,770
Polythene or glass 20 litres storage vessels with tap
#REF! 1.257 No
at bottom 2,740
#REF! 1.258 Set of stiff broom and soft broom with handles No 500
#REF! 1.259 Vernier callipers, 150mm, accurate to 0.1 mm No 750
#REF! 1.260 As above but 200mm, accurate to 0.002 mm No 10,710
#REF! 1.261 Pestle and mortar No 4,240
#REF! 1.262 Linear shrinkage mould (BS 1377) No 3,990
#REF! 1.263 Average least dimension gauge No 19,930
Lockable tool box containing: 1 pair “Molegrips”2 x
150mm screwdriver, 2 x 200mm screwdriver,2x
300mm screwdriver, (1 standard and 1 `Phillips’ star
head of each), adjustable spanners 200mm and
300mm, 1 pr. Round-nosed pliers, 1 pr general
purpose pliers, 2 No plastic faced mallet (1 kg), 1
#REF! 1.264 set imperial spanners 14” to 15/16”, 1 set metric No
spanners 8mm to 20mm, 2 tyre pressure gauge
range 0-100 P.S.I or equivalent approved
6,980
Plastic or metal bucket including lid, 10 litres
#REF! 1.265 No
capacity 500
#REF! 1.266 Polythene wash bottle (500ml) No 500
#REF! 1.267 A4 size clipboard No 500
Mercury thermometer, range – 1deg. Cent. to
#REF! 1.268 No
15deg. Cent., glass (BS 593) 750
Maximum and Minimum thermometer (BS 692)
#REF! 1.269 No
1,000
#REF! 1.270 Daily Rain gauge No 6,480
Portable dial thermometer +5deg. Cent. to + 250o
#REF! 1.271 No
accurate to 3oC with 0.65m long stem 16,940
#REF! 1.272 As above but with 1m long stem No 28,900
5 litre capacity steel storage containers with leak
#REF! 1.273 and dustproof lids for storage of bitumen samples No
250
Hotplate 200mm diameter with simmerstat heat
#REF! 1.274 No
control unit 32,630
450mm diameter x 150mm deep metallic karais
#REF! 1.275 No
500
#REF! 1.276 MOT straight edge with accessories No 81,700
#REF! 1.277 Metric wedge No 1,500
#REF! 1.278 Transit case No 1,500
#REF! 1.279 Standard Specifications (Latest Editions) 0 -
#REF! 1.280 KS 1725 No 22,920
#REF! 1.281 BS 12 No 22,920
BS 812 : 1975 Parts 1 to 4 inc., methods for
#REF! 1.282 sampling and testing of mineral aggregates, sands No
and fillers. 22,920
BS 882: 1201 Part 2, 1973, Aggregates from
#REF! 1.283 No
natural sources for concrete 22,920
BS 1377: 1990, Methods of testing soils for civil
#REF! 1.284 No
engineering purposes 32,630
BS 1881: Parts 1 to 6 inl, 1970/71, Methods of
#REF! 1.285 No
testing concrete 22,920
#REF! 1.286 BS 1924 No 32,630
#REF! 1.287 BS 5835 Part I No 32,630
#REF! 1.288 BS 433: Part 1 and 2, Bitumen road emulsions No 22,920
BS 556: Part 2, 1972, Concrete cylindrical pipes
#REF! 1.289 No
and fittings 22,920
#REF! 1.290 BS 594, 598, Sampling of bituminous mixtures No 47,080
#REF! 1.291 BS 890: 1972, Building limes No 22,920
#REF! 1.292 BS 1194, Concrete porous pipes No 22,920
BS 1198, 1119 and 1200: 1976, Building sands from
#REF! 1.293 No
natural sources 28,650
#REF! 1.294 BS 1924, Methods of testing stabilised soils No 32,630
#REF! 1.295 BS 3148, Test for water for making concrete No 22,920
BS 4449, Hot rolled bars for reinforcement of
#REF! 1.296 No
concrete 19,680
BS 4466, Bending dimensions and scheduling of
#REF! 1.297 bars for the reinforcement of concrete No
22,920
BS 4483, Steel fabric for the reinforcement of
#REF! 1.298 No
concrete 22,920
BS 445: Parts 1 to 3 incl., Methods of testing
#REF! 1.299 No
cement 22,920
BS 5911: Parts 1 and 2, Precast Concrete pipes and
#REF! 1.300 No
fittings 32,630
#REF! 1.301 BS 8110: 1997, Structural use of concrete No 42,100
#REF! 1.302 BS 2004: Foundations No 53,800
TRRL Road Note 39, Recommendations for road
#REF! 1.303 No
surface dressing 48,320
#REF! 1.304 AASHTO Part I: Standard Specifications No 44,340
#REF! 1.305 AASHTO Part II: Materials Testing No 45,580
BillNo BillPrefix ItemNo
1 1 0
1 1 1
1 1 0
1 1 0
1 1 0
1 1 0
1 1 0
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1
1 1 1 Extra over
item for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
item for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
item for mileage over 4000km per vehicle month
1 1 1
As Item but 4WD Double cabin diesel engine pick-up - 2500 c.c
1 1 1 Extra over
item for mileage over 4000km per vehicle month
1 1 1
As Item but 4WD Single cabin pick-up diesel engine - 2500 c.c
1 1 1 Extra over
item for mileage over 4000km per vehicle month
1 1 1 As Item but saloon- 1800c.c.
1 1 1 Extra over
item for mileage over 4000km per vehicle month
1 1 1
As Item but 4WD Double cabin pick-up diesel engine
1 1 1
1 1 1 Extra over
item for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
Item for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
Item for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
Item for Contractor's profit and overheads
1 1 1
1 1 1
1 1 1 Extra over
Item for Contractor's profit and overheads
1 1 1
1 1 1
1 1 1
1 1 1 Extra over
Item for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
Item for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
Item for Contractor's profit and overheads
1 1 1
1 1 0
1 1 0 As Item but secretary
1 1 0 As Item but 2 office attendants
1 1 0 As Item but 2 CAD Technicians
1 1 0 As Item but 3 chainmen
1 1 0 As Item but 4 laboratory attendants
1 1 0 As Item but 8 casual workers
1 1 1 Extra over
items for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
item for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
item for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
item for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
item for Contractor's profit and overheads
1 1 1
1 1 1 Extra over
item for Contractor's profit and overheads
4 4 1
4 4 1
4 4 1
As Item but to spoil as directed by the Engineer
4 4 1
4 4 1
4 4 1
4 4 1
4 4 1
4 4 1
4 4 1
4 4 1
4 4 1
4 4 1
5 5 0
5 5 1
5 5 1
5 5 1
5 5 1
5 5 1 Extra over
Item for compaction of top 300mm to 100% MDD (AASHTO T99)
5 5 1
5 5 1
5 5 1
5 5 1
5 5 1
5 5 1
5 5 1
7 7 1
7 7 1
7 7 1 Extra over
Item for excavation in hard material
7 7 1
7 7 1
7 7 1
7 7 1
7 7 1 Extra over
Item for grout
7 7 1
7 7 1 Extra over
Item for excavation in hard material
7 7 1
7 7 1 As item but mattresses 0.3m thick
7 7 1
7 7 1
7 7 1
7 7 1
7 7 1
7 7 1
8 8 0
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1 Extra over
Items for excavation in hard material
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 0
8 8 0 As Item but 450 mm dia.
8 8 0 As Item but 750 mm dia.
8 8 0 As Item but 900 mm dia.
8 8 0 As Item but 1200 mm dia.
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
8 8 1
9 9 1
9 9 1
9 9 1
9 9 1
9 9 1
9 9 1
9 9 1
9 9 1
9 9 1
9 9 1
10 10 0
10 10 1
10 10 1
11 11 0
11 11 1
11 11 1
11 11 1
11 11 1
11 11 1
11 11 1
11 11 1
11 11 1
11 11 1
11 11 1
11 11 1
12 12 0
12 12 1
12 12 1
12 12 1
12 12 1
Provide,
place and
mix
additional
gravel to
Item
12 12 1
12 12 1
13 13 0
13 13 1
13 13 1
13 13 1
13 13 1
14 14 1
14 14 1
14 14 1
14 14 1
14 14 1
14 14 1
17 15 0
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
As Item but for second seal coat at a rate of 0.6l/m2
17 15 1
17 15 1
As Item but for second seal at a rate of 0.8-1.2l/m2
17 15 1
As Item but for third seal at a the rate of 0.6-1.0 l/m2
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
17 15 1
18 16 0
18 16 0
18 16 1
18 16 1
18 16 1
18 16 1
18 16 1
18 16 1
18 16 1
18 16 1
18 16 1
18 16 1
18 16 1
18 16 1 As Item but 6/11 mm size
18 16 1
19 17 1
19 17 1
19 17 1
19 17 1
19 17 1
19 17 1 As Item but Class UF2
19 17 1 As Item but Class UF3
19 17 1
19 17 0
19 17 0
19 17 0 As Item but F2 finish
19 17 0 As Item but F3 finish
19 17 0 As Item but F3 finish
19 17 0 As Item but F3 finish
19 17 1
19 17 1
19 17 1
19 17 1
19 17 1
19 17 1
As Item but diameter greater than 16 mm.
19 17 1
19 17 1
As Item but diameter greater than 16 mm
19 17 1
19 17 1
19 17 1
19 17 1
19 17 1
20 18 1
20 18 1
20 18 1
21 19 1
21 19 1
21 19 1
21 19 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1 As Item but 750mm size
22 20 1 As Item but 600mm size
22 20 1
22 20 1
22 20 1 As Item but 750mm size
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
As Item but equal or more than 1m2 but less than 2 m2
22 20 1
As Item but equal or more than 2m2 but less than 5 m2
22 20 1 As Item but equal to or more than 5m2
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
22 20 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
As item but handrail posts 75x75x4mm RHS
23 21 1
23 21 1
23 21 1
23 21 1
As Item but 25 mm deep by 10 mm wide.
23 21 1 As Item but 20 mm deep by 5 mm wide.
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1 As item but 150mm dia.
23 21 1
23 21 1
23 21 1
23 21 1
As item but 50mm dia. weep holes through abutmet
23 21 1 As item but 75mm dia. weep holes
23 21 1 As item but 100mm dia. drain pipes
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
23 21 1
24 22 0
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
24 22 1
25 22 0
25 22 1
25 22 1
25 22 1
25 22 1
26 22 0
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
26 22 1
28 24 0
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1
28 24 1 Extra over
Item for profits and overheads
28 24 1
28 24 1
27 23 1
27 23 1
27 23 1
27 23 1
27 23 1
27 23 1
27 23 1
27 23 1
27 23 1
27 23 1
27 23 1
27 23 1
27 23 1
29 25 1
29 25 1
29 25 1
29 25 1 Extra over
item for Contractor's profit and overheads
30 1 0
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 0
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 0
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 0
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 0
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
30 1 1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Mortar mixes to produce 1m3
Mix Cement (kg) Sand (m3) Sand (Kg)
1:2 687.5 1.1 1815
1:3 480 1.15 1897.5
1:4 357.5 1.15 1897.5
1:5 287.5 1.15 1897.5
1:6 240 1.15 1897.5
Concrete mixes to produce 1m3
Concrete Class Aggregate Size Slump Ratio
Cement Total Aggregates Coarse Fine
40 50-100 180 1950 1218.8 731.3
7 20 25-75 210 1900 1187.5 712.5
14 10-50 0.0 0.0
10 10-25 0.0 0.0
40 50-100 210 1900 1187.5 712.5
20 25-75 240 1850 1110.0 740.0
10
14 10-50 0.0 0.0
10 10-25 0.0 0.0
40 50-100 250 1850 1156.3 693.8
20 25-75 270 1800 1080.0 720.0
15
14 10-50 0.0 0.0
10 10-25 0.0 0.0
40 50-100 300 1850 1264.2 585.8
20 25-75 320 1800 1170.0 630.0
20
14 10-50 340 1700 1020.0 680.0
10 10-25 360 1750 962.5 787.5
40 50-100 340 1800 1230.0 570.0
20 25-75 360 1750 1137.5 612.5
25
14 10-50 380 1700 1020.0 680.0
10 10-25 400 1700 935.0 765.0
40 50-100 370 1750 1195.8 554.2
20 25-75 400 1700 1105.0 595.0
30
14 10-50 430 1700 1020.0 680.0
10 10-25 460 1650 907.5 742.5
% Fine Aggregates
37.5
37.5
37.5
37.5
37.5
40.0
37.5
37.5
37.5
40.0
37.5
37.5
31.7
35.0
40.0
45.0
31.7
35.0
40.0
45.0
31.7
35.0
40.0
45.0