Bill of Materials

Civil Works/Manpower/HS/Mod de Mob UOM Lowest Price/Material


Equipment Utilization 8-Hour Rate
Item No. Description Unit
1 Service Vehicle/ mini truck unit day

2 Concrete Cutter/ Saw 14" Manual W/O Blade; 9Hp , Gasoline per hr 422.17
445
3 Air Compressor; 161 - 185 Cfm 69Hp per hr 2,600.00 5500
4 Pneumatic Breaker; All Models With 50 Ft Hose, Oiler And Attach per hr 400.00
900
5 Portable Grinder; Makita Grinder, 7In per hr 84.99 90
6 Boom Truck/Palfinger per hr 4,400.00 6640
7 Generator Set; 20 Kw; 25Kva per hr 880.00 2800
Generator Set; 30 Kw; 38Kva per hr 880.00 3150
Generator Set; 40 Kw; 50Kva per hr 920.00 3370
Generator Set; 50 Kw; 63Kva per hr 920.00 3640
8 Dewatering Pump (Diesel); 5Hp;50Mm; 567Lpm per hr 844.00
Output/Discharge 1676
Dewatering Pump (Diesel); 75Mm; 6.7Hp; 1517Lpm
per hr 1,100.00
Ouput/Discharge 2213
Dewatering Pump (Diesel); 100Mm; 10Hp; 2367Lpm
per hr 2,650.00
Output/Discharge 4541
9 Cutting Outfit per hr 79.39 80
10 Plate Compactor (Diesel Driven); 4.5Hp (300-400Plate Width) per hr 984.00
2192
11 Traffic light (Arrow/Blinker) unit day 1,800.00 3325
MS Steel Plate for Traffic Requirement, 25mm thk ( Re-use) @ 24
12 pc-day 1,800.00
hours 2400
MS Steel Plate for Traffic Requirement, 25mm thk ( Re-use) @ 24
sqm-day 704.24
hours 833
MS Steel Plate for Traffic Requirement, 40mm thk ( Re-use) @ 24
pc-day
hours
MS Steel Plate for Traffic Requirement, 40mm thk ( Re-use) @ 24
sqm-day
hours
Backhoe (Hydraulic, Wheel Mtd.- Komatsu) Pw130Es-6;
13 0.60Cum / 0.78 Cyd 105Hp; 4M Dig Depth unit day 16,000.00
45000
14 Boring Machine
2" ( 50mm ) Tapping Machine unit day 1,000.00 17645.48
3" ( 75mm ) Tapping Machine unit day 1,000.00 20865.6
4" ( 100mm ) Tapping Machine unit day 1,000.00 35486.71
6" ( 150mm ) Tapping Machine unit day 1,000.00 35486.71
8" ( 200mm ) Tapping Machine unit day 1,000.00 35486.71
10" ( 250mm ) Tapping Machine unit day 1,000.00 46401.6
12" ( 300mm ) Tapping Machine unit day 1,000.00 48417.6
Materials Utilization/COVID Essentials/TSD
Item No. Description Unit Rate
1 Cement bag 210.00 240
Ready Mix Cement
Concrete @ 14days cum 5,750.00 7733
Concrete @ 7days cum 6,355.87 8151
Concrete @ 3days cum 7,009.67 8550
Concrete @ 1day cum 10,077.86 10640
Cold mix Asphalt cum
2 Gravel / Sand bag
3 Sacks pcs
4 Paint liter 150.00

5 Asphalt, Bituminous concrete surface course hot laid ( Item 310) mt 4,300.00
5600
Asphalt, Bituminous tack coat (SS-1) (Item 302) drum 11,650.00 15000
6 Rebar Kg 48.00 60
7 COVID Essentials/Provisions
Rapid Testing ( COVID Provision) ea 800.00 1400
PCR / Confirmatory Test ( COVID Provision) ea 2,950.00 4500
Face Shield (6 pcs for replacement every 2 months) pcs 5.00
15

Face Mask (cloth type) (6 pcs for replacement every 2 months) pcs 15.00

20
Special COVID-PPE for Safety Officer/Responder (3-sets -
set 500.00
minimum stocks reserve) 2750
Disinfectant Consumables -(Disinfectant Solution @ 4-gals per
day/ Soap @ 2-pcs per mo./ Ethyl Alcohol @ 2-gals per mo./ lot 1,000.00
Spray Container/ Other Consumables) 7000
Quantity RATE
7 PPEs 5
8 TRAFFIC SAFETY DEVICES (reusable for 1 yr)
Half/Full Sized Board-ups, Reflectorized 4
Bollards, 1000 x 370mm (TSD-2) 6 57.80 60
Caution Tape (Roll) 0.1 10.00 50
A-frame, 900 x 1000mm ( TSD -3) 1
Traffic Signage , Road Work Signage TSD 4c 1
Activity Signage (Maintenance Works Ahead) TSD 4c 1