Filling crusher run base course, 150mm thick, compacted in layers of 75mm thick
maximum [RM/M2]
Material
Labour
Machine output
Labour output
Overheads – 8%,
Profit – 2%
[Take area of road 1.00m2]
A. Material
C. Labour
Material
Plant
[Transportation cost for each plant to and from site is charged at RM1200/tonne of materials laid for the
project]
Labour
Foreman – RM60.00/day
Machine output
Labour output
Overheads – 8%,
Profit – 2%
[Quantity of wearing course for the project is assumed 3500m2]
A. Material
3 nr @ RM1200/tonne RM3600
| 3500m2 | RM 2.80
|2.72m2/tonne |
D. Labour
RM37.50/hr
Thermoplastic road painting powder –RM 60/bag (weight per bag - 25kg)
(Consumption: 5kg/m2 - thickness: 1.8mm)
A. Material
C. Labour