You are on page 1of 17

Handi Sulistyo Widodo

handi.sulistyo@bmkg.go.id
handi.sulistyo.widodo@gmail.com
Outline
• BMKG
– Visi dan Misi
– Organization Structure
• BMKG Seismic Network
• Monitoring System
– Maintenance Technical Flowchart
Vision and Mission

Vision
“BMKG realize a reliable, responsive and able to support
the safety of the community and the success of national
development, and plays an active role at international level.”
Vision and Mission
Mission
In order to realize the vision of BMKG, we need a clear vision in the
form of steps BMKG to realize the mission that has been set as
follows:
1. Observe and understand the phenomena of meteorology,
climatology, air quality and geophysics.
2. Providing data, information and services of meteorology,
climatology, air quality and geophysics reliable and trustworthy.
3. Coordinate and facilitate the activities in the field of meteorology,
climatology, air quality and geophysics.
4. Actively participate in international activities in the field of
meteorology, climatology, air quality and geophysics.
ORGANIZATION STRUCTURE
BMKG
DIRECTOR GENERAL

EXECUTIVE
INSPECTOR SECRETARY

DEPUTY DIR.GEN.FOR
DEPUTY DIR.GEN. FOR DEPUTY DIR.GEN.FOR DEPUTY DIR.GEN.FOR INSTRUMENTATION, CALIBRATION,
METEOROLOGY ENGINEERING AND
CLIMATOLOGY GEOPHYSICS COMMUNICATIONS NETWORK

CLIMATOLOGICAL,
AVIATION AND MARITIME AGROCLIMATOLOGICA INSTRUMENTATION,
METEOROLOGICAL L AND MARITIME
EARTHQUAKE AND
TSUNAMI CENTRE CALIBRATION AND
CENTRE CLIMATOLOGICAL ENGINEERING CENTRE
CENTRE
EARTHQUAKE
PUBLIC CLIMATE CHANGE ENGINNERING
METEOROLOGICAL AND AIR QUALITY AND DATA BASE CENTRE
CENTRE CENTRE GEOPOTENTIAL
CENTRE
COMMUNICATIONS
NETWORK CENTRE

TRAINING AND EDUCATION RESEARCH AND


CENTRE DEVELOPMENT CENTRE ACADEMY OF METEOROLOGY,
REGIONAL CENTRE
STATIONS CLIMATOLOGY &
GEOPHYSICS
BMKG Seismic Network
before 2004
Monitoring System
Monitoring System
• They do, check waveform visually. To check is
there station have a problem, like: gaps, died
at night, or completly died. Then report
through email, text, phone to binops.
Monitoring System
• Then we do check using slmon and Data
Availibility web page.
Monitoring System
• Nanometrics Tool
• Rbfsum, naqsview, SOHextrp(if necessary)
Framework: Roles & Responsibilities
• Describe the task of PIC DO Division
• Receive, forward, and confirm any issues regarding
maintenance
Problem Manager • Follow-up of monitoring result Technical PIC
Partner, PIC DO, and PIC Local Office
• Preparing materials for SOP of Operationional
system and Maintenance in headquarter and local
office

• Monitoring of InaTEWS Operational System


• Report of problem in InaTEWS Operational
PIC Management Operation Division System
• reporting and scheduled preventive maintenance
are needed
• Coordination with Technical PIC Partner

• Monitoring of InaTEWS OperationalSystem in


Station
• Report of problem in InaTEWS Operational
PIC Local Office System to PIC DO
• Coordination with Technical PIC Partner
Problem
• We have a power supply problem for almost
all site, due to lack of battery, regulators
failure, solarpanel didn’t work optimal.
• And some are instruments problem. Just like a
few weeks ago, we replace Sensor at PSI from
STS2 into Trillium 120P feedback, because one
channel not working.
Problem
• We have a problem of funding due to
procurement of spareparts.
• Also, for distribution of spareparts because of
our wide region.
• And we have problem with knowledge of local
site technician. Due to movement or
retirement.
TERIMA KASIH

You might also like