TASK

task_code status_cowbs_id task_namestart_datend_date resource_delete_record_flag


Activity ID Activity WBS Code Activity (*)Start (*)Finish(*)ResourDelete This Row
A1000 未开始 BS-8.1 第一栋别墅2019/8/5 星期一 7:00:00
A1010 未开始 BS-8.1 第一栋别墅2019/8/22 星期四 7:00:00
A1020 未开始 BS-8.1 别墅交付(12019/9/29 星期日 7:00:00
A1030 未开始 BS-8.1 别墅交付(10栋) 2019/8/5 星期一 7:00:00
A1040 未开始 BS-8.1 别墅交付(25栋) 2019/8/5 星期一 7:00:00
A1050 未开始 BS-8.4.2 10%别墅构件预制完成
2019/8/5 2019/8/8 星期四 17:00:00
A1060 未开始 BS-8.4.2 20%别墅构件预制完成
2019/8/5 2019/8/8 星期四 17:00:00
A1070 未开始 BS-8.4.2 30%别墅构件预制完成
2019/8/5 2019/8/8 星期四 17:00:00
A1080 未开始 BS-8.4.2 40%别墅构件预制完成
2019/8/5 2019/8/8 星期四 17:00:00
A1090 未开始 BS-8.2.1 1B-1B深化图批复
2019/8/5 2019/8/8 星期四 17:00:00
A1100 未开始 BS-8.2.1 挡土墙结构2019/8/5 2019/8/8 星期四 17:00:00
A1110 未开始 BS-8.2.1 色系批复 2019/8/5 2019/8/8 星期四 17:00:00
A1120 未开始 BS-8.2.2 新作业 2019/8/5 2019/8/8 星期四 17:00:00
A1130 未开始 BS-8.2.2 新作业 2019/8/5 2019/8/8 星期四 17:00:00
A1140 未开始 BS-8.2.2 新作业 2019/8/5 2019/8/8 星期四 17:00:00
A1150 未开始 BS-8.2.2 新作业 2019/8/5 2019/8/8 星期四 17:00:00
A1160 未开始 BS-8.4.3.地下MEP安装 2019/8/5 2019/8/8 星期四 17:00:00
A1170 未开始 BS-8.4.3.垫层施工 2019/8/5 2019/8/8 星期四 17:00:00
A1180 未开始 BS-8.4.3.基础施工 2019/8/5 2019/8/8 星期四 17:00:00
A1190 未开始 BS-8.4.3.墙板吊装 2019/8/5 2019/8/8 星期四 17:00:00
A1200 未开始 BS-8.4.3.楼板吊装 2019/8/5 2019/8/8 星期四 17:00:00
A1210 未开始 BS-8.4.3.连接节点处2019/8/5 2019/8/8 星期四 17:00:00
A1220 未开始 BS-8.4.3.穿线接管 2019/8/5 2019/8/8 星期四 17:00:00
A1230 未开始 BS-8.4.3.终端设备安2019/8/5 2019/8/8 星期四 17:00:00
A1240 未开始 BS-8.4.3.找平层施工2019/8/5 2019/8/8 星期四 17:00:00
A1250 未开始 BS-8.4.3.含找坡层施2019/8/5 2019/8/8 星期四 17:00:00
A1260 未开始 BS-8.4.3.防水层及细2019/8/5 2019/8/8 星期四 17:00:00
A1270 未开始 BS-8.4.3.地砖及墙砖2019/8/5 2019/8/8 星期四 17:00:00
A1280 未开始 BS-8.4.3.墙漆施工 2019/8/5 2019/8/8 星期四 17:00:00
A1290 未开始 BS-8.4.3.门窗橱柜安2019/8/5 2019/8/8 星期四 17:00:00
A1300 未开始 BS-8.4.3.地下水箱及2019/8/5 2019/8/8 星期四 17:00:00
A1310 未开始 BS-8.4.3.围墙及大门2019/8/5 2019/8/8 星期四 17:00:00
A1320 未开始 BS-8.4.3.停车区及人2019/8/5 2019/8/8 星期四 17:00:00
A1330 未开始 BS-8.4.3.消缺工作 2019/8/5 2019/8/8 星期四 17:00:00
A1340 未开始 BS-8.4.3.验收移交 2019/8/5 2019/8/8 星期四 17:00:00

Page 1
RSRC

rsrc_shorrsrc_namersrc_title_name
Resource Resource Title
MathisL Lane Mathis, CIO
AndersonGGlen Anderson, VP Development
VincentI Ian Vincent
CharlesM Mandy Charles, VP IT Ops
ZhuS Shannon Zhu
LaffertyVVanessa Lafferty
BennettC Carina Bennett
PaxsonD Dan Paxson
SinghD Deepak Singh
SharpeD Dan Sharpe
ITCon IT Consultant
LiR Roy Li
RiceB Barbara Rice, PMO Director
ChopraA Amit Chopra
AbrahamM Molly Abraham
WrenJ Jo Wren
ATM ENG Automation Systems Engineer
IT Information Technology Group
Product DProduct Development Resources
ManufEng Manufacturing Engineering Group
CaseyA Andrea CaSix Sigma Engineer
RileyP Paul RileProduct Engineer
MarshallGGary MarsProduct Engineer
LeeC Cindy LeeProduct Engineering Specialist
ProductOpProduct Operations Group
HillF Frank Hill
WestL Larry West
BaxterS Sue Baxter
WynnA Alice Wynn
ProductMkProduct Marketing Group
LincolnR Robert LiManufacturing Engineer
ShawH Harry ShaSenior Engineering Lead
JacksonL Lendell Jackson
RickelsS Sam Rickels
IthanP Peg Ithan
CorporateCorporate Resources
Bpmpmo Business Process PMO
JohnsonR Rea Johnson
McneillL Lori McNeil
OperationProcess Operations
BillingsJJudy Billings
Chuf Frank Chu
Contr External Contractors
Bpm001 BPM Consultant 1
Bpm002 BPM Consultant 2
Bpm003 BPM Consultant 3
FrostB Ben Frost
CooperP Peter Cooper
PetersonMMichelle Peterson
PrescottWWayne Prescott
E&C ResouE&C Resources
SubcontraSubcontractor

Page 2
RSRC

Trades Trades
ManagemenManagement
PurchasinPurchasing Department
EngineeriEngineering Department
CretefiniConcrete Finisher
Admin Administrator
FabricatiFabrication
Elev InstElevator Installer
Elec Electrician
Floor Floor and Carpet Layer
Operator Operator
Plumb Plumber
FCarp Finish Carpenter
RCarp Rough Carpenter
GenLabor Laborer-Construction
FieldEng Field Engineer
IrnWrk Ironworker
FieldEngSField Eng-Senior
FieldEngAField Eng-Assistant
Exc Excavator
KimP Paul Kim Design Engineer
YoungJ Jeff YounAnalyst
PMs Project Managers
ResnerW Wendy ResAutomation Systems Engineer
DesEng Design Engineer
McGuireO Owen McGuire, Project Manager
Project CProject CAccounts Manager
InsEng Instrumentation Engineer
HVAC HVAC
Millwork Millwork Subcontractor
Thermal PThermal Protection Subcontractor
Finishes Finishes & Fit-out Subcontractor
Concrete-Concrete Foundation Subcontractor
SpecialtySpecialty Metal Fabricator Subcontractor
Pools Pool Installation Subcontractor
ConveyingConveying Subcontractor
Fire SuppFire Suppression Subcontractor
LandscapiLandscaping Subcontractor
SpecialtiFF&E Specialties
Drywall Drywall Subcontractor
Roofing Roofing Subcontractor
Glass Glass & Glazing Subcontractor
Paving Paving & Roadways Subcontractor
UtilitiesUtilities Subcontractor
OPTGP Operations Test Group
INSP InspectioSenior Inspector
Hydro Hydroblaster
Paint Painter
Material Material Resources
Test resoNew Resource Name
Test ResoNew Resource Name-1
R (新资源)
R-1 (新资源)
BDH Bisha

Page 3
RSRC

C Cost
BH EquipmBisha Housing Equipments
BH Mat Bisha Materials
BH WorkerBisha Housing Worker
CarpenterCarpenter
Mason Mason
Plumbing Plumber
Dump TrucDumper
Steel FixSteel Fixer
Painter Painter
MC Mobile Crane
ElectriciElectrician
Labor Labor
R-292 Excavator
R-293 Compactor
R-294 Concrete Pump
R-295 Membrane
R-296 Concrete Mixer
R-297 Steel Rebars
R-298 Concrete
R-299 Formwork
R-300 Tile Fixer
R-301 Complete Kitchen Cabinets
R-302 Tiles
R-303 Paint
C-01 Budgeted cost
L-4 Concrete worker
L-14 Dump truck dirver
L-1 Foreman
L-5 Installer
E-1 Excavator
E-2 Dump truck
E-3 Mobile Crane
L-12 General worker
L-2 Steel fixer
L-13 Excavator Operator
L-16 Moblic crane Operator
L-7 Painter
L-6 Mason
L-3 formwork worker
E-8 Mortar Mixer
L-8 Plumber
L-9 Electrician
E-7 Generator(50 KW)
L-17 Bulldozer operator
L-10 Surveyor
E-10 Flatbed Truck
L-11 Signal Man
E-9 Bulldozer
E-11 Steel Roller
L-20 Steel roller Operator
E-13 Frog Rammer
E-14 Plate Vibrator
E-12 Plate Compactor

Page 4
RSRC

L-22 Grouter
E-16 Skid steer Loader
L-23 Skid Steer loader
L-21 Flated truck driver
E-15 Pervibrator
R-24 Tester
DHP Manpower
L Labor
CR Concreter
M Manson
CD Joiner
P Painter
E Electrician
ELV ELV electrician
PL Plumber
ME Duct Man
W Waterproofer
Money Cost
EX Excavator
RO Roller
FO Forklift
DT Damp Truck
WT Water Tanker
GEN Generator
LO Loader
AB55 Budgeted Cost
Backhoe Backhoe (JCB)
Mech Mechanic
Helper Helper
RIGGER Rigger
TM Transit Mixer
R1 Earth Works
R1.2 2 BHK
R-129 1BHK
R-155 3 BHK
R-176 4 BHK
DHP - RESDHP weightages
S-1 1 BHK
S-2 2 BHK
S-3 3 BHK
S-4 4 BHK
R- besha-weightage
R-2 (新资源)

Page 5
TASKPRED

pred_projproj_id PREDTASK_TASK__PROpred_tasktask_id PREDTASK_TASK__taspred_typelag_hr_cnPREDTASK_


(*)紧前项目 (*)后续项目 (*)Predec(*)Succes紧前作业 后续作业 (*)Predecessor (*)Successor
关系类型 延时 (*)Predecessor

Page 6
TASKPRED

TASK__staPREDTASK_TASK__rsrdelete_record_flag
(*)Successor
(*)Predecessor
(*)Successor
Delete This Row

Page 7
PROJCOST

task_id cost_nameTASK__statarget_coact_cost remain_cototal_cosdelete_record_flag


作业代码 其他费用条(*)作业状态 预算费用 实际费用 尚需费用 完成时费用Delete This Row

Page 8
TASKRSRC

task_id TASK__starsrc_id role_id acct_id rsrc_typestart_datend_date delete_record_flag


作业代码 (*)作业状态 资源代码 角色代码 费用科目代(*)资源类型 (*)开始 (*)完成 Delete This Row

Page 9
USERDATA

user_data
UserSettings Do Not Edit

Page 10