QUALITY CONTROL REQUIREMENTS

2. The Contractor shall submit all conformance records to the Superintendent for Copies of
inspection and approval. If requested by the Superintendent, the Contractor shall provide Records
copies of the records or test results at no cost to the Principal. Contractor’s
Cost

MEASUREMENT AND PAYMENT

QC6 PAY ITEMS

1. Payment shall be made for all activities associated with testing, survey and
supplier's documentation required to demonstrate conformance to the specification
requirements.

2. Cost adjustments, if applicable, will apply the same as to any other Pay Item in
the Schedule.

Pay Item QCP1 QUALITY VERIFICATION AND CONTROL

1. The Lump Sum for this item shall include all costs for inspections, conformance
surveys and testing required to verify that all aspects of the work under the Contract
comply with the quality requirements of the Contract, including the ongoing compilation of
quality records.

2. Payments shall be made pro rata on the monthly value of work done.

City of Greater Dandenong Page 33 of 538 Status REV-B


Approved By: Peter White © Copyright Date OCT-07