Requirement Contents
INITIAL REQUIREMNT
o To provide complete Equipment backup of VFD and
Automation panel.
o We are offering Danfoss VFD FC 302 Automation drive as
well as SIEMENS Micromaster drives for this project.
CONTROL SYSTEM
o To provide the equipment backup of SIEMENS Control
System.
o To come up with the programming backup of existing PLC
system.
HMI INTERFACE
o To provide SIEMENS HMI as a replacement backup of KINCO
HMI
o To provide the graphics and logical interfacing of HMI with
PLC and existing hardware.
We hope you will find our offer meet your satisfaction in all respects and look forward to
receive your valued order.
Offer for PLC based Control system:
Serial Details Price
1 Automation Equipment 750000.00
2 PLC programing backup, Logic design, HMI Design and backup 260000.00
Responsibilities of Customer
• All the existing drawings/documents/information necessary to carry out the study
of program and logic development.
• Any extra work will be consider as additional task.
• PLC License key will be provided by end user otherwise activation key will be
charge accordingly.
• Everything will be informed to end user prior to action.
• All safety standard and protocols has been adopted and responsibility of end user
to update us accordingly.
• Installation & Commissioning charges for the VFDs is not included in quotation.
Payment Terms & Conditions
• We are exempted from deduction of withholding Income and Sales tax as per Section
153(5) of Income
• Tax Ordinance, 2001 and Rule 5(XI) of Sales Tax Special Procedure Rules.
• Separate and specific undertaking on firm’s letterhead will be provided with Invoice.
• For ordered products
o 30% advance and 40% at the time of delivery of all instrumentation, PLC
and control valve equipment.
o 20% after completion of project.
o PLC code and wiring layout will be submitted after clearance of full project
payment.