Professional Documents
Culture Documents
Abuttment Design PDF
Abuttment Design PDF
A2
4.59
A4 LBL 569.20
A1
5 1.5 4
PCTL 568.00
1.50
PCBL 566.50
10.5
1
Abutment sketch
All dimensions are in meters
Babai River Bridge
1. Bridge data
Name of Bridge Babai khola Bridge, Dang
Bridge Location google coordinates 27°59'40.84"N 82°26'2.14"E
Bridge Length 140 m
Each span 35 m
Type Of Bridge PSC i.e. Prestressed Concrete
width of superstrcture 11 m (carriage way 7.5m + footpath)
2. Material Data
Unit weight of materials
3
Concrete (ϒc) 25 KN/m
3
macadam (ϒas) 22 KN/m
3
water (ϒw) 10 KN/m
3
soil (ϒs) 18 KN/m
3
Submerged soil density(ϒ') 10 KN/m
Grade of Concrete
abutment stem.dirt wall,return wall M25
Abutment cap M25
Foundation M35
Grade of steel Fe500
2
Permissible stress in steel 240 N/mm
Geotechnical Data
Pile Capacity 1947.3 KN
angle of repose(φ) 28 degree 0.489 radian
Surcharge angle(β) 0 degree 0.000 radian
Angle of back of abutment(α) 90 degree 1.571 radian
angle of friction between soil and wall(δ) 16 degree 0.279 radian
Coefficient of friction 0.5
Calculations:
Abutment
Parameters Stem,Return and Abutment
Dirt wall cap,Pedestal,Stopper Foundation
Modulus of elasticity (Gpa) 29 29 31.5
Permissible direct compressive stress(Mpa) 6.25 6.25 8.75
Permissible flexural compressive stress(Mpa) 8.33 8.33 11.67
Permissible tensile stress(Mpa) 0.61 0.61 0.67
modular ratio(m) 10 10 10
neutral axis depth factor (n) 0.258 0.258 0.327
Lever arm factor (j) 0.914 0.914 0.891
Moment Factor (Q) 0.982 0.982 1.7
Dimension of abutment
b1 1.2 h1 4.59
b2 0.3 h2 1 A6
b3 0.4 h3 3.3 h7=1.20
b4 0.25 h4 0.25
b5 1.9 h5 0.25
b6 3.5 h6 0.3
h8=2.80
h7 1.2
h8 2.8
C.G Calculation (from back bottom face of abutment) all dimesion are in m.
Reinforcement calculation
2
Reinforcement Area(mm ) Bar dia(mm) Req. Nos c/c spacing (mm)Required Nos
Tensile reinforcement 44550 25 91 120 93 AS1
Compressive reinforcement 22275 20 71 150 75 AS2
2
Total area of provided tensile reinforcement ,Ast 45651.27 mm
2
Total area of provided compressive reinforcement ,Asc 23561.94 mm
2
Total longitudinal reinforcement 69213.21 mm
0.419 % Ok
Babai River Bridge
AS3
AS1
AS2
AS4
ACP2
ACP1 AC2
AC1
fig: Pedestal
(below jacking
point & below AC3
bearing.
Design of RCC Stoppers: 8mm dia.
Base width of sttoper, b1 0.6 m dimensions are calculated exactly to match the Bars at 100
Height above abutment cap, h1 1.41 m cross girder slope mm c/c
h2 0.815 m AST3 spacing
Length of sttoper, l 1.50 m
Horizontal force acting on the stopper above
abutment cap 10% of vertical load
174.00 KN 1410
Moment at the base of stopper 245.34 KNm 815
Effective depth required 408.12 mm 12 dia.
Depth provided 600.00 mm OK 600 bars@150
2
Area of steel required 1965.62 mm mm c/c
Provide AST2
dia 16 mm 16 dia. bars@150 mm c/c spacing
Number 10 Nos AST1
Spacing 160 mm
Provide spacing 150 mm
Max. Shear stress developed at base of stopper 0.20 N/mm2
Percentage area of steel provided 0.26 %
Permissible shear stress 0.23 N/mm2 OK
Design of Dirt wall
Due to Earth Pressure
Active earth pressure due to surcharge load 254.04 KN
Lever arm 1.65 m
Active earth pressure due to backfill load 349.30764 KN
Lever arm 1.386 m
Design Moment 903.31 KNm
Clear cover(assume) 25 mm
Effective Depth Required 289.18 mm
Dia of bar assume 16 mm
Provided 367 mm OK
2
Required area of tensile reinforcement 11220.53 mm
Bar provided
dia of bar 16 mm 16_diabars@300c/c
Number of bars required 56 Nos
Spacing 200 mm
Provide
dia 12 mm
spacing 300
Number 67
Ast provided 7573.33
Shear Check
Shear force 603.34956 KN
2
Shear stress @ base 0.149 N/mm
100Ast/bd 0.187
2
From chart, Permissible Shear stress 0.2048 N/mm OK
Transverse Reinforcement: nominal reinforcement on top and bottom =0.15% of area 1980 mm2 each
bar dia 12 mm side
Number Required 9 Nos
A1 4.59m
LBL 569.20
A4
5.00m 4.00m
1.20m 0.30m PCTL 568.00m
1.50m A8
PCBL 566.50m
T
MSL 566.00m
15.00m
PBL 551.50m
1.00m m
4 rows of piles @3m c/c
3.00m
3.00m
10.50m
1 Design Data
Length of abutment 11 m
Diameter of pile 1 m
Spacing of pile along L-
direction 3 m
Spacing of pile along in T-
direction 3 m
Pile cap length along L-
direction 10.5 m
Pile cap length along T-
direction 11.4 m
Nos of pile along L-
direction 4 Nos
Nos of piles along T-
direction 4 Nos
Total nos of piles 16 Nos
Edge distance from outer
edge of pile in pile cap in
L-direction 0.25 m
Edge distance from outer
edge of pile in pile cap in
T-direction 0.7 m
Length of Pile 15 m
2 Material Properties
Parameters Pile cap Pile
Grade of concrete M35 M35
Modulus of elasticity
(Gpa) 31.5 31.5
Permissible direct
compressive stress(Mpa) 8.75 8.75
Permissible flexural
compressive stress(Mpa) 10 10
Permissible tensile
stress(Mpa) 0.67 0.67
modular ratio(m) 10 10
Steel Grade Fe500 Fe500
Allowable steel stress in
tension and shear 240 240
Allowale steel stress in
direct compression 205 205
neutral axis depth factor
(n) 0.294 0.294
Lever arm factor (j) 0.902 0.902
Moment Factor (Q) 1.326 1.326
Calculation of
area,volume, weight and
CG of whole
substructure wrt bottom
3 toe,T
Part of Substructure Area(Ai) xi(m) yi(m) Volume(m3) Weight wi(KN)Wixi Wiyi
A1 5.51 4.90 3.80 60.59 1454.11 7125.15 5518.36
A2 2.30 5.15 6.59 25.30 607.20 3127.08 4001.45
A3 1.12 6.10 8.74 12.32 295.68 1803.65 2584.24
A4 0.69 4.20 3.03 7.57 181.76 763.41 550.74
A5 4.90 7.47 7.96 3.92 94.08 702.46 748.56
A6 4.20 8.05 9.49 3.36 80.64 649.15 765.27
A7 0.13 6.43 9.84 1.38 33.00 212.03 324.72
A8 15.75 5.25 0.75 179.55 4309.20 22623.30 3231.90
34.59 Sum 7055.68 37006.23 17725.25
x bar 5.24 m
y bar 2.51 m
Weight of abutment only 2746.48 KN
Babai River Bridge
Position of CG from
superstructure load point -0.01 m
Position of superstructure
load from toe point 5.25 m
Height of abutment 8.89 m
Height of abutment
including footing 10.39 m
Length of abutment 11 m
Offset of base slab
provided from the edge of
stem (L drn) 0.2 m
Offset of base slab
provided from the edge of
stem (T drn) 0.7 m
Horizontal Vertical
Verical Horizontal Moment
Forces/Loads Load coefficient lever arm Lever Moment across
force (KN) force(KN) along axis
(m) arm
Superstructure DL 1 3480 0.4 1392.00
Live Load 1 1161.45 0.4 464.58
Abutment and footing 1 7055.68 0.01 36.07
Soil mass/earth pressure 1 8801.1 -2.75 3496.403848 4.36 -8945.42
Approach slab including footpath 1 303.1875 -2.4 -727.65
Total Horizontal force 1 154.78 7.59 1174.78
Total 20801.41 3651.183848 -6605.64 0.00
2
top bar (0.12% ) bothways 10260 mm
provide,
dia of bar 16 mm
Number 35 Nos
spacing required 300 mm
Spacing provided 200 mm
provided area
2
compressive side @ top 10756.81 mm
Check for shear
Shear force at deff
distance from face of
abutment 4820.46 KN
2
shear stress developed 0.3001 N/mm
reinforcement provided 0.50 %
2
permissible shear stress 0.31 N/mm Ok
Check for punching
shear stress
effective depth of section
provided 1409 mm
total shear force 20801.41 KN
Area of cap resistinf the
punching shear perifery
2
of 'deff/2' of stem face 42927000.00 mm
punching shear stress
2
developed 0.48 N/mm
Babai River Bridge
Permissible punching
2
shear stress 0.16*sqrt(fck) 0.95 N/mm OK
Check For Corner Pile
punching shear as per
IRC 307.2.5.5
Load on Pile 1465.23 KN
Effective area for resisting
2
shear 4103097.245 mm
punching shear stress
developed on outer pile
area 0.357 OK
Provide nominal shear
reinforcement 12 mm dia bars 10 legged @ 300mm c/c
Design of Pile
Daimeter of pile 1000 mm
4
MOI of pile section 0.049087385 m
Modulus of elasticity of
pile material 31500 MN/m^2
Calculation of Length of
Fixity as per IS
2911.1.2.2010 Annex C
Soil type Dry Cohesionless Soil
SPT
number(Blows/30cm) 12 Granular Soil as per Bore Log Data lowest value of banks
Modulus of subgrade
reaction from table as per
code 2.7 MN/m^3
Stiffness Factor,T 3.561 m
Length of Pile 15 m
Length of pile upto scour
level,L1 0.5 m
Embeded length,Le 14.5 m Le/T= 4.07 Long Pile
L1/T 0.140
Lf/T 1.849
Lf 6.583 m
Reduction factor 0.856
Actual Moment 691.45 KNm
2
Sectional area of pile(Ag) 785398.16 mm
Provide main
reinforcement (% of
sectional area of pile ) 1.1 %
Total area of
2
reinforcement 8639.38 mm
Provide,
Bar diameter 25
number of bars 18 Nos
clear cover provided 75 mm
spacing 150 mm
Provided diameter of
transverse reinforcement 12 mm
Diameter upto the line of
reinforcement,Dc 801 mm
Area of reinforcement
2
provided,As 8835.73 mm
2
Area of concrete,Ac 776562.43 mm
Babai River Bridge
Percentage of longitudinal
reinforcement provided 1.125 1.125
Allowable shear stress 0.435 0.653
No shear
No Shear reinforcem
reinforcement ent
required required
Provide 12mm circular rings @ 100 mm c/c upto height of 3m from the top of pile and
150 mm c/c in rest of pile
16mm_dia@300mmc/c_spacing
PC3 and PC4
32dia@115mmc/c_spacing
PC1 and PC2
6 10884
300 12 AS6 18 22.57 406.22 0.889 361.09
100
2 1800
16 AC2 74 5.6 414.40 1.580 654.85
900
100
1400
Total 1441.18
Babai River Bridge
2 500
12 AST2 10 2.46 24.60 0.889 21.87
1960
200
800
In one
pedestal 129.16
Total in 2 pedestal 258.31
BAR BENDING SCHEDULE oF Approach Slab
Bar Unit Total
dia. Bar Total
SN Sketch Nos length weight Weight
(mm) mark length (m)
(m) (kg/m) (Kg)
1 3420 12 AS1 74 3.82 282.68 0.889 251.27
200
3420
2 200 12 AS2 74 3.82 282.68 0.889 251.27
2 11200
900 32 PC2 90 13 1170.00 6.321 7395.56
3 10300
900 16 PC3 50 12.1 605.00 1.580 956.05
4 11200
1080 20 PC4 34.33 13 446.33 2.469 1102.06
TOTAL 15954.80
Total 1495.01