JOM MIX FORMULA

Agregat Klas B
2014

PAKET PEKERJAAN :
PELEBARAN JALAN LEMBAR - SEKOTONG - PELANGAN - LABUAH POH 3 (NASIONAL)
NOMOR KONTRAK
KU.08.08/PJN WIL I NTB - PPK03/283/2014
TANGGAL KONTRAK
24 MARET 2014

TAHUN ANGGARAN 2014

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

PT. GLOBAL PROFEX SYNERGY HUTAMA KARYA - BUNGA RAYA, JO


REPUBLIKA DEMOCRATICA DE TIMOR LESTE
SECRETARIO ESTADO DAS OBRAS PUBLICAS
DIRECCAO NACIONAL DE ESTRADAS, PONTES, E CONTROLO DE CHEIAS
RUA : JOAO PAOLO II DILI - TIMOR LESTE Telp. 3311408

THE COMPOSITION OF THE SUB BASE COURSE MIX AGGREGRAT


OF THE BUCKET LOADER
GRADING TYPE MIXTURE CLASS B

A. AGGREGRAT SUB BASE COURSE CLAS B

Crushed Stone 30 - 50 = 40 %

Crushed Stone 20 - 30 = 10 %

Sand Screen = 50 %

COMPARISON AGAINST M³
Kapasitas Bucket Loader = 2.4 m³

spgr Bucket
Sand Screen = 1.112 x 2.4 m³ = 5.3 m³

Crushed Stone 30 - 50 1.604 x 2.4 m³ = 9.6 m³

Crushed Stone 20 - 30 1.604 x 2.4 m³ = 3.8 m³

B CALCULATION OF THE BUCKET LOADER

5.3 11.8269857478617
Sand Screen x 100% = 28.38
( 4.5 + 9.4 + 3.7 )

9.6 8.52562311965856
Crushed Stone 30 - 50 x 100% = 51.15
( 4.5 + 9.4 + 3.7 )

3.8 0.852562311965856
Crushed Stone 20 - 30 x 100% = 20.46
( 4.5 + 9.4 + 3.7 )
100

C THE COMPARISON MIX FOR LOADER

Sand Screen 12
Crushed Stone 30 - 50 7
Crushed Stone 20 - 30 6

CONTRACTOR
MINISTERIO DAS OBRAS PUBLICAS
TINOLINA & KING CONCTRUCTION

OSVALDO A. DE OLIVEIRA YUSAFAT ANDRIANTO, ST


Supervisor Koord. Laboratory Technical
REPUBLIKA DEMOCRATICA DE TIMOR LESTE
SECRETARIO ESTADO DAS OBRAS PUBLICAS
DIRECCAO NACIONAL DE ESTRADAS, PONTES, E CONTROLO DE CHEIAS
RUA : JOAO PAOLO II DILI - TIMOR LESTE Telp. 3311408

SUMMARY AGREGRAT SUB BASE COURSE

PROJECT : REHABILITATION OF VARIATION ROAD AT SAME VILLA


CONTRACTOR : TINOLINA & KING CONTRUCTION Jo
YEARS : 2015

IDENTITAS MATERIAL SUB BASE COURSE

NO TYPE OF MATERIAL PROPORSI EX. MATERIAL


1 Sand Screen 50% Ex. Karaulun
2 Crushed Stone 20 - 30 10% Ex. Karaulun
3 Crushed Stone 30 - 50 40% Ex. Karaulun

HASIL PENGUJIAN

No. Jenis Pengujian Satuan Spesifikasi Hasil Uji Acuan Metode


1 Analisa Saringan % - Lihat Lampiran SNI 03 - 1968 - 1990
Pemeriksaan Berat Jenis dan Penyerapan SNI 1969 - 2008
2 - - 2.604
Air SNI 1970 - 2008
Batas Atterberg : LL % 0 - 35 SNI 1967 - 2008
3 PL
PI
%
%
-
6 - 12
NP SNI 1966 - 2008
4 Percobaan Pemadatan gd max gr/cm 3
- 2.077 SNI 1742 - 2008
5 Kadar Air Optimum % - 5.56 SNI 1965 - 2008
6 Kadar Air Optimum Ideal % - 10.92 < KA Opt. < 13.92 SNI 1965 - 2008
7 CBR Laboratorium % min. 25 0.00 SNI 03 - 1744 - 1989
8 Abrasi Agregat Kasar % 0 - 50 0.00 SNI 2417 - 2008

Keterangan :

0 0
0
0 0

OSVALDO A. DE OLIVEIRA 0 0
Supervisor 0 0
PAKET 6
Pengawasan Teknik Pelebaran Jalan Lembar - Sekotong -
Pelangan - Labuhan Poh 3

PEMERIKSAAN ABRASION TEST ( KEAUSAN )


( SNI. 2417 - 2008 )
Paket Pekerjaan : Pelebaran Jalan Lembar - Sekotong - Pelangan - Labuhan Poh 3
Penyedia Jasa : PT. Hutama Karya - Bunga Raya, JO
Konsultan : PT. Global Profex Synergy
Sumber Material : Ex. Pringgabaya
Jenis bahan : Agregrat Klas B
Tanggal : 04 Mei 2014

Gradasi Pemeriksaan
I II
Saringan
Berat Berat Berat Berat
LOLOS TERTAHAN
Sebelum (a) Sesudah (b) Sebelum (a) Sesudah (b)
76.20 mm ( 3" ) 63.50 mm ( 2.5" )
63.50 mm ( 2.5" ) 50.80 mm ( 2" )
50.80 mm ( 2" ) 37.50 mm ( 1.5" )
37.50 mm ( 1.5" ) 25.40 mm ( 1" )
25.40 mm ( 1" ) 19.00 mm ( 3/4" )
19.00 mm ( 3/4" ) 12.50 mm ( 1/2" ) 2500 2500
12.50 mm ( 1/2" ) 9.50 mm ( 3/8" ) 2500 2500
9.50 mm ( 3/8" ) 6.30 mm ( 1/4" )

6.30 mm ( 1/4" ) 4.75 mm ( #4 )

4.75 mm ( #4 ) 2.36 mm ( #8 )
a. JUMLAH BERAT 5000 5000
b. BERAT TERTAHAN SESUDAH SARINGAN NO.12 3764 3791

I a= 5000 g II a = 5000 g
b= 3764 g b = 3791 g
a-b= 1236 g a-b = 1209 g

KEAUSAN I = 24.72 % KEAUSAN II = 24.18 %

Keausan Rata - rata = 24.45 %


Paket :
Penyedia Jasa
Jenis bahan :
Tanggal

ANALISA SARINGAN

AGREGAT KASAR
Berat Contoh 1 = 6324 gram Berat Contoh 2 = 7842 gram

No. % No. %
Ind. Komulatif % Lolos Ind. Komulatif % Lolos Rata2 Spec.
Ayakan Tertahan Ayakan Tertahan
2" 0 0 0 100 2" 0 0 0 100 100 100 - 100
1,5" 0 0 0.00 100 1,5" 0 0 0.00 100 100.00 88 - 95
1" -54386 -54386 -860 960.00 1" -67755 -67755 -864 964.00 964.00 70 - 85
3/8" -31114 -85500 -1352 1452.00 3/8" 71107 3352 42.75 57.25 754.625 30 - 65

AGREGAT HALUS
Berat Contoh 1 = 500 gram Berat Contoh 2 = 500 gram

No. % No. %
Ind. Komulatif % Lolos Ind. Komulatif % Lolos Rata2 Spec.
Ayakan Tertahan Ayakan Tertahan
#4 256 256 50.83 49.17 #4 277 277 52.08 47.92 48.55 25 - 55
# 10 322 578 67.37 32.63 # 10 304 581 69.55 30.45 31.54 15 - 40
# 40 190 768 89.02 10.98 # 40 199 780 87.25 12.75 11.87 8 - 20
# 200 98 866 93.94 6.06 # 200 92 872 92.23 7.77 6.92 2 - 8

100
90
80
70
60
% Lolos

50
40
30
20
10
0
#200 #40 #10 #4 3/8" 1" 1,5" 2"
No Ayakan
REPUBLIKA DEMOCRATICA DE TIMOR LESTE
SECRETARIO ESTADO DAS OBRAS PUBLICAS
DIRECCAO NACIONAL DE ESTRADAS, PONTES, E CONTROLO DE CHEIAS
RUA : JOAO PAOLO II DILI - TIMOR LESTE Telp. 3311408

ANALISA SARINGAN SUB BASE COURSE


Project : REHABILITATION OF VARIATION ROAD AT SAME VILLA
Contractor : TINOLINA & KING CONTRUCTION Jo
Type of Material : Sub Base Course
Date : 18 November 2015

Sample of Weight I : 11159 Gram. Sample of Weight II : 10557 Gram.

Brt. Tertahan Komulatif Brt. Tertahan Komulatif Rata2


SIEVE SIEVE
SPEC
SIZE % Lolos
Ind. Komulatif % Tthn. % Lolos SIZE Ind. Komulatif % Tthn. % Lolos

2" 50.0 0.0 0.00 100 2" 50.0 0.0 0.00 100 100 100 - 100
1.½" 37.5 653.0 5.85 94.15 1.½" 37.5 0.0 0.00 100.00 97.07
1" 3533.0 4186.0 23.62 76.38 1" 2573.0 2573.0 24.37 75.63 76.00 55 - 85
3/4 " 1700.0 5886.0 48.83 51.17 3/4 " 2240.0 4813.0 45.59 54.41 52.79
3/8 " 48.0 5934.0 54.98 45.02 3/8 " 282.0 5095.0 48.26 51.74 48.38 40 - 75
#4 615.0 6501.0 63.25 36.75 #4 387.0 5200.0 49.26 50.74 43.75
# 10 1370.0 7871.0 76.49 23.51 # 10 3070.0 8270.0 78.34 21.66 22.59
# 40 311.0 8182.0 87.32 12.68 # 40 285.0 8555.0 81.04 18.96 15.82
# 200 1433.0 9615.0 93.26 6.74 # 200 1093.0 9648.0 91.39 8.61 7.68 0 - 12
Prosentase Lolos %

GRAFIC OF GRADATION
AGREGRAT SUB BASE COURSE
GRAFIC OF GRADATION
SUB BASE COURSE
100 100
100.00
90
85
80
75 76.00
70
60
55
50 48.38
40 40
30
20 12
7.68
10
0 0
# 200 #3/8" #1 #2 "

SIEVE SIZE

Keterangan :
: Batasan Spesifikasi
: Gradasi Gabungan

CONTRACTOR
MINISTERIO DAS OBRAS PUBLICAS
TINOLINA & KING CONCTRUCTION

OSVALDO A. DE OLIVEIRA YUSAFAT ANDRIANTO, ST


Supervisor Koord. Laboratory Technical
REPUBLIKA DEMOCRATICA DE TIMOR LESTE
SECRETARIO ESTADO DAS OBRAS PUBLICAS
DIRECCAO NACIONAL DE ESTRADAS, PONTES, E CONTROLO DE CHEIAS
RUA : JOAO PAOLO II DILI - TIMOR LESTE Telp. 3311408

ANALISA SARINGAN SUB BASE COURSE


Project : REHABILITATION OF VARIATION ROAD AT SAME VILLA
Contractor : TINOLINA & KING CONTRUCTION Jo
Source Material : Ex. KARAULUN
Type of Material : Sub Base Course
Date :

Type of Material : COURSE AGREGRAT


Sample of Weight I : 5913 Gram. Sample of Weight II : 4826 Gram.

Brt. Tertahan Komulatif Brt. Tertahan Komulatif Rata2


No.
No. Ayakan SPEC.
Ind. Komulatif % Tthn. % Lolos Ayakan Ind. Komulatif % Tthn. % Lolos % Lolos

2" 0 0 0.00 100.00 2" 0.0 0.0 0.00 100.00 100.00 100 - 100
1.5" 653 653.0 11.04 88.96 1.5" 0.0 0.0 0.00 100.00 94.48
1" 3533.0 4186.0 70.79 29.21 1" 2573.0 2573.0 53.32 46.68 37.95 55 - 85
3/4" 1700.0 5886.0 99.54 0.46 3/4" 2240.0 4813.0 99.73 0.27 0.36
3/8" 3/8" 40 - 75
#4 #4
# 10 # 10
# 40 # 40
# 200 # 200 0 - 12

100.00

90.00

80.00
% Lolos

70.00

60.00

50.00

40.00

30.00

20.00

10.00

0.00
3/4 1" 1,5" 2"
SIEVE SIZE

CONTRACTOR
MINISTERIO DAS OBRAS PUBLICAS
TINOLINA & KING CONCTRUCTION

OSVALDO A. DE OLIVEIRA YUSAFAT ANDRIANTO, ST


Supervisor Koord. Laboratory Technical
REPUBLIKA DEMOCRATICA DE TIMOR LESTE
SECRETARIO ESTADO DAS OBRAS PUBLICAS
DIRECCAO NACIONAL DE ESTRADAS, PONTES, E CONTROLO DE CHEIAS
RUA : JOAO PAOLO II DILI - TIMOR LESTE Telp. 3311408

ANALISA SARINGAN SUB BASE COURSE


Project : REHABILITATION OF VARIATION ROAD AT SAME VILLA
Contractor : TINOLINA & KING CONTRUCTION Jo
Source Material : Ex. KARAULUN
Type of Material : Sub Base Course

Type of Material : MEDIUM AGREGRAT.


Sample of Weight I : 6521 Gram. Sample of Weight II : 5215 Gram.

Brt. Tertahan Komulatif Brt. Tertahan Komulatif Rata2


No.
No. Ayakan SPEC.
Ayakan % Lolos
Ind. Komulatif % Tthn. % Lolos Ind. Komulatif % Tthn. % Lolos

2" 2" 100 100 - 100


1.5" 0.0 0.0 0.00 100 1.5" 0.0 0.0 0.00 100 100
1" 0.0 0.0 0.00 100 1" 0.0 0.0 0.00 100 100 55 - 85
3/4" 0.0 0.0 0.00 100 3/4" 0.0 0.0 0.00 100 100
3/8" 5934.0 5934.0 91.00 9.00 3/8" 5095.0 5095.0 97.70 2.30 5.65 40 - 75
#4 567.0 6501.0 99.69 0.31 #4 105.0 5200.0 99.71 0.29 0.30
# 10 0.0 0.0 0.00 0.00 # 10 0.0 0.0 0.00 0.00 0.00
# 40 0.0 0.0 0.00 0.00 # 40 0.0 0.0 0.00 0.00 0.00
# 200 0.0 0.0 0.00 0.00 # 200 0.0 0.0 0.00 0.00 0.00 0 - 12

100

90

80

70
% Lolos

60

50

40

30

20

10

0
#200 #40 #10 #4 3/8" 1"
SIEVE SIZE

CONTRACTOR
MINISTERIO DAS OBRAS PUBLICAS
TINOLINA & KING CONCTRUCTION

OSVALDO A. DE OLIVEIRA YUSAFAT ANDRIANTO, ST


Supervisor Koord. Laboratory Technical
REPUBLIKA DEMOCRATICA DE TIMOR LESTE
SECRETARIO ESTADO DAS OBRAS PUBLICAS
DIRECCAO NACIONAL DE ESTRADAS, PONTES, E CONTROLO DE CHEIAS
RUA : JOAO PAOLO II DILI - TIMOR LESTE Telp. 3311408

ANALISA SARINGAN SUB BASE COURSE


Project : REHABILITATION OF VARIATION ROAD AT SAME VILLA
Contractor : TINOLINA & KING CONTRUCTION Jo
Source Material : Ex. KARAULUN
Type of Material : Sub Base Course

Type of Material : SIRTU


Sample of Weight I : 9712 Gram. Sample of Weight II : 9758 Gram.

Brt. Tertahan Komulatif Brt. Tertahan Komulatif Rata2


No.
No. Ayakan SPEC.
Ind. Komulatif % Tthn. % Lolos Ayakan Ind. Komulatif % Tthn. % Lolos % Lolos

2" 2" 100 100 - 100


1.5" 0.0 0.0 0.00 100 1.5" 0.0 0.0 0.00 100 100
1" 0.0 0.0 0.00 100.00 1" 0.0 0.0 0.00 100.00 100.00 55 - 85
3/4" 0.0 0.0 0.00 100.00 3/4" 0.0 0.0 0.00 100.00 100.00
3/8" 0.0 0.0 0.00 100.00 3/8" 0.0 0.0 0.00 100.00 100.00 40 - 75
#4 0.0 0.0 0.00 100.00 #4 0.0 0.0 0.00 100.00 100.00
# 10 7871.0 7871.0 81.04 18.96 # 10 8270.0 8270.0 84.75 15.25 17.10
# 40 311.0 8182.0 84.25 15.75 # 40 285.0 8555.0 87.67 12.33 14.04
# 200 1433.0 9615.0 99.00 1.00 # 200 1093.0 9648.0 98.87 1.13 1.06 0 - 12

100

90

80

70
% Lolos

60

50

40

30

20

10

0
#200 #40 #10 #4 3/8" 1" 1.5"
SIEVE SIZE

CONTRACTOR
MINISTERIO DAS OBRAS PUBLICAS
TINOLINA & KING CONCTRUCTION

OSVALDO A. DE OLIVEIRA YUSAFAT ANDRIANTO, ST


Supervisor Koord. Laboratory Technical
REPUBLIKA DEMOCRATICA DE TIMOR LESTE
SECRETARIO ESTADO DAS OBRAS PUBLICAS
DIRECCAO NACIONAL DE ESTRADAS, PONTES, E CONTROLO DE CHEIAS
RUA : JOAO PAOLO II DILI - TIMOR LESTE Telp. 3311408

Project : REHABILITATION OF VARIATION ROAD AT SAME VILLA


Contractor : TINOLINA & KING CONTRUCTION Jo
Source Material : Ex. KARAULUN
Type of Material : Sub Base Course
Date : 18 November 2015

COMBAIN GRADASI AGGREGATE SUB BASE COURSE


1 2 3 1 2 3 Total
Jenis Material
CA MA SIRTU CA MA SIRTU % Lolos Spesifikasi
No.Ayakan % Lolos 40% 10% 50% Comb
2" 50 100 100 100 40 10 50 100.00 100 - 100
1.5" 37.5 94.48 100 100 37.79 10 50 97.79
1" 25 37.95 100 100 15.18 10 50 75.18 55 - 85
3/4 " 9.5 0.36 100 100 0.15 10 50 60.15
3/8 " 2.36 48.38 100 4.84 50 54.84 40 - 75
#4 4.75 0.30 100 0.03 50 50.03
# 10 2.36 17.10 8.55 8.55
# 40 1.18 14.04 7.02 7.02
# 200 0.075 1.06 0.53 0.53 0 - 12
Prosentase Lolos %

GRAFIC OF GRADATION
SUB BASE COURSE

100 100
100.00

90
85
80
75 75.18
70

60
54.84 55
50

40 40

30

20

10 12

0 0.53
0
#2 " #3/8 #1 " # 200
SIEVE SIZE 1"

Keterangan :
: Batasan Spesifikasi
: Gradasi Gabungan

CONTRACTOR
MINISTERIO DAS OBRAS PUBLICAS
TINOLINA & KING CONCTRUCTION

OSVALDO A. DE OLIVEIRA YUSAFAT ANDRIANTO, ST


Supervisor Koord. Laboratory Technical
Project :
Contractor : NTN
Source Material : EX COMORO RIVER
Type of Material : SUB - BASE COURSE
Date : 1 - Februari 2017
At of Test : Laboratory ADN

MOISTURE-DENSITY RELATIONS OF SOIL


a Heavy Wet Soil ( gr ) 5500 5500 5500 5500 5500
b Initial Moisture Content (%) 1.55 1.55 1.55 1.55 1.55
c Adding Water (%) 2 4 6 8 10
d Adding Water ( cc ) 50 150 250 350 450
CONTENT WEIGHT
A Wet Soil Weight + Mold ( gr ) 10870 11110 11220 11280 11270
B Weight Mold ( gr ) 6183.0 6183.0 6183.0 6183.0 6183.0
C Heavy Wet Soil (A-B) ( gr ) 4687 4927 5037 5097 5087
D Mold Contents ( gr ) 2103.0 2103.0 2103.0 2103.0 2103.0
E Wet Bulk Density g (C)/(D) 2.229 2.343 2.395 2.424 2.419
E
x 100%
F Dry Bulk Density g 100 + 6
-0.328 -0.380 -0.379 -0.396 -0.331

WATER CONTENT
No. Tin box 1 2 3 4 5
A Berat material basah + cawan ( gr ) 411.4 376.6 380.6 381.3 433.4
B berat material kering + cawan ( gr )
C Berat cawang ( gr ) 52.8 52.5 52.0 53.6 52.2
D Berat Air (A-B) ( gr ) 411.4 376.6 380.6 381.3 433.4
E Berat kering (B-C) ( gr ) -52.8 -52.5 -52.0 -53.6 -52.2
F Kadar Air Rata-rata = ( 4 ) / ( 5 ) x 100 -779.17 -717.33 -731.92 -711.38 -830.27
7 Kadar Air Rata-rata (W) (%) -389.58
DENSITY-358.67
CHART -365.96 -355.69 -415.13
g Dry Density

2.400

2.350

2.300

2.250

2.200
% OMC : 7.18

2.150

2.100

2.050

2.000
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Water Content (%)

g d Maximum = -0.379 gr/cm ³ W optimum = 7.18 %


Source Material : International Airport of President Nicolau Lobato
Type of Material : Sub Grade
Date : 30/05/2019
At of Test : Laboratorium ADN

MOISTURE-DENSITY RELATIONS OF SOIL


a Heavy Wet Soil ( gr ) 5500 5500 5500 5500 5500
b Initial Moisture Content (%) 0.82 0.82 0.82 0.82 0.82
c Adding Water (%) 1 3 5 7 9
d Adding Water ( cc ) 44 119 228 338 446
CONTENT WEIGHT
A Wet Soil Weight + Mold ( gr ) 10060 10494 10801 10581 10378
B Weight Mold ( gr ) 6183.0 6183.0 6183.0 6183.0 6183.0
C Heavy Wet Soil (A-B) ( gr ) 3877 4311 4618 4398 4195
D Mold Contents ( gr/cm3) 2106.0 2106.0 2106.0 2106.0 2106.0
E Wet Bulk Density g (C)/(D) 1.841 2.047 2.193 2.088 1.992
E
x 100%
F Dry Bulk Density g 100 + 6 1.812 1.986 2.077 1.934 1.823

WATER CONTENT
No. Tin box 1 2 3 4 5
A Berat material basah + cawan ( gr ) 236.2 212.1 243.4 289.6 266.2
B berat material kering + cawan ( gr ) 233.4 207.4 234.2 273.5 250.3
C Berat cawang ( gr ) 55.4 55.5 68.6 71.4 78.4
D Berat Air (A-B) ( gr ) 2.8 4.7 9.2 16.1 15.9
E Berat kering (B-C) ( gr ) 178.0 151.9 165.6 202.1 171.9
F Kadar Air Rata-rata = ( 4 ) / ( 5 ) x 100 1.57 3.09 5.56 7.97 9.25
7 Kadar Air Rata-rata (W) (%) 0.79 1.55
DENSITY CHART 2.78 3.98 4.62
g Dry Density

2.500
2.400
Zero Air Void
2.300
2.200
2.100
2.000
1.900
1.800
1.700
1.600
1.500
0 1 2 3 4 5 6 7 8 9 10 11 12
Water Content (%)

gd Maximum = 2.077 gr/cm ³ W optimum = 5.56 %


PEMERIKSAAN CBR LABORATORIUM
SNI.03 - 1744 - 1989

Paket Pekerjaan :
Penyedia Jasa :
Sumber Material :
Jenis bahan :
Tanggal :

Tumbukan : 10X 29.4

PENGEMBANGAN Berat Isi Sebelum Sesudah


Tanggal a. Berat Mold + Tanah Basah 10727 10850
Jam b. Berat Mold 6368 6368
Pembacaan c. Berat Tanah Basah 4359 4482
d. Volume Mold 2121.99 2121.99
Proving Ring = 4.5 Lbs/div. e. Berat Isi Basah (c/d) 2.054 2.112
PENETRASI
Dial (Div) Beban f. Berat Isi Kering (e/100+G)x100% 1.875 1.881
Waktu Penurunan (Lbs)
( Min ) ( Inch )
atas bawah atas bawah 2880

0 0 0 0
0.25 0.0125 6 80 ### 2640
0.5 0.0250 11 147
1 0.0500 20 267 2400
2 0.0750 29 387
2 0.1000 65 868 2160
3 0.1500 83 1108
Beban ( Lbs )

4 0.2000 100 1335 1920


6 0.3000
8 0.4000
1680
10 0.5000

NILAI CBR ATAS 1440

900
0,1" x 100% 30.00 1200
3 x 1000
1450.00
0,2" x 100% 32.22
3 x 1500 960

720
Kadar Air Sebelum Sesudah

A. Berat Tanah Basah +Tin Box 586.3 645.7 480


B. Berat Tanah Kering +Tin Box 554.5 599.2
C. Berat Tin Box 220.7 219.9 240
D. Berat Air A-B 31.8 46.5
E. Berat Tanah Kering B-C 333.8 379.3 0
D 0 0.1 0.2 0.3 0.4 0.5
F. Kadar Air x 100% 9.53 12.26 Penuruan ( inch )
E
RATA- RATA 10.89 NILAI CBR SEBELUM DIRENDAM = 32.22 %
NILAI CBR SESUDAH DIRENDAM = #REF! %
PEMERIKSAAN CBR LABORATORIUM
SNI.03 - 1744 - 1989

Paket Pekerjaan :
Penyedia Jasa :
Sumber Material :
Jenis bahan :
Tanggal :

Tumbukan : 35X 29.4

PENGEMBANGAN Berat Isi Sebelum Sesudah


Tanggal a. Berat Mold + Tanah Basah 11198 11291
Jam b. Berat Mold 6608 6608
Pembacaan c. Berat Tanah Basah 4589.9 4683.2
d. Volume Mold 2121.99 2121.99
Proving Ring = 4.5 Lbs/div. e. Berat Isi Basah (c/d) 2.163 2.207
PENETRASI
Dial (Div) Beban f. Berat Isi Kering (e/100+G)x100% 1.974 1.960
Penurunan
Waktu (Lbs)
( Min ) ( Inch ) atas bawah atas bawah
0 0 0 0 4800

0.25 0.0125 4 53 ### 4560


0.5 0.0250 20 267 4320
1 0.0500 45 601
4080
2 0.0750 66 881
2 0.1000 97 3840
1295
3 0.1500 131 1749 3600
Beban ( Lbs )

4 0.2000 172 2296 3360


6 0.3000
3120
8 0.4000
2880
10 0.5000
2640
NILAI CBR ATAS 2400
1600
0,1" x 100% 53.33 2160
3 x 1000
1920
2400.00
0,2" x 100% 53.33 1680
3 x 1500
1440

1200
Kadar Air Sebelum Sesudah
960
A. Berat Tanah Basah +Tin Box 505.3 700.3
720
B. Berat Tanah Kering +Tin Box 480.4 644.9
C. Berat Tin Box 220.7 206.0 480

D. Berat Air A-B 24.9 55.4 240


E. Berat Tanah Kering B-C 259.7 438.9 0
D 0 0.1 0.2 0.3 0.4 0.5
F. Kadar Air x 100% 9.59 12.62 Penuruan ( inch )
E
RATA- RATA 11.11 NILAI CBR SEBELUM DIRENDAM = 53.33 %
NILAI CBR SESUDAH DIRENDAM = #REF! %
PEMERIKSAAN CBR LABORATORIUM
SNI.03 - 1744 - 1989

Paket Pekerjaan :
Penyedia Jasa :
Konsultan :
Sumber Material :
Jenis bahan :
Tanggal :

Tumbukan : 65X 29.4

PENGEMBANGAN Berat Isi Sebelum Sesudah


Tanggal a. Berat Mold + Tanah Basah 12400 12542
Jam b. Berat Mold 7572 7572
Pembacaan c. Berat Tanah Basah 4827.5 4969.7
d. Volume Mold 2121.99 2121.99
Proving Ring = 4.5 Lbs/div. e. Berat Isi Basah (c/d) 2.275 2.342
PENETRASI
Dial (Div) Beban f. Berat Isi Kering (e/100+G)x100% 2.077 2.083
Penurunan
Waktu (Lbs)
( Min ) ( Inch ) atas bawah atas bawah
0 0 0 0 5280

0.25 0.0125 6 80 ### 5040


0.5 0.0250 11 147 4800
1 0.0500 38 507 4560
2 0.0750 64 854 4320
2 0.1000 97 1295
4080
3 0.1500 176 2349
3840
Beban ( Lbs )

4 0.2000 203 2710


3600
6 0.3000
8 0.4000 3360

10 0.5000 3120

2880
NILAI CBR ATAS 2640
1600 2400
0,1" x 100% 53.33
3 x 1000 2160
3100.00
0,2" x 100% 68.89 1920
3 x 1500
1680

1440
Kadar Air Sebelum Sesudah 1200

A. Berat Tanah Basah +Tin Box 621.1 650.5 960

B. Berat Tanah Kering +Tin Box 586.3 602.9 720

C. Berat Tin Box 220.7 219.5 480


D. Berat Air A-B 34.8 47.6 240
E. Berat Tanah Kering B-C 365.6 383.4 0
D 0 0.1 0.2 0.3 0.4 0.5
F. Kadar Air x 100% 9.52 12.42 Penuruan ( inch )
E
RATA- RATA 10.97 NILAI CBR SEBELUM DIRENDAM = 68.89 %
NILAI CBR SESUDAH DIRENDAM = #REF! %
Paket : Pelebaran Jalan Lembar - Sekotong - Pelangan - Lb.POH 3
Penyedia Jasa : Hutama - Bunga Raya, JO
Konsultan : PT. Global Profex Synergy
Tahun : 2014

BERITA ACARA

Pada hari ini Jumat Tanggal Sembilan Bulan Mei Tahun Dua Ribu Empat Belas,
Telah dilaksanakan Trial Lapis Pondasi Agregat Kelas B dihadiri oleh.
1. Bina Marga Provinsi
2. PT. Global Profex Synergy
3. Hutama - Bunga Raya,JO
Adapun peralatan yang dipakai sebagai berikut :
1. Excavator
2. Tandem Vibrator Roller
3. Tangki Air

Tebal : 25 Cm
Gembur : 28 Cm
Padat : 25 Cm

Untuk Pelaksanaan Dilakukan Pemadatan Dengan Menggunakan


Passing 16 Passing 18 Passing 22
~ 16 Lintasan (Passing).

Evaluasi Hasil Test

NO URAIAN STA KEPADATAN

Tandem Vibrator Roller 14 Pass


1 0+700 R - 0+735 R 96.26%
Tangki Air 2 Pass

Tandem Vibrator Roller 16 Pass


2 0+735 R - 0+784 R 100.18%
Tangki Air 2 Pass

Tandem Vibrator Roller 18 Pass


3 0+784 R - 0+829 R 104.07%
Tangki Air 2 Pass

0 + 700 0 + 735 0 + 784 0 + 829

PELEBARAN KANAN

BINA MARGA KONSULTAN PENYEDIA JASA

Zainuddin,ST Darminto,ST Mirza Adhia Putera,ST


Pengawas Quality Quality Engineer Quality Control
Paket :
Penyedia Jasa :
Konsultan :
Jenis bahan :
Tanggal :

PENGUJIAN KEPADATAN LAPANGAN


AASHTO T - 191

A STA TO STA 14 PASSING KANAN


B Titik pemeriksaan 0+710 0+725 0+825 0+535
C Lapisan No. 1 1
LOKASI
D Berat pasir + gelas + corong ( sebelum ) Gr 8224 8154 8109 8157
E Berat pasir + gelas + corong ( sesudah ) Gr 3968 3598 4078 3995
F Berat pasirdalam corong & Lubang ( D - E ) Gr 4256 4556 4031 4162
G Berat pasir dalam corong ( Lab ) Gr 1613 1613 1613 1613
H Berat pasir dalam Lubang ( F - G ) Gr 2643 2943 2418 2549
I Berat isi pasir ( Lab ) Gr / cc 1.431 1.431 1.431 1.431
J Volume Lubang ( H / I ) Gr / cc 1847 2057 1690 1781
CONTOH
K Berat contoh + wadah Gr 4122 4400 3977 3487
L Berat wadah Gr 156 156 156 156
M Berat contoh ( K - L ) Gr 3966 4244 3821 3331
DENSITY
N Berat Isi Basah ( M / J ) Gr / cc 2.147 2.064 2.261 1.870
O Berat isi Kering ( N / ( 1 + ( Y/100 )) Gr / cc 1.985 1.825 2.054 1.547
P Kadar Air Optimim ( Lab ) % 9.50 9.50 9.50 9.50
Q Berat isi kering Maximum ( Lab ) Gr / cc 2.073 2.073 2.073 2.073
R Derajat kepadatan ( O / III x 100 ) % 97.4 95.1 95.3 74.6
KADAR AIR
T Berat contoh Basah + Wadah Gr / cc 373 434 447 365
U Berat contoh Kering + Wadah Gr / cc 358 404 422 332
V Berat Wadah Gr / cc 174 174 174 174
W Berat Air (T-U) Gr / cc 15 30 25 33
X Berat contoh Kering ( U - V ) Gr / cc 184 230 248 158
Y Kadar Air ( W / X )x 100 % 8.15 13.04 10.08 20.89
KOREKSI
I Berat Butiran Tertahan No. # 4 Gr 1805 1801 2161
II % Butiran Tertahan No.# 4 ( I / M )x100 % 45.51 42.44 56.56
III Berat isi Kering Maksimum Terkoreksi Gr / cc 2.038 1.920 2.155
Paket :
Penyedia Jasa :
Konsultan :
Jenis bahan : 0
Tanggal : 11 Mei 2014

PENGUJIAN KEPADATAN LAPANGAN


AASHTO T - 191

A STA TO STA 16 PASSING KANAN


B Titik pemeriksaan 0+750 0+775 0+868 0+535
C Lapisan No. 1 1
LOKASI
D Berat pasir + gelas + corong ( sebelum ) Gr 7987 8005
E Berat pasir + gelas + corong ( sesudah ) Gr 3830 3227
F Berat pasirdalam corong & Lubang ( D - E ) Gr 4157 4778 0 0
G Berat pasir dalam corong ( Lab ) Gr 1613 1613 1613 1613
H Berat pasir dalam Lubang ( F - G ) Gr 2544 3165 -1613 -1613
I Berat isi pasir ( Lab ) Gr / cc 1.431 1.431 1.431 1.431
J Volume Lubang ( H / I ) Gr / cc 1778 2212 -1127 -1127
CONTOH
K Berat contoh + wadah Gr 4185 5125
L Berat wadah Gr 156 156 156 156
M Berat contoh ( K - L ) Gr 4029 4969 -156 -156
DENSITY
N Berat Isi Basah ( M / J ) Gr / cc 2.266 2.247 0.138 0.138
O Berat isi Kering ( N / ( 1 + ( Y/100 )) Gr / cc 2.081 2.096 0.138 0.138
P Kadar Air Optimim ( Lab ) % 9.50 9.50 9.50 9.50
Q Berat isi kering Maximum ( Lab ) Gr / cc 2.073 2.073 2.073 2.073
R Derajat kepadatan ( O / III x 100 ) % 100.9 99.4 6.7 6.7
KADAR AIR
T Berat contoh Basah + Wadah Gr / cc 418 488
U Berat contoh Kering + Wadah Gr / cc 398 467
V Berat Wadah Gr / cc 174 174 174 174
W Berat Air (T-U) Gr / cc 20 21 0 0
X Berat contoh Kering ( U - V ) Gr / cc 224 293 -174 -174
Y Kadar Air ( W / X )x 100 % 8.93 7.17 0.00 0.00
KOREKSI
I Berat Butiran Tertahan No # 4 Gr 2183 2872
II % Butiran Tertahan No # 4 % 54.18 57.80
III Berat isi Kering Maksimum Terkoreksi Gr / cc 2.061 2.108
Paket :
Penyedia Jasa :
Konsultan :
Jenis bahan : 0
Tanggal : 11 Mei 2014

PENGUJIAN KEPADATAN LAPANGAN


AASHTO T - 191

A STA TO STA 18 PASSING KANAN


B Titik pemeriksaan 0+800 0+813 0+868 0+535
C Lapisan No. 1 1
LOKASI
D Berat pasir + gelas + corong ( sebelum ) Gr 8068 8283
E Berat pasir + gelas + corong ( sesudah ) Gr 3400 3483
F Berat pasirdalam corong & Lubang ( D - E ) Gr 4668 4800 0 0
G Berat pasir dalam corong ( Lab ) Gr 1613 1613 1613 1613
H Berat pasir dalam Lubang ( F - G ) Gr 3055 3187 -1613 -1613
I Berat isi pasir ( Lab ) Gr / cc 1.431 1.431 1.431 1.431
J Volume Lubang ( H / I ) Gr / cc 2135 2227 -1127 -1127
CONTOH
K Berat contoh + wadah Gr 5150 5367
L Berat wadah Gr 156 156 156 156
M Berat contoh ( K - L ) Gr 4994 5211 -156 -156
DENSITY
N Berat Isi Basah ( M / J ) Gr / cc 2.339 2.340 0.138 0.138
O Berat isi Kering ( N / ( 1 + ( Y/100 )) Gr / cc 2.154 2.161 0.138 0.138
P Kadar Air Optimim ( Lab ) % 9.50 9.50 9.50 9.50
Q Berat isi kering Maximum ( Lab ) Gr / cc 2.073 2.073 2.073 2.073
R Derajat kepadatan ( O / III x 100 ) % 103.9 104.2 6.7 6.7
KADAR AIR
T Berat contoh Basah + Wadah Gr / cc 313 357
U Berat contoh Kering + Wadah Gr / cc 302 343
V Berat Wadah Gr / cc 174 174 174 174
W Berat Air (T-U) Gr / cc 11 14 0 0
X Berat contoh Kering ( U - V ) Gr / cc 128 169 -174 -174
Y Kadar Air ( W / X )x 100 % 8.59 8.28 0.00 0.00
KOREKSI
I Berat Butiran Tertahan No. # 4 Gr 2804 2999
II % Butiran Tertahan No. # 4 % 56.15 57.55
III Berat isi Kering Maksimum Terkoreksi Gr / cc 2.085 2.108
REPUBLIKA DEMOCRATICA DE TIMOR LESTE
SECRETARIO ESTADO DAS OBRAS PUBLICAS
DIRECCAO NACIONAL DE ESTRADAS, PONTES, E CONTROLO DE CHEIAS
RUA : JOAO PAOLO II DILI - TIMOR LESTE Telp. 3311408

CHART
CORECTION FOR COARSE PARTILES IN THE SOIL
Compaction Test AASHTO T 224 ~ 67 ( 1974 )

Material : SUB BASE COURSE

2.8

170 2.7

Bulk Sp.Gr
2.6
160
2.5

150
2.4

Maximum Dry Density


140

130

120

110

100

90
0 10 20 30 40 50 60 70 80 90 100

Ket : 1.

Sp.Gr. = 2.604 Gr/cm3


Ket : 2.
Tertahan no. 4 = 2.073 %
3
Max. Dry Density = 2.077 Gr/cm

#REF!
#REF!
#REF!
REPUBLIKA DEMOCRATICA DE TIMOR LESTE
SECRETARIO ESTADO DAS OBRAS PUBLICAS
DIRECCAO NACIONAL DE ESTRADAS, PONTES, E CONTROLO DE CHEIAS
RUA : JOAO PAOLO II DILI - TIMOR LESTE Telp. 3311408

KOREKSI SANDCONE SUB BASE COURSE

Berat tertahan no. 4


No. Koreksi Density Keterangan
(%)
1 31 1.790
2 32 1.802 Density : 2.193
3 33 1.814 Sp.Gr.:2.704
4 34 1.826
5 35 1.838
6 36 1.849
7 37 1.861
8 38 1.873
9 39 1.885
10 40 1.896
11 41 1.908
12 42 1.920
13 43 1.932
14 44 1.944
15 45 1.955
16 46 1.967
17 47 1.979
18 48 1.991
19 49 2.002
20 50 2.014
21 51 2.026
22 52 2.038
23 53 2.050
24 54 2.061
25 55 2.073
26 56 2.085
27 57 2.097
28 58 2.108
29 59 2.120
30 60 2.132
31 62 2.155
GRAFIK HUBUNGAN ANTARA
KEPADATAN DENGAN NILAI CBR

AGREGAT KLAS 'B

2.2 2.2
2.15 2.15
2.1 2.1
2.05 2.05

Brt. isi kering ( Gr/cm³ )


Brt. isi kering ( Gr/cm³ )

2 2
1.95 1.95
1.9 1.9
1.85 1.85 CBR = 68 %
1.8 1.8
1.75 1.75
1.7 1.7
2 4 6 8 10 12 14 16 18 0 50 100
Kadar air ( % ) Nilai CBR ( % )

KADAR AIR OFTIMUM ( OMC ) : 9.50 %


YD MAXIMUM : 2.073 Gr/cm³
NILAI CBR : 68.89 %
REPUBLIKA DEMOCRATICA DE TIMOR LESTE
SECRETARIO ESTADO DAS OBRAS PUBLICAS
DIRECCAO NACIONAL DE ESTRADAS, PONTES, E CONTROLO DE CHEIAS
RUA : JOAO PAOLO II DILI - TIMOR LESTE Telp. 3311408

SPESIFIKASI TES GAYA BERAT DAN PENYERAPAN


Project : REHABILITATION OF VARIATION ROAD AT SAME VILLA
Contractor : TINOLINA & KING CONTRUCTION Jo
Material : Sub Base Course
Date :

Agregat : Kasar
No. Tes I II
A. BERAT CONTOH KERING OVEN (Gram ) A 1745 1591
B. BERAT CONTOH KERING PERMUKAAN (Gram ) B 1756 1632
C. BERAT CONTOH DALAM AIR (Gram ) C 1105 975
A 2.680 2.422
* BERAT JENIS BULK ( KERING OVEN )
B-C Avarage 2.551
B 2.697 2.484
* BERAT JENIS BULK ( KERING PERMUKAAN )
B-C Avarage 2.591
A 2.727 2.583
* BERAT JENIS SEMU
A-C Avarage 2.655
(B - A) x 100 0.630 2.577
* PENYERAPAN
A Avarage 1.604

Agregat : Halus
No. Tes I II
A. BERAT BENDA UJI KERING PERMUKAAN JENUH (Gram) 500 500 500
B. BERAT CONTOH KERING OVEN (Gram) A 494 495.0
C. BERAT CONTOH DALAM AIR (Gram) B 689 657.0
D. BERAT CONTOH+BOTOL+AIR SAMPAI BTS KALIBRASI (Gram) C 987 988
A 2.446 2.929
* BERAT JENIS BULK ( KERING OVEN )
(B+500-C) Avarage 2.687
500 2.475 2.959
* BERAT JENIS BULK ( KERING PERMUKAAN )
(B+500-C) Avarage 2.717
A 2.520 3.018
* BERAT JENIS SEMU
(B+A-C) Avarage 2.769
(500-A) x100 1.215 1.010
* PENYERAPAN
A Avarage 1.112

SPGR Gabungan = 100


60 40
2.551 2.687

= 2.604 gr/cc

CONTRACTOR
MINISTERIO DAS OBRAS PUBLICAS
TINOLINA & KING CONCTRUCTION

OSVALDO A. DE OLIVEIRA YUSAFAT ANDRIANTO, ST


Supervisor Koord. Laboratory Technical
REPUBLIK INDONESIA
KEMENTRIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL METROPOLITAN 1 SURABAYA
PEJABAT PEMBUAT KOMITMEN - BANGKALAN - BATAS KAB. SAMPANG 1 BACK UP
Jumla
Jalan Mojopahit Nomor 2, Sidoarjo - Jawa Timur No. DATA
h
Lem
Paket : 1 Lemb
PELEBARAN JALAN BATAS KOTA BANGKALAN - BATAS KAB. SAMPANGbar
ar
Kontraktor : PT. CITRA GADING ASRITAMA
Konsultan : PT. BLANTICKINDO ANEKA
Sumber Material : WIRA BUMI ( Ex. Ngoro )
Jenis bahan : Agg. B
Tahun : 2013

PENGUJIAN ANGULARITAS AGREGAT KASAR


( DoT'S PTM No. 621 )

Satu Bidang Pecah / Lebih


URAIAN
I II
A. BERAT CONTOH SEBELUM UJI + TAKARAN 1564 1615
B. BERAT CONTOH SETELAH UJI + TAKARAN 1512 1566
C. BERAT TAKARAN 424 486
D. BERAT CONTOH SEBELUM UJI A-C 1140 1129
E. BERAT CONTOH SETELAH UJI B-C 1088 1080
F. NILAI ANGULARITAS E / D x 100 95.44 95.66
NILAI RATA - RATA 95.55

Satu Bidang Pecah / Lebih


URAIAN
I II
A. BERAT CONTOH SEBELUM UJI + TAKARAN 1473 1584
B. BERAT CONTOH SETELAH UJI + TAKARAN 1378 1493
C. BERAT TAKARAN 405 486
D. BERAT CONTOH SEBELUM UJI A-C 1068 1098
E. BERAT CONTOH SETELAH UJI B-C 973 1007
F. NILAI ANGULARITAS E / D x 100 91.10 91.71
NILAI RATA - RATA 91.41

DISETUJUI OLEH DIPERIKSA OLEH DIKERJAKAN OLEH

BINA MARGA KONSULTAN KONTRAKTOR


Paket :
Kontarktor :
Konsultan :
Jenis Bahan :
Tahun :

PEMERIKSAAN KADAR AIR TANAH


( SNI 1965 - 2008 )

No. Contoh 1 2 3 4 Unit


1.Berat Tempat 40.5 40.0 gram

2.Berat Tempat+Tanah Basah 70.48 72.11 gram

3.Berat Tempat+Tanah Kering 68.13 69.76 gram

4.Berat Air (2) - (3) 2.07 2.23 cc

5.Berat Tanah Kering (3) - (1) 32.81 31.06 gram

(4)
7.Kadar Air = x 100% 6.31 7.18 %
(5)

Rata - Rata 6.75 %

BINA MARGA KONSULTAN KONTRAKTOR

(..........................) (............................) (.........................)