Professional Documents
Culture Documents
Fire Alarmsvelosi Company Profile
Fire Alarmsvelosi Company Profile
LOCAL SERVICE
GLOBAL PROVIDER
of Asset Integrity Management, HSE, Engineering Services & Software Solutions
WWW.VELOSIAIMS.COM
2 Velosi Asset Integrity Limited Velosi Asset Integrity Limited 3
The Oil and Gas industry worldwide is today undergoing its most dramatic shifts.
We offer a full range of specialist Price volatility and geopolitical uncertainties-technological advances, mergers and acquisitions, as
well as new reporting and regulatory changes are redefining how the industry will move beyond
engineering consultancy services complete tomorrow into the next decade of the 21st century.
with our own in-house proprietary
Central to this evolution is global competition for fast-depleting natural resources, and the
software that has been developed and
emphasis on sustainability, which are fundamental to the communities in which we work.
tailored to the energy business.
MR. IJAZ UL KARIM RAO
Managing Director As a service provider, we are always proactive
and listen to the voice of our customers to fully
understand their needs.
About Velosi
Velosi is a leading global consulting firm that provides Asset Integrity Management,
HSE, Engineering Services and Software Solutions to clients in the energy industry
Velosi has developed a comprehensive Asset Integrity Management software; VAIL-Plant, that can
be tailored to fulfill the specific needs of Energy companies worldwide.
By combining global coverage and local knowledge with our wide range of services we are able to
create tailored solutions to complex problems. Our range of inter-related services and modular
methodology ensures that we can accommodate a wide range of projects.
The strength of our approach comes from offering a multiregional service while meeting local
needs. Velosi achieves this because we operate in selected world’s major established and emerging
markets.
From your local offices, you will be able to easily access our network to receive the service that
you need. This approach provides a solution to companies who are trying to control operations in
unfamiliar territories remotely. With local staff and local knowledge, we are uniquely positioned to
support companies that need to control operations remotely or in unfamiliar territories.
By cutting through barriers, we provide companies with the highest levels of commitment and
personalized services.
6 Velosi Asset Integrity Limited Velosi Asset Integrity Limited 7
Abandon Commission
Operate
Our very successful retention of existing clients speaks for itself. It is a testimonial of the reputation Improve
and confidence our clients have in our team and our services. Demand driven by new projects
and concerns over safety and the environment makes the services VELOSI provides a ‘must-have’
investment for all energy companies.
Maintenance Inspect
Corrosion
Global Reach,
Local Service
We operate globally through our associated offices in Middle-East, Africa and Asia. We have
operational offices in Pakistan and Head office in UAE (Abu Dhabi) and associated offices in 29
Where we Fit
countries worldwide. With local staff and local knowledge, we are uniquely positioned to support
companies that need to control operations remotely or in unfamiliar territories.
Oil Refineries GOSP’s Gas & NGL Plants
Our Services
Asset Integrity
Engineering Services
Management Services
Safety Integrity Level (SIL) p11 Fitness For Service (FFS) p18
Risk Assessment & Management p14 VAIL-PHA (Process Hazard Analysis) p23
Asset Integrity
Management Services
Risk Based Inspection (RBI) Structural Integrity Management System
For Oil & Gas, Power and Petrochemical Installations, Risk Based Inspection Structures accommodate all the facilities offshore & onshore and are
(RBI) is a systematic approach to create an accurate, well-targeted inspection considered as one of the vital assets. Therefore, it is important to ensure
strategy based on risk. The inspection plans are developed to mitigate the its integrity.
specific failure mechanisms identified.
Velosi offers services of Structural Integrity Management System to ensure
RBI study is performed in compliance with standards API 580, 581, API 571.
that:
It is applicable to offshore & onshore installations such as fixed or mobile
The safety, environment and commercial risks associated with the operation
units as well as FPSO’s and pipelines.
of structures are identified and assessed.
Appropriate risk reduction measures are identified, established and
Pressure Vessels / Drums Columns Pressure Relief Devices
maintained.
Heat Exchangers Filters In-Plant Piping Risks to personnel, environment and business profitability are reduced to as
(Shell and Tube, Fin Fan) Flare / Stack Pipelines DELIVERABLES low as reasonably practicable.
Storage Tanks Offshore Structure Tag Marked Drawings Ensure that structural designs are fit for the intended purpose and
engineered to approved standards.
Asset Register
Assure the integrity of structures during all phases of their life cycle and
DELIVERABLES Inspection Plans
assign single point accountability for this.
Asset Passport
Corrosion Loop Drawings RBI Methodology adopted for structures risk assessment is based on criteria
RBI Report (SIMS) Study
Inventory Group Drawings provided in international codes ISO 19900, ISO 19902 & ISO 19904, API RP
Corrosion and Inspection Strategy Document. 2 SIM
Risk Based Inspection (RBI) Report Velosi covers the following types of structures, as minimum:
Inspection Isometric Drawings for Equipment and piping Offshore Platforms – Subsea Structures
Offshore Platforms – Topside Structures
Floating Production Storage and Offloading (FPSO)
Pipeline Integrity Management System Onshore Structures
(Onshore & Offshore)
An overview of the features and philosophy of Pipeline Integrity Management
Safety Integrity Level (SIL)
System (PIMS) highlights pipeline regulations and codes which are normally
based on safety as well as risk philosophy. The design requirements are Safety Integrity Level (SIL) is the discrete level for specifying the safety
established so as to fulfill the objectives of the safety standards. The set of integrity requirements of safety functions to be allocated to the “Electrical/
design criteria may thus be seen as the practical interpretation of it. Electronic/Programmable Electronic Systems” safety related systems where
Pipeline Integrity Management System is performed in compliance with SIL 4 has the highest level of safety integrity and SIL 1 has the lowest.
international standards like API 1160, ASME B31.8S. SIL study is performed in compliance with standards IEC-61508, IEC-61511,
ISA TR 84.00.02.
The Pipeline Integrity Management System program
(PIMS) is developed for use by the pipeline engineers
DELIVERABLES
and for serving the following purpose:
Section Layout Drawings
Mechanical Assessment Sheet To monitor the technical and safety condition of the
DELIVERABLES
Inspection Plan pipeline system.
SIL Methodology
RBI Report (PIMS) Study To define inspection frequency and technical content
SIL Classification Report
Integrity Operating Window (IOW) of inspection programs.
SIL Verification Report
Asset Passport To recommend pipeline intervention work or repair
Safety Requirement Specification (SRS)
when needed.
Safety Life Cycle
12 Velosi Asset Integrity Limited Velosi Asset Integrity Limited 13
Asset Integrity
Management Services
Wellhead Integrity Management System Reliability Centered Maintenance (RCM)
Velosi uses FMECA based RBI Methodology for Wellhead Integrity RCM is a formal method to determine the maintenance requirements of an
Assessment. The methodology is developed in accordance with BS EN asset in its operating context. It stresses a proactive approach to maintenance
60812, IEC 60812, OREDA, API 6A, API 14B, API 14C, API RP 57 and ISO- while attempting to match best maintenance practice to mitigate a potential
TS-116530-2 to optimize the preventive maintenance activities. failure relative to the importance of preventing that failure.
RCM study is performed in compliance with standards BS EN 60812, SAE
In the context of well integrity, Velosi recommends use of reliability analysis JA1011, SAE JA 1012, ISO-14224 & OREDA
methods that can be used to identify and assess the impact of failures of
well barrier elements. If performed properly, RCM will:
Such analysis are useful for: DELIVERABLES Reduce overall maintenance cost
DELIVERABLES Improve realized reliability/availability
Comparing different well maintenance alternatives Asset Register
Formulization of Asset Register.
FMECA (Failure Mode Effects Criticality
with respect to blowout probabilities
Identification of applicable damage Analysis) Report
Evaluating the blowout risk for specific well equipment Maintenance Strategies Recommendations,
mechanism / de-gradation mechanism.
Identifying potential barrier problems in specific well task list with Bill of Materials (BOM)
Risk Ranking & Calculation of criticality
types Job Plans
based on calculated POF & COF.
Assessing the effect of various risk reduction methods
Development of Inspection plan
Identifying potential barrier problems during well Reliability Availability Maintainability Services (RAM)
against calculated criticality factors.
interventions/maintenance activities Velosi provides detailed Reliability, Availability & Maintainability (RAM)
analysis, to optimize a system by reducing the downtime, increase efficiency
& optimize maintenance plans. RAM study is performed as per OREDA, ISO-
Velosi uses FMECA approach to answer the following
14224, BS-5760, BS-EN 61703, BS 4778-3.
questions:
The ultimate purpose of RAM study is asset management; that is, running
In what ways can system components fail? the system at maximum efficiency with minimum cost. RAM refers to three
What are the underlying causes of failures? related characteristics of a system and its operational support: Reliability,
How can failures be detected? Availability, and Maintainability.
What are the failure effects, on the failed component
and on the system? The RAM study provides a statistical foundation for each
How critical are the failure effects, in terms of damage DELIVERABLES asset’s contributions to the overall system availability
to humans, the environment, or material assets? and reliability.
Identification potential bottlenecks
What are the common industrial practices to mitigate Estimating the on-stream availability of the
the failures against identified mechanisms? unit
Prediction the impact of equipment
redundancy and sparing
Development and mitigation strategies for
expected failure modes
Perform a preliminary equipment criticality
analysis
RAM study report
14 Velosi Asset Integrity Limited Velosi Asset Integrity Limited 15
and developing cost-effective control strategies. Fire & Gas Mapping Study
HSEIA Report
OHID Workshop Report
Hazop Workshop & Report
OHRA Report
Noise Survey and Assessment H2S Dispersion & Zoning Study
(FEED). In FEED, main focus is on the technical requirement along with estimated
Particular areas of experience include:
budget investment cost of the project. FEED also serves as the basis for the bidding
Review of Existing Plans & Policies of Execution phase contracts i.e EPC & EPIC.
Assessment of Emergency Preparedness Conceptual Design, FEED, Detailed Design and Engineering Consultancy Services are
Composing & Producing Emergency Plans performed in compliance with standards IEC 61537, NFPA 70, ASME Section VIII,
ASME B31.1, ASME B31.3, ASME B31.4, ASME B31.8, IEC 60079, ISA 75.1, NFPA 72,
AISE-360-10, ACI-318, ASCE-07-10, API RP14E, API 520/521, API 650, API 620, API 526,
API 12J, NFPA 13, NFPA 20, TEMA & other industrial code standards.
DELIVERABLES
Emergency Management Procedure DELIVERABLES
Emergency Management Plan
Process - Piping Stress Analysis Report and Instrumentation & Control
- P&ID Supporting Piping Design Calculation - Datasheet for TT, PT, Gas Analyser,
- PFD - 3D model - Chromatograph and ESD
- Instrument Location Drawings
Environmental Services - Cable Block Diagrams
Equipments Civil & Structural - Instrument Index
While every development leaves a footprint on the natural world, better practices - Mechanical Design Report GA & - Pipe Bridge Structural Framing Plans - Instrument Cable List
and more balanced approaches reduces the impressions on the Environment Detail Drawings and Elevations - Instrument Installation Detail
- Pipe Bridge Structural Calculation Drawings
Report - Loop Diagrams
management and monitoring guidelines and ultimately complying with local and Piping - Pipe Sleepers Foundation Layout - DCS/SCADA Modification
- Mechanical & Piping Plot plan and Details
- Piping General Arrangement - Design Calculation for Sleepers Electrical
environment. Drawing - Foundation and Sleepers Layout - Single Line Diagrams (SLDs)
- Piping Line List Details
- Piping Tie In Schedule & Drawing - Schematics
- Foundation Details - Wiring Diagrams
Environmental Impact Assessment to Baseline Monitoring Surveys Waste Consultancy - Piping Isometric - Structural Design Calculation for
- Piping MTO - Earthing Diagrams
and Environmental Audits. Our approach in Environmental services starts from the Pipe Supports, Foundations - Cable Layout
- Pipe Support Details Drawing - Road Crossing/ Duct Bank Design
- Pipe Support Schedule - Cable Schedule
Engineering Services
DELIVERABLES
Design Verification Report
DELIVERABLES
Inspection Report
RLA Calculation
FFS Assessment calculation as per API 579
RLA & FFS Study report including all
inspection & test result
DELIVERABLES
RLMUs
Updated Native Files
Updated Database/Model
20 Velosi Asset Integrity Limited Velosi Asset Integrity Limited 21
Software Solutions
VAIL-Plant (Asset Integrity Management System) PIMS (Pipeline Integrity Management System)
such as SAP and MAXIMO. It is also certified by EXIDA, for compliance with
Probability of Failure (POF) calculation and plotting
IEC 61508, API 580 and ASME B31.8S.
along the pipeline (POF Vs TIME) against applicable
We have a proven track record of working with major Oil & Gas damage mechanism
Operators like LUKOIL, DRAGON OIL, TANAP, ADGAS, Groupment Berkine, Consequences of Failure (COF) calculation against
PETRONAS and many others. applicable damage mechanism
Risk Assessment against Stress Corrosion Cracking
VAIL-Plant software is based on modular approach, (SSC)
covering all types of assets in oil and gas industry. External and Internal Corrosion Direct Assessment
(ECDA & ICDA)
The modules include but not limited to:
Risk Assessment against third party damage
PEMS - Pressurized Equipment Management Corrosion calculation (NORSOK M-506)
System Scheduling of integrity management and inspection
Defect Assessment based on B31.G, B31.G Modify &
PIMS Onshore - Pipeline Integrity Management
Shell 92
System for Onshore Pipelines
exchangers etc. It facilitates Risk Assessment, Inspection and predicts the assets remaining and next inspection date.
April 3, 2022.
Software Solutions
Page
# Location Services
Case Studies Clients #
1 Integrity and Remaining Life Assessment ADNOC Refining Abu Dhabi Integrity and Remaining Life 26
(RLA) of HP Boiler At Ruwais Refinery (EAST) Assessment
2 Consultancy and Professional Services ADNOC Onshore Abu Dhabi Operating Manuals and 27
Agreement for Update Operating Manuals Procedures
& Procedures for ADNOC Onshore Fields,
Terminals & Pipelines - Full Implementa-
tion Across ADNOC Onshore Assets.
3 Updating of Critical Drawings for Zirku ZADCO Abu Dhabi 3D Laser scanning and 28
Island, Abu Dhabi production of “Primitive
3D Model“ (As Built)
Site walkthroughs of P&ID,
SLDS, Layouts
Updation of native files as
per Red line Markup
4 Design Review of NG pipework for Hannover Abu Dhabi Design Review of NG Pipe 29
construction of a building at Sector RBW- Consulting Network
7, Plot C25, Al-Raha Beach, Abu Dhabi Engineers
5 Basic Engineering Study for Fire Risk ADOC Mubarraz Island, FEED for Fire Risk Assess- 30
Assessment Implementation (PHASE-1) AR & GA Fields, ment
UAE
6 BeAAt Expansion Project – Health, Safety ADNOC Ruwais, UAE HSEIA Study 31
and Environmental Impact Assessment
(HSEIA) Study
7 HSE & Fire Quantitative Risk Assessment Qatar Petroleum Dukhan, QP Quantitative Risk Assessment 32
Studies For Dukhan Fields Qatar (QRA)
8 The Study Of Verification Of Safety Levels Sonatrach Arzew and Safety Integrity Level (SIL) 33
Integrities (SIL) All Instrumented Functions Skikda, Algeria
Safety Complex GL1Z, GL2Z, GL1K, GP2Z
And GP1Z
9 Asset Integrity Management System Aims TANAP Turkey AIMS, Risk Based Inspection 34
for Onshore and Offshore TANAP Assets (RBI), Software Implementa-
tion & Management
10 RBI Implementation Project With Groupement Algeria Risk Based Inspection (RBI), 35
Provision of Software and Associated Berkine FMECA Analysis, Software
Services Provision
13 Integrity Management Software Dragon Oil Turkmenistan Software Supply & System 38
Development Implementation
Documentation, training &
support
14 Preventive Maintenance Optimization Dolphin Energy Ras Laffan, Qatar Reliability Centered Mainte- 39
Limited nance (RCM)
26 Velosi Asset Integrity Limited Velosi Asset Integrity Limited 27
Client: Client:
ADNOC Refining ADNOC Refining
Location: Location:
Abu Dhabi Abu Dhabi
Region: Region:
Middle-East Middle-East
Services: Services:
Integrity and Remaining Operating Manuals and
Life Assessment Procedures
Updating of Critical Drawings for Zirku Island, Design Review of Natural Gas pipework for
Abu Dhabi construction of a building at Sector RBW-7,
Plot C25, Al-Raha Beach, Abu Dhabi
•
P&ID, SLDS, Layouts
Updation of native
Region:
files as per Red line Middle-East
Markup
Services:
Objective Design Review of NG
Pipe Network
ZADCO facilities were designed and built in the early 1980’s. During the past, many changes and improvements
have been made to these facilities. As a result of the uncontrolled process on drawing production by
consultants/engineers, most of the drawings are of poor quality with out-of-date and/or duplicated data,
Objective
each carrying different information pertaining to the project, it was originally produced for.
ZADCO hired Velosi to perform 3D Laser scanning and production of Primitive 3D model. This also includes There are eight (08) floors in the mixed use residential building, which is to be constructed at Sector RBW-7,
the preparation of As-built of critical drawings. Plot C29, at Al-Raha beach, Abu Dhabi. Hannover Consulting Engineers is the main consultant hired to perform
third party design reviews design of Natural Gas pipework in the building as per ADNOC specifications. This
includes of drawings, hydraulic calculations for all the retail and residential gas connections as per ADNOC
Scope of Work Deliverables
guidelines.
Laser Scanning. 1. Design Document Report: (including)
Creation of 3D Panoramic (360 degrees) view - Primitive 3D model
of the facilities in color, capturing all As-built - Piping and mechanical drawings
Scope of Work Deliverables
physical data - Electrical, Instrumentation and Telecom drawings
Creation of a Primitive 3D Model (As-Built) from - Electrical TSD Drawings Conceptual design review of the pipework in the 1. Design Document Review Report: (including)
building.
the Laser Scans - SLD’S - Approved Schematic Drawings and Gas
Review of hydraulic calculations.
Layouts
Generation of a complete package of a master - Cable Schedule Review of the schematic drawings and gas
- Compliance certificate as per ADNOC
“As Built” drawings from “Primitive 3D Model” - Telecom Drawings layouts.
Review of the typical details for below ground standards
- Instrumentation Drawings - Pipework Design verification
and above ground pipe network.
- Fire protection equipment/ safety equipment/ Compliance certificate for ADNOC approval. - Reviewed Design Calculations
escape route layouts - Findings and Conclusions
30 Velosi Asset Integrity Limited Velosi Asset Integrity Limited 31
Region:
Middle-East
Services:
FEED for Risk Assess- Objective
ment
BeAAT expansion is the up gradation of existing facility owing to increased future treatment/disposal
requirement of Hazardous Waste generated from ADNOC Operating Companies (OPCO’s)., a HSEIA Study
Objective shall be prepared which will describe how to design for HSE integrity, and shall be prepared in accordance
with ADNOC COPV1-02.
ADOC has carried out HSEIA for its offshore facilities as per ADNOC CoP V1-02. The study has recommended
some control measures to prevent, control and mitigate the major accident events. One of the
recommendations was to review the design and adequacy check of fire protection system of ADOC Scope of Work Deliverables
offshore facilities.
Identify the hazards inherent in the operation of 1. HAZID/ENVID/OHID Workshops & Reports
the facilities/plant/equipment etc. through hazards 2. Bow-Ties Workshop & Report
In order to close out this recommendation ADOC has carried out Fire Risk Assessment (FRA) study. The study identification techniques such as HAZID 3. ALARP Workshop & Report
has reviewed existing Fire protection systems and has produced GAP report with options of implementation (including safety, environment and occupational 4. Simultaneous Operations (SIMOPS) workshop
of GAP. ADOC intends to implement the recommendation of the GAP report in Phases over the next 5 years. health hazards), HAZOP etc. Quality Performance & Report
Standards shall be set up for the above standards. 5. Environmental Impact Assessment
Scope of Work Deliverables 6. Fire Risk Analysis
Build a Hazard & Effects Register with the
To produce technically viable, cost effective 1. Fire & Gas Mapping Study classification of these hazards into High, Medium 7. Quantitative Risk Assessment Report
designs and technical documentation for Fire & Low risk. All “Severe” & “Catastrophic” severity 8. Pollution Prevention and Control Report
2. Sprinkler System
Risk Assessment Implementation (Phase-1) hazards and “Critical High Risk” hazards will form 9. Noise Assessment Study Report
at Mubarraz field, Umm Al Anbar Field (AR), 3. Fire Water Curtain Major Accident Hazards (MAH). 10. Occupational Health Risk Assessment Report
Neewat Al Ghalan Field (GA) and Central 4. Fire & Gas Block Diagrams 11. Air Dispersion Modelling and Assessment
Build Bow-ties for the MAH to identify the HSE Critical
Facilities Platforms (CFP) 5. Data Sheets Report
Equipment Systems and HSE Critical Activities.
To prepare EPC contracting documentation for 12. HSECES identification, Performance standards
6. Fire & Gas Layout
implementing the above designs Perform suitable and sufficient risk assessments & written scheme of examination
To generate cost estimates for the additions 7. Instrument Index and demonstrate ALARP. 13. Control of Major Accident Hazards (COMAH)
and modifications to the existing systems 8. Method Statements 14. Emergency Response Plan
To establish the long lead items and prepare bid Develop HSECES Performance Standards with the
9. Specifications 15. Fire & Gas Mapping Study
documentation for the same related HSE Integrity Activities and Written Scheme
10. Schematics of Examination. 16. Evacuation, Escape and Rescue Analysis (EERA)
To update the project execution strategy and an
17. Emergency System Survivability Analysis (ESSA)
optimum execution schedule 11. Material Take Off (MTOs)
18. HSEIA Report
12. EPC Costing Sheets
32 Velosi Asset Integrity Limited Velosi Asset Integrity Limited 33
HSE & Fire Quantitative Risk Assess- The Study Of Verification Of Safety Levels Integrities
ment Studies For Dukhan Fields (SIL) All Instrumented Functions Safety Complex GL1Z,
GL2Z, GL1K, GP2Z And GP1Z
Client: Client:
Qatar Petroleum Sonatrach
Location: Location:
Dukhan, QP Qatar Arzew and Skikda,
Algeria
Region: Region:
Middle-East Africa
Services: Services:
Quantitative Risk Safety Integrity Level
Assessment (QRA) (SIL) studies
Objective Objective
The objective of the CONTRACT is to provide a technical survey and HSEF QRA study for the Facilities. The technical Sonatrach decided to carry out SIL Study of all safety instrumented functions for Complexes GL1Z, GL2Z,
survey shall enable QP to be aware of the current risk status (non conformities) in the Facilities by department and asset. GL1K, GP2Z and GP1Z“ and the training of the Client’s staff in IEC61508 and IEC 61511, for intended safety
The findings of the technical survey shall be carried forward into the HSEF QRA study which outcome shall be risk-based
and fit for purpose for the next 20 years.
recommendations for risk reduction (closing of gaps to ALARP) where necessary with clear, feasible and prioritized
recommendations consisting in potential corrective measures/actions and improvements for risk reduction to ensure
safe operations.
Asset Integrity Management System Aims RBI Implementation Project With Provision of
for Onshore and Offshore TANAP Assets Software and Associated Services
Client: Client:
TANAP Groupement Berkine
Location: Location:
Turkey Algeria
Region: Region:
Europe Africa
Services: Services:
AIMS, Risk Based In- Risk Based Inspection
spection (RBI), Software (RBI), FMECA Analysis,
Implementation & Man- Software Provision
agement
Client: Client:
SNGPL Petronas
Location: Location:
Pakistan Malaysia
Region: Region:
Asia Southeast Asia
Services:
Pipeline Integrity Man-
agement Program (PIMP), Services:
Risk Based Inspection Risk Based Inspection
(RBI), Software Imple- (RBI), Software Implemen-
mentation tation
Scope of Work 2. VAIL Plant Software Modules: Scope of Work 2. VAIL Plant Software Modules:
PIMP: • PEMS – Pressurized Equipment Management A Risk Based Inspection Program Development for • SIMS – Structure Integrity Management System
Development of Pipeline Integrity Management System Petronas FLNG 1 (L) LTD Topside structure and Hull • HIMS – Hull Integrity Management System
Manual in line with ASME B31.8S. Implementation • PIMSON – Pipeline Integrity Management Structure including for:- • ISMS – Inspection Scheduling Management
of PIM Program (PIMP) includes all the required System - Onshore System
field surveys & activities for 2 Buried Pipelines, Sales • ISMS – Inspection Schedule Management • Topside Structure Including Turret • Integration of VAIL-Plant Software with SAP
Metering Station & 1 Over Head River Crossing Line. System • Hull Structure Including Cargo Tanks
• EIRMS – Electrical Instrumentation Rotary • Mooring System
Management System • Flexible Riser
Training:
• CPMS – Cathodic Protection Management • RBI Software
Comprehensive Training and hands on
System
familiarization of SNGPL Engineers and IT Officer
during development, implementation of PIM VAIL Plant Software:
Manual and designated software. RBI Software Package for risk assessment and
recording of RBI data including inspection plan
VAIL Plant Software: with database which shall be valid throughout the
Development of customized software in accordance FLNG1 design life.
with ASME B31.8S for various modules.
38 Velosi Asset Integrity Limited Velosi Asset Integrity Limited 39
Client: Client:
Dragon Oil Dolphin Energy Ltd.
Location: Location:
Turkmenistan Ras Laffan, Qatar
Region: Region:
Central Asia Middle-East
Services:
Software Supply &
System Implementation Services:
Documentation, Reliability Centered
training & support Maintenance (RCM)
In order to manage the integrity of assets, Dragon Oil VAIL-Plant Software, which is an Asset Integrity Dolphin Energy Limited (DEL) Qatar, hired Velosi to 1. Detailed Method Statement for full fledged
required a robust ASSET INTEGRITY MANAGEMENT & Inspection Management Application carry-out Reliability Centered Maintenance (RCM)/ RCM Study.
SOFTWARE tool to support all of its assets Onshore & developed on modular approach to meet all the Failure Mode generic maintenance strategy per 2. Detailed Method Statement for Failure Mode
Offshore Pipeline, Pressurized Equipment, Structures, objectives of Dragon Oil Turkmenistan Limited. The object type for assets at Company’s Ras Laffan Task List/ Generic Task List based on Object
PSVs, Electrical & Rotatory equipment. Industrial City (RLIC) Onshore Facility in order to Type.
following modules of VAIL-Plant were successfully
The software was intended to store all relevant data in
implemented for Dragon Oil Turkmenistan Limited have an effective optimized maintenance strategy. 3. SAP Templates
accordance with industry or other relevant standards,
allow for future upgrades and future developments of along with training, User Acceptance Testing and 4. RCM Report with results and attachments;
pilot study:
modules to enable a variety of analyses that are expected Scope of Work • Complete Asset Register
to be used for decision-making. • Dominant Failure Modes per Object type.
• PEMS (Pressured Equipment Management To perform Reliability Centered Maintenance (RCM)
System) • Failure Mode scenarios: The combination of
Study which includes: a dominant failure, failure effect and failure
• PIMS-ON (Pipeline Integrity Management
Scope of Work System Onshore)
• Failure Mode and Effect Analysis (FMEA) mode characteristics is the failure mode
• Software System Supply • Identify Failure Mode Characteristics scenario.
• PIMS-OFF (Pipeline Integrity Management • Identify Equipment Criticality/ Failure Mode
• System Implementation System Off-shore) • Failure Mode Criticality and Equipment
• Documentation Criticality Criticality.
• SIMS (Structure Integrity Management System)
• Training • CMMS Interface (ORACLE interface module) • PM task list per equipment per failure mode
• Maintenance & Support Define Maintenance Strategy and Tasks Lists after rationalization along with task duration
• APMS (Asset Performance Management Optimize Maintenance Strategy and Tasks List
• Pilot study for Topside Equipment (94),Process System) and resource requirement.
Piping (160), Structures Platforms (3) and which includes: • Preventive Maintenance manpower
• ISMS (Inspection Schedule Management • For each failure mode, define maintenance
Pipelines (5) System) requirement and changes from existing PM
strategy and tasks that will reduce the failure manpower requirement.
• PSVMS (Pressure Safety Valves Management mode criticality to as low as reasonably
The software should be able to integrate into the System • Critical Spares Review for Full Fledged RCM
Oracle E-business Suite applications database and possible. Assets aligning with task list and failure mode.
• EIRMS (Electrical, Instrumentation & rotary • Determine task frequency based on Failure
handle inspection records for the following asset Management System)
types: Mode information (experience, history, etc)
• Pressurized equipment & Piping • Perform Failure Mode tasks effectiveness
• Pressure Safety Valves (future) assessment for cost benefit evaluation.
• Onshore Pipelines
• Jacket Structures
• Offshore Pipelines
40 Velosi Asset Integrity Limited Velosi Asset Integrity Limited 41
Associate Offices
Associate Offices Worldwide
Middle East Office (Head Office) UK Office (Registered Office)
Worldwide UAE (Abu Dhabi): United Kingdom :
Suite No. 1104, Al Ghaith Tower, IFC1, Esplanade, St. Helier, Jersey, JE2 3BX
Hamdan Bin Mohammed Street Channel Islands, United Kingdom
P.O.Box No. 114192, Email : info@velosiaims.com
Abu Dhabi United Arab Emirates
Tel.: +971 2 634 9815
Fax.: +971 2 634 9816
Email: info@velosiaims.com
Company
Clients
© VELOSI ASSET INTEGRITY LIMITED
Suite No. 1104, Al Ghaith Tower,
Hamdan Bin Mohammed Street,
P.O.Box NO. 114192,
Abu Dhabi, United Arab Emirates
E: info@velosiaims.com
www.velosiaims.com