You are on page 1of 212

THE YEAR IN INFRASTRUCTURE 2012

2012
the year in Infrastructure
the extraordinary Infrastructure projects of the 2012 Be Inspired Awards

9006_YII_Content_1012.indd 1 11/21/2012 12:17:04 PM


Bentley’s mission is to provide innovative software and services for
the enterprises and professionals who design, build, and operate the
world’s infrastructure – sustaining the global economy and
environment for improved quality of life.

The Year in Infrastructure 2012 is a Bentley Systems, Incorporated publication that showcases
the extraordinary work of Bentley users sustaining the world’s infrastructure. For additional print
copies, go to www.bentley.com/2012yearbook.
For information about how to enter your innovative project for consideration in the next
Be Inspired Awards competition or for additional information about this program,
visit www.bentley.com/beinspired.

onlIne VerSIonS
digital versions of Be Inspired Awards publications are available online at
www.bentley.com/yearininfrastructure. choose to view a specific issue or search within each
issue or across all issues using terms, titles, or keywords.
also browse Bentley’s Be Inspired project portfolios at www.bentley.com/projects, which
feature the winners and finalists in Bentley’s annual Be Inspired Awards competition. through
these multimedia portfolios of exemplary project achievements, Bentley shares innovative best
practices with the architects, engineers, constructors, geospatial professionals, and owner-
operators who sustain the world’s infrastructure.

ISBn number: 978-1-934493-19-9.


published by Bentley Systems, Incorporated
685 Stockton drive
exton, pa 19341 USa

www.bentley.com

9006_YII_Content_1012.indd 2 11/21/2012 12:17:06 PM


Working Smarter, Together:
Accelerating Information Mobility
Bentley’s mission of sustaining infrastructure is about supporting our users – infrastructure enterprises and owner‑operator
professionals – in projects that increase our collective global economic capacity while also reducing our environmental footprint.
This support includes innovative software and services providing information modeling and engineering information management
that ensures the AECO information they rely upon and share is both mobile and secure — across the entire infrastructure lifecycle.
In the pages of The Year In Infrastructure 2012 are our users’ pioneering projects that improve our world in countless ways, by
creating buildings that are energy efficient, resilient to natural and man-made disasters, and provide owners with strong ROI;
roads and bridges that are safe, uncongested, and economical to operate and maintain; water and wastewater systems that are
highly dependable and able to serve a growing population; processing plants that are environmentally friendly, cost-effective to
operate, and safe; and much more. recognizing the critical importance of being a good corporate citizen, Bentley is
uncompromisingly committed to supporting ecological sustainability. this support
These projects span a wide range of size and scale, from the Crossrailgoesmega transportation
beyond project
the stewardship and Gelantan
of environmental Hydropower
resources to include investment
Station to work focused on emerging technologies, such as the Ecofys in Wind Turbine
strategic Test Site
educational and Modular
and training GTL
initiatives Commercial
that foster a workforce of skilled
Demonstration Plant. But they all exemplify the unprecedented demand infrastructure professionals
for information capable
mobility of meeting
that can the world’s
help teams growing sustainability
leverage
challenges.
information modeling through integrated projects to create better-performing, intelligent infrastructure.
The Year in Infrastructure 2012 is one small example of Bentley’s commitment
Four years ago we introduced our Be Inspired Special Recognition Awards into our
to promoting Be Inspired
sustainable Awardsthrough
development program to acknowledge
its business practices. as part of
outstanding projects that are uniquely innovative and visionary, transcending individual categories. This year, in recognition
this effort, this publication has been printed on Forest Stewardship of council (FSc)
new technologies and practices driving higher quality and increased certifi
ROI inedthe infrastructure
paper, which identifiand owner‑operator
es products that containcommunities,
wood fiber from well-
we expanded the Special Recognition Awards categories to also include managed forests. Information Mobility, Innovation in Asset
Advancing
Performance Management, and Bentley Developer Network.
More than ever, architects, engineers, constructors, and owner-operators are working smarter, together, as advances in information
mobility empower information reuse and streamlined collaboration that benefit all project stakeholders and facilitate the creation of
sustainable, inspiring infrastructure!
Bentley Systems, Incorporated

© 2012 Bentley Systems, Incorporated. The Year in Infrastructure 2012 is published by Bentley Systems, Incorporated, 685 Stockton drive, exton, pa USa 19341. Bentley, the “B” logo, Bentley, Be, Bentley learn, Bentley map,
Bentley plantSpace, Bentley plantWise, Bentley Select, autopIpe, autoplant, cloudWorx, conSpan, culvertmaster, eB, Flowmaster, Generativecomponents, GeopaK, Geo Web publisher, gInt, Hammer, Hevacomp, Inroads,
InspectTech, LEAP, MicroStation, MicroStation PowerDraft,, MicroStation PowerDraft, MX, MXRAIL, MXROAD, Optram, PlantWave, PlantWise, Pointools, PondPack, PowerCivil, ProConcrete, ProjectWise, promis•e, ProSteel, RAM,
SacS, Select, Sewercad, SewerGemS, speedikon,Staad, Staad.pro, Stormcad, Watercad, and WaterGemS are either registered or unregistered trademarks or service marks of Bentley Systems, Incorporated, or one of its direct
or indirect wholly owned subsidiaries. Google earth is a trademark of Google Inc. adobe is a registered trademark of adobe Systems Incorporated in the United States and/or other countries. oracle is a registered trademark of oracle
and/or its affiliates. microsoft is a registered trademark of microsoft corporation in the United States and/or other countries. other brands and product names are trademarks of their respective owners. 1

9006_YII_Content_1012.indd 1 11/21/2012 12:17:07 PM


Table of Contents

About the 2012 Be Inspired Awards 3

About the 2012 Be Inspired Awards Jurors 4–8

Special Recognition Award Winners 9 – 17


Sustaining Our Society 10
Sustaining Our Environment 11
Sustaining the Professions 12
Attaining Return on Innovation 13
Advancing Information Mobility 14
Innovation in Asset Performance Management 15
Bentley Developer Network 16
Educator of the Year 17

2012 Be Inspired Awards 19 – 190


Connecting Project Teams 19 – 27
Innovation in Asset Lifecycle Information Management 29 – 32
Innovation in Bridges 33 – 41
Innovation in Building 43 – 58
Innovation in Communications Networks 59 – 62
Innovation in Construction 63 – 72
Innovation in Generative Design 73 – 77
Innovation in Geotechnical and Geoenvironmental Engineering 79 – 81
Innovation in Government 83 – 88
Innovation in Land Development, Engineering, and Management 89 – 93
Innovation in Mining and Metals 95 – 102
Innovation in Offshore Engineering 103 – 110
Innovation in Power Generation 111 – 119
Innovation in Process Manufacturing 121 – 128
Innovation in Rail and Transit 129 – 134
Innovation in Roads 135 – 148
Innovation in Structural Engineering 149 – 166
Innovation in Utility Transmission and Distribution Networks 167 – 172
Innovation in Water and Wastewater Treatment Plants 173 – 176
Innovation in Water, Wastewater, and Stormwater Networks 177 – 190

Index
2012 BE Inspired Awards

Alphabetical by Organization 191 – 196


Project Location by Country 197 – 203
Alphabetical by Category 204 – 208

9006_YII_Content_1012.indd 2 11/21/2012 12:17:08 PM


About the 2012 Be Inspired Awards
The annual Be Inspired Awards program brings together infrastructure professionals and members of academia from around the globe. Its goal
is twofold: to advance innovation and best practices in design, engineering, construction, operations, and project delivery, and to promote the
extraordinary work of the organizations that help sustain the world’s infrastructure.

The Be Inspired Awards has recognized more than 2,000 of the world’s most outstanding infrastructure projects since its inception in 2004.
The projects nominated for the Be Inspired Awards are submitted by Bentley’s global community of users. This year, five independent panels of
jurors, comprising accomplished Bentley users and distinguished industry experts, selected the 58 finalists and the Special Recognition Awards
candidates from nominations submitted by organizations in 39 countries.

At the 2012 Be Inspired: Innovations in Infrastructure event in Amsterdam, representatives of the Be Inspired Awards finalists presented their
projects before the jurors – for their consideration in the final tally – as well as the members of the media and other industry executives in
attendance. The winners were announced during the highly anticipated Be Inspired Awards ceremony, which was the culmination of the event.

Winners of the Be Inspired Special Recognition Awards also presented their projects and were recognized during the ceremony. The candidates for
these awards were placed into nomination by the jurors for their uniquely innovative and visionary achievements embracing multiple Be Inspired
Awards categories. The nominees were then reviewed by a panel of Bentley executives.

All of this year’s nominated projects are presented in The Year in Infrastructure 2012. By showcasing the outstanding achievements in
sustaining infrastructure across the globe, Bentley shares the innovation in best practices among the organizations and professionals who
make these projects possible. Searchable digital versions of Be Inspired Awards publications are available online at www.bentley.com/
yearininfrastructure, and Bentley’s Be Inspired Project Portfolios are available at www.bentley.com/projects. In addition, the recorded
presentations of the winning and finalist projects can be viewed on Bentley’s Be Connected online video library. Using streaming media,
Be Connected is a sustainable way to learn from the innovative best practices and application of technologies from today’s infrastructure
thought leaders. To view these presentations, go to www.bentley.com/beconnected.
Bentley Systems, Incorporated

9006_YII_Content_1012.indd 3 11/21/2012 12:17:08 PM


About the 2012 Be Inspired Awards Jurors
This year’s jury ranges from industry and discipline experts, editors, and publishers to previous award winners and other Bentley
software users. Representing independent experts from around the world in various fields of infrastructure, this well-rounded group
has volunteered wisdom, critical assessment, and enthusiasm for the difficult task of choosing the best among the best.

Michael E. Beehler, P.E.


Vice President, Burns & McDonnell
Mike Beehler joined Burns & McDonnell as a senior transmission engineer and project manager in 1995
after 14 years with investor-owned electric utilities in Tucson, Arizona, and Honolulu, Hawaii. Beehler has
written and presented extensively about the Smart Grid and has initiated the sustainable electric energy
design (SEED) process for substation design. He received his bachelor’s degree in civil engineering from
the University of Arizona in 1981 and an M.B.A. from the University of Phoenix in 1984. He is a registered
professional engineer in eight states, a member of IEEE, and a fellow in the American Society of Civil
Engineers.

Daniel J. Belcher, P.E., P.S.


Design Services Manager, Michigan Department of Transportation
Dan Belcher is design services manager for the Michigan Department of Transportation and a licensed
civil engineer and land surveyor in the state of Michigan. His 23 years in consulting and state service spans
construction inspection, surveying, photogrammetry, and environmental and civil engineering with an
emphasis in information technology.

Aileen Cho
Senior Editor, Transportation, Engineering News-Record
Aileen Cho is the senior editor for all things transportation at Engineering News-Record. She has been on
several award-winning editorial teams covering such crises as the I-35W bridge collapse, Hurricane Katrina,
and 9/11. She won a Neal Award – the business publication equivalent of the Pulitzer Prize – for Best Feature
and Best Technical Article in 2011 and 2012 respectively. Cho also received a journalism prize in 2006 from
the American Association of Engineering Societies and an Honorable Mention from the Construction Writers
Association for her article on airports in 2004. She has written for the Los Angeles Times, New York Times,
Monster.com, and Shipping & Trade News.

Daniel A. Cuoco, P.E., F.ASCE


Editor-in-Chief, ZweigWhite, LLC
Daniel Cuoco is editor-in-chief of Structural Engineer magazine, a ZweigWhite monthly publication. He
recently retired as president and CEO of Thornton Tomasetti, a 600-person international engineering and
design firm, and currently serves as a consultant to the firm. Cuoco is a licensed professional engineer in
several states, a fellow of the American Society of Civil Engineers, and serves on the Board of Directors of
the American Concrete Institute’s Strategic Development Council. His experience ranges from the design of
2012 BE Inspired Awards

major projects to the investigation of structural failures, and he has lectured widely in the United States and
abroad. Cuoco has bachelor’s and master’s degrees in civil engineering from City College of New York and
New York University, respectively, and an M.B.A. from Adelphi University.

9006_YII_Content_1012.indd 4 11/21/2012 12:17:10 PM


Edwin Ecob
Senior Principal Consultant, Cambashi
Edwin Ecob is a senior principal consultant with 30 years of experience in the IT, manufacturing,
civil engineering, and utility industries. Since joining Cambashi in 1998, he has focused on the use of
enterprise and technical applications in the manufacturing and production industries, and has managed
and delivered a series of training programs for vendors of IT solutions. Prior to joining Cambashi, Ecob
was head of a pan-European sales and marketing program for Unisys, with a focus on solutions for
the telecom and utility industries. His early career was spent working for leading international civil
engineering contractors on transportation projects in South America and Southeast Asia. Ecob holds an
honors degree in mathematics from the University of Nottingham.

Shunji Kusayanagi, Professor, Dr. Eng.


Professor, Kochi University of Technology, Japan
Dr. Shunji Kusayanagi is a professor who specializes in international construction project management
at Kochi University of Technology, Japan. He provides technical and educational lectures on
international construction management, estimating, cost control, scheduling, productivity analysis,
quality control, and quantitative analysis in contract administration for groups of engineers working
in the construction field. Dr. Kusayanagi is a civil engineer with over 36 years of experience as
construction and consulting engineer on domestic and international projects.

Felix Mara, RIBA


Technical Editor, The Architects’ Journal
Felix Mara has been employed as an architect for over 20 years, most recently at Nick Evans Architects,
West and Partners, Volume 3 Architects, and SLLB Architects. He has lectured at the University of
Humberside, School of Architecture, and has had various articles on architecture published in The
Times Literary Supplement, AA Files, and Hinge. He has also been a technical editor of The Architects’
Journal and editor of AJ Specification since 2009 and has authored articles in these magazines. Mara
received a bachelor of arts in Architectural Studies from Oxford Brookes University, bachelor’s of
architecture from the University of Manchester, master’s of science in architecture from The Bartlett,
University College, and a bachelor of arts from Birkbeck College, University of London. He is an ARB-
registered architect since 1987 and RIBA-chartered architect since 1988.

Stuart Matthews
Writer/Editor, Construction Week
Stuart Matthews is a writer and editor who has spent much of his career covering design, construction,
and industry. Currently based in the Middle East, he works as a managing editor for ITP Publishing,
looking after a suite of print, online, and award products aimed at the GCC construction and design
industry. The GCC is a union of the Arab states bordering the Persian Gulf on or near the Arabian
Bentley Systems, Incorporated

Peninsula: Bahrain, Kuwait, Oman, Qatar, Saudi Arabia, and United Arab Emirates. He has a financially
debilitating interest in old Italian cars and vintage watches.

9006_YII_Content_1012.indd 5 11/21/2012 12:17:11 PM


About the 2012 Be Inspired Awards Jurors (continued)

Antony Oliver
Editor, New Civil Engineer
Antony Oliver has edited New Civil Engineer (NCE), one of the best-read weekly magazines in construction,
for 12 years. A chartered member of the Institution of Civil Engineers, he spent six years working as a civil
engineer with Owen Williams and Balfour Beatty before crossing over to journalism. He started on NCE as
a junior reporter and has worked on all sections of the magazine covering some of the biggest and most
interesting stories in construction over the last 15 years. Oliver is dedicated to ensuring that NCE reflects the
industry and is passionate about ensuring the next generation views the profession as a sound career option.
He was named Business Magazine Editor of the Year 2008 by the Periodical Publishers Association and was
shortlisted for the British Society of Magazine Editors Awards in 2008, 2009, and 2010.

Jim Porter
Founder and President, Sustainable Operations Solutions, LLC
Jim Porter is the founder and president of Sustainable Operations Solutions, which provides consulting
services to help companies make significant and sustainable improvements in workplace safety, process safety
management, capital effectiveness, and operations productivity. He recently retired from DuPont, where he
had served as chief engineer and vice president of engineering and operations since 2006. Porter is a member
of the board of governors for the Argonne National Laboratory, the board of directors of the Chemical Heritage
Foundation, and the National Research Council’s Board on Infrastructure and the Constructed Environment. He
also has served as chair for the Construction Industry Institute and Delaware’s United Negro College Fund, and
has served on the boards of Fiatech, the Mascaro Sustainability Initiative, and the Fieldbus Foundation. Porter is
a fellow of the American Institute of Chemical Engineers and a member of the University of Tennessee’s College
of Engineering board of advisors and National Academy of Construction.

Earl C. Schneider, P.E.


Vice President, Hatch Mott MacDonald
Earl Schneider has 22 years of experience in the planning, design, permitting, and construction of potable
water supply projects, including surface and groundwater supply, treatment, transmission, pumping, and
storage facilities. He has focused his career on strategic and master planning, asset management practices,
hydraulic modeling, and information management system development for water and wastewater utility
clients throughout North America.

Monica Schnitger
Founder and President, Schnitger Corporation
Monica Schnitger is the founder and president of Schnitger Corporation. She has been quoted in publications
such as Automotive Design and Production, Business Week Online, Forbes, Information Week, Mechanical
Engineering, Wards Auto World, and Washington Technology, and was a guest on American Public Media’s
Marketplace. Schnitger has over 25 years’ experience in engineering and CAD/CAM, and has held positions
as a senior VP of market analysis at Daratech, in software development management at Computervision
2012 BE Inspired Awards

Corporation, and as an engineer at Bath Iron Works. She holds a bachelor’s degree in naval architecture and
marine engineering from the Massachusetts Institute of Technology and an honors M.B.A. from the F.W. Olin
School of Management at Babson College.

9006_YII_Content_1012.indd 6 11/21/2012 12:17:12 PM


Dick Slansky
Director, ARC Advisory Group
Dick Slansky’s responsibilities at ARC include directing research and consultation in areas such as
product lifecycle management, asset lifecycle management, engineering design tools for both discrete
and process industries, factory floor architecture, and manufacturing enterprise architecture. He
also provides technical consulting services for discrete manufacturing end users in the aerospace,
automotive, and other industrial verticals. Additionally, he focuses on engineering design tools for
process, energy, and infrastructure. Slansky holds a bachelor of science in mechanical engineering
from the University of Kansas and a bachelor’s of science in computer science from Seattle Pacific
University. He also holds a certificate in client/server project management from the University of
Washington (Seattle).

Rita Stange
Managing Editor, ConnectPress
Rita Stange is the managing editor of ConnectPress, an online publisher of design and technology
websites including MicroStation Connections, where she has worked since 2006. During this time she
has covered all sectors of infrastructure, with a heavy focus on the building industry and sustainable
design. She lives in Albuquerque, New Mexico, and has an interest in green practices, which is shown
through her volunteer work with the 2012 GreenBuilt Tour and the United States Green Building Council,
New Mexico Chapter. As a lover of the arts, she covers the AEC industry with a true appreciation for
seeing design as a captivating art form.

Jantien Stoter, Ph.D.


Associate Professor, Delft University of Technology
Dr. Jantien Stoter is associate professor at the GIS Technology section, Delft University of Technology,
and leads the research group on Spatial Information Infrastructure. She is also employed at the
Kadaster. For her Ph.D. work on 3D cadastre (TU Delft, 2004) she received the Prof. J.M. Tienstra
Research Prize. In 2010 she received a prestigious Vidi award for research from the Netherlands
Organisation for Scientific Research. Dr. Stoter is the chair of the EuroSDR Commission on Data
Specifications and also leads the national 3D project in the Netherlands, in which over 100 private,
governmental, and academic organizations work together to push 3D developments in that country.
In 2011, the Open Geospatial Consortium (OGC) awarded this project with the OGC 3D award for the
achieved national 3D standard.

Marc Thomas
Consultant, Isisst Project Technology
Bentley Systems, Incorporated

Marc Thomas is the owner of the United Kingdom-based CAD and BIM consultancy Isisst Project
Technology. A chartered architect with over 28 years of experience in the building industry, he has been
working as a specialist consultant since 2008. Thomas has been involved with CAD and IT since the
early 1990s and regularly writes on these topics for AEC Magazine and Building Design. Previously he
spent 17 years at Architects Design Partnership, where he transitioned from his architectural role to
develop the firm’s CAD capabilities from modest beginnings into an integrated nationwide ICT system.

9006_YII_Content_1012.indd 7 11/21/2012 12:17:14 PM


About the 2012 Be Inspired Awards Jurors (continued)

Bernhard D. Valnion, Ph.D.


Editor-in-Chief, Economic Engineering
For more than 14 years, Dr. Bernhard Valnion has been editor-in-chief with special interest magazines
reporting on enterprise and engineering IT. Dr. Valnion is the founder of digitalPLANT business+engineering,
a special insert of Economic Engineering magazine, reporting exclusively on IT strategies for the plant
industries. In 1998, Dr. Valnion finished his Ph.D. in experimental nuclear physics at the University of Munich,
Germany.

Joseph Young
Editorial Director and Publisher, O Empreiteiro and Minérios & Minerales
Born in China, Joseph Young is the editorial director and publisher of O Empreiteiro, a trade magazine
dedicated to infrastructure and construction in Brazil for 50 years, and Minérios & Minerales, a trade
magazine dedicated to the mining industry in Brazil for 35 years. O Empreiteiro publishes yearly research
on the 500 largest construction and engineering companies in Brazil, and Minérios & Minerales conducts
an annual review of the 200 largest mines in Brazil. Young has extensive knowledge of the infrastructure,
construction, mining, and metals industries in Brazil, Europe, and the United States; equipment industries and
technology; infrastructure design; and construction processes.

Sharifah Zaida-Nurlisha
General Manager of Project Management Services, MMC Oil and Gas Engineering Sdn Bhd
Sharifah Zaida-Nurlisha began her career as an instrument engineer before moving on to project management
at MMC Oil and Gas Engineering. She has been involved in the oil and gas industry for 22 years in design
positions ranging from conceptual, detailed, and construction to hookup and commissioning of onshore and
offshore oil and gas facilities. Zaida-Nurlisha received her bachelor’s of electrical and electronics and an
M.B.A. from Nottingham University, England.
2012 BE Inspired Awards

9006_YII_Content_1012.indd 8 11/21/2012 12:17:15 PM


Special Recognition Award Winners
Winners of the Special Recognition Awards exemplify outstanding projects nominated by the jurors themselves as
representing both excellence and innovation in a way that is emblematic of Bentley’s mission of Sustaining Infrastructure.
They were placed into nomination for their uniquely innovative and visionary infrastructure project achievements.

Sustaining Our Society


The award in this category is given to a project that best demonstrates the power of infrastructure to benefit society
by accomplishing one or all of the following: improving quality of life, promoting economic development, and providing
responsiveness and resilience to natural disasters or climate change.

Sustaining Our Environment


The award in this category is given to a project that excels in meeting the challenge of preserving the environment as it
addresses the needs of mankind through infrastructure. Technology is a key element in how infrastructure can help reduce
our ecological footprint, increase bio-capacity, and embody a wise use of non-renewable resources.

Sustaining the Professions


This award recognizes organizations that demonstrate a commitment to sustain the infrastructure professions through
continuous learning, professional development, and mentoring the next generation of infrastructure professionals, while
providing an exceptional environment for learning.

Attaining Return on Innovation


The award is given to an organization that best exemplifies innovation by utilizing technology and creative workflows to
create value and deliver better-performing infrastructure with demonstrated, quantifiable results.

Advancing Information Mobility


The ultimate goal of interoperability is to enable information mobility. The award for this category is given to a project that
best illustrates the innovative reuse of engineering information throughout the design and construction of a project, and
provides the ability to deliver a “digital asset” for use in ongoing operations.

Innovation in Asset Performance Management


The award recognizes a project that optimizes infrastructure asset performance to make operations and maintenance
more efficient, to improve safety, and to increase throughput of the asset over its lifecycle.

Bentley Developer Network


The award for this category is given to an organization that leverages the power of Bentley’s platform technology to
develop unique and innovative custom applications.
Bentley Systems, Incorporated

Educator of the Year


An educator of the year demonstrates achievements that stand out above those of his or her peers. In addition, he or
she brings a passion for inspiring students to not only participate in science and engineering fields, but also sets the
expectations for them to excel in their chosen profession, all while interlacing cutting-edge technologies and theories that
ultimately enhance and sustain infrastructure.

9006_YII_Content_1012.indd 9 11/21/2012 12:17:15 PM


Sustaining Our Society
CompanyBrinckerhoff
Parsons Name and Arup JV
Project Link,
Airport NameNorthern Busway (Windsor to Kedron) and Airport Roundabout Upgrade WINNER
Location Australia
Brisbane,

FINALIST

Company Name
Project Name
Location

A vital addition to Brisbane’s road network, this Parsons Brinckerhoff and Arup teamed in 2006 Leading-edge on many levels, the Airport Link
project provides a critical new link between the to form Parsons Brinckerhoff and Arup JV, which project has delivered an economic and social legacy
city’s northern suburbs and two of southeast delivered the detailed design and carried out for the broader Brisbane community. It has literally
Queensland’s most important economic centers. construction phase services for this AUD 5.6 billion redefined the urban fabric of the city through an
It encompasses two tunnels and a new airport project. Bentley software was used for the design innovative and inspired design. The Airport Link
connection: 6.7 kilometers of the mainly (MicroStation, MXROAD, InRoads, Structural project took an approach that strongly recognized
underground Airport Link toll road, the Windsor Modeler, and gINT) and project collaboration that communities and clients increasingly expect
to Kedron section of the Northern Busway, and document control (ProjectWise), all of which proved urban-design excellence to be a key feature of
an upgraded interchange improving access to the critical to the integration of the geographically major infrastructure projects.
Brisbane Airport precinct. dispersed project team.
2012 BE Inspired Awards

ALSO A FINALIST IN CONNECTING PROJECT TEAMS AND INNOVATION IN ROADS


VIEW PRESENTATION
10

9006_YII_Content_1012.indd 10 11/21/2012 12:17:18 PM


Sustaining Our Environment
Company
CH2MName
HILL
WINNER Project Name
Metro Wastewater Reclamation District, Northern Treatment Plant
Location
Denver, Colorado, United States

VIEW PRESENTATION

Company Name
Project Name
Location

The Northern Treatment Plant in Denver, Colo., To ensure consistent data definition across The primary focus of this USD 475 million project is
will bring new wastewater treatment capacity the over 20 facilities on site, CH2M HILL to return treated water back into the environment.
to the Metro Wastewater Reclamation District utilized intelligent modeling tools – including Sustainability is at the heart of the process as
as it continues to meet the rising demands of its MicroStation, ProjectWise, Bentley Navigator, treated output is re-integrated to preserve and
customers now and into the future. Designed with Bentley PlantSpace, OpenPlant, InRoads, and enhance what remains of the planet’s water
keen awareness of the environmental impact, the Bentley Raceway and Cable Management – that resources. The energy required for the treatment
new plant will set the standard for both local and were configured to meet the building information process is also carefully planned and optimized to
regional treatment by taking advantage of the modeling goals as agreed to by the client. reduce the carbon footprint of the overall project
latest proven technologies across every aspect of throughout its lifecycle.
Bentley Systems, Incorporated

its design.

ALSO A FINALIST IN WATER AND WASTEWATER TREATMENT PLANTS


VIEW PRESENTATION
11

9006_YII_Content_1012.indd 11 11/21/2012 12:17:22 PM


Sustaining the Professions
Company Name
HydroChina Zhongnan Corporation
Project Name
Utilization of the Bentley LEARN Training Subscription WINNER
Location China
Changsha,

FINALIST

Company Name
Project Name
Location

Established in 1949, HydroChina Zhongnan employs Corporate goals include training existing staff; As a result of the training initiative, commitment by
more than 3,700 people across three continents. attracting and retaining new talent; teaching staff senior management to invest in learning has resulted
Serving clients around the world, the company has how to better compete in the global market; and in a total of 593 colleagues being trained in basic 3D
won numerous industry awards and is recognized fostering a proactive culture in which colleagues design using MicroStation in a two-month period
as one of the top five design institutes in China for take the initiative to further educate themselves. in 2011. In 2012, more than 900 colleagues will
hydropower and wind power design. The company’s Senior management has made it compulsory for receive Bentley application-related training through
core values of teamwork, integrity, innovation, and each unit to have at least 40 percent of its staff the Bentley LEARN training subscription. Applying
efficiency have enabled the organization to deliver attend 40 hours of job-related technical training incremental learning has improved the quality of
exceptional results to its clients. each year. their deliverables while also reducing cost.
2012 BE Inspired Awards

12

9006_YII_Content_1012.indd 12 11/21/2012 12:17:24 PM


ATTAINING Return on Innovation
Company
Pacific Gas and Electric Name
Company
WINNER Project Name
Bentley Substation Implementation
Location
San Francisco, California, United States

VIEW PRESENTATION

Company Name
Project Name
Location

Pacific Gas and Electric’s Substation Engineering Using Bentley Substation allowed the team to Projected annual savings based on 120
Services department is responsible for over 1,000 utilize 3D symbols with an integrated database internal projects is USD 1.9 million on physical
substations throughout its service territory, which to link and track all components of the project arrangements and USD 2.8 million on schematics.
spans two-thirds of California. Using traditional design. The company expects to gain over 40 By gaining accuracy and efficiency on engineering
CADD methods required not only limited resources percent efficiency on its physical arrangement drawings, the expected construction savings
devoting significant hours to substation design, designs by using 3D symbols and automatic could average 40 man-hours per project, or USD 1
but it also had the potential to generate errors that project documentation. It also foresees a gain of million annually. Total projected annual savings is
ultimately led to costly rework in the field. over 40 percent efficiency on schematics by using projected to be USD 5.7 million. Taking the learning
intelligent and integrated designs. curve into consideration, this project could have a
Bentley Systems, Incorporated

return on investment in less than two years.

ALSO A FINALIST IN INNOVATION IN UTILITY TRANSMISSION AND DISTRIBUTION NETWORKS


VIEW PRESENTATION
13

9006_YII_Content_1012.indd 13 11/21/2012 12:17:26 PM


ADVANCING Information Mobility
Company
Shaw Name
Power Group
Project Name
Virginia City Hybrid Energy Center WINNER
LocationCity, Virginia, United States
Virginia

FINALIST

Company Name
Project Name
Location

Shaw Power Group executed an engineering, With four major areas of work being performed The project was completed interference free
procurement, and construction project to design by various design firms using different design with no rework on site because interferences
and construct a 585 megawatt circulating fluidized systems, Shaw configured Bentley PlantSpace so were resolved in the 3D models. Design reviews
bed (CFB) greenfield electric power generation the vendor models were superimposed as one. were conducted efficiently and ahead of schedule
station near St. Paul, Va. The USD 1.5 billion project The success of the Bentley PlantSpace, i-models, by using i-models to collaborate and share
included a 650 megawatt steam turbine generator and Bentley Navigator coordination has resulted in information, and man-hours were reduced on site
and two CFB boilers, associated infrastructure and Bentley Navigator becoming the preferred means of due to readily available, accurate quantities and 3D
equipment, and vendor-supplied systems. accessing all 3D design information at construction model visualization. ConstructSim, AutoPIPE, and
sites regardless of which CADD design system has Structural Modeler were also utilized.
been used.
2012 BE Inspired Awards

ALSO A FINALIST IN INNOVATION IN POWER GENERATION


VIEW PRESENTATION
14

9006_YII_Content_1012.indd 14 11/21/2012 12:17:30 PM


Innovation in Asset Performance Management
Company Name
Ecofys Netherlands B.V.
WINNER Project
Wind Turbine Name
Test Site
Location
Lelystad, Netherlands

VIEW PRESENTATION

Company Name
Project Name
Location

The reasons for wind energy’s rise to prominence The high-level project goal was to increase the Ecofys first identified information sources and
may be well known, but perhaps less well known is scale and minimize the complexity of the wind relationships from which it was possible to build
that wind energy now accounts for over one-third turbines, reduce project and construction costs, and an intelligent asset register and comprehensive
of all capital expenditure in power generation, make operations and maintenance more efficient. data model, and then focused on replicating and
second only to thermal (coal and gas-fired) plants. Through the use of AssetWise configuration streamlining workflows around administrative tasks
At this USD 30 million test site in the Netherlands, management technology from the nuclear industry such as permit-to-work requests and other health,
Ecofys was able to reduce costs and improve safety reapplied to the wind energy industry for an safety, and environment issues. These procedures
and efficiency of wind turbines through better offshore wind farm with 30x3 megawatt turbines, were modeled in AssetWise to provide efficient and
management of project and asset information Ecofys estimates it will achieve cost savings of USD tight control of the information.
Bentley Systems, Incorporated

throughout the lifecycle. 4.3 million over a 20-year lifetime.

ALSO A FINALIST IN INNOVATION IN ASSET LIFECYCLE INFORMATION MANAGEMENT


VIEW PRESENTATION
15

9006_YII_Content_1012.indd 15 11/21/2012 12:17:34 PM


Bentley Developer Network
Company Name
Hitachi-GE Nuclear Energy, Ltd.
Project Name
Integrated Plant Construction System WINNER
LocationJapan
Hitachi,

FINALIST

Company Name
Project Name
Location

Because any error occurring in the upstream On this JPY 400 billion project Hitachi-GE Nuclear Bentley Developer Network members develop
phase considerably affects construction in the Energy utilized MicroStation to leverage the complementary applications exclusively for
downstream phase, Hitachi-GE Nuclear Energy EPC integrated construction system, which has in-house customization, integration, and use on
developed a high-quality and reliable power plant now been deployed in the field. It supports a Bentley products. For this project, MicroStation’s
construction system that provides consistent design team distributed over multiple locations versatility of support for various devices like
and coordinated project control throughout the and accelerates information sharing and mobile terminals, laptops, desktops, and large-
engineering, procurement, and construction (EPC) communications across project teams. screen devices and its information handling and
lifecycle and improves quality and efficiency by visualization coordinates information through
closely managing and monitoring field work. field construction from planning to execution and
management.
2012 BE Inspired Awards

ALSO A FINALIST IN INNOVATION IN CONSTRUCTION


VIEW PRESENTATION
16

9006_YII_Content_1012.indd 16 11/21/2012 12:17:37 PM


Educator of the Year
Guenter Company
Maresch,Name
Ph.D.
WINNER Project
Professor, University Name
of Salzburg
Salzburg,Location
Austria

VIEW PRESENTATION

Company Name
Project Name
Location

Dr. Guenter Maresch holds a doctorate in computer- Students studying technology, engineering, Curricula include eLearning and computer-aided
aided design and eLearning from the University of architecture, and design as well as fields such as design (ELCAD)/MicroStation for students and
Salzburg, and a master’s in geometry and math from art, mining, and medicine require a knowledge of teachers. These curricula are being used in
the Technical University of Vienna. For 22 years, geometry. Dr. Maresch designed a new way of approximately 90 classes in schools, and have been
he has taught geometry and math at schools and teaching geometry using professional CAD systems presented to close to 600 students at university.
universities for the information and communication such as MicroStation, and tools including videos, According to external evaluations, students
technologies (ICT). podcasts, and presentations. His methods go exposed to Dr. Maresch’s innovative technique
beyond the 2D approach to teaching geometry using increase their spatial, geometrical, and logical
pencil and ruler to teach in three dimensions. intelligence up to six times faster than through
Bentley Systems, Incorporated

traditional lessons.

17

9006_YII_Content_1012.indd 17 11/21/2012 12:17:50 PM


2012 BE Inspired Awards

18

9006_YII_Content_1012.indd 18 11/21/2012 12:17:54 PM


Connecting Project Teams
Bentley Systems, Incorporated

There is an increasing need among infrastructure organizations to connect people and secure critical project information.
The projects in this category demonstrate success in connecting widely distributed project teams
for dynamic collaboration and work sharing to improve project performance.

19

9006_YII_Content_1012.indd 19 11/21/2012 12:17:55 PM


Connecting project teams
Company
Saudi Name Company/Implemented by Nahil Computer Company
Electricity
Project Name of Kingdom-wide EDMS at SEC
Establishment WINNER
Location
All Regions, Saudi Arabia

FINALIST

Company Name
Project Name
Location

Saudi Electricity Company was established in 2000 with ProjectWise enabled Saudi Electricity to support high availability,
the merger of dozens of electricity producers throughout load balancing, distributed processing, and open standards,
Saudi Arabia. At a cost of USD 2 million over 12 years, eight which allows integration with other enterprise systems. Nahil
subprojects consolidated and standardized Saudi Electricity’s provided the software, implementation, training, support, and
information infrastructure in an enterprise-level engineering backlog conversion and migration of all technical documentation
document management system (EDMS) based on ProjectWise. into the EDMS. Nahil is also the Bentley SELECT support partner
providing kingdom-wide support.
2012 BE Inspired Awards

VIEW PRESENTATION
20

9006_YII_Content_1012.indd 20 11/21/2012 12:17:56 PM


Connecting project teams
Fluor/HDR Global Design Consultants
FINALIST RTD FasTracks Eagle P3 Project
Denver, Colorado, United States

The USD 2.1 billion RTD FasTracks Eagle P3 project is part of the Denver, Colo., ProjectWise allowed team members to access documents and collaborate in
Regional Transportation District’s (RTD) initiative to expand and improve public real time from any location. Fluor/HDR used ProjectWise‑managed workspaces
transit through three commuter lines, a maintenance facility, and 14 stations. to automatically deploy and update a client/project-specific MicroStation
As design lead, Fluor/HDR Global Design Consultants assembled a core team of workspace at every location, which saved hundreds of CAD management hours.
210 professionals supported by 300 auxiliary team members scattered across Using ProjectWise – in conjunction with Bentley Descartes and LEAP CONSPAN
77 offices in the United States, Europe, and Japan. – Fluor/HDR saved an estimated USD 3.1 million.

VIEW PRESENTATION

Hanson Professional Services Inc.


FINALIST I-74 Mississippi River Crossing Corridor
Davenport, Iowa, and Moline, Illinois, United States

The USD 1.4 billion I-74 Mississippi River Crossing Corridor will connect In addition to MicroStation and GEOPAK, the firm used ProjectWise as the
Davenport, Iowa, and Moline, Ill. The project requires maintenance of traffic central storage system, which allowed more than 700 users in five states
for 75,000 motorists while not only building new bridges, retaining walls, and to access the 28,000 project documents. The portal enabled seamless
ramps, but also demolishing old structures. Collaboration among the Iowa and communications among team members. As the area’s traffic needs continue
Illinois Departments of Transportation, 10 consultants, and 10 state and local to grow, the I-74 Mississippi River Crossing Corridor will continue to improve
agencies was facilitated by a web-based portal for sharing project documents. traffic flow, mobility, and safety, and enhance economic development
opportunities in the region.

Bentley Systems, Incorporated

VIEW PRESENTATION
21

9006_YII_Content_1012.indd 21 11/21/2012 12:17:59 PM


Connecting project teams
Parsons Brinckerhoff and Arup JV
Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade FINALIST
Brisbane, Australia

Arup and Parsons Brinckerhoff formed the PBA Joint Venture to design ProjectWise ultimately managed 1.5 million documents with 4.8 terabytes of
Australia’s largest transport infrastructure project – the AUD 5.6 billion data accessed by over 2,000 users in 40 global locations. The system saved
Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout time and costs in locating data (23,000 hours), controlling documents (USD
Upgrade. Rapid mobilization of the project necessitated fast-track deployment 1 million), updating drawings (260 weeks), and traveling (USD 3.6 million).
of ProjectWise, which came online within three weeks of the project being Other products utilized in the project included ProjectWise, MicroStation, MX,
awarded in 2008. InRoads, gINT, and Structural Modeler.

Special recognition award winner: sustaining our society


VIEW PRESENTATION

Camargo Corrêa
Jirau Hydropower Plant
Porto Velho, Brazil

Located on the Madeira River in northwestern Brazil, the Jirau Hydropower Using ProjectWise allowed Camargo Corrêa to implement a controlled and
Project will have a capacity of 3,750 megawatts generated by 46 turbines. transparent workflow and deploy a decentralized workforce of 200 users, all
Construction is being undertaken by a consortium of companies that includes of which reduced approval time of documents and contracts up to 17 days and
Camargo Corrêa to design, construct, and operate one of the largest decreased work accidents by approximately 3 percent. ProjectWise’s real-time
hydropower plants in the world that will ultimately supply energy for more than management information for decision making enabled the firm to participate in
10 million families. the second biggest hydropower plant under construction in Brazil.
2012 BE Inspired Awards

22

9006_YII_Content_1012.indd 22 11/21/2012 12:18:01 PM


Connecting project teams
Dewberry
New Jersey Turnpike
Camden County, New Jersey, United States

The I-295/I-76/Route 42 Direct Connection project in Camden County, N.J., ProjectWise created a single project data set shared across the team, enabling
will relieve a severe bottleneck at the interchange by constructing a direct real-time collaborative production to meet project deadlines while maintaining
connection on I-295. This and other highway improvements will reduce quality. The system managed more than 80,000 files totaling 256 gigabytes
congestion and enhance traffic operations and safety. To design this USD 893 of data. Multiple tiers of caching combined with delta-file transfer technology
million project, Dewberry mobilized more than 100 professionals across five enhanced connectivity and reduced use of network resources. Other software
Dewberry and four partner offices. used included InRoads, LEAP Bridge, and StormCAD.

GE Water & Process Technologies


Automated Drawing Release Using ProjectWise
Burlington, Massachusetts, United States

GE Water & Process Technologies saved on labor costs by automating the Using ProjectWise, GE now publishes PDFs automatically based on the status
release of P&ID, piping assembly, and fabrication drawings. The previously of drawings in ProjectWise. With MicroStation as the plotting engine, PDFs
manual process involved creating and uploading PDFs to a document repository, are published from both DWG and DGN formats. The PDFs are automatically
creating records in the enterprise resource planning system, and linking the uploaded to ProjectWise and linked to the enterprise resource planning system.
records to the PDF files. The system paid for itself in less than a year. The automated process is predicted to save 500 man-hours per year for an
annual cost savings in excess of USD 36,000 for this Burlington, Mass., project.

Bentley Systems, Incorporated

23

9006_YII_Content_1012.indd 23 11/21/2012 12:18:03 PM


Connecting project teams
GHAFARI Associates, LLC
Sutter Health Eden Medical Center
Castro Valley, California, United States

Sutter Health’s Eden Medical Center is a USD 400 million campus in Castro The firm hosted the integration server at its headquarters and strategically
Valley, Calif., with a 130-bed acute-care hospital and an attached four-story deployed file storage and caching servers near teams doing the work. All 3D
clinic and radiology center. An integrated project delivery team is responsible models, 2D CAD files, specifications, and other project documents were stored
for the interior tenant build-out. GHAFARI Associates customized a ProjectWise on the system. The use of ProjectWise saved the equivalent of a full-time
deployment to support the project’s document-sharing needs and improve document manager for four years, equating to approximately USD 1 million in
overall team collaboration. cost savings. MicroStation and Bentley Navigator were also used in the project.

Louisiana Department of Transportation and Development


ProjectWise Custom PDF Publishing
Baton Rouge, Louisiana, United States

The Louisiana Department of Transportation and Development automated The custom PDF publishing system was an enhancement to an existing
PDF plan-set production for capital projects. The goals for the project were to ProjectWise system. Bentley helped develop a client/server-based solution that
improve quality by enforcing standards, simplifying plan creation, and enabling offers one configuration for internal employees and one for outside contractors.
collaboration with outside contractors. Contractors now use the same process Plans now have the same index attributes as the originating design and plan
as the Louisiana Department of Transportation and Development, which locations and naming conventions are automated. Users are notified via email
ensures conformity and consistency. about PDF status.
2012 BE Inspired Awards

24

9006_YII_Content_1012.indd 24 11/21/2012 12:18:05 PM


Connecting project teams
Moh and Associates, Inc.
Collaboration and Integration of ProjectWise
New Taipei City, Taiwan

The challenging design of the USD 50 million Metro Rail Transit station Moh and Associates implemented ProjectWise to enable efficient collaboration
under development in New Taipei City, Taiwan, prompted the project team and integration among design disciplines. All project information was classified,
to introduce building information modeling (BIM) into the design phase. BIM stored, and shared through ProjectWise. Efficient model and version control, as
models built using Autodesk Revit were integrated by converting them into well as change management in associated models, contributed to better cost
compatible Bentley i-model formats, which streamlined document management, control and construction quality. Improved performance saved 15 percent in
file synchronization, and version control. man-hours for an annual savings of approximately USD 250,000.

MTR Corporation Limited


ProjectWise for Railway Business
Hong Kong, China

Four million passengers ride the nine Mass Transit Railway (MTR) lines in Hong The drawing management system enhancements have improved searching
Kong every weekday. MTR’s existing drawing management system is based on and drawing upload, tightened integration with CAD and building information
ProjectWise technology and houses more than 1.4 million as-built and working modeling software, and provided a more user-friendly interface for its 1,500
engineering drawings. With 40 percent growth forecast for the number of users. Collaborating in a single environment and navigating files in different
drawings, an upgrade was required to ensure its continued ability to record, formats using a web browser, users more efficiently retrieve information from
organize, control, and store drawings. ProjectWise.

Bentley Systems, Incorporated

25

9006_YII_Content_1012.indd 25 11/21/2012 12:18:06 PM


Connecting project teams
Ove Arup & Partners
Augmented Reality for Fulton Street Transit Center
New York, New York, United States

The USD 1.4 billion Fulton Street Transit Center project in lower Manhattan, Viewable on a tablet device, the model was geo-referenced and included
N.Y., integrates five existing stations and a national historic landmark building data on above-ground and underground infrastructure. The model can be
into one transport hub. To convey the scale of the project to stakeholders, interrogated and manipulated to reveal component details and data layers.
Arup worked with Bentley’s Applied Research Group to produce an augmented Bentley Navigator, ProjectWise iPad apps, and the augmented reality
reality model of the site. The model displayed the project elements overlain on a application were used to produce the desired effect, enabling on-site and off-
360-degree photo panorama. site personnel to interact with the model.

Parsons Brinckerhoff
ProjectWise Automated PDF Generator
Norfolk, Virginia, United States

The design-build team for the USD 4 billion Midtown Tunnel project in Norfolk, The ProjectWise Automated PDF Generator takes under two minutes to create
Va., needed to allow reviewers and task leaders across multiple companies and a PDF from an updated contract document and place it in a controlled-access
offices to view PDFs depicting design progress. Team members also needed output folder in the ProjectWise directory. Team members can also use the
to produce PDFs that conform to correct plot criteria and standards. Parsons generator to create PDFs on demand. The PDF generator allows task leaders
Brinckerhoff built an automated PDF generator that uses real-time DGN files to to track work side by side with other disciplines, narrowing the gap between
create the PDFs every night. design and review.
2012 BE Inspired Awards

26

9006_YII_Content_1012.indd 26 11/21/2012 12:18:14 PM


Connecting project teams
PechorNIPIneft
Construction of Booster Oil-refining Station on Bayanduskoe Oil Field
Usinsk, Russia

LUKOIL is an international, vertically integrated oil and gas company. LUKOIL’s AutoPLANT and Bentley Navigator were used for 3D modeling to reduce design
subsidiary, PechorNIPIneft, designed a booster station for the oil refinery at the errors and conflicts. ProjectWise was used to accelerate information sharing
Bayanduskoe oil field located near Usinsk. The team used a common platform and communications across the project team. As a result, the time taken to
for team member interaction and facilitated the process of coordinating and release design documentation for new objects was reduced by 15 to 20 percent.
approving design solutions.

Robins & Morton Power & Industrial


Carbo Ceramic’s Millen Proppant Facility
Millen, Georgia, United States

Robins & Morton formed the Power & Industrial Division in April 2011 to provide ProjectWise was selected to enable work sharing between multiple
engineering, procurement, and construction services to the power and industrial engineering and construction sites as well as to share information among
markets. In July 2011, the division was awarded contracts for Carbo Ceramic’s offices, construction teams, suppliers, and clients. Using ProjectWise saved
proppant facility in Millen, Ga. To quickly deploy resources in two newly formed approximately three hours per drawing, resulting in significant savings on the
offices, ProjectWise was installed, configured, and running via the web by project’s 1,200 drawings. MicroStation, Bentley Navigator, and STAAD were
mid-August 2011. also used on the project.

Bentley Systems, Incorporated

27

9006_YII_Content_1012.indd 27 11/21/2012 12:18:22 PM


2012 BE Inspired Awards

28

9006_YII_Content_1012.indd 28 11/21/2012 12:18:26 PM


Innovation in Asset Lifecycle
Information Management
Bentley Systems, Incorporated

Asset lifecycle information management improves information integrity and operational efficiency while streamlining the business
processes associated with sustaining infrastructure assets over their lifecycles. This category highlights enterprise deployments that
have demonstrated excellence in existing infrastructure operations through improved change management, enhanced accessibility of
information to stakeholders, improved process efficiency, greater productivity, and added safety.

29

9006_YII_Content_1012.indd 29 11/21/2012 12:18:29 PM


Innovation in Asset Lifecycle Information Management
Company Company
Southern Name
Project
Data NameManager Implementation ROI
Quality WINNER
Location
Birmingham, Alabama, United States

FINALIST

Company Name
Project Name
Location

Having successfully implemented eB Data Quality Manager to Southern Company spent USD 1.8 million over five years to
leverage asset information for its USD 2.8 billion Plant Ratcliffe implement the system, but in one year eB Data Quality Manager
project – a 582 megawatt clean-coal facility with nearly 300,000 demonstrated a potential ROI of USD 200 million over 40 years
assets – Southern Company is now deploying eB Data Quality of plant operation via automated document searches vendor data
Manager across its fleet of 70 fossil fuel units. The software access, and turnover package assignments for Plant Ratcliffe.
ensures that complete and accurate asset information is When it is deployed across its fleet, the company expects to
delivered to the startup and commissioning, construction, and realize a further ROI of USD 1.5 million for a 6,000 asset system
operations and maintenance departments. over a 20-year system lifecycle.
2012 BE Inspired Awards

VIEW PRESENTATION
30

9006_YII_Content_1012.indd 30 11/21/2012 12:18:32 PM


Innovation in Asset Lifecycle Information Management
Ameren Callaway Energy Center
FINALIST eB Supports Nuclear Outage Management
Fulton, Missouri, United States

The Ameren Callaway Energy Center generates electricity at the 1,190 eB Insight provides access to documents containing data from about 240,000
megawatt nuclear unit power plant near Fulton, Mo. Planned outages for plant components. By creating relationships between all types of information
modifications and maintenance require the nuclear reactor to be shut down, objects, eB Insight allows the staff to locate a component and see relevant
costing nearly USD 1 million per day in lost revenue. With approximately data, drawings, maintenance records, and design-basis documentation.
7,500 tasks outlined in roughly 3,000 work packages for a typical outage, it Integration with Ameren Callaway’s work management system enables the
is essential to expedite the location and review of documentation to stay on configuration management department to function with less resources.
schedule.

VIEW PRESENTATION

Crossrail Ltd
FINALIST Asset Information Management System
London and South East England, United Kingdom

Crossrail will link London and South East England via twin 21 kilometer eB Insight met AIMS requirements for tagging assets; creating hierarchies
tunnels connecting surface sections and eight new stations. With more than 1 based on location, function, and class; and relating assets to each other.
million assets to be recorded in the Crossrail Asset Information Management Integration with other information technologies will create a hub for smart
System (AIMS), the project’s scope encompasses the transfer of all asset data operational and infrastructure asset management. This strategy will save 20
created during design and construction through the information lifecycle into percent of the cost of conventional asset maintenance. Efficiencies gained
maintenance and operations. through construction alone will save nearly GBP 100 million.

Bentley Systems, Incorporated

VIEW PRESENTATION
31

9006_YII_Content_1012.indd 31 11/21/2012 12:18:36 PM


Innovation in Asset Lifecycle Information Management
Ecofys Netherlands B.V.
Wind Turbine Test Site FINALIST
Lelystad, Netherlands

Ecofys owns and operates a wind energy test site with capacity for nine 2.5 AssetWise produced direct time savings by synchronizing asset information,
megawatt turbines. Ecofys implemented and configured AssetWise at Test Site streamlining workflows, and reducing delays and other consequential effects of
Lelystad in the Netherlands to demonstrate the benefits of asset information poor asset information. Based on a hypothetical offshore wind farm with 30x3
management for offshore wind farms. Using Bentley Geo Web Publisher for megawatt turbines, Ecofys estimates a total cost savings of USD 4.3 million
the front-end, AssetWise improved visualization and control of assets in the over the 20-year lifetime of the farm.
context of site layout, project, or procedure.

Special recognition award winner: innovation in asset performance management


VIEW PRESENTATION

“I sleep easier because I don’t have to remember all the details


involved in this multistakeholder, multiaction project.”
– Nico Stolk, Site Manager, Test Site Lelystad, Ecofys Netherlands
2012 BE Inspired Awards

32

9006_YII_Content_1012.indd 32 11/21/2012 12:18:39 PM


Innovation in Bridges
Bentley Systems, Incorporated

Improved capabilities in bridge information modeling are helping to make the most challenging bridge projects a success. The projects
in this category demonstrate how advanced technology can enhance problem solving at every stage of the project delivery process,
from planning, design, and engineering to construction simulation and analysis.

33

9006_YII_Content_1012.indd 33 11/21/2012 12:18:42 PM


INNOVATION IN BRIDGES
Company and
Modjeski Name
Masters, Inc.
Project
Huey NameBridge Widening
P. Long WINNER
Location
New Orleans, Louisiana, United States

FINALIST

Company Name
Project Name
Location

The USD 1.2 billion Huey P. Long Bridge Widening project in LEAP CONSPAN was used to design the Type III, IV, and BT
New Orleans, La., will have three 11-foot lanes for both east prestressed girders for these structures. For the curved approach
and west bound traffic that feature eight-foot outside and two- to the west bank, girder lengths varied by span and within a
foot inside shoulders. Previously, the bridge had two narrow, span. The software permitted the beam and girder designs to be
nine-foot lanes in each direction, along with two railroad tracks. performed efficiently. The bridge design enabled highway, rail,
New approaches and interchanges include continuous steel and marine transportation to continue with minimal interruptions
and prestressed girder spans with ramps connecting main line and delays.
structures to the street level.
2012 BE Inspired Awards

VIEW PRESENTATION
34

9006_YII_Content_1012.indd 34 11/21/2012 12:18:45 PM


INNOVATION IN BRIDGES
Armando Rito Engenharia SA
FINALIST April 4 Bridge
Catumbela, Angola

The April 4 Bridge connects the cities of Benguela and Lobito, Angola, replacing Armando Rito Engenharia selected RM Bridge to conduct a tridimensional
a one-lane steel bridge dating from the early 20th century. Now the Catumbela model analysis. The software helped define pylon geometry, design stay cables,
river crossing takes minutes instead of several hours. Located in the heart of and determine installation forces. The optimization module allowed for stress
Catumbela village, the EUR 26 million, cable-stayed bridge symbolizes freedom operations and time-dependent behavior. Innovations included a special saddle
and the end of war to the people of Angola. for the stays that reduced steel quantities and allowed for slimmer concrete
masts.

VIEW PRESENTATION

Borton-Lawson
FINALIST Lehigh/Pohopoco Bridge Replacement
Parryville, Pennsylvania, United States

The Pennsylvania Turnpike Commission replaced twin northbound and Borton-Lawson designed the prestressed concrete bridge concept in four weeks
southbound bridges on I-476 over the Lehigh River and Pohopoco Creek with using MicroStation and InRoads. During final design, innovative use of the
four new bridges. A dramatic increase in steel prices prompted the original software in conjunction with Microsoft Excel saved an estimated 410 hours,
curved-steel, long-span design to be set aside in favor of a less costly concrete valued at USD 41,000. Borton-Lawson delivered the final design in less than
alternative, which required complete structural redesign, a new geotechnical eight months. The USD 101.5 million project was completed one year ahead of
program, and environment permit amendments. schedule, saving USD 7 million over the original design.

Bentley Systems, Incorporated

VIEW PRESENTATION
35

9006_YII_Content_1012.indd 35 11/21/2012 12:18:53 PM


INNOVATION IN BRIDGES
Anhui Transport Consulting & Design Institute Co., Ltd.
The Application of 3D Design Technology in Complex Bridge Design
Hefei City, China

The USD 45.23 million Zhaohe River Bridge is situated near Chaohu Lake, The design was presented to reviewers in the context of area topography using
which is part of a scenic tourism area in Hefei, China. It was important that the MicroStation’s 3D modeling and visualization technology. The visualization
bridge design reflect the art and culture of the nearby villages. Anhui Transport combined the bridge model with a surface model, creating an accurate
Consulting & Design Institute used 3D modeling technology to design the 3D representation. The artful design was unanimously approved. The 3D
complex structure, consisting of a main bridge and approach span totaling 907 visualization facilitated cooperation among disciplines and saved approximately
meters. four weeks of design time, or USD 160,000.

ARCADIS France
SEA High-speed Track Bridges
Poitiers, France

The EUR 9 billion LGV SEA (Southern Europe Atlantic) is a 300-kilometer-long ARCADIS developed a 3D model using RM Bridge to implement approximately
high-speed rail line that will reduce journey time between Paris and Bordeaux 500 stages of construction, which called for incremental launching of the decks.
from three to two hours. ARCADIS designed seven major bridges on the line, Each segment was assembled to the previous one by temporary post-tensioning
with lengths ranging from 438 to 522 meters and spans ranging from 30.1 to 47 and stabilized by temporary stays. The stays were attached to a mast located
meters. Their standardized design featured a prestressed concrete box girder over the pier at the beginning of the span under construction.
deck with internal and external post-tensioning.
2012 BE Inspired Awards

36

9006_YII_Content_1012.indd 36 11/21/2012 12:18:56 PM


INNOVATION IN BRIDGES
Finley Engineering Group, Inc.
Palmetto Section 5, SR 826/836 Interchange Bridge 11 – Precast Segmental
Miami, Florida, United States

New connections between SR 826 (Palmetto Expressway) and SR 836 (Dolphin Finley designers used RM Bridge, MicroStation, and Bentley Rebar to generate
Expressway) in Miami, Fla., include four segmental bridges costing USD 125 segment and tendon geometries, reinforcing layouts, and integrated drawings.
million. Finley Engineering Group reduced construction costs for Bridge 11 with The software enabled the geometry for four segmental bridges to be evaluated
innovative use of pier caps to support the balanced cantilever, which eliminated within weeks, and segmental dimensions to be established early in the design
temporary falsework, and diabolos to allow variable tendon geometry and stage. The firm’s design of the longest span (774 meters) eliminated two interior
continuous external tendon ducts, which eliminated bent steel pipes. expansion joints, reducing labor and materials by 50 percent.

Guizhou Province Traffic Planning, Survey, and Design Institute Limited


Application of RM Bridge V8i to the Longjiang River Super-large Bridge
Bijie City, China

The Longjiang River Bridge in Guizhou Province, China, extends from the The Bridge Design Institute adopted RM Bridge to perform 3D analysis of the
mountainous region of Zhijin to the Nayong Expressway. To deliver the complex structural system, including steel cable settings, structural supports, main
design for this USD 31.45 million structure, the Guizhou Province Traffic beam stiffness, and static and dynamic forces. Compared to other software,
Planning, Survey and Design Institute (Bridge Design Institute) compiled and RM Bridge reduced modeling time by 80 percent, achieved at least 95 percent
implemented guidelines for the design of a low-tower, cable-stayed bridge with precision, and reduced calculation time by more than 65 percent. As a result,
plane curve and longitudinal cross slopes. approximately USD 410,000 was saved on this project.

Bentley Systems, Incorporated

37

9006_YII_Content_1012.indd 37 11/21/2012 12:19:01 PM


INNOVATION IN BRIDGES
Iowa Department of Transportation
New Bridge Inspection Software System
Des Moines, Iowa, United States

The Iowa Department of Transportation (DOT) needed an integrated bridge Iowa DOT selected InspectTech Collector and InspectTech Manager to provide
inspection and management system to serve as a one-stop location for data a customizable solution. The DOT’s inspection forms, electronic files, and 13
on 4,000 state-owned bridges and 21,000 locally owned bridges. The system databases were integrated at one location, accessible via the web at any time.
had to allow data storage, search, and access for better decision making and A field version runs on tablets and laptops for inspectors to generate complete
resource allocation. With 830 people in 99 counties and 300 cities statewide, reports. Iowa DOT estimates the system will save about USD 70,000 per year
the DOT also needed to streamline workflows and minimize oversight. and has already realized a 25 percent boost in efficiency.

K2 Ingenieria
Continuous Bridges Formed by Precast Beams
Elche, Spain

The six-span, 200-meter-long bridge over Boch Gorge near Elche, Spain, is part K2 Ingenieria used RM Bridge to model the construction sequence, taking
of the Mediterranean high-speed rail lines in Spain. The deck is comprised of into account the different stages of the deck elements. The software enabled
precast continuous beams and a post-tensioned top slab, with the precast U analysis of the non-linear effects of creep and shrinkage on the forces affecting
beams joined in the pier support section by post-tensioned bars. The bridge was the deck during construction. RM Bridge proved to be highly accurate and saved
constructed at a cost of EUR 60 million. time during design, design modification, and construction.
2012 BE Inspired Awards

38

9006_YII_Content_1012.indd 38 11/21/2012 12:19:05 PM


INNOVATION IN BRIDGES
PEDELTA Colombia S.A.S.
Huasco Viaduct Bridge
Vallenar, Chile

The USD 13 million Huasco Viaduct replaced an obsolete bridge on Route RM Bridge enabled PEDELTA to achieve low material ratios using hollow
5 North in Vallenar, Chile. Located near the Atacama fault, the deep valley concrete piers on shallow foundations. The software allowed designers to
crossing had to meet strict seismic and geometric requirements. The solution consider all possible loads and conditions during each phase of development
was a 116-meter main span with 42-meter lateral spans and a 23.3-meter-wide and estimate deformations, allowing fast and controlled construction using the
single-cell deck. Use of a segmental continuous girder with variable depth cantilever method. Design was performed on time and under budget using
optimized material usage. RM Bridge’s optimization tools and built-in AASHTO LRFD specifications.

PEDELTA Colombia S.A.S.


South-East and 44th Street Interchange
Santiago de Cali, Colombia

The USD 20 million South-East 44th Street Interchange eliminated traffic The structure was detailed, analyzed, and designed considering the behavior
congestion by introducing a straight bridge over South Highway, joined to a of the structure during each construction phase using RM Bridge. The software
curved branch conducting vehicles back to the highway. Designed as a city allowed PEDELTA to assess such effects as concrete creep and retraction,
landmark, the structure features a slender bridge deck comprised of post- preventing costly rectifications on site. Using RM Bridge, PEDELTA completed
tensioned, cast-in-place concrete and hollow-core box girder. Three-phase the design ahead of schedule despite the complexity of different geometries for
segmental construction avoided total closure of the roadway. the main straight segment and joined curved branch.

Bentley Systems, Incorporated

39

9006_YII_Content_1012.indd 39 11/21/2012 12:19:11 PM


INNOVATION IN BRIDGES
PEDELTA Colombia S.A.S.
The Triplet Bridges
La Paz, Bolivia

La Paz, the seat of government in Bolivia, commissioned the USD 14.3 million With spans of over 100 meters, the project called for balanced cantilever
Triplet Bridges to connect the eastern and western parts of the city. Each bridge construction and a stayed-cable supported deck. RM Bridge allowed PEDELTA
crosses a steep valley at 60 meters. PEDELTA’s emblematic design featured to model all construction stages and easily adapt parameters throughout.
three extradosed bridges with three spans each. Main spans ranged from 92.5- Changes, such as widening from two to four lanes on deck, were introduced
113.5 meters and were partially suspended by a single plane of 28 stay cables, quickly with parametric data entry and rapid structural re-evaluation.
deviated at the two pylons by built-in saddles.

RITES, Ltd.
Farakka Bridge Across Farakka Feeder Canal
Farakka, India

Traffic from the National Thermal Power Corporation (NTPC) generating plant Reducing the superstructure’s dead weight reduced the size of the foundation
in Farakka, India, exceeded the capacity of a single-lane bridge across a water- and substructure, comprised of reinforced concrete circular solid piers and
supply feeder canal. NTPC constructed a new, 290-meter-long bridge with a reinforced concrete solid abutments on bored cast-in-situ long piles.
three-lane carriageway and footpaths on either side. RITES’s cost-efficient STAAD.Pro was used for structural analysis and design optimization of the main
design included a steel through-truss superstructure for water spans and steel truss, girders and deck slab, and pile foundations as well as to assess seismic
composite girders for land spans. forces. The USD 11.5 million bridge will improve local and regional mobility.
2012 BE Inspired Awards

40

9006_YII_Content_1012.indd 40 11/21/2012 12:19:17 PM


INNOVATION IN BRIDGES
Saanvi Infrastructure Pvt Ltd
Hill Bypass Road Kharkhari to Motichur Station
Haridwar, India

The River Ganges enters the North Indian River Plain for the first time Saanvi Infrastructure designed the seven-span reinforced concrete,
at Haridwar, a pilgrimage city and municipality in the Haridwar district curved-arch bridge using STAAD.Pro for analysis of the structure’s complex
of Uttarakhand, India. The USD 60 million Hill Bypass Bridge, with two geometry as required by IRC codes. The alignment is along the curve, with
carriageways and a footpath on either side, aims to reduce traffic congestion a 99.2 meter radius of curvature. STAAD.Pro’s element library allowed 3D
on road networks around the city’s busy Kharkhari to Motichur train station. modeling of the site conditions. The firm also used STAAD.Pro for analysis of
approach viaducts connecting the existing road to the main bridge on one end.

“It is not sufficient to just do things better. We need to do


better things. Bentley’s solutions make every engineer’s
dream become reality.”
– P.V. Mayur, Director, Saanvi Infrastructure
Bentley Systems, Incorporated

41

9006_YII_Content_1012.indd 41 11/21/2012 12:19:19 PM


2012 BE Inspired Awards

42

9006_YII_Content_1012.indd 42 11/21/2012 12:19:22 PM


Innovation in Building
Bentley Systems, Incorporated

Advanced technology aids in the delivery of high-quality buildings in terms of aesthetics, adherence to program, and meeting budget.
It is also increasingly critical in areas of environmental sustainability, operational performance, and compliance with regulations and
accreditations. Moreover, today’s buildings must provide a clear return on investment. The projects in this category demonstrate
excellence in designing, building, or operating one or more buildings.

43

9006_YII_Content_1012.indd 43 11/21/2012 12:19:23 PM


INNOVATION IN BUILDING
Company
John Name+ Partners
McAslan
ProjectCross
King’s NameStation Redevelopment WINNER
LocationUnited Kingdom
London,

FINALIST

Company Name
Project Name
Location

The GBP 547 million redevelopment of King’s Cross station The 3D representation of the western concourse roof – which
will transform the historic rail station into a modern transport covers 7,500 square meters, rises 20 meters, and spans 150
interchange and iconic gateway to London. Restoring the meters – allowed an international team to coordinate 16 steel
historic façade, vaulted train shed, and other features as well tree-form columns that support the single-span structure amid a
as interfacing with existing rail, underground rail, and road network of subway and service tunnels. The benefits of rapid file
networks required ongoing verification of the design. John sharing and high-quality validated data extended from schematic
McAslan + Partners used MicroStation to produce an accurate design through to construction, producing time and cost savings.
3D representation at all stages.
2012 BE Inspired Awards

VIEW PRESENTATION
44

9006_YII_Content_1012.indd 44 11/21/2012 12:19:25 PM


INNOVATION IN BUILDING
Arthur Golding and Associates
FINALIST Helsinki Central Library Competition
Helsinki, Finland

Arthur Golding and Associates prepared a conceptual design for the new MicroStation was used for design, modeling, and visualization. Plug-ins
Helsinki (Finland) Central Library international design competition. Budgeted enabled incorporation of detailed models of vehicles, trees, escalators, and
for EUR 69.9 million, the concept proposed a building within a building with a furniture. Using MicroStation’s integrated modeling and rendering capabilities
transparent/translucent outer skin that forms a veil independent of the library facilitated development of a detailed model with photorealistic images. The
floors within. Technological innovations included a multistory climate wall and program’s ability to translate, export, and import files in different formats aided
advanced structural system without perimeter columns, beams, or mullions. coordination with structural and energy/HVAC engineers.

VIEW PRESENTATION

Morphosis Architects
FINALIST Giant Interactive Group Corporate Headquarters
Shanghai, China

The Giant Interactive Group headquarters in Shanghai, China, defies current Products such as Bentley Architecture and Structural Modeler allowed
trends toward vertical urban development with a compact campus on the designers to take a holistic view as well as address singular building systems.
outskirts of the city. Its integrated 3D design methodology achieved an organic This integrated process increased productivity and reduced the number of staff
approach to space for work, recreation, and socialization. The 3D models necessary for design, coordination, and delivery of the project. The federated
improved communication of the design intent and allowed simultaneous model also enabled design and construction teams to coordinate fabrication,
exploration of complex architectural spaces and coordination of building installation, and construction.
systems.

Bentley Systems, Incorporated

VIEW PRESENTATION
45

9006_YII_Content_1012.indd 45 11/21/2012 12:19:36 PM


INNOVATION IN BUILDING
Aestudio
Competition for New Trade Center
Scandiano, Italy

Aestudio entered the design competition for a new trade center in Scandiano, The firm used MicroStation and Bentley Tas Simulator to model, simulate, and
Italy. The EUR 9.2 million complex will be the first low-energy consumption predict energy consumption, CO2 emissions, operating costs, and occupant
complex in town. The buildings of the trade center will be low-lying and feature comfort. Working with intelligent reference files saved significant time during
double-curved roofs to blend into the landscape near the Secchia River. the design stages.

Aestudio
Strategic Center for Earthquake Emergency
Scandiano, Italy

Aestudio developed the conceptual design for the Strategic Center for The firm used MicroStation, Bentley Architecture, and Bentley Tas Simulator
Earthquake Emergency in Scandiano, Italy. The EUR 4.98 million building will to design the center and model, simulate, and predict the building’s energy
be the town’s first low-energy consumption building of more than 4,000 square consumption, CO2 emissions, and operating costs. Working with intelligent
meters. The design concept features a photovoltaic field on the roof, which also reference files saved time during design.
acts as insulation to reduce the need for cooling.
2012 BE Inspired Awards

46

9006_YII_Content_1012.indd 46 11/21/2012 12:19:38 PM


INNOVATION IN BUILDING
Andrea Girotto Architetto
Real Classic Mood Café
Caserta, Italy

The new owner of a café and bakery in Caserta’s Vanvitelli Square had high The firm used MicroStation to provide a realistic visualization of the design
expectations for its décor. The shop is located near the Royal Palace of Caserta, with ultra-detailed views in every frame and angle. Communicating through 3D
a UNESCO World Heritage Site and emblem of Baroque architecture in Italy. renderings and 3D PDFs allowed real-time checking of furnishing components,
The project goal for Andrea Girotto Architetto was to create a classic mood for colors, and textures. Changes took less time than expected, and the final 3D
the café. version became the working drawing for the manufacturer.

Arkitekterna Krook & Tjäder


Friends Arena
Solna, Sweden

Friends Arena in Solna, Sweden, is a multipurpose arena built to accommodate Arkitekterna Krook & Tjäder assembled more than 20 team members to work
50,000 soccer spectators or 65,000 concertgoers. A retractable section of the simultaneously on modeling and producing drawings. Bentley Architecture
grandstand and a retractable roof make this SEK 2.8 billion facility a flexible made it easy for the team to try various design alternatives for the façade,
venue for a variety of events. The design enables the arena to be reconfigured staircase buildings, and other components and still produce deliverables on
in the shortest possible time, freeing up more days for booking events. time. Taking data directly from model files to stake out building components on
site speeded up the construction process.

Bentley Systems, Incorporated

47

9006_YII_Content_1012.indd 47 11/21/2012 12:19:41 PM


INNOVATION IN BUILDING
Bassani Edilizia S.p.A.
Centro Residenziale Dogana
Ortonovo, Italy

Bassani Edilizia designed a EUR 2.5 million mixed-use development for a MicroStation was used for conceptual design and 3D modeling. The solution
residential area in the municipality of Ortonovo, Italy. The project is comprised accelerated design while providing transparency and identifying priorities in
of a residential building, a commercial building, gardens, and parking. Goals for design areas and elements. Efficiencies achieved using MicroStation enabled
the complex included creation of comfortable living spaces, use of energy- Bassani Edilizia to provide estimates within about two business weeks. Overall,
saving materials, and improvement of the environment and quality of life both MicroStation saved 10 percent of the design time and related costs.
indoors and outdoors.

Bina Puri Construction Sdn Bhd


33 Units Alamesra
Kota Kinabalu, Malaysia

Bina Puri Construction, a wholly owned subsidiary of Bina Puri Holdings, The client’s highly detailed specifications included a requirement to use 3D
provides civil and building engineering and construction services in both modeling. The company used Bentley Architecture to develop a contemporary
Malaysia and internationally. The MYR 17.36 million project in Kota Kinabalu, layout and design for the commercial spaces. The efficiencies gained by using
Malaysia, featured 33 units of two- to three-story shop offices occupying the 3D modeling software enabled the company to provide material quantities
three blocks. before the construction started.
2012 BE Inspired Awards

48

9006_YII_Content_1012.indd 48 11/21/2012 12:19:53 PM


INNOVATION IN BUILDING
Building Studio Architects
The Lantern
Melbourne, Australia

Located at the gateway to the Melbourne Docklands in Victoria, Australia, Bentley Architecture was used from the project’s inception for design,
this project encompasses a 9,884-square-meter commercial new-build in documentation, and visualization to ensure delivery of documentation ahead of
the landmark Lantern building and 10,076 square meters of commercial the fast-track construction program. GenerativeComponents was used to design
refurbishment in the heritage-listed Goods Shed South. Building Studio the facetted façade, which had variable panel geometry that required key node
Architects designed the AUD 45 million complex to achieve maximum lettable points along the building perimeter. The software also allowed the façade and
area and a five-star Green Star rating. heritage building roof to be accurately designed and detailed.

Caruso Mainardi Architetti Associati


Residential Buildings
Milan, Italy

A EUR 11.9 million residential apartment complex located in the Milan region Caruso Mainardi Architetti Associati used MicroStation to achieve project goals
of Italy occupies a former industrial building site that is bisected by the and provide a high-quality design within the available budget. MicroStation’s
administrative border of two municipalities. The complex has two buildings flexible and intuitive software enabled designers to optimize the time spent
housing a total of 98 apartments. The building in San Giuliano Milanese is long drafting and revising the design. Both buildings achieved energy Class A
with vertical connections, and the building in San Donato Milanese is a tower. certification.
Façades feature loggias, stairs, and balconies.

Bentley Systems, Incorporated

49

9006_YII_Content_1012.indd 49 11/21/2012 12:19:58 PM


INNOVATION IN BUILDING
Ekofarma S.r.l.
Furnishing of a Pharmacy
Rome, Italy

Ekofarma specializes in studying, designing, and manufacturing custom Ekofarma chose MicroStation to achieve the project goals and Progenio to
furnishings for pharmacies. S. Onofrio, a privately owned pharmacy in Rome, coordinate the project. Progenio is a MicroStation-based Bentley Channel
Italy, retained Ekofarma to update the store’s retail space and functionality Partner-developed application for the furniture, exhibition, building, and other
to achieve a more modern image and customer experience. The EUR 260,000 markets. From design through development, MicroStation allowed the team
redesign created a contemporary pharmacy that featured emotional cues to to meet the requirements for flexibility and 3D photorealistic renderings that
capture consumers’ attention. communicated the design concepts to the customer.

Falegnameria Grottaroli S.a.s.


Store Furnishing
Palma de Mallorca, Spain

Falegnameria Grottaroli creates customized furniture solutions for commercial Using Progenio allowed the company to manage design and production phases,
customers throughout Europe. For a shop located in Palma de Mallorca on and monitor the progress of orders from suppliers. The applications provided
Spain’s Balearic Islands, Falegnameria Grottaroli built a modern locale while flexible CAD, rapid 3D modeling, and accurate data, which enabled designers to
maintaining the standards of practicality and functionality. Falegnameria automatically generate production documentation from the 3D model, including
Grottaroli chose MicroStation and the Bentley Channel Partner-developed data sheets, bills of material, production and assembly instructions, and
application to optimize production for the EUR 80,000 project. drawings and DXF files.
2012 BE Inspired Awards

50

9006_YII_Content_1012.indd 50 11/21/2012 12:20:02 PM


INNOVATION IN BUILDING
Ingenieurbüro Zammit GmbH
Production Facility for Auto Body Construction
Emden, Germany

Volkswagen commissioned Ingenieurbüro Zammit to plan the ventilation/air To ensure no interferences with other technical systems in the facility,
conditioning and sprinkler systems for a EUR 100 million auto-body production Ingenieurburo Zammit used MicroStation and a building information modeling
facility in Emden, Germany. The 550-by-120-meter facility required planning for toolkit for 3D project implementation. The 3D representation of technical
a total supply/exhaust volume of 1.5 million cubic meters per hour. More than 20 systems in conjunction with the 3D structural model enabled engineers to
supply/exhaust units and 40 technical extraction units were integrated within coordinate the technical systems, verify clearances with the building structure,
the limited space of a penthouse. and support Volkswagen’s decision-making process.

John Portman & Associates


Bao’an Oct Hotel
Shenzhen, China

Now under construction on the waterfront in Shenzhen, China, the Bao’an Oct John Portman & Associates used MicroStation and Bentley Architecture to
Hotel complex is comprised of a 26-story, 360-room, five-star hotel tower; define the fluid forms and curvilinear features of the project. The 3D model was
29-story business apartment tower; four-story atrium with art gallery, ballroom, used to resolve geometry and joinery, prepare structural detailing, and detect
and meeting space; and a three-level basement. Using building information interferences or problems with clearances early in the design process. The
modeling on a common software platform allowed team members in different architects produced renderings and sun studies in-house, saving the firm out-of-
countries to explore options and make revisions while staying on schedule. pocket project costs.

Bentley Systems, Incorporated

51

9006_YII_Content_1012.indd 51 11/21/2012 12:20:12 PM


INNOVATION IN BUILDING
John Wardle Architects
Mineral & Materials Research Hub
Adelaide, Australia

The AUD 48 million Mineral & Materials Research Hub in Adelaide, Australia, Bentley Architecture integrated other CAD platforms and facilitated model
was designed to catalyze education and engagement among students, exchange and coordination among subconsultants. The software also enabled
researchers, and industry stakeholders. MicroStation and Bentley Architecture the management of documentation to suit a progressive procurement schedule.
allowed John Wardle Architects to visualize the design potential for spatial Drawing extraction from the single building model produced productivity gains
interconnection and flexibility throughout the building. Layout, orientation, of 15 percent compared to 2D methods. Efficient design data management
façade, and materials contributed to achieving a five-star Green Star rating. allowed a smaller team to manage drawing production.

LAB Architecture Studio


Museum of Bristol M Shed
Bristol, United Kingdom

The new Museum of Bristol’s M Shed is housed in a refurbished 1951 steel- Utilizing MicroStation and GenerativeComponents enabled the design team
framed cargo shed on Bristol’s Floating Harbour in the United Kingdom. to transform an existing historical framework into a contemporary museum
Originally a transit shed for storing shipping goods, the M Shed is now a with a design that retains the historic characteristics of the original structure.
190-meter-long environmentally sensitive maritime structure. Central to LAB Continuing investment and training in Bentley products ensures that the
Architecture Studio’s proposal has been the creation of two distinct and company has access to correct-fit technologies that can deliver the design and
dramatic foyers that provide breathtaking views. documentation requirements for a range of vastly different projects.
2012 BE Inspired Awards

52

9006_YII_Content_1012.indd 52 11/21/2012 12:20:20 PM


INNOVATION IN BUILDING
LCA
Borgo Della Neve
Montefiore Conca, Italy

Located in Montefiore Conca, Italy, Borgo Della Neve is a new residential block LCA used MicroStation and Bentley Architecture to connect control, display,
of 30 apartments with buildings arranged in a square around a central garden and calculation tools used on multiple platforms and office locations. All of the
and playground. The challenge for this EUR 5 million development was to blend data from consultants working with different software products was merged
in with the neighboring historic buildings while achieving an environmentally, on MicroStation. The ability to exchange data between platforms and offices
socially, and economically sustainable design. allowed the team to quickly and effectively deliver quality work, saving time
and money.

Meijer, Inc.
The Virtual Store Project
Grand Rapids, Michigan, United States

Headquartered in Grand Rapids, Mich., Meijer owns more than 190 multiline The USD 15 million intelligent virtual store project involved first automating
stores in five states. The retailer revolutionized its approach to design and the creation of specifications sent to contractors, which cut the design team’s
construction by creating an intelligent 3D model of a 200,000-square-foot retail workload by 50 percent. Phase two automated the distribution of purchase
store using MicroStation for utilities, programming, and drawing, and Bentley orders to procurement to eliminate errors, and Phase three placed shelving,
Navigator and Bentley View for 3D views and user interaction. equipment, retail products, and signage into the 3D model.

Bentley Systems, Incorporated

53

9006_YII_Content_1012.indd 53 11/21/2012 12:20:24 PM


INNOVATION IN BUILDING
Ochs Schmidhuber Architekten
Unterföhring Nursery
Unterföhring, Germany

Located on the edge of a business park in Unterföhring, Germany, this two-story MicroStation and MicroStation PowerDraft enabled the seamless integration
building is a nursery school for 48 children. Ochs Schmidhuber Architekten of project functions, from basic evaluation of the design and visualizations
designed and built the Unterföhring Nursery with the sustainable use of to detailed planning and execution to documentation. The integration of
resources in mind. A unique hybrid construction technique combined the participating firms was comfortable and uncomplicated due to the availability of
advantages of wood panel and solid construction, resulting in fast construction various exchange formats. Rendering allowed the client to visualize the nursery
at reduced costs. during preliminary stages and ensure the building met expectations.

Proma S.r.l.
Spaces Design for Luxury Cosmetics
Alessandria, Italy

Proma applies innovative materials and technologies to the design and Following approval by the client, drawings with dimensions and material
manufacture of furnishings for the retail industry. The goal for the luxury specifications went to production. MicroStation allowed Proma to accurately
cosmetics retail space project was to create an interior concept for an exhibit manage the process from design through assembly and to have control of the
stand that reinforces the customers’ behavioral patterns. The firm used product, which saved time, reduced the budget, and improved quality. The
MicroStation to design a 3D model that was a photorealistic representation of project satisfied all requirements related to creating an innovative exhibit space
the space, complete with lights, colors, shading, and materials. that would increase sales.
2012 BE Inspired Awards

54

9006_YII_Content_1012.indd 54 11/21/2012 12:20:28 PM


INNOVATION IN BUILDING
RendArk
Shop Monnalisa “Red Leaf”
Shanghai, China

RendArk, an architectural design and graphics firm, designed a new Monnalisa By using MicroStation for the entire project, RendArk took advantage of
brand shop in Shanghai, China. Bentley software allowed the project to be the tools that enable an efficient and effective workflow. Dynamic displays
delivered in record time to meet an aggressive schedule. facilitated discussions about design concepts, and the Luxology rendering
engine for MicroStation saved time.

RMF Engineering, Inc.


New OSU Chilled Water Plants
Columbus, Ohio, United States

As part of Ohio State University Medical Center’s USD 1 billion expansion, AutoPLANT allowed the design team to optimize configuration of heavy
two new central chiller plants are being built to provide chilled water for machinery, piping, and wiring to ensure adequate clearances for construction,
air conditioning. The USD 51 million South Plant will initially produce a firm serviceability, and replacement. Time spent customizing the mechanical and
capacity of 12,500 tons of chilled water. The USD 32 million East Plant will electrical component specification database for the South Plant was recouped
provide 15,000 tons. Together, the plants represent over 130 pieces of rotating on the East Plant, improving the schedule by two months.
machinery, 70,000 feet of process piping, and 11,000 feet of conduit.

Bentley Systems, Incorporated

55

9006_YII_Content_1012.indd 55 11/21/2012 12:20:32 PM


INNOVATION IN BUILDING
schweizermessebau AG
The Diamant
Basel, Switzerland

Based in Basel, Switzerland, schweizermessebau conceptualized the MicroStation’s modeling tools allowed the designers to create a unique
architectural design for a CHF 250,000, custom-built exhibition stand stand that successfully sells the customer’s ideas. By using MicroStation in
incorporating 3D graphics. The unique façade created a conceptual conjunction with a Bentley SELECT subscription, schweizermessebau maintains
architectural design that featured dynamic interaction between the virtual the software by gaining access to the latest upgrades.
and real world of the exhibition space.

Störmer Murphy and Partners


Intelligent Quarters
Hamburg, Germany

Intelligent Quarters will be a new three-building complex prominently located The complex was divided into components to be coordinated by multiple project
on the Elbe River in Hamburg, Germany. The complex will have a gross floor teams using MicroStation for smooth data exchange, reciprocal referencing
area of 70,000 square meters and include an 18-story tower with residential, of plans, and reliable performance. The intuitive user interface and adjustable
commercial, and office spaces. Störmer Murphy and Partners performed the functions led to highly efficient workflows, which enabled the firm to finish
high-level planning, taking cost and schedule targets into consideration. planning in less time than comparable projects.
2012 BE Inspired Awards

56

9006_YII_Content_1012.indd 56 11/21/2012 12:20:39 PM


INNOVATION IN BUILDING
Studio Agnellini
Renovation of Residential Building
Lerici, Italy

A EUR 600,000 residential building renovation project located in Lerici, Italy, Studio Agnellini achieved the project goals using MicroStation. The software’s
required the application of bio-building principles. The design had to create a processing speed, intuitive commands, and use of reference files for creation of
space that was healthy for both people and the environment, using eco- drawings contributed to a 20 percent time savings during design. The efficiency
compatible technologies and materials. Energy conservation was also a goal. with which the project team executed this design saved approximately 5
percent of project costs.

Takenaka Corporation
G Project
Tokyo, Japan

A new office complex constructed by Takenaka in Tokyo, Japan, provides Takenaka built an IT network on site and installed MicroStation PowerDraft
96,000 square meters of floor space in 12 stories. Built at a cost of JPY 36.5 to be shared by participating subcontractors. The system supported rapid
billion, the building features highly complex construction including a large- information dissemination, concurrent preparation of working drawings, and
scale anti-seismic system, pillar-less space, and large atrium. Takenaka and mechanical system interference checking, which enabled construction to be
14 subcontractors adopted a common CAD system and constructed a building completed as planned within a tight schedule. Using a common information
information model to coordinate installation of mechanical systems and model and MicroStation’s 3D capabilities reduced review time by one third.
equipment.

Bentley Systems, Incorporated

57

9006_YII_Content_1012.indd 57 11/21/2012 12:20:43 PM


INNOVATION IN BUILDING
Warren and Mahoney
BRANZ Headquarters
Porirua City, New Zealand

Warren and Mahoney transformed the 1960s-era corporate campus of the The rural setting is 13 kilometers from Porirua City, requiring on-site provision
Building Research Association of New Zealand (BRANZ) into headquarters that of core services, ranging from sewage treatment to technology infrastructure.
reflect best practices in sustainable design. The NZD 11.4 million refurbishment Warren and Mahoney collaborated with BRANZ to discuss ideas and review
created a contemporary staff facility and laboratory that facilitates inter- concept drawings, sketch renderings, and design models. Consolidation on
department communications, with the goal of fostering a more interactive and MicroStation and Bentley Architecture streamlined workflows and minimized
sustainable culture. the risk of cost and time overruns.

Warren and Mahoney


University of Otago Plaza
Dunedin, New Zealand

The University Plaza Building houses academic and recreational facilities for Warren and Mahoney’s design concept – which provided for social interaction,
the University of Otago in Dunedin, New Zealand. The NZD 40 million facility recreational sport, outdoor relaxation, and casual dining – delivered a series of
was designed as a catalyst for student life at the eastern periphery of campus. stacked recreational spaces surrounded by classroom spaces, a central “social
Since opening, the facility has had 40 to 50 percent more patronage than a staircase,” and two distinct atriums (academic and recreational). The firm used
comparable facility, putting it on target to achieve annual usage of 1 million MicroStation and Bentley Architecture to streamline workflows and minimize
visits. the risk of cost and time overruns.
2012 BE Inspired Awards

58

9006_YII_Content_1012.indd 58 11/21/2012 12:20:47 PM


Innovation in
Communications Networks
Bentley Systems, Incorporated

Projects in this category demonstrate best practices in the use of intelligent network models, easy-to-use field and web
viewing tools, automated engineering work-order creation, sophisticated network engineering tasks, and end-to-end
network modeling and management.

59

9006_YII_Content_1012.indd 59 11/21/2012 12:20:48 PM


Innovation in Communications Networks
CompanyInc.
IMMCO, Name
Project Control
Quality Name Automation WINNER
LocationColorado, United States
Denver,

Multiple system operators store, analyze, and retrieve massive IMMCO developed an automated Quality Control Toolkit
amounts of hybrid fiber coaxial outside plant (OSP) data. that works seamlessly with Bentley Expert Designer
Automated quality control checks and procedures maintain the Communications. The toolkit takes advantage of Bentley’s
accuracy and consistency of data used for critical applications relational database storage model so OSP data analysis can
such as serviceability analysis, customer provisioning, inventory be quickly performed against enterprise-wide databases. The
tracking, facility and equipment maintenance, and network toolkit improves accuracy and data consistency, saves time, and
planning. reduces costs. A typical analysis now takes about 24 minutes
instead of one week.
2012 BE Inspired Awards

VIEW PRESENTATION
60

9006_YII_Content_1012.indd 60 11/21/2012 12:20:50 PM


Innovation in Communications Networks
Precision Valley Communications
FINALIST Utilizing Bentley in the Hottest Spots
Boston, Massachusetts, United States

A major multiple-system operator (MSO) awarded Precision Valley Completed Wi-Fi locations were tracked via an internal project tracking database
Communications a fast-track project to design construction work packages website, which provided weekly reports to the project team. Precision Valley
for 1,000 Wi-Fi hot spots throughout the greater Boston region within five Communications also provided an on-site project coordinator to verify each
months. Working from the MSO’s network map in Bentley Expert Designer installation. The software enabled the company to complete approximately 63
Communications, the company used Bentley Coax and Bentley Fiber to identify hot spots per week for 16 weeks and meet the project deadline. As a result,
antenna locations, route and verify connections, and generate bills of material. Precision Valley Communications was awarded a contract for 500 more locations.

VIEW PRESENTATION

Infotech Enterprises Ltd.


InfiPlan Office Suite
San Jose, California, United States

Infotech Enterprises developed in-house tools to facilitate optical fiber planning Infotech developed the InfiPlan Office Suite using .NET Framework 3.5,
and design and then consolidated them in the InfiPlan Office Suite, which MicroStation application programming interfaces, and Oracle Spatial 11g. Built
encompasses all phases of FTTx network planning, design, and operation. The on two-tier, client-server architecture, the product is configurable, scalable,
application suite contains a data model that can be customized to any map easily maintainable, and extendable. The application suite can be configured for
standard. any FTTx network building.

Bentley Systems, Incorporated

61

9006_YII_Content_1012.indd 61 11/21/2012 12:20:53 PM


Innovation in Communications Networks
PT. Link Net
Link Net Fiber and Coax Drawing
Jakarta, Indonesia

PT. Link Net, an Internet service provider headquartered in Jakarta, Indonesia, In addition, Bentley Expert Designer Communications improved efficiency and
achieved cost efficiencies and shortened construction time by enabling end-to- productivity by merging network design and work management in a single
end collaboration and ensuring network information was current and accurate. environment. Collaboration among the GIS, design, and core management
Bentley Coax enabled the company to create a single, centralized database divisions improved team allocation, pre-sales team performance, and sales
and eliminate multiple versions of design and as-built documents across the team support. The software also enabled instant updates from the field,
company, ensuring accurate network documentation. facilitated project progress tracking, and shortened construction time and time
to repair.

“Bentley’s communications software is the most


effective system to manage and collaborate
within a company with many divisions.”
– Ignatius Andy Setiawan, Element Management & Engineering Support Div. Head, PT. Link Net
2012 BE Inspired Awards

62

9006_YII_Content_1012.indd 62 11/21/2012 12:20:57 PM


Innovation in Construction
Bentley Systems, Incorporated

Projects in this category exemplify overall excellence during the construction phase of a project. They demonstrate a clear return on
investment via shortened project schedules, mitigated risks to avoid overruns, and the application of technology for advanced work
processes within the construction workforce to benefit all stakeholders.

63

9006_YII_Content_1012.indd 63 11/21/2012 12:20:58 PM


Innovation in Construction
Company
Taylor Name
Woodrow-BAM Nuttall JV
Project Name
Victoria Station Upgrade Jet Grouting WINNER
LocationUnited Kingdom
London,

FINALIST

Company Name
Project Name
Location

Eighty million people pass through Victoria Station on the Initial design of jet grout column orientation was carried
London Underground in the United Kingdom each year. The out using MicroStation. Survey information on the location
station upgrade currently under construction includes a series of services and utilities was fed into the 3D model, column
of sprayed concrete tunnels connecting new and existing parts orientations were adjusted, dynamic sectional views were
of the station. To make the gravel substrate suitable for tunnel reviewed, and construction planning visualizations were created.
construction, 2,500 jet-grout columns were installed by the Geometry data was transferred from the model to the rig
Taylor Woodrow-BAM Nuttall Joint Venture in a GBP 37 million control system, and as-built data was fed back into the model,
work package. eliminating data entry errors.
2012 BE Inspired Awards

VIEW PRESENTATION
64

9006_YII_Content_1012.indd 64 11/21/2012 12:20:59 PM


Innovation in Construction
HNTB Corporation
FINALIST Firm-wide Design-build Quality Plan
Alexandria, Virginia, United States

HNTB’s TrueViz Q-Assist program develops protocols to align quality procedures HNTB uses MicroStation to display data from all applications; ProjectWise
with the aggressive schedules and 3D deliverables associated with alternative as the central data store; Bentley Navigator for mark-up checking and conflict
delivery projects. These procedures make data from multiple sources available resolution; ProjectWise to capture mark-ups in a managed environment; and
for review by staff at multiple locations and capture results in a managed Bentley Navigator for 4D construction phasing. A pilot test during Virginia
environment. HNTB standardized this process on integrated software. Department of Transportation’s USD 600 million 95 Express Lanes project
detected more than 500 potential conflicts on the first run, saving about USD
100,000 on a single resolution.

VIEW PRESENTATION

Shawmut Design and Construction


FINALIST Dudley Square Municipal Building
Boston, Massachusetts, United States

Located in Boston’s Roxbury neighborhood, the USD 86 million Dudley Square Shawmut Design and Construction’s design methodology allowed the
Municipal Building will occupy the site of the historic Ferdinand Building in construction management team to collaborate closely with the design team
Massachusetts. The urban location posed significant challenges, including on resolving constructability issues in real time. This reduced rework and
preservation of three historic facades, coordination among two architectural kept the project on the shortest path to delivery. The firm used ProjectWise
design teams and dozens of subcontractors, and six construction-document to collaborate, ProjectWise clash resolution to review components within the
release packages. model, and Bentley Navigator to review models.

Bentley Systems, Incorporated

VIEW PRESENTATION
65

9006_YII_Content_1012.indd 65 11/21/2012 12:21:04 PM


Innovation in Construction
Hitachi-GE Nuclear Energy, Ltd.
Integrated Plant Construction System FINALIST
Hitachi, Japan

Hitachi-GE Nuclear Energy provides engineering, procurement, and construction MicroStation was adopted as the platform because it is customizable and
services for nuclear power plant construction and maintenance. The Japanese extensible, offers an easy-to-use tool for field workers, interoperates with
company adopted a design approach to developing a construction system that in-house CAD, features fast and expressive graphics, and supports a range of
provides field work information intuitively. The system uses 4D visualization to hardware. The system provides 4D information handling and visualization from
display procedures and information via simulations or movies featuring real field planning to execution and management. Hitachi-GE Nuclear Energy expects the
objects and situations as seen from any viewpoint or aspect. integrated construction system to reduce field installation work by 20 percent.

Special recognition award winner: Bentley Developer network


VIEW PRESENTATION

A. Burmester Arquitectos Associados Lda


Electricity of Portugal
Lisbon, Portugal

The EUR 800,000 Electricity of Portugal project in Lisbon, Portugal, is MicroStation PowerDraft is enabling multiple designers from three different
being designed by A. Burmester Arquitectos Associados. It is a sustainable organizations to work on files simultaneously. At the same time, the files are
project with LEED Gold certification. The project team is using MicroStation constantly updated.
PowerDraft as a collaborative platform.
2012 BE Inspired Awards

66

9006_YII_Content_1012.indd 66 11/21/2012 12:21:07 PM


Innovation in Construction
Afcons Infrastructure Ltd.
Jammu-Udhampur Section Construction
Udhampur, India

This USD 291 million project involved construction, rehabilitation, and Afcons Infrastructure constructed an analysis model in STAAD.Pro to simulate
expansion to four lanes of NH-1A from Jammu to Udhampur in India. The the kinematics of the launching truss by providing the correct loading and
section required 67 bridges to be constructed in difficult terrain. Afcons boundary conditions. This required testing numerous load cases, a process that
Infrastructure determined that a uniform bridge deck structure was needed and took two weeks as opposed to the two months it would have taken using an
selected 20-meter pretension I-girders. The cost-effective solution involved alternative means of analysis. The STAAD.Pro simulation successfully predicted
launching the girders with a launching truss. the actual performance of the structure.

Afcons Infrastructure Ltd.


Metro Rail Viaduct Construction
Kolkata, India

The 11-kilometer metro rail viaduct under construction for Rail Vikas Nigam Afcons Infrastructure designed and analyzed a model of the formwork in
Limited in Kolkata, India, is being executed in two stages over a period of 30 STAAD.Pro. This enabled the design team to perform multiple iterations in much
months. One critical component is the segment casting and erection. Early less time than typically required, and the optimized design led to considerable
design of segment formwork and submission for approval was a primary savings in material.
objective.

Bentley Systems, Incorporated

67

9006_YII_Content_1012.indd 67 11/21/2012 12:21:09 PM


Innovation in Construction
COMSA
Multipurpose Hall of Gran Canaria
Las Palmas de Gran Canaria, Las Palmas, Spain

As contractor for the Multipurpose Hall of Gran Canaria in Las Palmas, Spain, MicroStation was used to verify the geometry and create a complete 3D model
COMSA anticipated a number of design changes and a short fulfillment time. of the structure. Displaying the original project plan and 3D model together
The goal for constructing this EUR 54 million multipurpose hall was to manage allowed COMSA to detect mistakes. Proposed changes were incorporated
information effectively and minimize fulfillment mistakes. in the model for review and issuance of updated plans. Using a constantly
updated, live model during fulfillment sped up communications and aided
decision making.

DPR Construction
Arizona State University New Business School
Tempe, Arizona, United States

DPR Construction developed a lean modeling approach to delivering 3D The integrated platform of Bentley Navigator, AECOsim Building Designer,
visualizations on site during construction of Arizona State University’s new USD MicroStation, and ProjectWise generated and packaged sequential building
60 million business school in Tempe. The goal for this project was to generate information models (BIMs) for field validation. The process eliminated
real-time virtual mock-ups from federated models to pave the way for 3D rolling reproduction of drawings/spool sheets from the model, which reduced field
completion lists and punch list mark-up items. BIM labor time by 12 to 14 percent. Based on initial metrics, the labor reduction
translated into a 35 percent cost savings on BIM resources during construction.
2012 BE Inspired Awards

68

9006_YII_Content_1012.indd 68 11/21/2012 12:21:11 PM


Innovation in Construction
DSD Ferrometalco SAE
New Doha International Airport Cargo Facility
Doha, Qatar

Qatar Civil Aviation Authority is adding capacity at the New Doha International The shipments included curved trusses, handrails, beams, and columns with
Airport in preparation for the 2020 World Cup Tournament in Qatar. DSD complex configurations. Using ProSteel enabled DSD Ferrometalco to meet the
Ferrometalco was tasked with fast-track delivery of steel for the EUR 80 million tight schedule. Modeling revealed optimal designs for efficient construction
cargo terminal currently under construction. The company detailed, fabricated, and reduced waste in material and cost. Shop-welding trusses reduced bolted
and shipped 18,000 metric tons of steel by truck from Egypt to Qatar within 12 connections by 30 to 40 percent. A 25 percent reduction in bolts and spice
months, which was a company record. plates shortened erection time.

Geico S.p.A.
Automotive Paint Shop
Russia

Geico is a turnkey supplier of original coating plants for the vehicle industry Using MicroStation and Bentley Building Mechanical Systems verified
around the world. The company recently completed an automotive paint shop discrepancies in real time during every phase of the project, and the team
for a 108,000-square-meter car factory in Russia. Efficiencies of its software reduced the time required for modeling by 20 to 25 percent. Compared to
enabled Geico to complete the design phase of the paint shop within six previous projects, the number of discrepancies was reduced by up to 30
months. percent. The reduced modeling time saved an estimated 20 percent in costs
compared to previous projects.

Bentley Systems, Incorporated

69

9006_YII_Content_1012.indd 69 11/21/2012 12:21:17 PM


Innovation in Construction
Guangzhou Panyu District Shiqiao Architectural Design Institute Co., Ltd.
Audi 4s Construction
Guangzhou, China

The iconic Audi brand shop in Guangzhou, China, is a 13,000-square-meter STAAD for China was used for steel structural analysis and design, achieving
facility with a three-story exhibition hall and four-story workshop. The a seamless connection between design and construction by leveraging 3D
exhibition hall is a large truss structure with a 32 meter span. As chief technical modeling. The STAAD solution facilitated clear cost accounting, reduced
engineers, Guangzhou Panyu District Shiqiao Architectural Design Institute was computational time, and shortened the construction period to just 90 days.
responsible for the entire project from design concepts through construction
completion and operation.

IBUG 21, S.L.


NIBUG
Barcelona, Spain

Based in Barcelona, Spain, IBUG 21 introduced NIBUG as a system to IBUG 21’s custom application consists of a series of instructions, macros,
industrialize any building. It is designed for use in international building markets and VBA scripts presented in a custom interface that guides the process
where off-site construction facilities are not readily available. The innovative of industrializing buildings. NIBUG can be applied to a variety of buildings,
technology was developed as a custom application within Bentley Architecture, from residential housing to hotels and hospitals. The only requirement is the
which provided easy access to native functions and interoperability with other availability of open, free space.
software.
2012 BE Inspired Awards

70

9006_YII_Content_1012.indd 70 11/21/2012 12:21:20 PM


Innovation in Construction
IDM E&C
Woonmoon Dam Auxiliary Spillway
Daecheon-ri, South Korea

Located in North Gyeongsang Province, South Korea, Woonmoon Dam is IDM E&C developed 4D construction simulations to demonstrate equipment
threatened by unpredictable weather such as typhoons. An USD 87 million, operations and procedures, and gather ideas for reducing costs and equipment
tunnel-type auxiliary spillway is being constructed to improve dam safety idle time. Digital terrain models were used to demonstrate coinciding cut-and-
and minimize environmental disruption. At 14.4 meters in diameter and 600 fill activity. The firm used MicroStation for 3D modeling, construction schedule,
meters in length, the spillway required innovative construction methods to be and method simulation; GEOPAK for 3D terrain modeling; and Bentley Navigator
completed within the tight schedule. for construction simulation demonstration.

Shinryo Corporation
Japan-China Friendship Center HVAC Renewal
Tokyo, Japan

The Japan-China Friendship Center in Tokyo, Japan, is a 37,792-square-meter Given just two months to prepare after the March 2011 earthquake, Shinryo
facility with 12 stories above ground, four stories below ground, and an annex surveyed and measured the building, created a 3D building information model,
for offices, hotel, museum, school, and dormitories. Building equipment repairs prepared work plans, and added a time axis to achieve integrated project
are done during interim periods in spring and fall when cooling and heating delivery. Using MicroStation to centralize the information reduced the effort to
systems are not operating. For this JPY 1 billion project, Shinryo had a 20-day build the work plan from eight people over 60 days to five people over 50 days.
window to replace HVAC equipment and restart operations.

Bentley Systems, Incorporated

71

9006_YII_Content_1012.indd 71 11/21/2012 12:21:28 PM


Innovation in Construction
Tianjin FAW Toyota Motor Co., Ltd.
New Toyota Factory
Tianjin, China

FAW Toyota’s 25,000-square-meter supply factory under construction in Using MicroStation, Bentley Navigator, Bentley Architecture, Structural
Tianjin, China, will produce USD 320 million in parts for 10 automobile models. Modeler, and Bentley PlantSpace, FAW Toyota accurately quantified materials
Preliminary 2D design of the USD 174 million project caused problems with and estimated construction costs. Interferences were eliminated during the
material estimates, interferences, on-site changes, and construction delays. To design phase, reducing on-site changes valued at USD 240,000. Construction
overcome these difficulties, Tianjin FAW Toyota Motor Co. created a 3D digital progress simulation, sequencing, and work package optimization maximized
factory model that improved work efficiency by 80 percent. the use of construction space and shortened the construction period by eight
weeks.

Zachry Industrial, Inc.


Zachry’s Use of ConstructSim
Southeastern United States

Zachry Industrial was contracted to perform engineering, procurement, and ConstructSim integrated data from Bentley PlantSpace, the schedule model,
construction services for a 1,200-megawatt combined-cycle natural gas Zachry’s quantity tracking database, and the steel fabricator’s CAD model
power plant in the southeastern region of the United States. The USD 348 and fabrication status information. Automating material takeoffs and building
million project required 3,500 pipe isometrics with 5,800 piping components smart field installation work packages saved an estimated 2,400 man-hours.
totaling 121,000 linear feet as well as 5,200 structural steel components with a ConstructSim’s integration of engineering, fabrication, and project control data
combined weight of 1,200 tons. put the project on pace to finish a month ahead of schedule.
2012 BE Inspired Awards

72

9006_YII_Content_1012.indd 72 11/21/2012 12:21:39 PM


Innovation in Generative Design
Bentley Systems, Incorporated

This category features projects that have used associative parametric modeling to automate design processes and accelerate design
iterations. These projects exemplify new ways to efficiently explore alternative building forms without manually building a detailed
design model for each scenario. Using generative design accelerates design and documentation efficiency.

73

9006_YII_Content_1012.indd 73 11/21/2012 12:21:41 PM


Innovation in Generative Design
Company
Robin Name Architects
Partington
Project
Park Name
House WINNER
LocationUnited Kingdom
London,

FINALIST

Company Name
Project Name
Location

The Park House is a 1.04-acre city block redevelopment on the GenerativeComponents enabled Robin Partington Architects to
edge of Mayfair in London, United Kingdom, calling for retail explore various iterations of glass technology and its abilities,
space at the basement, ground, and first-floor levels; seven floors which allowed the team to use cold-bending on over 85 percent
of office space on the western end; and 39 private residential of the glass panels to minimize the need for curved panels. The
flats to the east. The GBP 100 million project posed structural advanced technology of MicroStation, Bentley Architecture, and
challenges due to its unique façade, mixed use, proximity to a Structural Modeler ensured that the team was never distracted
London Underground tunnel, and retail requirements of a world- from the main goal of design and development.
renowned location.
2012 BE Inspired Awards

VIEW PRESENTATION
74

9006_YII_Content_1012.indd 74 11/21/2012 12:21:43 PM


Innovation in Generative Design
LAB Architecture Studio
FINALIST Guardian Towers
Abu Dhabi, United Arab Emirates

A collaboration between LAB Architecture Studio and ERGA Progress, the LAB Architecture Studio used GenerativeComponents for extensive testing
Guardian Towers project in Abu Dhabi, United Arab Emirates, is a mixed-use and visualization of the double-skinned façades and fritted glazing, which
complex comprised of an 18-story residential tower, 18-story commercial office were designed specifically for the extreme heat and humidity of the locale.
tower, and a two-level retail podium. The offset tower footprints break the The project was delivered two months early with considerable savings, and
static tradition of extruded, rectangular tower blocks. the office and residential towers are now fully occupied. Utilizing MicroStation
streamlined not only the complexities of the design, but also the logistical
challenges of the team of international partners.

VIEW PRESENTATION
 
   
 

Stanley Beaman & Sears


FINALIST Atlanta History Center Design Competition
Atlanta, Georgia, United States

The goal of the Stanley Beaman & Sears submission to the Atlanta History GenerativeComponents allowed team members to shape the gently
Center Design Competition was to reflect the energy coursing through swooping ceiling forms. MicroStation and Bentley Architecture were used
Atlanta, Ga. The existing space is a series of outdated, darkened galleries and to draw and model the existing space as well as the proposed remodel. The
undersized public areas. The proposed USD 8 million design is a light-filled Luxology rendering engine was used for all visualization and renderings. The
space featuring a dynamic wing-like ceiling flanked by bright, freshly renovated 3D information model also allowed the firm’s fabrication shop to produce
galleries on either side. a physical-scale model MicroStation’s lifelike rendering was used for all
visualizations.

Bentley Systems, Incorporated

VIEW PRESENTATION
75

9006_YII_Content_1012.indd 75 11/21/2012 12:21:52 PM


Innovation in Generative Design
CODA LiTA
Jukbuin
Barcelona, Spain

In the race for more efficient buildings that require less energy, the potential of CODA LiTA proposed a lightweight grid shell with a low-tech fabrication
active-bending structures and the seduction of the slenderness and rigidity of process based in vernacular weaving techniques using strictly industrialized
weaving techniques triggered the exploration of traditional basketry principles. boards. Using GenerativeComponents allowed the firm to standardize elements,
The challenge for this project in Barcelona, Spain, was to minimize energy and which reduced project cost and sped assembly by non-specialists and enabled
material waste while simplifying assembly. the team to develop efficient fabrication and assembly.

Ove Arup & Partners


Fulton Street Transit Center
New York, New York, United States

Situated in New York City, the USD 1.4 billion Fulton Street Transit Center Ove Arup & Partners used MicroStation, Bentley Navigator, and Bentley
project will integrate five existing stations and an historical landmark apps for the iPad to manage over 3,500 2D drawings over seven years and
building into a streamlined transport hub. Dubbed the Grand Central of Lower create a detailed 3D multidisciplinary model that required no changes after
Manhattan, the Fulton Street Transit Center will improve transportation in the an independent engineering review. Clash analysis included all elements –
area, increase property values, expand business opportunities, improve energy structural, mechanical, electrical, and architectural – and improved design
efficiency, and create subway network improvements. coordination prior to being released to the field. LEED certification is expected.
2012 BE Inspired Awards

76

9006_YII_Content_1012.indd 76 11/21/2012 12:21:56 PM


Innovation in Generative Design
Pavilion Architecture
KREOD
London, United Kingdom

Designed in the shape of a seed, the KREOD pavilion is a multifunctional The pavilion was created using generative design, scripting, rapid
exhibition space inspired by nature to celebrate new life. Set on castors so manufacturing techniques, and digital fabrication. The traditional meaning of
no trench or foundation is required, it demonstrates a sustainable approach architect in the mid-16th century was master builder, in which architects were
through the use of recyclable and eco-friendly timber. The pavilion, which can the masters of spatial effect. Through the use of advanced technology like
be securely located indoors or outdoors, demonstrates a practical approach to GenerativeComponents, Pavilion Architecture has regained the medieval role by
transportation, storage, disassembly, and reassembly. becoming the master builder once again.

“Our innovative application of experience and knowledge sharing


enables us to create aesthetically, functionally, economically, and
environmentally friendly designs. Architecture is our passion.”
– Chun Qing Li, Managing Director, Pavilion Architecture
Bentley Systems, Incorporated

77

9006_YII_Content_1012.indd 77 11/21/2012 12:21:58 PM


2012 BE Inspired Awards

78

9006_YII_Content_1012.indd 78 11/21/2012 12:22:02 PM


Innovation in Geotechnical and
Geoenvironmental Engineering
Bentley Systems, Incorporated

The projects in this category maximize the value of centrally managed subsurface data through multiproject reporting and dramatically
extended querying power. Encompassing transportation operations, engineering consultancies, plants, campuses, and state and federal
agencies with vast quantities of geotechnical data, these projects demonstrate the reuse of subsurface mapping information to better
serve civil, structural, geotechnical, and environmental information processes for owner-operators, engineers, and constructors.

79

9006_YII_Content_1012.indd 79 11/21/2012 12:22:02 PM


Innovation in Geotechnical and Geoenvironmental Engineering
Company Name
Mississippi Department of Transportation Geotechnical Department
Project
gINT Name
Implementation at Mississippi Department of Transportation WINNER
Location Mississippi, United States
Jackson,

FINALIST

Company Name
Project Name
Location

A disjointed workflow for processing geotechnical field data The first phase of the project involved creating a geotechnical
in the geotechnical and materials departments had resulted in database structure, report templates, and gINT subroutine to
information being archived as Excel or PDF files with no search import existing spreadsheets. Phase two expanded the database
capabilities. Manual transfer of data between departmental structure to accommodate triaxial test data and reports, and to
reporting tools also introduced errors. The Mississippi import external lab data. The final phase will import legacy data.
Department of Transportation implemented gINT to streamline gINT reduced boring log production time from one hour to 15
the collection, processing, and storage of geotechnical data for minutes and reduced project time by 50 percent.
use in boring log reports and GIS applications.
2012 BE Inspired Awards

VIEW PRESENTATION
80

9006_YII_Content_1012.indd 80 11/21/2012 12:22:04 PM


Innovation in Geotechnical and Geoenvironmental Engineering
Astiv Ingeniería
FINALIST Restoration of Recycled Slag Landfill
Zumárraga, Spain

ArcelorMittal, the world’s leading steel and mining company, operates a blast Astiv Ingeniería designed and built the EUR 3.5 million slag recycling plant using
furnace that had disposed of slag at a landfill site in Zumárraga, Spain. The PowerCivil for Spain to overcome the challenges associated with building on an
landfill was closed in compliance with the strict environmental regulations of existing industrial site. Project engineers estimated that using PowerCivil for
the Basque region, and a slag recycling plant was constructed in its place on the Spain as an integrated solution reduced project time and costs by 33 percent.
same site.

VIEW PRESENTATION

“Bentley’s commitment to meeting our vision for customizing the


gINT software allowed us to transition flawlessly to its use with
very little training and substantial time savings for every project
from here out.”
– Virgil Payne, P.E., Mississippi Department of Transportation
Bentley Systems, Incorporated

81

9006_YII_Content_1012.indd 81 11/21/2012 12:22:05 PM


2012 BE Inspired Awards

82

9006_YII_Content_1012.indd 82 11/21/2012 12:22:09 PM


Innovation in Government
Bentley Systems, Incorporated

The submissions in this category have demonstrated excellence in local, state, provincial, federal, and national government projects.
These projects leverage engineering content and team collaboration, geospatial, civil engineering, and communications network
technology, or combinations thereof. They also use innovative and cost-effective techniques to manage land parcels, create cadastral
fabric, analyze land uses, and execute land and site development projects.

83

9006_YII_Content_1012.indd 83 11/21/2012 12:22:10 PM


INNOVATION IN GOVERNMENT
Company Ltd
Crossrail Name
Project Name
Crossrail WINNER
LocationUnited Kingdom
London,

FINALIST

Company Name
Project Name
Location

Crossrail is being built under central London to link network rail To ensure integrated data management throughout all phases
lines to the east and west of the United Kingdom’s capital. The of the project, Crossrail integrated MicroStation, ProjectWise,
GBP 14.8 billion project includes 21 kilometers of twin tunnels Bentley Map, Bentley Geo Web Publisher, gINT, Hevacomp,
and multiple below-ground stations. The project demonstrates Bentley RailTrack, and STAAD.Pro. The interoperable software
a federated data approach that links systems and 2D/3D data provides data management solutions across the Crossrail
repositories. Crossrail’s strategy incorporates a combination of enterprise. The lifecycle approach saved more than 5,000 man-
standards, methods, and procedures as well as software, tools, hours in 12 months on the tunnel project alone.
and hardware.
2012 BE Inspired Awards

VIEW PRESENTATION
84

9006_YII_Content_1012.indd 84 11/21/2012 12:22:12 PM


INNOVATION IN GOVERNMENT
City of Copenhagen
FINALIST Solar Exposure of Copenhagen City
Copenhagen, Denmark

Copenhagen, Denmark, will be the world’s first carbon-neutral capital in For this DKK 250,000 project, MicroStation and Bentley Map were used to
2025 as a result of 60,000 square meters of solar panels being installed on visualize the solar exposure results along with building information models so
existing and new buildings owned by the municipality. The panels will reduce buildings with solar potential could be quickly located. Intersecting the 3D solar
carbon dioxide by 80,000 tons per year compared to 2010. The 3D city model exposure triangles with the 2D footprint of the buildings saved thousands of
of Copenhagen, which covers 74.4 square kilometers, was analyzed to identify man-hours necessary to assess the buildings manually.
optimum locations for the solar panels in about two weeks.

VIEW PRESENTATION

Napier City Council


FINALIST GIS and Asset Management
Napier, New Zealand

The Napier, New Zealand, city council consolidated its infrastructure asset WorkIT was used to manage the financial and non-financial aspects of the
management systems known as WorkIT to create a single authoritative system assets. For city water supply services, Bentley Map has replaced the
data source for surveying, CAD, GIS, and asset management applications. existing GIS product; Bentley Water provides tools for enforcing business rules;
Standardizing on one technology platform allowed data to be reused without and an Oracle database tracks data changes. WorkIT II not only provided the
being reworked. WorkIT II has improved workflow and data flow while required audit trail and transparency, but also enabled staff to complete one
maintaining data accuracy. year’s worth of water asset data maintenance in fewer than three weeks.

Bentley Systems, Incorporated

VIEW PRESENTATION
85

9006_YII_Content_1012.indd 85 11/21/2012 12:22:14 PM


INNOVATION IN GOVERNMENT
Georender srl
Arco D’Augusto
Aosta, Italy

This urban regeneration and environmental improvement project regenerated The major challenge for the team was to collect and manage the as-built data
the old city square where the Arch of Augustus is located and which connects of the area with a high degree of accuracy. The laser scanner survey provided
with a pedestrian path to the Dora Baltea River in the town of Aosta, Italy. the data that was to be converted in 3D elements, onto which a photorealistic
Characterized by heavy urban traffic, buildings, schools, and shops, this texture was applied. MicroStation enabled the design team to manage the as-
archeological site was surveyed using laser scanning. built data for the urban regeneration design.

I.P.S. Vial S.L.


Global Cities and Roads Inventory Management (InCa)
Madrid, Spain

The Madrid, Spain, municipality traffic enforcement authority is in charge of The goal was to upgrade a custom-developed solution called InCa. I.P.S. Vial
maintaining vertical traffic signs, road markings, parking reserves, and vehicle used MicroStation and MicroStation PowerDraft to develop an intuitive tool for
entrances on all Madrid public roads, which translates into 171,592 coded signs, large volumes of managed information and Bentley Geo Web Publisher allowed
6,526 address signs, and 3,297,036 meters of road line paintings, 585,889 users to access the latest version of the municipality information. Once the
square meters of surface in pedestrian crossing, 11,192 reserved parking zones project is completed in Madrid, it will be implemented in more than 20 other
(private and public), and 43,579 vehicle entrances. Spanish cities.
2012 BE Inspired Awards

86

9006_YII_Content_1012.indd 86 11/21/2012 12:22:17 PM


INNOVATION IN GOVERNMENT
Sarawak Land and Survey Department
Integrated Photogrammetry Solution With MicroStation
Sarawak, Malaysia

The vision of the Sarawak Land and Survey Department in Malaysia is to MicroStation is unique because it can be used for other digital airborne
provide excellence in land administration and land management through reliable surveying technologies such as LiDAR and radar as well as imagery, which
geospatial data. Unlike cadastral mapping that typically involves individual land allowed Sarawak Land and Survey Department’s to deploy the relevant
surveyors to acquire data, topographic mapping requires specific high-accuracy geospatial data collection technology in this USD 4 million project as an
airborne surveying technology that can enable users to extract geospatial efficient digital workflow to accelerate the mapping process. The team is now
features from the survey data outputs. able to produce digital topographical data based on 1:25,000, 1:10,000, 1:5,000,
and 1:2,500 scales.
2400000 2405000 2410000 2415000

10m 10m
5m

5m
10m

10m
Restricted. For Official use only. 10m
Compiled by Director 5m
of Lands & Surveys on 02/08/2012

15m
1

5m
5m
5m

5m
15m

10m
15m
5m
20m 5m 10m
25m

35m
35m
0

20m
30m 20m

10m 10m 20m


10m 25m

10m
25m
25m

5m

20m
10m 35m

15m
10m
10m
10m

30m
35m 15m

15m
25m

15m
35m 10m
10m 20m 20m
10m
10m 20m
20m

15m
15m 20m

20m
10m

10m
10m

20m
5m 15m
10m

5m
10m

15m
5m
15m

20m
20m

10m
15m 20m

10m
10m
20m

10m
20m

15m
10m

15m
10m
20m

10m

20m
10m

15m
25m
5m 30m

10m
25m
10m 20m

10m
20m 20m

30m

30m
20m

10m

25m
10m
25m 10m

10m
20m

10m
15m

20m
25m

25m
5400000

5400000
SHIP. Z

25m
25m 6
KPG

20m

10m
20m

25m
10m
EC KPG 30m 25m
45m 25m

45m
25m 30m
15m
KPG 15m

10m
10m

25m
25m
25m
15m 15m

25m
10m

25m
15m
35m 30m

25m

10m
30m
30m

20m

25m
KPG 30m

25m
5m 20m

20m
IND. A SC

30m
35m
10m 15m
15m

10m
30m
10m 10m 25m 20m

25m
5m 15m
25m
15m KPG

40m
15m

25m
20m 30m 30m
25m EC 30m
15m 40m
25m

15m
30m

40m

30m
25m
25m 15m 10m

15m
15m
35m

35m
3 10m
10

30m
25m
45m
EC KPG
15m
4

40m
25m

50m
15m
IND. A 20m
20m
25m
20m 20m 25m
50m 15m
20m

30m
45m 40m 15m
EC

15m
15m 10m
IND. A

10m
EC

50m

55m
40m 60m

35m
30m
CSC

15m
EC

10m
40m 15m
IND. A
30m

30m

10m
55m 60m
IND. A 50m
50m

50m
45m
SUB STN
35m

35m
35m
30m

45m
35m

15m
50m
40m 4

45m
50m

15m
40m

20m
35m
30m
40m EC EC

10m
20m
40m

15m
15m
40m 40m 55m
50m
20m
30m

40m
IND. A 60m REC.Z
40m
35m

10m
70m 60m 15m
4

50m
APSFIC

45m
65m
55m

40m 30m
25m
EC
50m

30m

20m
5m 15m
25m
25m CSC SUB STN 20m 15m
45m

15m

10m
40m 25m
40m
20m

30m

25m
10m 5m

30m
25m

5m
50m
30m CUR 30m 20m
10m

20m
35m

55m 5m 30m
10m
50m

80m 30m 25m


65m 85 m
75m

15m

30m
55m

T.C
45m

60m 30m 4
45m

5m
35m

40m

5m
35m 50m
25m

EC

15m
35m
15m

50m

25m
45m
60m

35m
30m
15m

5m
CSC 50m
35m

35m

35m
45m 50m 15m 10m 25m
10m

40m
35m
REC.Z IND. A
45m

50m 45m
60m

30m 30m
35m
20m

25m 40m 40m


5m

35m
30m

30m
55m
30m

25m

25m 25m
15m
35m 5m T.C 40m
5m
50m
30m

15m

25m 30m 65m


15m
40m

5m

45m
40m
35m

60m
15m
40m

15m
25m

30m
45m
15m

25m
25m

40m

30m 20m
25m

5m
EC 35m 30m 45m
30m

20m 35m 30m


35m

30m 40m
10m

EC CSC
55m
20m

50m
15m

40m

IND. A EC
35m

35m
30m

EC CSC
35m

25m 40m

APSFIC CSC
20m
5m

35m 20m 35m 20m

30m
45m
40m
35m

40m
25m 10m

15m
20m
40m
REC.Z
45m

30m

35m

20m
45m

30m 10m
60m

45m 55m

20m
40m 45m 50m
60m
50m
REC.Z
35m

10m
50m

10m
55m

35m
45m
EC
35m

15m
60m

70m

40m
5395000

5395000
CSC
65m

25m
65m

70m
40m

35m 55m

85m
60m

55m

PORT 20m
40m
25m EC
75m

50m 25m 15m


20m

65m 60m
50m 20m 15m 15m
10m 40m
30m

70m 60m
APSFIC 15m
45m

15m
30m

10m 10m

C
55m

70m RES A
40m

25m 45m 25m


50m
35m

65m
45m

40m 45m
EC
35m

55m
45m

55m

20m
40m

55m
45m

35m 30m 60m


CSC EC 35m
35m

60m
50m

50m
EC
50m
30m

35m 65m
45m
50m

40m
45m

25m
55m

35m 35m 45m


50m

25m

40m 40m 25m


10m 35m
50m

APSFIC
35m

30m
50m

20m
35m

25m

30m
35m
35m 40m

40m
40m

40m 35m
SUB STN REC.Z 35m 25m
20m

40m

40m 25m
25m

35m

35m

25m 35m
50m

40m
45m

30m
30m

45m
25m

45m

45m 35m 40m


45m

55m
40m

30m 35m
25m 20m
40m

30m
60m
55m

40m

35m
CUR 40m
45m
50m

40m 55m 35m 35m


50m
10m

50m 25m 30m


35m
25m
50m

65m 50m 35m


55m
45m

IND. A
25m

40m
REC.Z
45m

25m
40m 50m
35m

35m
25m

45m

30m

20m 40m
30m
60m

40m
25m

20m

B
60m

45m

55m
40m

45m 50m
IND. A
35m

45m 50m
40m

45m

40m
APSFIC 50m
50m

60m

35m
45m
45m
30m

55m
25m

45m

45m 40m
45m
30m
25m

30m 45m
45m

45m
20m
40m

25m 30m 50m


20m
40m
50m

30m
40m

45m

25m 35m 20m 45m


25m

20m
30m

10m
45m
45m

25m 15m 45m


40m

45m 30m
ECCSC 50m
APSFIC
35m

55m 40m
55m

55m
45m

45m
15m

30m 40m
APSFIC
30m

25m 30m 45m


30m
50m
30m

40m
APSFIC 45m
45m
45m

45m
APSFIC
30m

40m
35m

30m

25m
SUB STN
20m

35m 35m
35m
25m

30m
45m

25m
30m

45m 30m 40m


40m
30m

15m 40m 50m 20m 35m 45m


35m

45m
25m
45m

20m 35m IND. A 25m


20m

45m
25m

35m 25m
20m

50m

EC 40m

A
20m

35m
45m

20m
EC
50m

35m 30m
20m

20m
APSFIC APSFIC 45m
EC IND. A 45m
20m

20m 20m 40m


45m 40m
40m

APSFIC
30m

50m
40m

35m
30m

25m
40m 40m
35m

40m 45m
30m

40m 50m 40m


15m

15m 45m
20m

20m

40m 35m
APSFIC
15m

35m 40m
20m

45m
20m

45m 45m 35m


IND. A 50m IND. A
45m
20m

DRAIN DRAIN
S.I.A
EC EC
40m

45m
20m

20m
40m

45m

CWC EWC
20m

40m
35m

EC
10m

20m
15m

35m 30m
30m 30m 35m 30m 25m
15m

20m 25m 25m


DRAIN
25m 25m IND. A 45m
40m

15m
15m

30m 20m
S.I.A EC EC
40m

35m

30m
35m

20m
45m

35m 50m
SHIP. Z 40m
35m
40m

20m 60m
REC.Z APSFIC
SC 25m 25m APSFIC 55m
70m
15m

IND. A
25m
15m
15m

30m
40m
20m

20m
35m

20m 20m
45m

S.I.A EC 40m 45m


10m

40m
20m

EC 45m
EC
15m

20m 45m
APSFIC 20m
50m

15m 20m
APSFIC DRAIN
45m

50m
SHIP. Z EC EC EC Legend
30m

20m EC
S.I.A IND. A
25m
IND. A
20m

20m

EC DESCRIPTION
20m

S.I.A
EC
50m

25m S.I.A EC EC
20m

APPSFIC APPROVE SITE FOR INDUSTRIAL COMPANY


15m

15m
10m

10m
15m
20m 20m
15m APSFIC CSC COMMON SERVICES CORRIDOR
25m

35m 25m
20m
SUB STN
25m

20m
30m
10m

30m 15m
15m

10m
25m CUR COMMON UTILITIES RESERVE
25m

15m
30m
15m

25m
EC CWC COMPANY WORKERS CAMP
25m

20m

E.R
30m
5390000

5390000
15m
15m
20m

40m
DRAIN DRAIN RESERVE
20m
25m

20m

25m 30m
EC
25m

25m 50m
APSFIC
45m

EC EC ENERGY CORRIDOR
50m

10m
15m
25m S.T.P
25m

ER
20m

EXISTING REFINERY
25m

45m
25m

20m
25m
25m 25m

35m

IND. A 45m 40m


20m

APSFIC EC EWC
EXISTING WORKER CAMP
30m

20m

25m
40m

45m

IND. A
30m

20m 25m
INDUSTRIAL AREA
35m

30m
WTP
15m

20m
25m
5m

30m

45m
50m
15m KPG KPG NYALAU SETLEMENT
20m
30m

25m 30m
45m
15m

REC.Z 25m 50m


RREC.Z RECREATIONAL ZONE
20m

20m
40m
20m

RES A
RESIDENTIAL AREA
20m

45m
30m

30m

40m
PORT
50m
SAMALAJU PORT
45m

45m
20m

40m
SC
5m 50m SERVICES CENTRE
40m

45m
S.T.P
45m
SEWERAGE TREATMENT PLAN
20m

SHIP.Z
30m

40m
SHIP BUILDING ZONE
30m
20m
35m

20m

30m
45m
40m

S.I.A
35m

SOPPORTING INDUSTRIAL AREA


40m

20m

30m 30m
SUB STN
35m

40m
25m SUB STATION
25m

20m 40m
45m 30m
T.C
30m TOWN CENTRE
35m

40m
40m

30m

WTP
30m

30m 45m WATER TREATMENT PLAN


40m
45m
30m

35m
35m

45m 20m
35m

PROPOSED_ROAD_RESERVE
40m

25m

30m
10m

40m
45m
40m

25m

30m
EXISTING_ROAD_RESERVE
20m
CONTOUR
SAMALAJU(5CONTOUR5M_MASTER_NEW.dxf
meter) Polyline
15m
25m

spot_height (meter)
25m

TERHAD

2400000 2405000 2410000 2415000

Orthophoto 2010_2011 SAMALAJU INDUSTRIAL PARK AND TOWNSHIP BINTULU SARAWAK


SCALE 1:20 000
0 250 500 1,000 1,500 2,000
Meters

Seh Nirman
Implementation of GIS in the Middle-class City of India
Bhiwandi, India

In this INR 55 million project for Bhiwandi, India, Seh Nirman created a GIS Using Bentley Map to create the GIS, Seh Nirman reduced data collection time
that has increased property tax collection by 10 times through an increase by 50 percent and increased GIS implementations and follow-ups by 60 percent.
in tax collection from 30 percent to 86 percent, which includes a 50 percent What made this project unique was the successful implementation of a GIS
increase of property tax collection for new properties. By implementing a GIS data collection, integration, and implementation within a large city within a
and conducting accurate GIS survey information, the city is now able to conduct single solution.
more accurate tax assessments.

Bentley Systems, Incorporated

87

9006_YII_Content_1012.indd 87 11/21/2012 12:22:29 PM


INNOVATION IN GOVERNMENT
South Carolina Department of Transportation
Outdoor Advertising Permitting System
Columbia, South Carolina, United States

The South Carolina Department of Transportation (SCDOT) manages more Bentley’s task was to integrate three permitting systems into one database
than 6,400 active billboard permits, 3,180 inactive billboard permits, and 1,400 that would allow for easy access of data, timely retrieval of information, a web-
vegetation maintenance permits. The Outdoor Advertising Permitting System based interface, and a system that puts SCDOT on the cutting edge of billboard
manages the application data – including transfer of sites, revision of active management. The application streamlines these workflows and manages data
permitted billboards, and the replacement of permit tags – and allows sign in a single database as well as transfers data residing in existing databases.
owners to review their applications and permits online. The workflow-driven solution is now available to other DOTs.

Ville de Grenoble
ProjectWise Interoperable Real Estate Municipal Database
Grenoble, France

With management oversight of more than 120,000 documents and 750 MicroStation, ProjectWise, and Bentley Map provided a complete integration
SCDOT _ Outdoor
municipal buildings, Advertising
a priority Permitting
for the municipality of Grenoble, System
France, is toImagesofTab_1
the city’s information system, which also acts as an experimental laboratory
optimize the management of municipal real estate. The goal of this project for implementing ProjectWise and Bentley Map in other cities. The system
was to federate and exploit heterogeneous data from an Oracle real estate integrates a design team distributed over multiple locations, facilitates
database, GIS, CAD software (DGN and DWG), and Bentley Map. The challenge rapid deployment of a project team, and accelerates information sharing and
was to offer a user-friendly solution without redundancy. communications across project teams.
2012 BE Inspired Awards

88

9006_YII_Content_1012.indd 88 11/21/2012 12:22:33 PM


Innovation in Land Development,
Engineering, and Management
Bentley Systems, Incorporated

The projects in this category demonstrate excellence in planning, engineering, analysis, design, and management of site projects for
buildings, plants, environmental, commercial, or governmental campuses. Managing a facility’s spaces, assets, and occupancy requires
information created in many systems by many people over time. A digital asset facilitates design collaboration, supports construction
delivery, and leverages facility information for operations and maintenance.

89

9006_YII_Content_1012.indd 89 11/21/2012 12:22:36 PM


Innovation in Land Development, Engineering, and Management
Company Name
Mortenson Construction
ProjectValley
Spring Name Wind Project WINNER
Location
Ely, Nevada, United States

FINALIST

Company Name
Project Name
Location

Located on 7,600 acres of land managed by the Bureau of Land Using MicroStation, InRoads, Bentley Map, and Bentley View,
Management near Ely, Nev., the Spring Valley Wind Farm’s 66 Mortenson reduced each turbine site by nearly 40 percent,
turbines will generate 152 megawatts of wind power. Mortenson resulting in a 77-acre reduction in approved ground disturbance
Construction modeled each stage of construction to optimize area. When identification of pygmy rabbit habitat required a
the layout of turbine parts and equipment. Reducing the project redesign of roads, turbines, and electrical connections, InRoads
footprint minimized the cultural, historical, and biological impact. enabled quick changes and model delivery for machine control
grading with no impact on the project schedule.
2012 BE Inspired Awards

VIEW PRESENTATION
90

9006_YII_Content_1012.indd 90 11/21/2012 12:22:39 PM


Innovation in Land Development, Engineering, and Management
BBKS-Projekt Sp. z o.o.
FINALIST Taxiways at Rzeszów-Jasionka Airport
Rzeszów, Poland

Rapid growth of passenger traffic at Rzeszów-Jasionka Airport in southeastern BBKS-Projekt partnered with a general contractor to deliver the project.
Poland prompted investment in infrastructure improvements. The USD 30 MicroStation PowerDraft, InRoads, and Bentley View were used to create the
million design-build project included a 3,000-meter-long parallel taxiway; 375- digital terrain model, develop geometry, model alternative alignments, model
and 400-meter rapid-exit taxiways; 182.5-, 205-, and 510-meter perpendicular tricky intersections, and check constructability. The software allowed the
taxiways; and a 4,600-square-meter apron extension. The new taxiways nearly project team to meet deadlines in a tight delivery schedule and provide the
tripled the airport’s capacity, enabling a single runway to handle up to 16 planes general contractor with accurate and ready-to-build data.
per hour.

VIEW PRESENTATION

Tandon Urban Solutions Pvt. Ltd.


FINALIST Nadaprabhu Kempegowda Green City Project
Bangalore, India

The USD 1.2 billion Nadaprabhu Kempegowda Green City Project was initiated The company used MicroStation and Geo Web Publisher for survey, mapping,
by the Bangalore Development Authority as a sustainable alternative to the and public information; PowerCivil for land development; MicroStation
haphazard growth typical of India. The site covers 4,043 acres encompassing GeoGraphics for town plots; MXROAD for roads and bridges; WaterGEMS,
12 villages. As the primary consultant on the project, Tandon Urban Solutions is StormCAD, and PondPack for water supply; SewerCAD for sewerage and
responsible for planning and design through construction and maintenance. sewage treatment; and Bentley Substation for power supply. This approach
cut planning time from 12 to 18 months to six months and saved about USD 1
million.

Bentley Systems, Incorporated

VIEW PRESENTATION
91

9006_YII_Content_1012.indd 91 11/21/2012 12:22:46 PM


Innovation in Land Development, Engineering, and Management
COWI India Private Limited
3D Property Mapping Using SOSI Standards
Oslo, Norway

Abstract 3D mapping of urban and semi-urban areas at scales larger than COWI India customized MicroStation to extract, integrate, and convert the
1:1000 is complicated by the coexistence of manmade and natural features of data to SOSI format. The digital environment maintained planimetric accuracy
various sizes and magnitudes. This project developed a 3D digital database of 0.15-0.55 meters for higher level and 10 to 50 meters for lower level data.
for managing land in urban areas within Oslo, Norway. In addition, the 3D Terrain information was three times more accurate than the allowed tolerance
geospatial vector data was converted to the country’s standard GIS format, for height per SOSI requirements. MicroStation’s flexibility allowed geo-
Systematic Organization of Spatial Information (SOSI). databases to be migrated and integrated with external GIS environments.

Giulio Vatteroni Architetto


3D Modeling of the Village of Casette
Casette, Italy

The village of Casette is located on the outskirts of Massa in Italy’s Tuscany Using MicroStation allowed the project team to import different file types from
region. Giulio Vatteroni Architetto was retained to design refurbishment different sources and manage the point clouds efficiently, which shortened the
projects for public gardens, parking facilities, and other areas. Laser scanning time spent on data management. These time savings translated into a higher
provided the point-cloud data required to create the 3D model and design the return on investment for both the customer and the architect.
refurbishments.
2012 BE Inspired Awards

92

9006_YII_Content_1012.indd 92 11/21/2012 12:22:50 PM


Innovation in Land Development, Engineering, and Management
Seoyeong Engineering Co., Ltd.
North Cheonan Industrial Complex Underground Piping Management (Pilot)
Cheonan, South Korea

The North Cheonan Industrial Complex Underground Piping Management Using MicroStation and InRoads provided a direct connection between
Project in Cheonan, South Korea, is a pilot project for 3D modeling of piping design and data management as well as interoperability with other
underground pipe management. By determining the design, clash detection, applications. In the future, having known coordinates will save weeks by
and pipeline route changes, Seoyeong Engineering now knows the exact eliminating the need to survey for pipeline locations during construction. A
coordinates of installed pipes for future maintenance. Construction contractors significant environmental and community impact is the improvements in the
can apply these coordinates to RTK survey equipment with RF sensors to lives of the residents who rely on underground pipes for water.
locate pipes.

U3D&C
South Pars Gas Field Development Project
Esfahan, Iran

The goal of this project was to develop a site and road model for use in U3D&C selected MicroStation as the solution for capturing 3D terrain
development of the USD 30 million South Pars Gas Field in Esfahan, Iran. information from Google Earth since surveying was not possible in inaccessible
U3D&C created a digital terrain model that was used to visualize the project areas. InRoads was used to make the digital terrain model based on this
area terrain. The client also requested that the 3D model be flexible enough to information. MicroStation and InRoads delivered a flexible 3D digital terrain
be easily changed as new information became available during construction. model at reduced cost and in less time than planned, allowing the project to be
completed two months early.

Bentley Systems, Incorporated

93

9006_YII_Content_1012.indd 93 11/21/2012 12:22:55 PM


2012 BE Inspired Awards

94

9006_YII_Content_1012.indd 94 11/21/2012 12:22:59 PM


Innovation in Mining and Metals
Bentley Systems, Incorporated

Mining and metals engineering professionals strive to shorten project schedules and lower operating costs through improved access to
mission-critical information. The projects in this category use software to demonstrate both short-term and long-term benefits that not
only improve the performance of engineering and construction capital projects, but also increase the efficiency of operations for mines
and metals processing and refining plants.

95

9006_YII_Content_1012.indd 95 11/21/2012 12:23:00 PM


INNOVATION IN MINING AND METALS
Company
Petra Name Limited
Diamonds
ProjectGIS
Finsch Name WINNER
Location
Lime Acres, South Africa

FINALIST

Company Name
Project Name
Location

Located in the Northern Cape province of South Africa, the The GIS links spatial data and information scattered in various
Finsch mine is operated by majority owner Petra Diamonds, databases. Survey and plan data are captured and digitized in
which developed a ZAR 700,000 integrated spatial data MicroStation; Bentley Map links features representing the mining
management system to manage geospatial data for five lifecycle, town layout, and residential setup; and Bentley Geo
departments that were functioning in isolation. The company Web Publisher makes the geospatial mining and town information
also co-manages the mining town of Lime Acres, for which the accessible to the whole mining group. For billings, the database
GIS-based system captures data and bills residents for water interrogates the human resources system and automatically sends
and electricity usage. invoices to residents.
2012 BE Inspired Awards

VIEW PRESENTATION
96

9006_YII_Content_1012.indd 96 11/21/2012 12:23:01 PM


INNOVATION IN MINING AND METALS
AMEC
FINALIST Cloudbreak Enhancement Project
Pilbara, Australia

As part of the Cloudbreak Enhancement Project Team Joint Venture, AMEC Rapid deployment of MicroStation, Structural Modeler, and Bentley PlantSpace
was awarded an AUD 247 million engineering, procurement, and construction enabled the multidiscipline project team to streamline workflows in an
contract for FMG’s Cloudbreak ore-handling plant wet front-end project in integrated, intelligent 3D modeling environment. Bentley Navigator was used to
Western Australia. The first phase examined a previous design, established visualize design concepts, and model reviews minimized downtime for tie-ins to
feasibility, and recommended agreed-upon improvements. Phase two entailed the existing plant. Issuing structural steelwork models directly to shop detailers
delivery of the project within 19 months. reduced steelwork drafting time by 31 percent.

VIEW PRESENTATION

Kumba Iron Ore Limited


FINALIST Kolomela Environmental Management Systems
Postmasburg, South Africa

Kumba Iron Ore developed an integrated environmental monitoring data Building on the MicroStation platform for cadastral and survey data, Kumba
management system for the Kolomela Mine in Postmasburg, South Africa. The added Bentley Map as the source for GIS-related features. Bentley Geo Web
ZAR 1 million project saves time by providing a one-stop shop for environmental Publisher was implemented to share geospatial and attribute data with other
monitoring data, such as water, dust, and biodiversity. An innovative handheld departments. Using the GIS tool to build an integrated Mine Closure Plan also
unit allows field data to be captured and automatically downloaded when the allows Kumba Iron Ore to track progress on managing closure liabilities and
unit is docked, eliminating human error during data transfer. rehabilitation projects.

Bentley Systems, Incorporated

VIEW PRESENTATION
97

9006_YII_Content_1012.indd 97 11/21/2012 12:23:05 PM


INNOVATION IN MINING AND METALS
3Deling sp. z o.o.
Wieliczka Salt Mine Laser Scanning
Wieliczka, Poland

Established in the 13th century, the Wieliczka Salt Mine in Poland is one of the 3Deling surveyed the mine with advanced 3D laser scanners and processed
word’s oldest operating salt mines and a UNESCO World Heritage Site. 3Deling the data using Bentley Pointools. The stereo movie was created by using
created a stereo 3D movie and virtual tour of the site, prepared 2D floor and parallel camera paths and then importing images to MicroStation and Bentley
ceiling plans and sections with high-resolution orthoimages, and archived point- Pointools. The interoperability of the tools and ability to process data in various
cloud data for comparison with future surveys. That data will aid in detection of file formats allowed for uninterrupted workflows, which saved time and the
rock layer deformation and historic preservation. expense of licensing other products.

Anglo American plc


Geospatial Integration Project
Johannesburg, South Africa

As one of the world’s largest mining companies, Anglo American operates in The ZAR 450,000 project utilizes ProjectWise, Bentley Geospatial Server,
Africa, Asia, Australia, North America, and South America. To realize its vision Bentley Geo Web Publisher, Bentley Descartes, Bentley Map, and MicroStation.
for fully automated and remote mining operations, the company needed to The technology provides caching servers, delta transfer, standards
exploit 3D spatial information. The Geospatial Integration Project was designed enforcement, and full audit trails that ensure data integrity and change control.
to build an integrated GIS platform based on a common architecture to provide Currently exceeding 15 terabytes, the managed data store informs decisions
a single management system for geospatial data, workflows, and reports. regarding mine planning, design, safety, and the environment.
2012 BE Inspired Awards

98

9006_YII_Content_1012.indd 98 11/21/2012 12:23:25 PM


INNOVATION IN MINING AND METALS
Aurecon Hatch
Wiggins Island Coal Export Terminal
Gladstone, Australia

The Wiggins Island Coal Export Terminal project is adding an 80‑million‑ton The Aurecon Hatch team adopted promis•e to deliver the remainder of
per‑annum coal export terminal to the Port of Gladstone, Australia. Aurecon the project, realizing benefits in the process: electrical drawing standard
Hatch’s work package included design, supply, and control of all low-voltage enforcement, data-centric modeling, automation of schematic drawing creation,
electrical components. An estimated 1,200 schematics formed part of the integration with Bentley PlantSpace, and automatic report generation. This
2,000 deliverables. Schematic drawing production began using AutoCAD but reduced the amount of resources needed to meet the project deadline and
transitioned to MicroStation to achieve time and cost savings. reduced manual checking by 50 percent.

Bechtel Australia Pty Ltd


Caval Ridge Coal Mine
Moranbah, Australia

The AUD 4.2 billion Caval Ridge greenfield project is developing an open-cut Bechtel used ProjectWise to manage project deliverables produced by offices
coal mine with more than 20 kilometers of haul roads and pit ramps, two in Australia and Taiwan. MicroStation was the main platform for design,
run-of-mine facilities, a crushed ore stockpile with stacking and reclaiming modeling, and drafting across all disciplines. Using InRoads for civil earthworks,
facilities, a new coal handling and preparation plant, two product coal road works, and drainage design allowed the fast-tracking of civil design work
stockpiles, an 11-kilometer overland conveyor, and rail spur and train and early site construction activities. Bentley Navigator and Bentley i-models
load-out facilities. enabled 3D model reviews.

Bentley Systems, Incorporated

99

9006_YII_Content_1012.indd 99 11/21/2012 12:23:26 PM


INNOVATION IN MINING AND METALS
China Nerin Engineering Co. Ltd.
Tongling Nonferrous Metals Copper Smelting Project
Tongling, China

The USD 1.1 billion copper smelting factory in Tongling, China, uses advanced China Nerin Engineering completed basic design, detailed design, and technical
flash smelting and flash converting technology to produce an annual output of service within 16 months using Bentley PlantSpace for 3D factory design and
400,000 tons of cathode copper and 1.45 million tons of sulfuric acid. The 3D ProjectWise for collaborative design management, which reduced changes by
engineering design work – from basic to detailed design – encompassed 15 56 percent. Optimizing the plant configuration decreased space requirements,
disciplines. Collaborative technology enabled some of the work to be done by reducing construction investment by 10 percent, and 3D construction planning
designers at headquarters instead of on site, which reduced labor hours by 35 shortened the 36-month schedule by nine weeks.
percent compared to comparable projects.

Hatch Associates Pty Ltd


Qinghai Magnesium Smelter – Dehydration Facility
Golmud, China

Qinghai Salt Lake Industry Company appointed Hatch to perform basic Hatch confirmed the plant layout using Bentley PlantSpace for piping,
engineering for modifications to a 100‑kiloton per‑annum magnesium smelter equipment, and cable tray layout. Structural Modeler was used for the building
project as well as front-end engineering and design for the dehydration facility. concrete structure and steel superstructure. Bentley Data Manager served as
With process engineering located in Montreal, Canada, and Perth, Australia, the master engineering database, which was synched with Bentley PlantSpace
and drafting carried out in Shanghai, China, ProjectWise facilitated review P&ID for confirmation of 248 P&IDs. The company performed 3D design reviews
cycles. using Bentley Navigator and Bentley i-models.
2012 BE Inspired Awards

100

9006_YII_Content_1012.indd 100 11/21/2012 12:23:29 PM


INNOVATION IN MINING AND METALS
Minerva Engineers Pty Ltd
Western Turner Syncline Phase 1
Tom Price, Australia

Rio Tinto engaged Minerva Engineers (now Calibre Global Pty Ltd) to design a Bentley’s intelligent 3D design software and Integrated Structural Modeling
32‑million‑ton per‑annum, 21-kilometer overland conveyor system to transport (ISM) tools allowed models to be exported for shop-detailed fabrication
iron ore from the new S10 mine to the existing Tom Price processing plant in drawing production. Material take-offs directly from models enabled orders to
Western Australia. From initial layout to shop fabrication, Minerva was involved be placed early, reducing the schedule by about three months. An additional
in the full engineering design cycle for this AUD 650 million project. 8,000 man-hours were saved using Structural Modeler and InRoads to
coordinate conveyor footing data.

OJSC Magnitogorsk Gipromez


Hot Rolling Mill’s Boiler Room
Magnitogorsk, Russia

OJSC Magnitogorsk Gipromez has a 72-year history as general designer Bentley Raceway and Cable Management provided automated cable routing,
for Magnitogorsk Iron and Steel Works in Russia’s Chelyabinsk region. The exact cable lengths, and accurate material quantities. The company modified
traditional 2D design company conducted a pilot project in 3D design of a hot Bentley Raceway and Cable Management catalogs to include equipment widely
rolling mill boiler room to improve design speed and quality while reducing used in Russia. AutoPLANT Piping was used to design boiler room pipelines,
mistakes. Bentley 3D solutions were adopted for the parts most widely present with input from the database of Russian distributors. The RUB 105.9 million
in the company’s work. project revealed the advantages of using 3D design to minimize errors and
obtain exact material counts.

Bentley Systems, Incorporated

101

9006_YII_Content_1012.indd 101 11/21/2012 12:23:32 PM


INNOVATION IN MINING AND METALS
SJM Tech S.a.s.
3D Mining Complex Virtual Tour
Buggerru, Italy

SJM Tech produced a 3D virtual tour of two historical mining facilities in MicroStation provided the platform for combining the complex survey data in
Buggerru, Italy. The interactive visualization was created using more than 1 optimized 3D textured models. SJM Tech’s work involved aerophotogrammetry
terabyte of survey data from more than 200 laser-scanner stations located at and digital cartography, 3D digital terrain model optimization, 3D mesh data
the Porto Flavia and Galleria Henry mines. Available for viewing on the web, the manipulation, laser scanner point-cloud visualization, and 3D modeling and
simulations provided a high-fidelity representation of the structures as well as texturization. The final DGN file was exported to the client’s CAD application.
audio-visual content strategically positioned along the visitor’s path.

Turkish Hard Coal Mining Authority


Gas Tracing at -1,000 Meters With Bentley Geo Web Publisher
Zonguldak, Turkey

The Turkish Hard Coal Mining Authority digitized 1,200 archived paper maps ProjectWise and Bentley Navigator enabled project collaboration and data
to improve accessibility and productivity for all project teams. In addition, standardization, which reduced man-hours by about 15 percent. A significant
galleries, wells, shafts, boreholes, and equipment for five branches were part of the final data was published using Bentley Geo Web Publisher and now
modeled in MicroStation. The USD 350,000 project encompassed 300 enables the authority to monitor gas-tracing sensors located in the galleries
kilometers of galleries, 8 million tons of coal reserve, and 250 boreholes. and take precautions in case of emergency, making it an effective emergency
warning system.
2012 BE Inspired Awards

102

9006_YII_Content_1012.indd 102 11/21/2012 12:23:34 PM


Innovation in Offshore Engineering
Bentley Systems, Incorporated

The projects in this category represent tremendous innovation in the use of Bentley software to produce intelligent infrastructure that
is measured in terms of operational efficiency, constructability, safety, and use of energy and non-renewable resources in marine
environments. This category recognizes projects that have created new and sustainable value in every stage of the facility lifecycle.

103

9006_YII_Content_1012.indd 103 11/21/2012 12:24:07 PM


INNOVATION IN OFFSHORE ENGINEERING
Company
Nippon Name
Steel & Sumikin Engineering Co., Ltd.
ProjectInternational
Tokyo Name Airport Re-expansion Project WINNER
Location
Tokyo, Japan

FINALIST

Company Name
Project Name
Location

The new JPY 600 billion D-runway at Tokyo International Nippon Steel & Sumikin Engineering performed detailed
Airport is needed to accommodate growing demand and provide design and led the five-year construction phase. SACS was
additional arrival and departure slots. With limited space, the used to conduct the complex fatigue analyses for the jacket
only option is to build into the sea on an island 3,120 meters long units – totaling nearly 40,000 checkpoints – in just six months.
with a 1,100-meter-long steel jacket-type pier. The first to be Automatic calculation of stress concentration factors shortened
used in construction of airport infrastructure, the jacket structure the time required, and material take-offs allowed quantity
is 520 meters wide, has an area of 520,000 square meters, and estimates to be made immediately upon completion.
comprises 198 separate units.
2012 BE Inspired Awards

VIEW PRESENTATION
104

9006_YII_Content_1012.indd 104 11/21/2012 12:24:25 PM


INNOVATION IN OFFSHORE ENGINEERING
CNGS Engineering
FINALIST Ice-resistant Offshore Platform LSP-1
Caspian Sea, Russia

Designed for offshore oil field development on the northern shelf of the Caspian The company used a variety of Bentley software for the 3D design of the piping
Sea, the LSP-1 is an ice-resistant stationary 20,000-ton platform that has systems and steel structures. Steel structures were designed with Structural
a fixed rig and custom-designed steel-plate jacket. The support units were Modeler; piping systems were designed with Bentley PlantSpace; and other
designed to sustain the platform’s massive weight as well as prevent ice load systems were designed with MicroStation. Metal strength analyses were
damage. Using 3D modeling from design through construction staging enabled double-checked in SACS, and ProjectWise enabled team members in different
CNGS Engineering to design the platform in less than one year. locations to collaborate.

VIEW PRESENTATION

Robert Elks & Associates


FINALIST Rock Bolting Rig
Onslow, Australia

The USD 37 billion Gorgon project is developing the Gorgon and Jansz gas The firm completed the project within 12 weeks. SACS calculated the
fields off the northwest coast of Western Australia. Part of this project is environmental load for hundreds of combinations and checked members against
the 59.4-kilometer-long subsea DomGas pipeline. Robert Elks & Associates standards. STAAD.Pro developed analysis models of welded assemblies, and
was retained to perform structural and mechanical engineering design and data exchange with the latest ProStructures model integrated the workflows.
fabrication detailing for the rock bolting rig, which will install 1,546 pairs of The 3D environment allowed collaboration, visualization, and clash detection for
stabilization anchors on the seabed along the pipeline. a fully coordinated design.

Bentley Systems, Incorporated

VIEW PRESENTATION
105

9006_YII_Content_1012.indd 105 11/21/2012 12:25:03 PM


INNOVATION IN OFFSHORE ENGINEERING
Francis Design Consulting SARL
Villa 567 Cote d’Azur
Châteauneuf de Grasse, France

Superyacht designer Martin Francis of Francis Design Consulting designed a The 3D functionality of MicroStation and its Luxology rendering engine enabled
100 meter motor yacht using 3D modeling for vessel design and analysis. The the entire yacht to be designed in 3D. The Luxology rendering engine allowed
EUR 250 million project involved conceiving and modeling the hull form and then rapid visualization of the vessel design. Embarking from the French Riviera, the
exporting the data file to MicroStation for the remaining work. Villa 567 Cote d’Azur will sail the oceans of the world.

Hyundai Heavy Industry


BP Quad 204 Project
Shetland, United Kingdom

Located on the United Kingdom continental shelf approximately 130 kilometers Hyundai Heavy Industry is the engineering, procurement, and construction
west of the Shetland Islands, BP’s Quad 204 project involves redevelopment contractor charged with completing the USD 1.3 billion project in 42 months.
of the existing Schiehallion and Loyal fields. This includes replacement of the SACS was used to model the structure and analyze load combinations for top
Schiehallion floating production, storage, and offloading (FPSO) vessel with side and hull appurtenance design and engineering, which saved significant
a new FPSO vessel, addition of production and water injection wells, and costs by optimizing the size and depth of sections and reducing the total
numerous subsea infrastructure. weight of steel. MicroStation and STAAD.Pro were also used in design and
engineering.
2012 BE Inspired Awards

106

9006_YII_Content_1012.indd 106 11/21/2012 12:25:39 PM


INNOVATION IN OFFSHORE ENGINEERING
Hyundai Heavy Industry
Shwe Gas Project
Rakhine State, Myanmar

Hyundai Heavy Industry operates a 215-acre offshore yard with a gantry crane Hyundai performed the primary structural analysis in the early stages of the
capable of lifting 1,600 tons. The company was retained as an engineering, project. Sea transportation and block handling were key issues in designing
procurement, and construction contractor for the USD 1.5 billion, 65-month the structure for transfer from the yard to the project site. SACS was used
project to construct facilities for producing, processing, and transporting for modeling, analysis, and optimization of the structural system under load
natural gas from the Shwe gas fields off the coast of Rakhine State in Western conditions like transport, installation, launching, floating and lowering,
Myanmar. on-bottom stability, block handling, load-out, wave response, fatigue, and
earthquake conditions.

ISC Consulting Engineers A/S


Upending Hinge Installation of Mono Piles
United Kingdom

ISC Consulting Engineers offers services within all areas of construction, The upending hinge measures 6 meters (outside dimension) by 80 meters
process engineering, technical systems, oil and gas industry, infrastructure, (length) and weighs 800,000 kilograms. To meet the requirements for
and IT, which include the design of tools for use in the installation of offshore fabrication within the allotted time frame, ISC used ProSteel to prepare the
windmills. The upending hinge for installation of mono piles was designed to workshop drawings. Within ProSteel’s 3D modeling environment, the project
ensure lateral guidance of the mono pile from uncontrolled movements during team achieved an innovative design that fulfilled the project requirements.
the mono pile upending and lifting process on the vessel.

Bentley Systems, Incorporated

107

9006_YII_Content_1012.indd 107 11/21/2012 12:26:16 PM


INNOVATION IN OFFSHORE ENGINEERING
Knowsley SK
Offshore Production Platform Deluge Skid
Manchester, United Kingdom

A USD 2.5 million fire-fighting foam deluge skid for use on an oil-and-gas With a design-build schedule of 26 weeks, Knowsley saved time by exporting
floating production, storage, and offloading unit was designed to be compact piping and structural models from current CAD applications to AutoPIPE and
and lightweight yet able to the withstand extreme weather of the North Sea STAAD.Pro. Integrating the piping and structural models allowed engineers to
and Gulf of Mexico. The challenge was to design the skid to withstand more analyze pipe work and steel work interaction under stress. This workflow saved
than 30 load conditions including transportation, rough seas, and high winds. an estimated 220 man-hours and reduced material costs by 10 percent.

Larsen & Toubro Limited


GDU-GSU Module for MHN Project
Mumbai, India

Installed at the Mumbai High North field off the west coast of India, the USD To reduce offshore installation time, the firm combined the GDU and GSU in one
925 million process and living quarter platform houses process gas compressor module. A new structural configuration of beams, columns, and vertical braces
modules, a turbine generator module, gas dehydration unit (GDU), gas was required to accommodate the units’ different geometries. SACS was
sweetening unit (GSU), and living quarters modules. Larsen & Toubro executed used to perform pre-service analysis for lift, load-out and transportation; and
the project for Oil and Natural Gas Corporation. in-service analyses for operating and extreme conditions. The optimized module
configuration reduced costs for materials, offshore lifts, and barge days.
2012 BE Inspired Awards

108

9006_YII_Content_1012.indd 108 11/21/2012 12:26:54 PM


INNOVATION IN OFFSHORE ENGINEERING
Ramboll Engineering Consultancy Services India Pvt. Ltd.
Offshore Platform As-built Model
Doha, Qatar

Ramboll Engineering Consultancy Services was retained to create an as-built Point-cloud data was imported to MicroStation to be digitized within a
model of an offshore platform. 3D laser scanning was used as a cost-effective tolerance of a few millimeters. The result for Ramboll Engineering was a highly
way to acquire as-built documentation of the complex structure and buildings. accurate as-built model of the offshore platform produced at significantly less
The laser technology captured point-cloud data on physical objects such as cost than other methods.
structures, pipe works, and mechanical components.

Ramboll Engineering Consultancy Services India Pvt. Ltd.


Small Bore Branch Support
Doha, Qatar

Ramboll Engineering Consultancy Services is a multidisciplinary engineering, To accomplish this, it was critical to visualize the support shown in the 2D
design, and consultancy company working across seven markets: buildings, drawings. Ramboll used MicroStation to model and visualize the small bore and
transport, environment, energy, oil and gas, telecoms, and management its supports. Supports of variable size were set up for parametric modeling.
consulting. The goal for this project was to design a small bore branch support This enabled the engineers to optimize the design and perform clash detection
system that minimized the number of supports to the small bore. during design review.

Bentley Systems, Incorporated

109

9006_YII_Content_1012.indd 109 11/21/2012 12:27:31 PM


INNOVATION IN OFFSHORE ENGINEERING
Zentech Engineering Co., Ltd.
2 Megawatt‑class Offshore Wind Turbine Project
Mokpyo, South Korea

Zentech Engineering applies advanced technology to onshore and offshore The KRW 12 billion project was the first that the company undertook using
engineering projects worldwide. For this project, the company designed the SACS software, which provided a set of tools for the design and analysis of
prototype for a 2 megawatt capacity wind turbine power plant as part of a wind offshore wind turbine structures subject to wave, wind, and mechanical loading.
power generation complex off the west coast of South Korea. The analysis approach is capable of predicting both fatigue and extreme loads
for the substructure and non-linear foundation. Using SACS ensured that the
project met the design requirements for the geographic region.

Zentech Engineering Co., Ltd.


Modularization Design for Ruwais Refinery Project
Geyjea, South Korea

The Abu Dhabi Oil Refining Company (Takreer) Ruwais refinery expansion will Zentech Engineering provided modularization design and construction for a
increase Takreer’s refining capacity by 417,000 barrels per day and double its USD 3.5 billion package. The company used SACS to design pipe support for the
production of transportation fuels. The USD 10 billion project is being developed offshore structure. The software analyzed static and dynamic load conditions
in eight packages, including crude distillation and sulphur recovery facilities, for load-out, transportation, and lifting as well as performed safety checks.
a residue fluidized catalytic cracker, off sites and utilities, storage tanks, SACS improved the design process and saved on‑site construction time.
infrastructure work, marine works, and two packages for site preparation.
2012 BE Inspired Awards

110

9006_YII_Content_1012.indd 110 11/21/2012 12:28:06 PM


Innovation in Power Generation
Bentley Systems, Incorporated

Power professionals from the largest utility to the smallest rural or municipal utility work to efficiently produce and deliver energy.
They share the common goals of improving efficiency, reducing cost, and delivering better customer service while sustaining
and expanding aging power generation plants and adding new generation capacity. This category recognizes innovative
projects ranging from the traditional fossil fuel power plants to nuclear power stations and renewable energy sources
such as hydroelectricity, solar, and wind power.

111

9006_YII_Content_1012.indd 111 11/21/2012 12:28:08 PM


INNOVATION IN POWER GENERATION
Company Name
HydroChina Zhongnan Engineering Corporation
Project Name
Standard Design and Application for the Pumped Storage Power Station WINNER
Location
Zunyi, China

FINALIST

Company Name
Project Name
Location

Using MicroStation, ProjectWise, Structural Modeler, Bentley The collaborative process produced a 3D information model that
PlantSpace, GEOPAK, AECOsim, and Bentley Raceway and Cable will be applied to the design, construction, and management
Management, HydroChina Zhongnan Engineering has created of future pumped storage power stations for a total savings of
standardized designs for large-scale pumped storage power more than USD 1.57 million for each project. Thousands of man
stations, moving from one-off designs to repeatable schemes days for each project will also be saved through a 90 percent
for power generation capacities of 4x300 megawatts and 6x300 reduction in design errors and shortening project feasibility
megawatts. studies from six months to four months.
2012 BE INSPIRED AWARDS

VIEW PRESENTATION
112
INNOVATION IN POWER GENERATION
China Water Resources Beifang Investigation, Design and Research Co. Ltd.
FINALIST Gelantan Hydropower Station (GLTHPP)
Pu’er, China

Located on the Lixian River in Yunnan, China, the USD 610 million Gelantan Multidisciplinary teams used MicroStation, ProjectWise, AECOsim Building
Hydropower Station is a 450 megawatt plant capable of generating 2 billion Designer, GEOPAK, Bentley Substation, Bentley PlantSpace, Bentley Raceway
kilowatt hours of electricity per year. The narrow riverbed, complex geological and Cable Management, and Bentley Navigator to create 3D models for
conditions, and slope stability problems complicated design of the roller- visualization and clash detection within 40 days. By completing the design
compacted concrete gravity dam. before the 90-day deadline, the organization saved about USD 200,000.

VIEW PRESENTATION

Southern Company
FINALIST Design Application Integration
Kemper County, Mississippi, United States

Located in Kemper County, Miss., the USD 2.8 billion Plant Ratcliffe project AutoPLANT was configured for each engineering discipline, and all models
is Southern Company’s first foray into clean-coal power generation using were managed through a controlled workflow in ProjectWise. eB Data Quality
transport integrated gasification technology. The 582 megawatt plant is Manager enabled efficient asset location and the transfer of approximately
expected to emit 65 percent less carbon dioxide than traditional coal-fired 75,000 vendor assets and design information vital to construction, operation,
plants. The company leveraged its software to create a fully integrated, and maintenance. As a result, the startup and commissioning group will save
managed environment that significantly improved design quality. nearly 6,000 man-hours.

Bentley Systems, Incorporated

VIEW PRESENTATION
113

9006_YII_Content_1012.indd 113 11/21/2012 12:28:18 PM


INNOVATION IN POWER GENERATION
Shaw Power Group
Virginia City Hybrid Energy Center FINALIST
Virginia City, Virginia, United States

Shaw Power Group was awarded a USD 1.5 billion engineering, procurement, After initiating the project on MicroStation and Intergraph PDS, Shaw
and construction contract for execution of the 585‑megawatt circulating transitioned to Bentley PlantSpace to improve engineering and construction
fluidized bed (CFB) electric power generation station near St. Paul, Va. Known performance. The integrated application suite was implemented while the
as the Virginia City Hybrid Energy Center, the project included a 650‑megawatt project was in full swing with no impact on budget or the 58-month schedule.
steam turbine generator, two CFB boilers, associated infrastructure, equipment, Interferences were resolved during 3D design, and construction was completed
and vendor-supplied systems. with no on-site rework.

Special recognition award winner: Advancing information mobility


VIEW PRESENTATION

Carson Engineers
Stacker-chase Coal-blending Facility
New Florence, Pennsylvania, United States

GenOn Energy’s Conemaugh Generating Station is a 1,700‑megawatt, coal-fired Carson Engineers used RAM Structural System to perform analysis and
electric generating station located near New Florence, Pa. To achieve the design the structural steel framework and conveyor supports. Various design
optimum heat value for burning coal, low- and high-value BTU coals are blended alternatives were considered before an optimum solution was found to allow
and directed to specific locations. The resulting mix consumes 7.5 percent less for material flow and placement. The company estimated that the USD 25
coal, which reduces both costs and undesirable by-products such as ash and million project would have taken twice as long without RAM Structural System.
greenhouse gases. Savings were estimated at USD 200,000.
2012 BE Inspired Awards

114

9006_YII_Content_1012.indd 114 11/21/2012 12:28:27 PM


INNOVATION IN POWER GENERATION
Desein Indure Pvt. Ltd.
2x20 MW Thermal Power Plant
Dibba, United Arab Emirates

Desein Indure performed complete 3D modeling for a 2x20 megawatt thermal The execution of this USD 200 million project demonstrated the advantages
power plant in Dibba, United Arab Emirates. The small multidiscipline project of a 3D platform. AutoPLANT products were used, including modules for
team received training in 3D design using AutoPLANT and completed the P&ID, equipment, piping, and raceways. In addition, the project team used
modeling within four months. All clashes were resolved, the design was MicroStation, ProSteel, Bentley Navigator, and Bentley speedikon. Design time
optimized, and the layout drawings were prepared. was reduced by about 25 percent and costs by about 12 percent.

Desein Indure Pvt. Ltd.


VISA Raigarh Super Thermal Power Project
Raigarh, India

VISA Power awarded Desein Indure a USD 400 million engineering, The fast-track project was executed using AutoPLANT, which provided a 3D
procurement, and construction contract for an ash-handling plant at its environment for virtual walkthroughs and design optimization. MicroStation,
super thermal power plant in Raigarh, India. Limited land space was a major Bentley Navigator, and ProSteel interoperability allowed project information to
challenge. The 3D modeling for the plant was started simultaneously with the be shared by multiple disciplines. Drawings were extracted only after clash-free
basic engineering and design. Using data, catalogs, and specifications built for routing. Using 3D design shortened the design cycle by 15 percent and reduced
previous projects reduced the development time for piping and steel. project costs by 10 percent.

Bentley Systems, Incorporated

115

9006_YII_Content_1012.indd 115 11/21/2012 12:28:32 PM


INNOVATION IN POWER GENERATION
Heilongjiang Province Investigation and Design Institute of Water Resources and Hydropower
Fendou Reservoir
Muling, China

Located on the Muling River in northeast China’s mountainous Heilongjiang Working on MicroStation, ProjectWise, and GEOPAK, the institute implemented
province, Fendou Reservoir encompasses a rolled concrete gravity dam and work and data sharing between upstream and downstream model reviews
hydropower station. The USD 120 million project required collaboration among that shortened the design cycle from three months to two months, including
more than 20 disciplines. Heilongjiang Province Investigation and Design training. The software improved design quality and efficiency, conserved human
Institute of Water Resources and Hydropower completed all design work. resources, expedited approvals, and reduced modifications.

ISGEC John Thompson Ltd.


Enka de Colombia
Medellin, Colombia

Enka de Colombia retained ISGEC John Thompson to install a 100 percent ProSteel enabled extensive information integration between mechanical,
coal-fed, fluidized-bed combustion boiler service at its plant in Medellin, piping, and structural engineers, and reduced the number of revisions due to
Colombia. The 63 ton-per-hour system was detailed and designed by ISGEC early detection of clashes and interferences. The 3D model developed for this
John Thompson using 3D modeling, which saved project time by revealing USD 200 million project will be used for projects involving modifications to the
constructability problems early in the project. The engineering team completed boiler facilities. Re-use of the model in the future will also reduce the lead time
the project in just nine months. for other projects.
2012 BE Inspired Awards

116

9006_YII_Content_1012.indd 116 11/21/2012 12:28:36 PM


INNOVATION IN POWER GENERATION
KEPCO Engineering & Construction Company, Inc.
Shin-Uljin Nuclear Plant Units 1 & 2 Project
Uljin, South Korea

The USD 6.3 billion Shin-Uljin Nuclear Power Plant Units 1 and 2 will add 1,400 MicroStation and Bentley PlantSpace were used for electrical design and
megawatts of generating capacity to the existing Uljin Nuclear Power Plant in automatic generation of electrical drawings from the 3D design environment.
South Korea’s Gyeongbuk province. KEPCO Engineering & Construction provided KEPCO quickly and efficiently generated drawings from the 3D models and met
detailed design for the two units and acted as overall coordinator for the 3D all the drawing requirements for the nuclear power plant. The time savings
design environment. added value throughout the life of the project.

KEPCO Engineering & Construction Company, Inc.


Yonghung Thermal Power Plant Units 3 & 4
Yonghung, South Korea

KEPCO Engineering & Construction provided comprehensive design services for Using MicroStation and Bentley PlantSpace established an intelligent design
Yonghung Thermal Power Plant, Units 3 and 4, which added two 800-megawatt environment, enabling designers to become 20 percent more productive. Other
units to the coal-fired power plant located on Incheon’s Yonghung Island Bentley products that improved communication among the contractors, vendors,
southwest of Seoul, South Korea. KEPCO achieved time-saving efficiencies engineers, and the client included AutoPIPE and STAAD.Pro. Snapshot views of
in all aspects of design, engineering, and construction support for the USD 4 the 3D model were used instead of traditional 2D drawings at the construction
billion plant. site.

Bentley Systems, Incorporated

117

9006_YII_Content_1012.indd 117 11/21/2012 12:28:40 PM


INNOVATION IN POWER GENERATION
Korea District Heating Engineering Co., Ltd.
Goyang Samsong Combined Heat & Power Generation
Goyang, South Korea

Korea District Heating Engineering provided services – from front-end The project team used MicroStation and Bentley PlantSpace to develop model-
engineering design through construction support – for an 800‑megawatt based engineering communication and work sharing for this USD 3.5 billion
combined heat distribution and power generation plant in Goyang, South Korea. project. The 3D visualizations clarified the design intent for each engineering
3D modeling was fundamental to success in the clash-free design of piping discipline as well as the client, and aided decision-making regarding design
layouts as the project team worked in parallel across disciplines and integrated changes. As a result, the design and the engineering design process improved.
design outputs for design review.

L&T-Sargent & Lundy Limited


375 Megawatt Phase III Combined Cycle Plant
Dhuvaran, India

The joint venture team of Larsen & Toubro and Sargent & Lundy was The team used MicroStation, Bentley Navigator, Structural Modeler, and
responsible for engineering the 375 megawatt combine-cycle power plant in STAAD.Pro for integrated analysis and modeling, which enabled engineers to
Dhuvaran, India. Located on the premises of existing units, the new plant was identify hindrances and optimize the layout in the turbine generator building.
built within the constraints of a 14-acre site. A compact single-shaft turbine 3D modeling resolved interferences in the routing of the main steam piping and
train was chosen to reduce space requirements by 30 percent. visualized structural erection of the main pipe rack within the confined space.
These efficiencies reduced engineering cycle time by 8 percent.
2012 BE Inspired Awards

118

9006_YII_Content_1012.indd 118 11/21/2012 12:28:43 PM


INNOVATION IN POWER GENERATION
Larsen & Toubro Limited
375 Megawatt GSECL Dhuvaran III
Anand, India

Gujarat State Electricity Corporation is setting up a 375‑megawatt combined AutoPLANT was used to engineer the equipment, electrical, instrumentation,
cycle power plant at Dhuvaran in the Anand district of Gujarat, India. Larsen and piping. Larsen & Toubro exported the STAAD.Pro structural model into
& Toubro Limited designed and manufactured the power heat recovery steam ProStructures for development, which reduced engineering man-hours by 10
generator. Product integration allowed the company to model each area and percent. The detailed model helped visualize and plan erection activity more
then bring the models together for clash detection. rapidly. Bentley Navigator ensured a negligible probability of clashes and zero
rework during shop fabrication.

“Bentley solutions have extensively supported our efforts for


environmentally friendly infrastructure.”
– Pius Kumar, General Manager, L&T-Sargent & Lundy Bentley Systems, Incorporated

119

9006_YII_Content_1012.indd 119 11/21/2012 12:28:44 PM


2012 BE Inspired Awards

120

9006_YII_Content_1012.indd 120 11/21/2012 12:28:48 PM


Innovation in Process Manufacturing
Bentley Systems, Incorporated

This category covers a wide range of industries including upstream and downstream oil and gas facilities, petrochemical and
chemical complexes, pharmaceutical and manufacturing plants, and more. For greenfield plants and retrofits to existing plants, safety
and environmental concerns are at the top of the priority list, and the management of engineering information and innovative use of
technology are critical to achieving project success and process improvements.

121

9006_YII_Content_1012.indd 121 11/21/2012 12:28:49 PM


INNOVATION IN PROCESS MANUFACTURING
Company
Zeton Inc.Name
Project Name
Modular GTL Commercial Demonstration Plant WINNER
Location Brazil
Aracaju,

FINALIST

Company Name
Project Name
Location

Zeton designed and built the world’s first modular gas-to-liquids AutoPLANT provided the robust 3D plant modeling solution
(GTL) commercial demonstration plant using Compact GTL’s required to scale GTL technology from pilot to commercial and
mini-channel reactor technology. The USD 20 million plant allowed team members on four continents to work together to
incorporated all aspects required for commercial application in resolve issues related to design of a compact, modular GTL plant.
treating gas at remote and offshore oil fields. In addition to AutoPLANT, the 3D design was completed using
Access to a real-time 3D model during fabrication improved ISOGEN for isometric piping drawings, AutoPIPE for pipe stress
accuracy and reduced rework. analysis, and ProStructures for structural steel design.
2012 BE Inspired Awards

VIEW PRESENTATION
122

9006_YII_Content_1012.indd 122 11/21/2012 12:28:52 PM


INNOVATION IN PROCESS MANUFACTURING
Giprotyumenneftegaz
FINALIST Booster Compressor Station on the Yurkharovskoye Oil Field
Nadym, Russia

The USD 720 million Booster Compressor Station under construction at MicroStation and Bentley Descartes were used to create the digital terrain
Novatek’s Yurkharovskoye oil field was designed by the oil and gas R&D model and Bentley PlantSpace was used for equipment selection, process flow
engineering company Giprotyumenneftegaz. The Russia-based company diagramming, and process pipeline design. The 3D design reduced the number
created an integrated information space that allowed engineering disciplines to of mistakes when generating design documentation and automated labor-
work in parallel and exchange information between stages. intensive processes such as detecting collisions, generating specifications, and
producing cost estimates. The resulting time savings produced 15 to 20 percent
cost savings.

VIEW PRESENTATION

PT. Inti Karya Persada Tehnik


FINALIST Betara Complex Development Project
Jabung, Indonesia

The USD 320 million Jambi Betara Complex Development Phase 3 & 4 Gas Intelligent 3D modeling was performed using MicroStation,
Plant in Jabung, Indonesia, is owned by PetroChina. As a subcontractor on the GenerativeComponents, STAAD.Pro, ProSteel, AutoPLANT, AutoPIPE, and
project, PT. Intl Karya Persada Tehnik performed the detailed engineering of the Bentley Navigator. The engineering team saved time by aggregating and
Betara Gas Plant using Bentley tools to gain speed, accuracy, and reduce costs, assembling geometry from multiple software sources, and explored more
and delivered PDS models as the owner mandated. design options in less time. The resulting design accuracy gave the construction
team increased visibility and credibility.

Bentley Systems, Incorporated

VIEW PRESENTATION
123

9006_YII_Content_1012.indd 123 11/21/2012 12:29:01 PM


INNOVATION IN PROCESS MANUFACTURING
Air Liquide Engineering India Pvt. Ltd.
Air Separation Unit Plant
Visakhapatnam, India

Rashtriya Ispat Nigam, a government-owned steel producer based in the Air Liquide implemented MicroStation for the modeling of the plant layout
Andhra Pradesh region of India, retained Air Liquide Engineering India to design including equipment, structures, piping, cableways, and instrument locations,
a 900 ton-per-day air separation unit for the production of oxygen, nitrogen, which simplified the process of accommodating the cold box requirements,
and argon in both gas and liquid form. The 100-by-120 meter plant is comprised storage system tank clearances, and O&M access areas. MicroStation was
of three main areas: warm unit, cold box, and storage-vaporization. Efficient used to model about 150 equipment foundations and access requirements as
design and consistent deliverables reduced man-hours by nearly 20 percent. well as generate more than 750 pipe support drawings.

BashNIPIneft
Trebs Oil Field: Central Collection Point
Naryan-Mar, Russia

Bashneft, one of the largest oil producers in Russia, holds the license for With training and technical support from Bentley’s partner in Russia,
development of the Trebs oil field located in the Arctic region of Nenets BashNIPIneft implemented AutoPLANT for piping, equipment, and raceways
Autonomous Okrug. Bashneft’s research and development institute, in addition to AutoPIPE, ProStructures, STAAD.Pro, and Bentley Interference
BashNIPIneft, a leading research institute in the field of oil and gas exploration, Manager. The 3D solutions reduced mistakes, exposed interferences, and
was contracted to execute the Central Collection Point project. expedited the project design and delivery.
2012 BE Inspired Awards

124

9006_YII_Content_1012.indd 124 11/21/2012 12:29:04 PM


INNOVATION IN PROCESS MANUFACTURING
Bayer Technology Services GmbH
Conceptual Design With PlantWise
Baytown, Texas, United States

Bayer Technology Services invested USD 120 million in upgrades and With no 3D information available, Bayer Technology Services used Bentley
improvements to the Bayer Material Science Baytown, Texas, manufacturing PlantWise to model the facility. Using 2D drawings and the software’s out-
facility, which produces methylene diphenyl diisocyanate, toluene diisocyanate, of-the-box object libraries, the firm created a high-level model of the existing
and polycarbonate. The toluene diisocyanate project remodeled an operational civil structures and process equipment, then modeled the new equipment
facility to improve process technology, make environmental upgrades, and locations and preliminary pipeline routes to ascertain space requirements.
improve energy efficiency and reliability for increased productivity. Overlapping the conceptual model with laser-scanned plant images helped to
avoid collisions.

Equinox Engineering Ltd.


CNRL Primrose East Pipelines
Cold Lake, Canada

Canadian Natural Resources is expanding its facilities in the East Primrose area AutoPLANT was used for intelligent 3D modeling and general arrangement
of the Cold Lake Air Weapons Range in northeastern Canada. The CAN$54 drawings. The ability to extract accurate bill of materials allowed the company
million project involves the development of six new cyclic steam stimulation to procure critical, long-lead items from around the world with no delays.
well pad facilities for bitumen recovery. Equinox Engineering provided design, AutoPLANT also worked seamlessly with AutoCAD-based terrain modeling
procurement, and construction of the associated above-ground thermal software, ensuring optimal pipeline heights and minimal forest clearing that
pipelines. reduced construction costs.

Bentley Systems, Incorporated

125

9006_YII_Content_1012.indd 125 11/21/2012 12:29:07 PM


INNOVATION IN PROCESS MANUFACTURING
GEI Industrial Systems Ltd.
FCCU and PRU Revamp Project (A&C)
Mathura, India

GEI Industrial Systems is one of the leading engineering and manufacturing An archival 2D drawing of the existing structure was available, but GEI was
companies that encompasses heat-transfer equipment, with a major thrust able to prepare a 3D model and detail drawing of the new steel structure using
in air-cooled heat exchangers and air-cooled steam condensers. The INR ProSteel. The improved visualization provided by the 3D model allowed for
99.9 million project to revamp the Fluid Catalytic Converter Unit (FCCU) and faster clash checking and drawing generation, with fewer errors. As a result,
Propylene Recovery Unit at a petroleum refinery in Mathura, India, required a there was less rework on site, which saved money.
new steel structure to be built for an air-cooled heat exchanger.

GS Engineering & Construction Corporation


Ruwais Refinery Expansion Project Package 2
Ruwais, United Arab Emirates

The Abu Dhabi Oil Refining Company (Takreer) Ruwais refinery expansion will GS Engineering & Construction was contracted for USD 3 billion package 2,
increase Takreer’s refining capacity by 417,000 barrels per day and double its which involves generating more than 70,000 general arrangement, piping
production of transportation fuels. The USD 10 billion project is being developed isometric, and other drawings. MicroStation provided 3D modeling that was
in eight packages: crude distillation and sulphur recovery facilities, a residue carried out at three locations in South Korea and India, with automatic work
fluidized catalytic cracker, off-sites and utilities, storage tanks, infrastructure sharing made possible by Bentley solutions. Using MicroStation to automate
work, marine works, and two packages for site preparation works. the production of drawings improved production quality and efficiency.
2012 BE Inspired Awards

126

9006_YII_Content_1012.indd 126 11/21/2012 12:29:11 PM


INNOVATION IN PROCESS MANUFACTURING
Larsen & Toubro Limited
Ammonia Plant Feedstock Changeover Project
Panipat, Haryana, and Bathinda, India

Under a government directive to bring down energy consumption per metric ton For this INR 23 billion project, Larsen & Toubro identified 60 critical systems
of ammonia, National Fertilizers Limited – a government of India undertaking – with 300 critical lines of up to 40-inches and a maximum temperature of 546
is converting ammonia plant feedstock from furnace oil/low sulfur heavy stock degrees Celsius. MicroStation, Bentley Navigator, Bentley PlantWave, STAAD,
to natural gas/regasified liquefied natural gas. Larsen & Toubro was contracted and AutoPIPE saved time and effort in the design of the most complex piping
to convert India plants in Panipat, Haryana, and Bathinda. systems. Easy extraction of load information, auto adjust for modifications, and
easy modeling of piping cleat supports reduced overall design time.

Larsen & Toubro Limited


Reformer for Ammonia Syngas Plant
Panipat and Bhatinda, India

National Fertilizers is India’s largest central public sector enterprise in the With such a compact layout, the project required design optimization every
fertilizers sector with an overall annual installed capacity of 3.23 million tons of step along the project lifecycle. Larsen & Toubro used MicroStation and Bentley
urea. National Fertilizers engaged Larsen & Toubro in this INR 11 billion project PlantWave for engineering, visualization, and output generation. Bentley
to revamp two fuel-oil based plants at Panipat and Bathinda for changeover of Navigator was used extensively for model reviews, clash checking, and internal
feedstock. This project is the second feedstock conversion project as part of a as well as external coordination. This has led to completion of the project
directive by the government of India within schedule with minimum resources, resulting in a compelling return on
investment.

Bentley Systems, Incorporated

127

9006_YII_Content_1012.indd 127 11/21/2012 12:29:12 PM


INNOVATION IN PROCESS MANUFACTURING
Pall India Pvt. Ltd.
Slurry Oil Backwash Filter System
Yeosu, South Korea

A global leader in filtration and purification systems, Pall India provided a During design review, the 3D model generated from AutoPLANT enabled the
USD 5.5 million filtration station for an oil plant in Yeosu, South Korea. The client to see the design details and suggest modifications. This more efficient
filtration system removes solids and water from sluggish oil before it is further process cut design time in half compared to previous projects completed
processed. Filtered water is recycled. Using AutoPLANT’s built-in libraries without Bentley software. In addition, the project team was able to deliver
saved time during design. Other time-saving tools included ProStructures, error-free reports and hand over the 3D model and 2D drawing to the fabricator.
Bentley i-model, and Bentley Navigator.

Tata Consultancy Services


Digital Definition of Paper-converting Production Line
Albany, Georgia, United States

Tata Consultancy Services developed a digital definition of the paper-converting Using promis•e, Tata’s centralized database can be used by multiple vendors
production line for a plant in Albany, Ga. The USD 4 million project provided a across multiple locations. The firm prepared a separate document to help plant
standardized solution that could be used across multiple production platforms. operators understand the relationship between the OEM-supplied drawings and
The firm created a standard electrical part and symbol library, developed the promis•e file. The ability to reuse digital definitions from the centralized,
reusable part master symbols, and provided centralized data maintenance. standardized database will save time for all parties.
2012 BE Inspired Awards

128

9006_YII_Content_1012.indd 128 11/21/2012 12:29:14 PM


Innovation in Rail and Transit
Bentley Systems, Incorporated

The projects in this category share the common goals of driving down maintenance costs, improving asset knowledge and reliability,
managing rail real estate, renewing and reconfiguring existing infrastructure, designing and delivering new infrastructure, and planning
urban integration. These projects demonstrate innovation in the rail and transit lifecycle, ranging from data collection and design to
maintenance and capital project planning.

129

9006_YII_Content_1012.indd 129 11/21/2012 12:29:14 PM


INNOVATION IN RAIL AND TRANSIT
Company
Sweco ABName
Project Name
Hallandsås “Live BIM” Railway Project WINNER
Locationto Båstad, Sweden
Förslöv

FINALIST

Company Name
Project Name
Location

The USD 1.5 billion Hallandsås Railway project includes a tunnel Sweco used MicroStation, InRoads, Bentley Rail Track,
section that will increase capacity from four to 24 trains per ProjectWise, and Bentley Navigator as the BIM platform for
hour as well as allow the weight of freight trains to be doubled. the railway from Förslöv to Båstad, Sweden. A 3D object library
The Swedish Transport Administration manages and provides was set up so objects can be reused in future projects, and
template and control files that support building information the project coordination model resolved collisions, improved
modeling (BIM), which was implemented to create value during constructability, and saved time and money during construction.
several stages of the project.
2012 BE Inspired Awards

VIEW PRESENTATION
130

9006_YII_Content_1012.indd 130 11/21/2012 12:29:16 PM


INNOVATION IN RAIL AND TRANSIT
Quigg Engineering Inc.
FINALIST High-speed Rail
Chicago, Illinois, to St. Louis, Missouri, United States

The Illinois Department of Transportation and Federal Railroad Administration MicroStation and GEOPAK enabled the team to produce aerial plan sheets for
partnered to create a USD 1.8 billion high-speed rail system between Chicago, field work, associate correct plane coordinates with DGN files, attach GIS shape
Ill., and St. Louis, Mo. With natural resources preservation a condition for files to correct locations, and identify natural features on aerial plan sheets for
construction, Quigg Engineering performed environmental studies along 35.24 the environmental assessment. Quigg Engineering completed the environmental
miles of mainline track to locate sensitive areas, endangered species, and study in half the usual time. Study results reduced time required to identify
wetlands within 100 feet of the centerline. harmful impacts, and review potential mitigation.

VIEW PRESENTATION

Utah Transit Authority


FINALIST A New, Innovative Transit Asset Management Solution
Salt Lake City, Utah, United States

The Utah Transit Authority was awarded funding for a Federal Transit The U.S.-based Utah Transit Authority implemented InspectTech Collector and
Administration Transit Asset Management (TAM) pilot program to demonstrate InspectTech Manager to simplify data collection and condition assessment by
best practices in managing structures, track, and rolling stock. The TAM enabling inspectors to upload data from the field, which allows each asset to be
program combines asset inventories and condition assessments to provide a individually tracked for ongoing inspection, assessment, and maintenance. The
unified, one-stop system for maintaining assets, and is also used to develop USD 250,000 TAM program ensures proactive management, better resource
maintenance budgets, identify critical issues, prepare lifecycle plans, and allocation, significant cost savings, and seamless operation.
mitigate risk.

Bentley Systems, Incorporated

VIEW PRESENTATION
131

9006_YII_Content_1012.indd 131 11/21/2012 12:29:18 PM


INNOVATION IN RAIL AND TRANSIT
Delhi Metro Rail Corporation
Kerala High-speed Rail
Thiruvananthapuram to Kasargod, India

Located on the Malabar Coast at the southwest tip of India, the state of DMRC used Bentley MXRAIL to design alternative alignments. The software
Kerala is a popular tourist destination. Kerala High Speed Rail Corporation simplified the iterative task of choosing an alignment and optimizing the design.
commissioned Delhi Metro Rail Corporation (DMRC) to conduct feasibility Bentley MXRAIL also generated the longitudinal sections without using other
studies for a high-speed rail corridor along the coast from Thiruvananthapuram CAD software. The three-man project team met the three-month deadline for
to Kasargod, with future extension to Mangalore, Karnataka. The 526.8 performing detailed design, generating plans and sections, and estimating
kilometer corridor will include 12 stations and cost an estimated USD 16 million. quantities. Bentley software saved an estimated 7.5 months.

JSC Mosgiprotrans
Moscow-St. Petersburg High-speed Rail Line
Moscow to St. Petersburg, Russia

The new high-speed rail line between Moscow and St. Petersburg, Russia, Mosgiprotrans used MicroStation for survey data processing and the creation
presents a unique opportunity to significantly improve the Russian transport of topographic maps and digital terrain models. This data was imported to
sector and lay the foundation for further development. Mosgiprotrans was Bentley Rail Track, which was implemented in the design of the railway and
retained to perform design and 3D modeling for the project. infrastructure. Bentley solutions accelerated the process of designing the high-
speed rail line and producing the design documentation.
2012 BE Inspired Awards

132

9006_YII_Content_1012.indd 132 11/21/2012 12:29:23 PM


INNOVATION IN RAIL AND TRANSIT
Quandel Consultants, LLC
Dearborn-Ypsilanti Second Track
Dearborn to Ypsilanti, Michigan, United States

With grant funds from the Federal Railroad Administration, the state of The Dearborn-Ypsilanti link incorporates multiple high-speed crossovers and
Michigan purchased 180 miles of existing railroad right of way from Norfolk turnouts, track geometry modifications, grading and drainage improvements,
Southern Railway to develop high-speed rail service between Detroit and and at-grade crossing safety enhancements. Quandel used laser point data
Chicago, Ill. Quandel Consultants developed base mapping and engineering to develop a digital terrain model, contours, and topographic mapping with
plans for the USD 50 million project to rehabilitate a 10-mile double-track MicroStation and Bentley Rail Track, which was also used to design subgrade
segment from Ypsilanti to Wayne and install a 9‑mile track from Wayne improvements, rail and roadway alignments, turnouts and crossovers, and
to Dearborn. hydraulics.

Rail Vikas Nigam Limited


Kolkata Metro Garia to Airport Line
Kolkata, India

The USD 1.6 billion Kolkata Metro rail extension links Garia and Netaji Subhas Rail Vikas Nigam Limited used Bentley Rail Track to optimize resource utilization
Chandra Bose International Airport (formerly Dum Dum Airport) in Kolkata, by suggesting the best alignment. Near the airport where there are numerous
India. The 29.4 kilometer alignment passes through narrow right of ways and flyovers, the problem of limited right-of-way was solved by building a common
shares limited space with major roadways. Numerous design consultants and pier for the road flyover and metro line viaduct. The solutions enabled structural
contractors on the project collaborated on the complex four-phase design. analysis and track design as well as managed alignment changes that affected
stations, platforms, and parking lots.

Bentley Systems, Incorporated

133

9006_YII_Content_1012.indd 133 11/21/2012 12:29:24 PM


INNOVATION IN RAIL AND TRANSIT
SNCF
Feasibility Study on the Kinshasa-Ilebo Railway
Kinshasa, Congo

SNCF, the state-owned French railway company, collaborated with the Louis Bentley Rail Track was used to design horizontal alignments, vertical profiles,
Berger Group to complete the first phase of a feasibility study for an 850 detailed cross sections, and track solutions. The software saved time designing
kilometer railway between Kinshasa and Ilebo in the Democratic Republic of an alignment that accommodated the 800 meter variations in topography.
Congo. Based on the study analyzing land use, topography, hydrology, and The study report outlined the most viable alternatives and recommended the
geotechnics, the engineers defined a preliminary two-track alignment. preferred alignment. Completing the study in three months rather than 10
months saved EUR 500,000 on this EUR 1.2 million project.

Vectura Consulting
Mälarbanan
Stockholm, Sweden

The Mälaren Line is a high-speed railway for passenger trains running between Bentley worked with Vectura to customize promis•e for 3D rail design of
Stockholm and Örebro, Sweden. Vectura Consulting created a 3D model of low voltage electricity, telecom, and trenching. The new tool – together with
the entire line for this SEK 10 billion project. The collaborative effort among MicroStation, Bentley Rail Track, Bentley Navigator, and ProjectWise – enabled
the customer, designer, and contractor introduced a new method for designing Vectura to create an intelligent 3D railway model that facilitated coordination
railways using building information modeling. among disciplines, improved dialog, and yielded higher quality design.
2012 BE Inspired Awards

134

9006_YII_Content_1012.indd 134 11/21/2012 12:29:25 PM


Innovation in Roads
Bentley Systems, Incorporated

The challenge of today’s civil and transportation engineers, contractors, governments, and owner-operators is to work
more productively, collaborate more globally, and deliver better-performing infrastructure assets. The projects in this category
have demonstrated excellence in planning, engineering, analysis, and design of roads or highways in a mission to sustain
transportation infrastructure.

135

9006_YII_Content_1012.indd 135 11/21/2012 12:29:26 PM


INNOVATION IN ROADS
Company Name
Creighton Manning Engineering
ProjectRoad
Fuller Nameand Washington Avenue WINNER
LocationNew York, United States
Albany,

FINALIST

Company Name
Project Name
Location

The USD 14.5 million reconstruction of the at-grade intersection Creighton Manning Engineering was challenged to design the
of Fuller Road and Washington Avenue in Albany, N.Y., will alignment within the constraints of I-90 and a new university
decrease traffic congestion, improve pedestrian and bicycle building site. The firm designed the entire project in 3D using
access, and enhance safety. The project realigned Washington MicroStation and InRoads for accurate dimensions, section
Avenue with a bridge over a two-lane roundabout on Fuller Road. details, and plan sets. The 3D model was used to produce
The bridge consists of two 95-foot-long single-span structures. visualizations for public information meetings as well as
to provide 3D data to the contractor for stakeless and
automated grading.
2012 BE INSPIRED AWARDS

VIEW PRESENTATION
136
INNOVATION IN ROADS
Foth Infrastructure & Environment, LLC
FINALIST NW 62nd Avenue Improvements
Johnston, Iowa, United States

Expansion of DuPont Pioneer’s world headquarters in Johnston, Iowa, required A project of this magnitude would typically take more than 16 weeks to design,
improvements to NW 62nd Avenue. Foth Infrastructure & Environment led the but the team completed the design in six weeks using MicroStation, GEOPAK,
USD 7 million project to widen and reconstruct nearly 1.5 miles and implement a StormCAD, FlowMaster, CulvertMaster, and LEAP. The firm’s innovative
non‑traditional intersection solution incorporating four multilane roundabouts. workflows, including automating geometric and staking details for plan
preparation and using custom reporting, contributed to significant time
and cost savings.

VIEW PRESENTATION

Sotepa Ltda.
FINALIST Humberto de Campos Street Extension
Blumenau, Brazil

Sotepa has been participating as a consultant in the 2050 Blumenau Program PowerCivil for Brazil was used to perform complex calculations for the design,
for urban infrastructure development in Brazil. The BRL 25 million Humberto de in which each lane follows a distinct grade and grade adjustments were needed
Campos Street extension was designed within right-of-way restrictions of a at intersections and access ramps. PowerCivil for Brazil’s interface allowed
narrow river valley. The firm defined a cross section that accommodates three the horizontal layout to be changed and points of vertical intersection to be
lanes in each direction, pedestrian sidewalks, and a bicycle lane. adjusted automatically. Compared to similar projects, this project took 25
percent less time to complete the geometric design.

Bentley Systems, Incorporated

VIEW PRESENTATION
137

9006_YII_Content_1012.indd 137 11/21/2012 12:29:33 PM


INNOVATION IN ROADS
Parsons Brinckerhoff and Arup JV
Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade FINALIST
Brisbane, Australia

Arup and Parsons Brinckerhoff formed PBA JV to design Australia’s largest ProjectWise ultimately managed 1.5 million documents with 4.8 terabytes of
transportation infrastructure project – the AUD 5.6 billion Airport Link, data accessed by over 2,000 users in 40 global locations. The system saved
Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade. Rapid time and costs in locating data (23,000 hours), controlling documents (USD 1
mobilization of the project necessitated fast-track deployment of ProjectWise, million), updating drawings (260 weeks), and traveling (USD 3.6 million). Other
which came online within three weeks of the project being awarded in 2008. products utilized in the project included MicroStation, MX, InRoads, gINT, and
Structural Modeler.

Special recognition award winner: sustaining our society


VIEW PRESENTATION

AECOM
Detailed Design of NH 6
Howrah to Medinipur, India

The National Highways Authority of India is entrusted with the development, AECOM used MXROAD in this USD 243.4 million project, which reduced man
maintenance, and management of India’s highways. AECOM was contracted to days for the triangulation model by 50 percent. MXROAD quickly handled
upgrade the existing four-lane highway of NH 6 to six lanes for a 111.4 kilometer repetitive and modifications to alignment and road components as the site
section. The four-lane highway had to be retrofitted on the recently constructed and conditions required, and the number of man-months required to prepare
four-lane highway whose existing horizontal alignment and vertical alignment alignment options has also been reduced by 50 percent compared with other
profile was retained except for a proposed underpass/flyover. road design software.
2012 BE Inspired Awards

138

9006_YII_Content_1012.indd 138 11/21/2012 12:29:38 PM


INNOVATION IN ROADS
AECOM
Udaipur Ring Road
Udaipur, India

AECOM was tasked with a greenfield project located on western side of It would typically have taken AECOM three months to complete this project, but
Udaipur, India. Known as the City of Lakes, Udaipur has an average elevation of using MXROAD enabled AECOM to complete it in half the time. MXROAD also
598 meters that features two national highways that intersect at Udaipur City. helped interface Google Earth terrain information to generate 3D terrain models
The INR 6 billion project encompassed designing the missing link of the Udaipur along the proposed alignment options in 50 percent less man days. STAAD.Pro
Ring Road between Kavita to Kaya. was used to calculate bending moments and shear force.

CDM Smith Inc


Four Laning of Ludhiana-Talwandi Section of NH 95
Ludhiana, India

The USD 1.5 billion project encompassed the creation of four lanes on the The project involves 80 kilometers of the existing two-lane facility, flyovers,
Ludhiana-Talwandi section of National Highway 95, which forms the major link underpasses, and major and minor bridges. MXROAD and STAAD.Pro were
between western and central India. Environmental safeguards are one of the used for the detailed project design with a primary objective of evolving a
critical components of the project that are subjected to an environmental plan ready-for-construction design of the highway and associated structures.
approved by the Ministry of Environment and Forests.

Bentley Systems, Incorporated

139

9006_YII_Content_1012.indd 139 11/21/2012 12:29:54 PM


INNOVATION IN ROADS
CIMA+
Turcot Interchange
Montreal, Canada

The Turcot Interchange is a Montreal traffic hub, with links to three highways Management of traffic for more than 290,000 vehicles per day is a major
and access to Champlain Bridge, the international airport, and city center. challenge. CIMA+ used 3D modeling to validate phasing of the work and
Nearing the end of its service life, the interchange is being reconstructed by eliminate conflicts with crossings and clearances. InRoads offered a single
Quebec’s Ministry of Transport. The CAN$3 billion project will construct and solution for geometric design as well as provided data for visualizing real-time
commission a new interchange with four access points and then demolish the navigation through the project, building a physical model from laser tracings,
old interchange. and producing videos for the project launch.

Conseil General de l’Ain


Using Point-cloud Data for Public Consultation for a Road Improvement
Pont de Veyle, France

Reducing traffic in urban areas is an objective of the General Council of Pont MicroStation, MXROAD, PowerCivil for France, and Bentley Descartes
de Veyle, France – to not only improve safety, reduce accidents, and enhance facilitated the project from conception to execution of the work. The
quality of life, but also address environmental concerns, including reducing acquisition of LiDAR surveys and display of point-cloud data enabled efficient
noise and atmospheric pollution, and mitigating flooding. Encompassing 4 communication and decision making. Without the software and point-cloud
million square meters including five roundabouts, this EUR 50,000 project’s technology, a part of this project would have had to be subcontracted.
objective was to divert truck traffic away from the city.
2012 BE Inspired Awards

140

9006_YII_Content_1012.indd 140 11/21/2012 12:30:01 PM


INNOVATION IN ROADS
Egis International
A63 Motorway Widening and Improving
Salles to Saint Geours de Maremne, France

The EUR 1.1 billion improvement project for the A63 highway between Salles Located in three offices across France, the design team used MicroStation,
and Saint Geours de Maremne, France, will convert a rural dual carriageway ProjectWise, GEOPAK, and GeoMacao. The collaboration technology and 3D
into a three-lane tolled motorway. Because the 104‑kilometer section suffered modeling ensured a coordinated design delivered on schedule. GeoMacao,
from severe congestion, the public-private partnership required the fast which was first developed by Egis for new builds and then later enhanced by
completion of a detailed design to ensure an early construction start. Egis Bentley, demonstrated advanced capabilities in refurbishment design.
International was charged with project management, planning, and design.

Feedback Infrastructure Services Private Limited


Design Rimuli to Roxy Section of NH 215
Rimuli, India

The four-laning of NH 215 from Rimuli to Roxy will facilitate the free movement Using the toolset, one person designed horizontal and vertical alignments for
of vehicles traversing east-west in northern Orissa, India. The prime arterial the highway, ramps, and interchange; provided a traffic management scheme
road for traffic in a major mining area, NH 215 will be safer and less congested and construction sequence; and selected the best-fit alignment, and permanent
with local traffic traveling on ground-level facilities. Feedback Infrastructure or false grade-separated structures. MXROAD integrated tasks from processing
Services used MXROAD to deliver this INR 6.5 billion project in minimum time. survey data to preparing bills of quantities, saving 25 percent of total design
costs and cutting 30 days from design time.

Bentley Systems, Incorporated

141

9006_YII_Content_1012.indd 141 11/21/2012 12:30:07 PM


INNOVATION IN ROADS
Halcrow Consulting India Pvt. Ltd.
Two Lane to Four Lane Widening of NH 59
Godhra, India

At the border of Gujarat and Madhya Pradesh, India, NH 59 traverses The project included 11 major junctions, four grade separations, four vehicle
agricultural plains and rolling hills to connect the ports of Kandla and Mundra. underpasses, and three at-grade intersections. Halcrow Consulting, a CH2M
The National Highways Authority of India is widening the section from two to HILL company, performed detail geometric design of the road and junctions
four lanes as part of the National Highways Development Project Phase III. This with MXROAD, and design of the bridge with STAAD.Pro. A team of two people
USD 130 million project is being built under a design, build, finance, operate, and met project milestones despite changes in widening schemes and inclusion or
transfer agreement. deletion of project components.

Hatch Mott MacDonald


Windsor-Essex Parkway
Windsor, Canada

The CAN$1.4 billion Windsor Essex Parkway is the roadway component of The Windsor Essex Mobility Group consortium was awarded the project, with
the new Detroit River International Crossing, which will create a direct route Hatch Mott MacDonald as design lead. The project includes 11 kilometers of
connecting Highway 401 in Windsor, Ontario, to Interstate 75 in Detroit, Mich. six-lane highway extension, 7.5 kilometers of below-grade urban freeway, 7.5
Delivered by the public-private partnership of Infrastructure Ontario and the kilometers of four-lane service road, and two new interchanges. The design
Ontario Ministry of Transportation, the project includes design, construction, team used InRoads, RM Bridge, STAAD.Pro, and Bentley Navigator. ProjectWise
financing, and operation. alone saved approximately USD 7 million in relocation expenses.
2012 BE Inspired Awards

142

9006_YII_Content_1012.indd 142 11/21/2012 12:30:13 PM


INNOVATION IN ROADS
Kokusai Kogyo Co., Ltd.
Sustainable Road Maintenance Using Mobile Mapping System
Minamiawaji City, Japan

To assess the physical condition of roads and prioritize maintenance on this Kokusai Kogyo filtered data to differentiate between the road surface and
JPY 5 million project, Kokusai Kogyo deployed a high-performance mobile non-road surface features using TerraScan and MicroStation. This process was
mapping system with high-resolution LiDAR scanners, a stereo camera, and seven times faster than the conventional manual method. Bentley Descartes
a 360-degree camera. The mobile mapping system was bundled to efficiently was used to display and overlay a stereo image pair and LiDAR point cloud
execute a road and related asset survey including measurement of road surface for data quality checks. The mobile mapping system enabled digital road data
cracks, ruts, and flatness. acquisition for sustainable asset management.

Larsen & Toubro Limited – ECC Division


Samakhiali-Gandhidham Road Project
Samakhiali, India

Widening the NH 8A from four to six lanes between Samakhiali and MXROAD was used to design and dynamically re-grade junctions and
Gandhidham in Gujarat, India, improved safety, service level, and capacity on roundabouts. Built-in rules enabled efficient application of super-elevations, and
this arterial route. Larsen & Toubro designed the USD 240 million project in surface analysis tools checked for accuracy. Plans, profiles, and drawings were
3D with MXROAD, which enabled engineers to identify and correct potential produced quickly and easily. Having quoted tight project quantities, Larsen &
problems during the design phase rather than incur the cost of rework on site. Toubro optimized the design using MXROAD to minimize quantities. The design
was delivered on schedule at a savings of USD 20 million.

Bentley Systems, Incorporated

143

9006_YII_Content_1012.indd 143 11/21/2012 12:30:17 PM


INNOVATION IN ROADS
Mouchel
Regional Road South Part
Kuwait

In association with Gulf Consult, Mouchel was commissioned by the Ministry Over 40 engineers and an additional 50 experts across all civil engineering
of Public Works in Kuwait to undertake the study, design, and construction disciplines collaborated on this USD 11.3 million project. MX was used to
supervision for the construction and maintenance of the Regional Road South develop detailed schemes that kept clients abreast of the many changes and
Part (Section One). The regional road will form part of the international the ramifications. MX’s parametric design ensured that plan layouts, vertical
Middle East Arab highways network under the Development of the Integrated alignments, and cross sections were directly related and linked. MX generated
Transport System Program. all element features in 3D.

R.V. Anderson Associates Limited


TTC Streetcar Replacement Projects
Toronto, Canada

The Toronto Transit Commission Streetcar Replacement Projects at Dufferin and R.V. Anderson Associates and the city of Toronto used InRoads and
McCaul Streets in the city’s downtown core consisted of replacing deteriorated MicroStation to generate, analyze, distribute, and share project information
streetcar tracks and improving road conditions. The CAN$10 million project while adhering to the city’s strict CAD and quality standards. The software met
included replacing 770 meters of combined sewers and resurfacing 1 kilometer the challenge of designing road surfaces sufficient to maintain streetcar tracks
of road on McCaul Street, along with replacing 1 kilometer of water main and yet acceptable for traffic and drainage. The complex project was completed
reconstructing 1 kilometer of road on Dufferin Street. within six months.
2012 BE Inspired Awards

144

9006_YII_Content_1012.indd 144 11/21/2012 12:30:21 PM


INNOVATION IN ROADS
Soyuzdorproekt Ltd
Reconstruction of the E-1 15 (M8 Kholmogory)
Moscow, Russia

The USD 220 million reconstruction of this section of Russian route M8, also Soyuzdorproekt delivered the design on schedule. Together with a Russian
known as the Kholmogory Highway, provided a convenient connection between software application called Rocada, InRoads enabled the designers to solve all
a major radial road in Moscow and the nearby cities of Korolev and Mytischi. problems related to planning the roadway and drainage system. The integrated
Challenges included excavating soft soils near the Yauza river, preserving a isopach capabilities were most useful. The project team successfully defined
historic church near the roadway, and designing multilevel directional exits. the optimal base of slope design for excavation.

Thouvenot, Wade & Moerchen, Inc.


I-57 Diverging Diamond Interchange
Marion, Illinois, United States

The Illinois Department of Transportation selected a diverging diamond Thouvenot, Wade & Moerchen produced alternative layouts and determined the
interchange configuration for the junction of I-57 and Morgan Avenue in Marion, most feasible design. It also facilitated prompt turnarounds to provide adequate
Ill., to allow traffic to enter and exit the highway without hindering through- review time. MicroStation and GEOPAK facilitated design of geometrics,
traffic along the avenue. The USD 9 million project included reconfiguration of profiles, and super-elevations. StormCAD was used for storm sewer layout, and
the existing partial conventional diamond interchange, a 10-foot wide bicycle/ CulvertMaster for crossroad culverts. STAAD.Pro was used to analyze the new
walking path, and widening of Marion Avenue from two to four lanes. bridge substructure.

Bentley Systems, Incorporated

145

9006_YII_Content_1012.indd 145 11/21/2012 12:30:24 PM


INNOVATION IN ROADS
TranSystems
Kansas Star Casino Interchange Design
Mulvane, Kansas, United States

The USD 7.3 million Kansas Star Casino interchange involved retrofitting an To keep the interchange operational, TranSystems redesigned the interchange
existing trumpet interchange as a dual-roundabout interchange with a separate ramps for temporary operating conditions while construction was performed on
exit for the state-run casino. The Kansas State Gaming Agency mandated that the roundabouts. GEOPAK was used to update grading as needed for temporary
the casino be fully operational within a timeline that allowed just three months paving arrangements. The software’s integration enabled TranSystems to
for design and six months for construction. Existing traffic had to be maintained essentially design the interchange twice in three months. In the past, this
throughout. design would have taken nine to 12 months.

URS Scott Wilson India Pvt Ltd


Re-engineering Design of Pune Bypass
Pune, India

URS Scott Wilson was challenged to widen an existing four-lane divided Adding one lane with paved shoulder on either side of the carriageway and
carriageway in the congested corridor between Mumbai and Bangalore, India. 75 kilometers of service roads increased daily capacity from 40,000 to 60,000
The 45 kilometer section of NH 4 from Pune to Satara passes through industrial cars. MXROAD was used from survey data analysis through detailed design
zones with restricted right-of-ways and includes 16 bridges, one tunnel, 10 and drawings. STAAD.Pro was used for all structures. The software saved 10
vehicular underpasses, two viaducts, two flyovers, five overpasses, four percent in project time and USD 2 million in implementation costs on this USD
pedestrian underpasses, and 20.5 kilometers of service roads. 120 million project.
2012 BE Inspired Awards

146

9006_YII_Content_1012.indd 146 11/21/2012 12:30:28 PM


INNOVATION IN ROADS
Washington State Department of Transportation
Point Defiance Bypass
Tacoma, Washington, United States

The USD 91 million Point Defiance Bypass project will enable Amtrak Cascades MicroStation’s raster image handling allowed WSDOT to work with early
to expand service from four to six daily round trips between Seattle, Wash., and sketches of the proposed design options, which were attached to the design
Portland, Ore. The Washington State Department of Transportation (WSDOT) file in plan view using Raster Manager, then matched into existing oblique
provided visualizations of draft proposals for rail grade separations at two aerial photos using Photomatch. Basic vertical clearances, roadway slopes, and
locations along the bypass route. The 3D concept models allowed for an in- general design criteria were used to develop 3D models on top of the sketches.
depth understanding of design options. The Luxology rendering engine produced the visualizations.

Washington State Department of Transportation


SR 92 – 99th Ave NE Roundabout
Lake Stevens, Washington, United States

The Washington State Department of Transportation (WSDOT) is building two Bentley worked with Andersson Technologies to develop a MicroStation tool
single-lane roundabouts on SR 92 in Lake Stevens: one at 99th Avenue NE and that allowed video footage to be used as the visualization background. With
one at 113th Avenue NE. The USD 7.6 million project will improve traffic flow this tool, WSDOT used aerial videography, the InRoads roundabout model, and
and reduce the risk of serious collision. A visualization showing the 99th Avenue MicroStation’s animation camera and traffic simulation tools to create realistic
roundabout in operation aided decision-making and public outreach. traffic in the proposed roundabout. The Luxology rendering engine provided
extra realism.

Bentley Systems, Incorporated

147

9006_YII_Content_1012.indd 147 11/21/2012 12:30:31 PM


INNOVATION IN ROADS
Wyoming Department of Transportation
Wyoming Diverging Diamond Interchange
Cheyenne, Wyoming, United States

The USD 2.3 million Diverging Diamond Interchange at the junction of I-25 and WYDOT used MicroStation and GEOPAK to develop the plans and cross
College Drive in Cheyenne, Wyo., will improve traffic flow without impacting sections for the project. The digital terrain model/triangulated irregular
the existing bridge over I-25. The Wyoming Department of Transportation network, road design, and 3D object files were constructed, and videos were
(WYDOT) designed the interchange to be forward compatible with a future created, to show traffic movement from above the interchange as well as from
four-lane design, as well as to provide capacity for a 20-year horizon without a driver’s perspective. Showing the videos at public meetings helped the public
costly modifications to the bridge. understand how the interchange would look and work.

“Bentley software is integrated and provides us with a single


application solution to go from 2D design to accurate 3D models
to get clearances and quantities, as well as provide the video
animation tools needed to present the project at public meetings.”
– Destry Schildmeier, Project Engineer, Wyoming Department of Transportation
2012 BE Inspired Awards

148

9006_YII_Content_1012.indd 148 11/21/2012 12:30:32 PM


Innovation in Structural Engineering
Bentley Systems, Incorporated

The projects in this category demonstrate excellence in analyzing, designing, or delivering one or more structures. These projects
illustrate how the use of technical innovation can deliver high-quality structures or improved structural project workflows that enhance
the structure’s functional performance, delivery process, or quality of service.

149

9006_YII_Content_1012.indd 149 11/21/2012 12:30:33 PM


INNOVATION IN STRUCTURAL ENGINEERING
Company
John Name& Associates, Inc.
A. Martin
Project
LAX Name
International Terminal Expansion WINNER
Location
Los Angeles, California, United States

Nicolas O.S. Marques, Photekt

FINALIST

Company Name
Project Name
Location

The USD 2 billion Tom Bradley International Terminal The complex structural system includes long-span steel special
Modernization Program will add approximately 500,000 square moment frames with non-orthogonal connections between
feet of new concourses and nearly 475,000 square feet of new beams and columns – a first for this unique design in California.
terminal space adjacent to the existing international terminal and RAM allowed the evaluation, analysis, and design of beam
concourses at Los Angeles International Airport. Designed for sizes, column loads, framing schemes, and framing and loading
the coastal location, the structure features rhythmic, overlapping configurations. The new facilities will achieve a minimum LEED
waves with a multiplanar, sloped, and curved roof. Silver certification from the U.S. Green Building Council.
2012 BE Inspired Awards

VIEW PRESENTATION
150

9006_YII_Content_1012.indd 150 11/21/2012 12:30:39 PM


INNOVATION IN STRUCTURAL ENGINEERING
Arup
FINALIST South Morang Rail Extension
Melbourne, Australia

The AUD 650 million South Morang rail extension will improve access to public MicroStation and Structural Modeler were used to model and document
transport for the northern suburbs of Melbourne, Australia. The fast-track the stations and pedestrian footbridge. Fully set-out 3D steelwork models
project included redevelopment of two existing stations, 3.5 kilometers of were provided to assist in rapid procurement and sequencing of steelwork
new double track extension, and the new South Morang Station and modal fabrication. Arup transferred models between Structural Modeler and Autodesk
interchange. Arup provided structural, mechanical, electrical, and hydraulic Revit, which improved productivity by allowing Arup to utilize 3D building
engineering for each station. information modeling with team members using different applications.

VIEW PRESENTATION

Fitzpatrick Engineering Group, PLLC


FINALIST Rehabilitation Center
Concord, North Carolina, United States

Fitzpatrick Engineering Group worked with its client, which had recently To fulfill these requirements, Fitzpatrick Engineering Group used AECOsim
implemented building information modeling (BIM) and adopted an integrated Building Designer as the preferred BIM application to share accurate data with
project delivery method for a USD 18 million inpatient rehabilitation hospital. the fabricator and the ISM Revit plug-in to provide a Revit deliverable. The
The project is a two-story, 65,000-square-foot steel building designed for SidePlate connection in RAM enabled Fitzpatrick Engineering Group to reduce
a future floor. In addition to paper deliverables, the client required Revit steel tonnage and field inspection costs by nearly USD 30,000.
deliverables from all design disciplines and expected the structural model data
to be shared with the fabricator.

Bentley Systems, Incorporated

VIEW PRESENTATION
151

9006_YII_Content_1012.indd 151 11/21/2012 12:30:44 PM


INNOVATION IN STRUCTURAL ENGINEERING
Afcons Infrastructure Ltd.
Underwater Metro Tunnel Project
Kolkata, India

The USD 200 million East West Metro Project in Kolkata, India, includes an To advance the tunnel boring machines along the alignment, a reaction frame
underground section from Howrah Maidan Station to Central Station. The provides a support strong enough to take a lateral reaction of 2,000 metric tons.
section will have three underground stations and 3.7 kilometers of railway Space constraints required the frame’s inclined struts to vary in length and
tunnels, including a 520 meter segment that will go 20 meters underwater. stiffness. In addition, uneven lateral forces from 32 hydraulic jacks had to be
The tunnels are being constructed using tunnel boring machines. distributed among the struts. Afcons Infrastructure used STAAD.Pro to model
the structure and arrive at optimum member sizes.

Aker Solutions
Process Structure for a Refinery Complex
Eastern India

The process structure at a refinery in eastern India is part of an aromatics Aker Solutions used STAAD.Pro for analysis and design, Intergraph PDS for 3D
complex consisting of integrated equipment for processing hydro-treated modeling, Bentley View and Bentley Navigator for reviews, and MicroStation
naphtha. The product is a clean, coke-free active catalyst. Measuring 64-by- for 2D drawing production. Dividing the sub- and superstructures into
24.5-by-95 meters, the structure is comprised of 3,500 metric tons of structural separate files reduced analysis time. Geometry was prepared by reviewing the
steel; 4,800 cubic meters of substructure concrete; and 1,500 cubic meters of preliminary 3D model. Input files were split so both concrete and steel releases
superstructure concrete. could be worked on simultaneously and then integrated to deliver consistent
design.
2012 BE Inspired Awards

152

9006_YII_Content_1012.indd 152 11/21/2012 12:30:47 PM


INNOVATION IN STRUCTURAL ENGINEERING
Ashok Manhar & Associates
200-seat Capacity Auditorium
Ujjain, India

The Madhya Pradesh Council of Science and Technology envisioned a new As the structural consultants, Ashok Manhar & Associates were responsible
200-seat auditorium that blends architectural creativity and engineering skill to for designing the ellipsis-shaped structure, which occupies 500 square meters
produce visually stunning geometry. Located near an astronomical observatory and has a 30-meter axis and a 20-meter axis. STAAD.Pro was used to analyze
in Ujjain, India, the INR 20 million auditorium is shell-shaped with an elliptical and visualize the unique geometry. The software enabled the engineers to
dome roof and curved RCC walls. determine the precise forces at critical sections and achieve the optimum
design for economy and safety.

Aswathanarayana & Eswara


Stamping Pit
Chennai, India

Aswathanarayana & Eswara designed automotive production Line 2 at the 7 The stamping pit was modeled using STAAD.Pro. About 42 load combinations
million-square-foot Renault-Nissan Alliance Plant in Chennai, India. The project were created, and analysis results were extracted for the design. The accurate
included a 46-meter-long, 13.5-meter-wide, and 8-meter-deep stamping pit for modeling and analysis saved nearly 30 percent of design time. The plate
one 2,400-ton press and three 1,000-ton presses. Retaining walls lining the elements representing the foundations were imported into STAAD.foundation,
pit absorbed dynamic vibrations from the presses, which rested on concrete which saved another 100 man-hours and reduced steel quantities by 25 percent.
columns. During construction, a contiguous piled diaphragm wall protected The entire design took just 24 days.
existing building foundation supports.

Bentley Systems, Incorporated

153

9006_YII_Content_1012.indd 153 11/21/2012 12:30:50 PM


INNOVATION IN STRUCTURAL ENGINEERING
Byggnadstekniska Byrån i Stockholm AB
AkzoNobel Swedish Head Office
Nacka, Sweden

Byggnadstekniska Byrån i Stockholm AB was commissioned to design Byggnadstekniska Byrån i Stockholm designed the project in Structural
the concrete and steel structure for the SEK 300 million head office of Modeler, with dedicated, multidiscipline coordination meetings to identify
Dutch chemical producer AkzoNobel. Located in Stockholm, Sweden, the collisions and other issues. Bentley Navigator was used to view 3D models from
13,300-square-meter building consists of laboratories and offices on nine other applications used by different disciplines. This allowed complications
stories. Laboratory installation and ventilation had to fit around the steel to be located and resolved at an early stage. The foundation was adapted to
and concrete structure, which was adapted to protect sensitive laboratory eliminate pressure on an existing tunnel partially beneath the building.
equipment from vibrations.

Carollo Engineers, Inc.


South San Francisco Generator Building
San Francisco, California, United States

The generator building located in San Francisco, Calif., ensures uninterrupted Traditional analysis would have been completed using in-house spreadsheets
power and water service in the event of extreme emergency caused by an and manual calculations. STAAD.Pro took approximately 25 percent less time
earthquake – a common occurrence in proximity to the San Andreas Fault. to perform the same analysis. Carollo Engineers also saved time by applying
Seismic design considerations factored into all aspects of Carollo Engineers’ reusable templates for seismic permutations available in STAAD.Pro technical
design of the USD 2 million building. Carollo used STAAD.Pro for structural reference documents. STAAD.Pro ensured that the project met the seismic
modeling and analysis. requirements of the American Society of Civil Engineers (ASCE).
2012 BE Inspired Awards

154

9006_YII_Content_1012.indd 154 11/21/2012 12:30:53 PM


INNOVATION IN STRUCTURAL ENGINEERING
CE Con Engineering
Auditorium at Mohali
Chandigarh, India

A new civic auditorium in Mohali, India, was designed as both a gathering STAAD.Pro helped CE Con Engineering to analyze the curvilinear roof structure
place for people and an architectural landmark for the city. The building has a with different load combinations. Design optimization was also achieved using
plan area of 115-by-53.3 meters, with a maximum height of 29.2 meters above additional Bentley software, which saved time and reduced project costs.
ground. The curvilinear steel roof structure spans 112 meters from end to end Design reports helped the engineers to analyze and select for design safety.
and incorporates a 14-meter cantilever slab that serves as the upper level The resulting shape and size of the structure have the desired visual impact.
balcony.

Daelim Industrial Co., Ltd.


Saudi Kayan High-density Polyethylene Plant
Jubail Industrial City, Saudi Arabia

Saudi Kayan retained Daelim Industrial as EPC contractor to build the high‑ Using STAAD.Pro for drawing production during the design phase avoided
density polyethylene (HDPE) plant in Jubail Industrial City, Saudi Arabia. confusion about the integrity of the engineering data. Bentley Navigator was
The USD 500 million HDPE plant will have an annual production capacity of used to share i-model reviews and mark-ups. Workflows and review cycles
400,000 tons. Daelim Industrial managed several partner companies that were more efficient with team members using consistent file formats. Daelim
handled various aspects of design and analysis through team collaboration and Industrial delivered 722 drawings after reviewing three times that many with
coordination. the help of Bentley Navigator.

Bentley Systems, Incorporated

155

9006_YII_Content_1012.indd 155 11/21/2012 12:30:55 PM


INNOVATION IN STRUCTURAL ENGINEERING
Energy Infratech Pvt. Ltd.
Teesta-III Hydro Electric Project
Chungthang Village, India

The INR 1.45 billion Teesta Stage III Hydro Electric Project is located on the Using STAAD.Pro, Energy Infratech identified the moments and stresses in
Teesta River near Chungthang Village, India. The high-head scheme includes just two days, compared to the 20 days it would have taken by performing
the headworks, dam, and associated structures. The gated service spillway is the calculations manually. This saved approximately INR 182,000. The bill of
located about 200 meters from the 60-meter-high concrete-faced rockfill dam quantities for steel was delivered ahead of schedule, enabling the order to be
and consists of two 40-meter-high gated inlet structures and two 1-kilometer- procured two months early at a savings of INR 200,000.
long, 10-meter-diameter spillway tunnels.

ESCOM Consultants Pvt. Ltd.


Nestlé R&D Centre
Manesar, India

The USD 25 million Nestlé R&D Centre in Manesar, India, is part of the Located in an earthquake-prone zone, the building structure’s dual system has
company’s global R&D network. The 90.6-by-69.0 meter plan area is comprised frame action and shear walls that act like an inverted cantilever to sustain
of ground-floor offices, first-floor laboratories, and a second-floor technical lateral forces from wind and earthquakes. The project team used STAAD.Pro to
gallery as well as parking and utility area in the basement. The unique hybrid analyze and predict the behaviors of the different materials under various loads.
structure includes a combination of components in steel and cast-in-situ, STAAD.Pro yielded accurate results that led to time and cost savings and an
precast, and prestressed concrete. optimal design.
2012 BE Inspired Awards

156

9006_YII_Content_1012.indd 156 11/21/2012 12:30:59 PM


INNOVATION IN STRUCTURAL ENGINEERING
Hamkar Company
Atlantic Residential Project
Arbil, Iraq

The design competition for the Atlantic Residential Project in Arbil, Iraq, pitted The USD 22.4 million quote was USD 5.6 million less than those of the other
three engineering firms against one another in pursuit of the most economical two firms. Hamkar achieved the low-cost alternative by using Bentley’s
design. Hamkar Company analyzed four alternatives for the 28-unit apartment Integrated Structural Modeling software to calculate the costs of various
complex before proposing a solution that was ultimately the most economical scenarios and perform finite element analysis. As a result, construction time
and the shortest in construction duration, compared to the other proposals. and materials were minimized. Bentley training and technical support were
instrumental in improving project team productivity.

HCR Bridge Machinery (M) Sdn. Bhd.


Kelana Jaya Light Rail Transit Line Extension
Klang Valley, Malaysia

The Light Rail Transit Line Extension project of Kelana Jaya Line in Malaysia HCR simulated the structural frame configuration and loading conditions to
crosses several major expressways. Construction of the elevated viaducts optimize section members and achieve the maximum allowable launching
required lifting 3,200 precast segmental box girders. HCR Bridge Machinery gantries weight on pier structures. A 3D model incorporating various boundary
supplied launching gantries designed for unique site conditions requiring conditions and critical load combinations was imported into STAAD.Pro, and
launching gantries supports to be set on the centerline of 29 types of piers. a utility determined the section properties. STAAD.Pro’s efficient workflow
Height and radius constraints further complicated the erections. reduced man-hours by about 50 percent.

Bentley Systems, Incorporated

157

9006_YII_Content_1012.indd 157 11/21/2012 12:31:02 PM


INNOVATION IN STRUCTURAL ENGINEERING
Hindustan Petroleum Corp. Ltd. (HPCL)
IFO Cooling Facility
Mumbai, India

The Hindustan Petroleum Corp. refinery in Mumbai, Maharashtra, India, has Hindustan Petroleum Corp. introduced a parallel intermediate fuel oil cooling
started processing heavier crude oil, which yields a higher intermediate fuel oil facility consisting of two air fin coolers erected on a 15-meter-high structure.
rundown than lighter crude oil. Previously, intermediate fuel oil rundown was The structure and its foundation were designed using STAAD.Pro and
cooled through one air fin cooler, but the air fin cooler capacity was inadequate STAAD.foundation. The structure was optimized to fit within the space
for the intermediate fuel oil rundown generated by the heavier crude. constraints and was erected over an existing pipe rack on this INR 10 million
project.

Hindustan Petroleum Corp. Ltd. (HPCL)


Softened Water to DM Water Service and Condensate Heat Recovery and Integration
Mumbai, India

At the Hindustan Petroleum Corp. plant in Mumbai, India, hot condensate Hindustan Petroleum Corp. designed a new road crossover bridge that could
was being cooled by using air fin coolers in the Diesel Hydro Desulphurisation accommodate the new pipeline load. The new bridge was erected at the same
(DHDS) Condensate Recovery Unit. The process was intended to conserve location as an existing bridge without disturbing existing pipelines or plant
energy, but heat and electricity were being wasted. To improve energy operations. Interferences were quickly resolved without compromising on
efficiency, softened water was piped to the Demineralized Water Service and design. The company reduced project time by one month using STAAD.Pro and
DHDS Condensate Heat Recovery Unit. STAAD.foundation on this INR 5 million project.
2012 BE Inspired Awards

158

9006_YII_Content_1012.indd 158 11/21/2012 12:31:03 PM


INNOVATION IN STRUCTURAL ENGINEERING
ISGEC Heavy Engineering Ltd.
Alcaravan Bioenergy
Puerto Lopez, Colombia

Located at the El Alcaravan Bioenergy Plant in Puerto Lopez, Colombia, this ISGEC Heavy Engineering used Colombian Code NSR-10 specifications for
INR 600 million project involved the design of the supporting structure for a the analysis of the boiler and supporting structure. Using STAAD.Pro saved
180-ton-per-hour boiler. The boiler was top-supported, and the structure was significant time and cost in the design of steel sections for various load
bolted construction designed to withstand 28-meter-per-second wind velocity combinations.
and Seismic Zone III seismic activity.

Kirby Building Systems India Ltd.


Pipavav Shipyard
Amreli, India

Located on the Arabian Sea in the District of Amreli, India, Pipavav Shipyard STAAD.Pro was used for 3D modeling of the three-part, 60,310-square-meter
handles ship construction and repairs, as well as fabrication and assembly of building. The structure houses multiple electric overhead traveling cranes, semi‑
vessels for the oil, gas, and defense sectors. The USD 10.52 million facility gantry cranes, and gantry cranes with capacities ranging from 7 tons to 150
accommodates vessels of up to 400,000 dead weight tonnage. Kirby Building tons. The main structures were completed in a record seven months. Bentley
Systems India designed the shipyard using pre-engineered building technology technology reduced man-hours by 22 percent and saved 12 percent in costs.
– a first in India.

Bentley Systems, Incorporated

159

9006_YII_Content_1012.indd 159 11/21/2012 12:31:05 PM


INNOVATION IN STRUCTURAL ENGINEERING
Kirby Building Systems India Ltd.
Pre-engineered Building Works for Kalyani Global Engineering
Kutch, India

Located in Kutch, India, the USD 19.63 million project for Kalyani Global Kirby analyzed the critical load combinations in one third the time using
Engineering involved the supply and construction of an integrated facility for STAAD.Pro, which improved productivity, reduced design cycle time, and cut
advanced subcritical and supercritical power plant equipment. Kirby Building costs through design optimization. Designs were easily imported to/exported
Systems India designed two pre-engineered buildings totaling nearly 14,700 from analysis packages. Integrated 3D models were reviewed to detect and
metric tons of steel. One critical area was designed to carry an electrical resolve clashes. The improved quality resulted in less rework and revision.
overhead traveling crane weighing 600 metric tons. STAAD.Pro reduced man-hours by 20 percent and costs by 15 percent.

Kirby Building Systems India Ltd.


Renault – Nissan Automotive India, Tamil Nadu
Chennai, India

The Renault-Nissan Alliance plant in Chennai, India, seamlessly mixes the Kirby Building Systems India performed engineering-to-construction services
production of both Renault and Nissan products on the same line to achieve using STAAD.Pro for design and analysis in a flexible modeling environment.
an annual capacity of 400,000 units. The 310,000-square-meter facility is the Kirby’s alternative design scheme reduced the pre-engineered building tonnage
largest pre-engineered building in the world, with a maximum width of 260 by 4,110 metric tons and saved the client INR 348 million. Building elements
meters and single slope of 130 meters. The design took into account thermal were erected stage by stage on site. The company reduced man-hours by 20
stress due to temperature fluctuations. percent and costs by 15 percent.
2012 BE Inspired Awards

160

9006_YII_Content_1012.indd 160 11/21/2012 12:31:07 PM


INNOVATION IN STRUCTURAL ENGINEERING
L&T-Sargent & Lundy Limited
Plant Structures: Interconnecting Coal Gallery
Koradi, India

L&T-Sargent & Lundy Limited devised an unconventional solution for an The 68.1-meter space between boilers was used for service roads and a
interconnecting coal conveyor gallery when presented with the challenge 33-meter-wide control room. Given this constraint, L&T-Sargent & Lundy
of optimizing the layout of a power plant in Koradi, India. Conventional coal proposed two-legged towers on each side of the control room to support the
conveyors feed isolated coal bunkers. With multiple boiler units in the same gallery. STAAD.Pro and Structural Modeler were instrumental in modeling the
complex, however, the conveyor had to run between boilers and feed bunkers design and erection scheme. Animated sequences generated from MicroStation
for all units from one side. communicated the plan to contractors.

Larsen & Toubro Limited


375 Megawatt GSECL Dhuvaran Heat Recovery Steam Generator
Anand, India

Gujarat State Electricity Corporation Limited (GSECL) is building a 375 Larsen & Toubro modeled the 1,000‑metric‑ton structure for the heat recovery
megawatt combined cycle power plant at Dhuvaran village located in Anand steam generator in STAAD.Pro, which integrated the steel structure, ducting-
district of Gujarat, India. The INR 11 billion project is the first single shaft casing plate, and steel stack in a single model. The STAAD.Pro Advanced
machine configuration combined cycle power plant to be set up by Larsen & Analysis Module was implemented for fast analysis of 570 load combinations.
Toubro, which designed and manufactured the heat recovery steam generator. The thorough analysis of steel components resulted in an optimized design at
reasonable cost savings.

Bentley Systems, Incorporated

161

9006_YII_Content_1012.indd 161 11/21/2012 12:31:10 PM


INNOVATION IN STRUCTURAL ENGINEERING
Larsen & Toubro Limited
India’s Largest Coke Oven Plant
Meramandalli, India

India’s largest coke oven battery, under construction at Bhushan Steel in Results revealed that the temperature load on the RCC deck slab supporting
Meramandalli, India, posed a unique challenge for Larsen & Toubro. The the coke oven battery was too high. The solution was a secondary layer – or
engineers designed a foundation to withstand the temperature variation (375 skin slab – made of heat-resistant concrete to shield the deck slab from thermal
degrees Celsius to 1,100 degrees Celsius) that occurs during the coal-coke expansion and dissipate thermal energy. Analysis using 3D modeling prompted
transformation. Larsen & Toubro used STAAD.Pro to model the coke oven the company to devise an innovative solution that was less costly than
battery foundation and perform a temperature stress analysis. installing a refractory layer.

Larsen & Toubro Limited – ECC Division


TSL Raw Material Handling System Package-1
Jamshedpur, India

This INR 3 billion Raw Material Handling System project is part of a Larsen & Toubro’s Construction division used STAAD.Pro to model the building
3‑million‑ton per‑annum expansion project at the Tata Steel plant in in three parts. Modeling the structure in 3D allowed the engineers to fit the
Jamshedpur, India. The RMHS feeds material to the pellet plant, which stores project into the existing plant while avoiding underground and overhead
8,800 million tons of pellets in a 44.5-by-10-by-13.1 meter bunker for continuous structures. Any necessary changes were immediately incorporated in the
delivery to the blast furnace. design and drawings for faster construction. The design team achieved a 5
percent cost savings and 15 percent time savings by using STAAD.Pro.
2012 BE Inspired Awards

162

9006_YII_Content_1012.indd 162 11/21/2012 12:31:12 PM


INNOVATION IN STRUCTURAL ENGINEERING
Macawber Beekay Pvt. Ltd.
1x500 Megawatt Bokaro A
Bokaro, India

Macawber Beekay provides dry ash handling systems throughout the power The tall and slender structure supports equipment at various levels. Some of
industry. The system it designed for the INR 1.5 billion 1x500 megawatt plant the pipelines connecting the equipment work under pressure, and others work
in the Bokaro district of India included an intermediate surge hopper support under vacuum. It is a critical structure, since its failure could lead to the closure
structure with equipment and piping. In this INR 180 million system, fly ash of the power house. STAAD.Pro saved considerable time and cost in the design
from the electrostatic precipitator hoppers is pumped to the intermediate surge of steel sections.
hopper and then conveyed to the fly ash silo.

Mahadeo Khurd & Associates


Cricket Stadium
Guwahati, India

The 60,000-capacity cricket stadium in Guwahati, Assam, India, features The INR 3.5 billion stadium posed several design challenges, including designing
pre-engineered building construction, in which all structural members were a pre-engineered building structure with curvature to withstand critical seismic
manufactured at a Delhi factory. Using pre-engineered buildings reduces on-site and wind conditions. Mahadeo Khurd & Associates used STAAD.Pro to analyze
labor while maintaining accuracy and quality. Mahadeo Khurd & Associates and design the structure, calculate the forces, and determine the exact size of
designed the north stand of the stadium, which was an irregular shape with the members. The software reduced total costs by nearly 25 percent.
curved forms.

Bentley Systems, Incorporated

163

9006_YII_Content_1012.indd 163 11/21/2012 12:31:17 PM


INNOVATION IN STRUCTURAL ENGINEERING
Shreecon Consultants
Army Public School
Jalandhar, India

The INR 240 million Army Public School in Jalandhar, India, is comprised of Modeling profiles of the structure and connection detailing for the roof’s
classrooms, administrative offices, facility block, and a multipurpose hall. The trussed joints at each end was challenging. Not more than two members in the
facility block is a unique, saucer-type structure with an inverted shell. The structure were the same. Shreecon Consultants saved a significant amount of
multipurpose hall is a two-story roller-compacted concrete structure with a time and effort by using STAAD.Pro for the analysis and design of the structure.
seven-sided sloped roof.

Studio Tecnico Mannelli e Associati


La City
Pescara, Italy

Located in Pescara, Italy, La City is a EUR 5.5 million redevelopment project Reinforced concrete slabs post-tensioned with sliding steel cables were
that created a mixed-use destination complex. The three main buildings house employed for the decks. RAM Concept calculated the bidirectional behavior
approximately 14,000 square meters of offices, commercial spaces, and a of the slab with the coaction of cables, in terms of both stresses and strains.
hotel with meeting and convention space. Studio Tecnico Mannelli e Associati Identifying the realistic behavior of the horizontal structures in ultimate
provided engineering design services including modeling and analysis of a and serviceability conditions enabled the engineers to define the optimal
unique post-tensioned slab. distribution of post-tension cables as well as the exact sequence of tensioning
during construction.
2012 BE Inspired Awards

164

9006_YII_Content_1012.indd 164 11/21/2012 12:31:20 PM


INNOVATION IN STRUCTURAL ENGINEERING
Studio Tecnico Mannelli e Associati
Progetto Ville Urbane
Pisa, Italy

Located in Pisa, Italy, Progetto Ville Urbane encompasses 40,000 square meters RAM Concept calculated the bidirectional behavior of the slab with the
of residential, commercial, and directional use space distributed over four coaction of cables. Identifying the realistic stresses and strain on the horizontal
buildings of up to seven floors above ground and two floors underground. Studio structures in both ultimate and serviceability conditions allowed the engineers
Tecnico Mannelli e Associati minimized construction costs on this EUR 6 million to define the optimal distribution of post-tension cables as well as the exact
complex by combining the use of post-tensioning and lightening technologies in sequence of tensioning to minimize construction costs. RAM Concept also
the reinforced concrete slabs. performed the sophisticated analysis in a short time.

Tata Power
Extension of Conveyor
Jojobera, India

The conveyor system at Tata Power’s plant in Jojobera, India, allows the As-builts for the 20-year-old junction tower and conveyor system were
simultaneous loading and unloading of coal. As part of an essential upgrade, a unavailable, but Tata Power engineers were able to use the structural steel
new Conveyor No. 5A was extended from the existing Conveyor No. 5 using the drawing for Junction Tower 4 to model mechanical loading of the existing
existing Junction Tower 4 for support. Because JNT-4 already supported four conveyor and proposed conveyor. The analysis was performed in-house using
operational conveyors, the tower required strengthening to handle the extra STAAD.Pro, which saved time and minimized the cost of ascertaining how much
loading. strengthening was required and at what cost.

Bentley Systems, Incorporated

165

9006_YII_Content_1012.indd 165 11/21/2012 12:31:23 PM


INNOVATION IN STRUCTURAL ENGINEERING
Tata Power
Strengthening of Emergency Stock Out Conveyor at Trombay
Mumbai, India

An increase in coal loads from 350 tons per hour to 500 tons per hour required Analysis for performance under increased loads revealed that 30 percent of the
capacity enhancements for the 30-year-old emergency coal berth stock out members did not pass load requirements. As a result, the stock out conveyor
conveyor at Tata Power’s plant in Mumbai, India. The original design of the was redesigned in STAAD.Pro and drawings were released for construction.
structure was unavailable, so Tata Power’s engineers modeled the existing
stock out conveyor structure in STAAD.Pro.

“The robust features of AECOsim and Bentley’s continued


commitment to interoperability have allowed Fitzpatrick
Engineering Group to move beyond the traditional ‘beams and
columns’ of BIM and set itself apart as an industry leader while
collaborating in mixed environments.”
– Douglas G. Fitzpatrick, P.E., President, Fitzpatrick Engineering Group
2012 BE Inspired Awards

166

9006_YII_Content_1012.indd 166 11/21/2012 12:31:23 PM


Innovation in Utility Transmission and
Distribution Networks
Bentley Systems, Incorporated

Organizations that plan, design, build, and operate utilities continuously strive to increase productivity, automate engineering tasks,
and deliver intelligent and highly accurate information models. The projects in this category exhibit best practices in the planning,
engineering, and management of utility infrastructure.

167

9006_YII_Content_1012.indd 167 11/21/2012 12:31:24 PM


INNOVATION IN UTILITY TRANSMISSION AND DISTRIBUTION NETWORKS
Company
Enogex Name
LLC
Project Name of AutoPLANT and ProjectWise
Implementation WINNER
Location Oklahoma, United States
Western

FINALIST

Company Name
Project Name
Location

Enogex and its subsidiaries own and operate more than 8,200 In 2009, average cycle time was 1,450 man-hours. Leveraging
miles of pipe, seven processing plants, and 24 billion cubic feet AutoPLANT reduced average cycle time to 220 man-hours in
of natural gas storage capacity in Oklahoma and Texas. In 2009, 2012. AutoPLANT’s multilevel model structure allowed several
Enogex implemented AutoPLANT to standardize and reduce users to access and modify files concurrently. Subsequent
design and drafting time for gas gathering compressor stations. integration with ProjectWise improved file organization,
Within three years, the USD 10 million initiative reduced cycle workflow, and information dissemination. As a result, project
time by 85 percent. request delivery turnaround time was shortened from 16.4
workdays in 2010 to 11.65 workdays in 2012.
2012 BE Inspired Awards

VIEW PRESENTATION
168

9006_YII_Content_1012.indd 168 11/21/2012 12:31:25 PM


INNOVATION IN UTILITY TRANSMISSION AND DISTRIBUTION NETWORKS
Henan Electric Power Survey and Design Institute
FINALIST Henan 500-kilovolt Power Grid 3D Digitized and Integrated Operations Platform
Zhengzhou, China

The Henan Electric Power Survey and Design Institute unified management The company used MicroStation, Bentley Substation, GEOPAK, and Bentley
and operation of the 500 kilovolt power grid in China’s Henan province through PlantSpace to build an integrated model of the power grid incorporating data
an integrated application for planning, design, construction, maintenance, for 26 transformer substations, 96 transmission lines totaling more than 7,000
and emergency and dispatch. 3D visualization of the grid included about 1,000 kilometers in length, and associated buildings and equipment. ProjectWise
electrical design models in more than 200 categories as well as 800 structural, enabled collaboration among about 200 people and allied power companies,
100 building, and 400 overhead line structure models. which reduced labor costs by USD 320,000 over the first two years.

Zhejiang Electric Power Design Institute


FINALIST Jinhua Converter Station
Jinhua, China

The 800 kilovolt extra-high voltage Jinhua Converter Station in Jinhua, China, is MicroStation, Bentley Substation, and STAAD/China were used to model and
part of the USD 3.75 billion Xiluodu Zuoan-Jinhua project, which will distribute optimize the layouts, detect clashes, and calibrate clearances so a process that
power to east China. With a converter capacity of 800 megawatts, the new would have taken seven days using 2D methods took just one day. An H-type
station will improve the regional power grid. Zhejiang Electric Power Design AC filter field layout scheme reduced the area by 21.4 percent. In addition, filter
Institute implemented 3D modeling to solve design challenges such as fitting field steel framework was decreased by 16.2 percent.
the field layouts within a confined space.

Bentley Systems, Incorporated

VIEW PRESENTATION
169

9006_YII_Content_1012.indd 169 11/21/2012 12:31:29 PM


INNOVATION IN UTILITY TRANSMISSION AND DISTRIBUTION NETWORKS
Pacific Gas and Electric Company
Bentley Substation Implementation FINALIST
San Francisco, California, United States

Pacific Gas and Electric’s Substation Engineering Services department is Bentley Substation replaced manual processes with the use of 3D symbols
responsible for more than 1,000 substations throughout a service territory that linked to an integrated database of components. A basic substation site layout
spans two-thirds of California. The department undertook a USD 2.5 million now takes a half day instead of three days to complete. Bills of materials are
initiative to accelerate substation design, improve quality and accuracy, and generated in minutes instead of up to 30 hours. Nearly error-free schematics
reduce engineering and construction costs by integrating intelligent 3D and 2D are generated in one-third the time. By gaining 40 percent efficiency during
design. design, Pacific Gas and Electric expects total annual savings of USD 5.7 million.

Special recognition award winner: attaining return on innovation


VIEW PRESENTATION

BashNIPIneft
Re-engineering Substation 35/6 Kilovolts
Ufa, Russia

BashNIPIneft is the research and development institute affiliated with the Using AutoPLANT Equipment, AutoPLANT Raceways, and ProStructures
exploration and production unit of JSOC Bashneft, an integrated oil and gas enabled complex 3D modeling of the facility, power supply systems, open
company engaged in exploration, development, and production of petroleum distribution service, overhead transmission lines, fiber-optic links, and flexible
resources in the Republic of Bashkortostan, Russia. BashNIPIneft recently bus bar. The software improved accuracy and reduced design time.
designed Electric Substation 35/6-kilovolt Leonidovka in the city of Ufa.
2012 BE Inspired Awards

170

9006_YII_Content_1012.indd 170 11/21/2012 12:31:33 PM


INNOVATION IN UTILITY TRANSMISSION AND DISTRIBUTION NETWORKS
ElectraNet Pty Ltd
Intelligent Substation Information Modeling
Adelaide, Australia

ElectraNet is the principal transmission network service provider in South The stricter adherence to design standards will have a direct cost-benefit with
Australia. To improve the efficiency and accuracy of the detailed design more accurate project estimates, precise bills of materials, and faster progress
of construction projects, the company needed to improve the substation toward construction. Bentley Substation was selected to enable the existing
drafting environment. The AUD 350,000 implementation project provided resource base to deliver more accurate detail drawings faster and at less cost.
in-house training to internal staff and external design partners, and created an As a result, capital expenditure requirements will be reduced.
ElectraNet library based on existing design templates and standards.

Hokkaido Aero Asahi Co. Ltd.


Suspended Power Line Route Planning
Hokkaido and Tsugaru Peninsulas, Japan

After the earthquake of March 11, 2011, Japan suffered a severe electricity LiDAR data was processed using MicroStation with TerraScan and
shortage that resulted in planned power outages. In response, the power TerraModeler. The laser point-cloud data was then used to calculate current
distribution grid is being revised to provide a stable electricity supply. and future timber heights, conduct offset simulations with virtual power lines,
Rebuilding the 50- to 100-year-old transmission line towers is urgent, so to and estimate the amount of timber to be cut at installation locations. Route
quickly study potential tower routes, Hokkaido Aero Asahi obtained detailed 3D selection time and cost were halved compared to conventional on-site survey
data using aerial laser measurements for this JPY 10.39 million project. methods.

Bentley Systems, Incorporated

171

9006_YII_Content_1012.indd 171 11/21/2012 12:31:56 PM


INNOVATION IN UTILITY TRANSMISSION AND DISTRIBUTION NETWORKS
swb Netze GmbH & Co. KG
Sharing GIS Information With Contractors: Utilities Infrastructure Portal (OPA)
Bremen, Germany

Each year, swb Netze receives 9,000 enquiries concerning line information At the core of OPA, Bentley Geo Web Publisher and ProjectWise provide a web
in Bremen, Germany. Previously, enquiries were processed during network front end from which registered users can request maps for heating, gas, water,
operator service hours. To reduce staff time commitment, swb Netze and electricity in specific regions. Because OPA administers about 90,000
implemented the Utilities Infrastructure Portal (OPA), which is available 24/7. documents, the automation of these processes enables swb Netze to reduce
OPA is also used internally for the digital provision of plans and as-builts. costs by approximately 75 percent for an annual savings of EUR 300,000.

Tenaga Nasional Berhad


Visualizing Digital Terrain Models From Airborne LiDAR
Slim River, Sungkai, Tapah, and Tanah Rata, Malaysia

As the largest electricity utility in Malaysia, Tenaga Nasional Berhad needs Integrated with Terrasolid applications, MicroStation enabled the display,
accurate digital terrain models (DTMs) during the preliminary design stage navigation, and visualization of data. Using GEOPAK data acquisition tools
of transmission line route planning. Airborne LiDAR presented an affordable enabled the generation of DTMs from point-cloud data with high-resolution
solution for obtaining point-cloud data, but the data set tended to be unwieldy imagery dynamically draped on top of the DTMs. This solution eliminated
for use in visualization. Tenaga Nasional Berhad invested USD 500,000 to the need for high-end workstations to manipulate LiDAR data. The tools
implement MicroStation as its LiDAR point-cloud data processing platform. streamlined workflows and improved outputs for better client communications.
2012 BE Inspired Awards

172

9006_YII_Content_1012.indd 172 11/21/2012 12:31:59 PM


Innovation in Water and Wastewater
Treatment Plants
Bentley Systems, Incorporated

Common goals of water resource professionals include increasing efficiencies in engineering processes while minimizing
environmental consequences, preserving public capital investment, and enhancing the level of service of costly but necessary water
infrastructure. This category features projects that demonstrate the innovative use of technology to plan, design, manage, model, and
construct water and wastewater treatment plants.

173

9006_YII_Content_1012.indd 173 11/21/2012 12:32:00 PM


Innovation in Water and Wastewater Treatment Plants
Company
Carollo Name Inc.
Engineers,
ProjectSecondary
South Name Improvements Project WINNER
LocationColorado, United States
Denver,

FINALIST

Company Name
Project Name
Location

The Metro Wastewater Reclamation District in Denver, Colo., As design engineer and owner’s representative, Carollo
is modifying and upgrading the South Secondary Treatment Engineers used MicroStation, Bentley Navigator, ProjectWise,
facilities to treat 114 million gallons of wastewater per day. The and InRoads to link 12,154 activities from the contractor’s
USD 136 million project had to be completed within the state- Primavera P6 baseline schedule with the 3D model to create a
mandated compliance schedule, requiring the contractor to place 4D visualization. The detailed 4D model aided the project team
approximately 75,000 cubic yards of concrete and install the in evaluating whether the accelerated schedule was achievable.
major electrical, mechanical, and instrumentation equipment in Proactive coordination resulted in 20 days of float ahead of the
the first 2.5 years. early completion date.
2012 BE Inspired Awards

VIEW PRESENTATION
174

9006_YII_Content_1012.indd 174 11/21/2012 12:32:01 PM


Innovation in Water and Wastewater Treatment Plants
GE Water
FINALIST Lanxess India – Thermal Zero Liquid Discharge Wastewater Treatment Plant
Nagda, India

GE Water is building a USD 4.6 million thermal zero liquid discharge plant to The entire plant was modeled using MicroStation and Bentley PlantSpace,
treat 260 cubic meters per day of wastewater generated by existing chemical which enabled the visualization, coordination, and optimization of equipment,
plants at the Lanxess Complex in Nagda, India. The treated water will be piping, pipe supports, and cable tray layouts. Structural and piping analysis
reused for boiler feedwater make-up in power generation. GE Water reduced and design were performed using STAAD.Pro and AutoPIPE. The 3D model also
man-hours during design and modeling by about 42 percent, which saved enabled accurate bill of materials extraction.
approximately USD 16,800.

VIEW PRESENTATION

Melbourne Water
FINALIST Eastern Treatment Plant Tertiary Upgrade
Melbourne, Australia

The AUD 418 million upgrade of Melbourne Water’s Eastern Treatment Plant Specialist team members on four continents worked concurrently to create
in Melbourne, Australia, will add an advanced tertiary treatment plant to 175 civil, structural, electrical, mechanical, and piping models that could
produce 708 megaliters per day of high-quality recycled water for non-potable be referenced in a single view and coordinated by the on-site design team.
applications. The plant will also improve treated effluent quality at the ocean Creating intelligent P&IDs using AutoPLANT P&ID, integrated structural design
discharge outfall and so benefit the marine environment. Automated piping using ProSteel, and 3D modeling of yard services in a single model optimized
isometrics alone saved about 8,000 man-hours. layouts, minimized clashes, and allowed interfaces to be managed.

Bentley Systems, Incorporated

VIEW PRESENTATION
175

9006_YII_Content_1012.indd 175 11/21/2012 12:32:04 PM


Innovation in Water and Wastewater Treatment Plants
CH2M HILL
Metro Wastewater Reclamation District, Northern Treatment Plant FINALIST
Denver, Colorado, United States

The primary focus of CH2M HILL’s USD 475 million project is to return treated To ensure consistent data definition across the over 20 facilities on site
water back into the environment. Specifically, the Northern Treatment Plant will in Denver, Colo., CH2M HILL utilized intelligent modeling tools – including
increase wastewater treatment capacity to the Metro Wastewater Reclamation MicroStation, ProjectWise, Bentley Navigator, Bentley PlantSpace, OpenPlant,
District. The firm will initially size the treatment plant to treat 24 million gallons InRoads, and Bentley Raceway and Cable Management – that were configured
per day with a future expansion capacity to 60 million gallons a day. to meet the building information modeling goals as agreed to by the client.

Special recognition award winner: sustaining our environment


VIEW PRESENTATION

SEIMAF Ingenierie
Study Details of Pipes and Hoppers
Le Plessis Robinson, France

SEIMAF Ingenierie is an engineering company based in Le Plessis Robinson, Information sharing in real time with the client was the key to successfully
France. The goal of this EUR 100,000 project was to model and detail the duct meeting the project deadlines with a significantly reduced margin of error.
network surrounding an oven. A particular challenge was to finalize the design MicroStation delivered a technology platform that enabled the exchange of
of the ducts while the provided 3D model was still evolving. data among participants. The main benefit on this project was the time saved
due to the rapid implementation of MicroStation.
2012 BE Inspired Awards

176

9006_YII_Content_1012.indd 176 11/21/2012 12:32:08 PM


Innovation in Water, Wastewater, and
Stormwater Networks
Bentley Systems, Incorporated

Projects in this category demonstrate excellence in planning, designing, building, operating, modeling, and analyzing water, wastewater,
or stormwater networks – enhancing system efficiency and reliability.

177

9006_YII_Content_1012.indd 177 11/21/2012 12:32:10 PM


INNOVATION IN WATER, WASTEWATER, AND STORMWATER NETWORKS
Company
Azersu Name
OJSC
Project Name
GIS-based Infrastructure Asset Management WINNER
Location
Baku, Azerbaijan

FINALIST

Company Name
Project Name
Location

Azersu OJSC is in charge of policy and strategy for Azerbaijan’s The USD 3 million GIS project is an advanced urban
water supply and sanitation services. With the influx of oil infrastructure and environmental management solution that
revenues in Azerbaijan, Azersu embarked on a four-year provides data security and access to maps and information for
infrastructure development program. AzersuCIS was launched in planning, production, operation, and emergency management.
conjunction with this program to gather and store infrastructure Using MicroStation and MicroStation PowerDraft, AzersuCIS is
data for better operation and maintenance of the system. web-accessible to more than 100 users in disparate locations.
Azersu saved USD 800,000 in just seven months using the
spatial database technology.
2012 BE INSPIRED AWARDS

VIEW PRESENTATION
178
Innovation in Water, Wastewater, and Stormwater Networks
Gannett Fleming, Inc.
FINALIST Innovative Model Data Integration Processes
Lehigh County, Pennsylvania, United States

Gannett Fleming worked with Lehigh County Authority to develop and apply Using innovative data integration processes, GIS and SCADA data were
a water system model, which involved establishing links to automate data transferred using WaterCAD, WaterGEMS, and SCADAConnect utilities, which
transfer between the model and existing GIS, customer data, and SCADA. shortened the model development process from four to eight weeks to mere
The USD 125,000 project resulted in a more accurate model requiring days. WaterGEMS will save up to 40 hours for future model updates.
significantly less financial and time commitment to maintain compared to a
traditional model.

VIEW PRESENTATION

NJS Engineers India Pvt. Ltd.


FINALIST JICA-assisted Agra Water Supply Project
Agra, India

The city of Agra, India, had an intermittent water supply, with pumping stations Rehabilitation and repair of two water treatment plants, overhead tanks, clear
operating for a few hours twice a day. The INR 34 billion Agra Water Supply water reservoirs, and distribution networks were also planned. WaterGEMS
Project will deliver an adequate supply of treated water 24/7. Undertaken by was used to develop a hydraulic model for existing, intermediate, and future
NJS Engineers for Uttar Pradesh Jal Nigam, the project includes construction water supply zones. The model was used to evaluate network flow, capacity,
of a 144 million-liter-per-day water treatment plant, sedimentation tank, and and pressure; plan system rehabilitation, improvement, and expansion; monitor
130-kilometer transmission pipeline. non-revenue water; and develop efficient operational strategies.

Bentley Systems, Incorporated

VIEW PRESENTATION
179

9006_YII_Content_1012.indd 179 11/21/2012 12:32:16 PM


Innovation in Water, Wastewater, and Stormwater Networks
ADCC Infocad Pvt. Ltd.
Deulgaon Raja Sujal Reform Project
Deulgaon Raja, India

In the state of Maharashtra, India, the Deulgaon Raja Municipal Council Using WaterGEMS to model current, intermediate, and ultimate population
initiated an INR 230 million project to analyze, improve, and augment existing stages, ADCC Infocad recommended improvement and rehabilitation of
and proposed water supply schemes, including conversion from intermittent to the water supply system including the optimization of valve operation, the
24/7 continuous service. ADCC Infocad performed the water and energy audits, remediation of water leakage in rising mains, and the replacement of PVC and
GIS mapping, consumer survey, flow-meter installation, and GIS-based hydraulic asbestos cement pipes. The proposed scheme will enable the city to better use
modeling of existing and proposed pipelines and distribution system. its water resources, reduce distribution and transmission losses, and move from
70 to 100 percent coverage.

AECOM India Pvt. Ltd.


Sewerage Master Plan of Delhi for Delhi Jal Board
New Delhi, India

Charged with sewerage collection, treatment, and disposal in India’s capital Coupling hydraulic modeling in SewerGEMS with GIS visualization in Bentley
city, Delhi Jal Board engaged AECOM India in association with WAPCOS Map and feature and attribute standardization in Bentley Water facilitated the
to prepare a sewerage master plan for 2031. The plan considered existing interpretation of results for thousands of kilometers of survey data. Multiple
infrastructure and a provision for new facilities, including unauthorized iterations of more than 100 SewerGEMS submodels yielded optimal designs
colonies and rural villages. The process combined survey and investigation, GIS that were imported into one SewerGEMS file, possibly the largest integrated
integration, map scheme standardization, hydraulic modeling, and design and hydraulic model in India.
planning.
2012 BE Inspired Awards

180

9006_YII_Content_1012.indd 180 11/21/2012 12:32:19 PM


Innovation in Water, Wastewater, and Stormwater Networks
AKATT S.A.
Automation System of DEYA Lamia
Lamia, Greece

DEYA Lamia is the water distribution company for the Municipality of Lamia The automation and telemetry system uses programmable logic controllers,
in central Greece. AKATT combined software and hardware technologies to SCADA software, wireless radio frequency/GSM networks, and sensor
create a EUR 2.2 million fully integrated information and automation system instruments for the remote control of water sources and tanks. An information
that will help detect and eliminate leakages in the water distribution network, system enables real-time data exchange among SCADA software, GIS,
reduce expenditures for spot inspections of water sources and tanks, and WaterCAD and its SCADAConnect module, enterprise resource planning, and
increase revenue through accurate modeling and pricing. water pump maintenance software, which give engineers full control of the
city’s water network.

Artelia Cyprus Limited


Greater Nicosia Sanitary Sewerage Project
Nicosia, Cyprus

In 2000 Nicosia, the capital of the Republic of Cyprus, initiated its first Artelia Cyprus provided design services, prepared tender documents, and
major sewerage project since 1974 with a massive infrastructure scheme supervised construction on the EUR 129 million project. SewerCAD was
that extended sewerage to the suburbs and 14 neighboring communities. used to optimize the networks and prepare bills of quantities. The software
Construction began in 2003 and is nearly 98 percent complete. The latest allowed team members working on different subcatchments to exchange data,
initiative is bringing more than 800 kilometers of sewer mains to previously constraints, and boundary conditions. SewerCAD reduced design time by 15
developed areas and enabling usage of treated wastewater for irrigation. percent, and optimizing the network reduced capital costs.

Bentley Systems, Incorporated

181

9006_YII_Content_1012.indd 181 11/21/2012 12:32:23 PM


Innovation in Water, Wastewater, and Stormwater Networks
Chongqing Water Group Co. Ltd
Chongqing Water Networks Operation Demonstration
Chongqing, China

Chongqing Water Group, through its subsidiaries, joint ventures, and associated WaterGEMS enabled the project team to import network asset management
companies, produces and sells tap water, collects and treats urban wastewater, information, model various scenarios for optimizing the network design, and
and constructs water supply and drainage facilities. This CNY 140 million forecast the system lifecycle cost to manage the network. The management
project implemented WaterGEMS to model network operations for the water of district metered areas helped control and reduce water leakage and the
supply system in the municipality of Chongqing, China. modeling initiative reduced network design and operation costs by CNY 3.6
million.

Delhi Jal Board


Sewerage Master Plan – 2031 for Delhi
New Delhi, India

In India’s capital city, Delhi Jal Board is responsible for sewage collection, The GIS-based network asset database was imported to SewerGEMS and
treatment, and disposal. AECOM India and WAPCOS were engaged to prepare a various tools available in SewerGEMS were used for analysis and design
sewerage master plan for 2031. The master plan aims to develop an integrated iterations. This approach enabled existing GIS asset files to be reused and
scheme that takes into account existing and planned sewerage infrastructure allowed the incorporation of data from varied sources. The performance of
in Delhi, its unauthorized colonies, unauthorized/regularized colonies, and rural existing and proposed sewerage systems was assessed under various planning
villages. scenarios.
2012 BE Inspired Awards

182

9006_YII_Content_1012.indd 182 11/21/2012 12:32:25 PM


Innovation in Water, Wastewater, and Stormwater Networks
Forsspac
Global Gateway Logistic City
Clark, Philippines

Global Gateway Logistics City is a 177-hectare master-planned mixed-use Challenges included storm drainage during heavy rains, and conflicts with
logistics and business center located 60 minutes north of Manila in the electrical conduits and other services. Forsspac trained the project team on
province of Pampanga, Philippines. Forsspac was retained to design the city’s InRoads, WaterGEMS, SewerGEMS, StormCAD, HAMMER, and AECOsim
underground utilities for sewer drainage, storm water, potable and reclaimed Building Designer. The interoperability among applications enabled the team to
water, and fire hydrant service. The city-wide low-pressure water network identify and resolve challenges using 3D modeling. Design and documentation
incorporated local water storage and pumps for each building. were completed within 15 months to meet the project milestone.

Frischmann Prabhu (India) Pvt. Ltd.


Mega City Water Supply System
Panvel, India

Patterned after Dubai’s Media City and Qatar’s Energy City, the INR 15 billion WaterGEMS was used to perform hydraulic modeling of scenarios involving
mixed-used development called Mega City in Panvel, India, will create a various system constraints, and determine pipe diameters for different pump
sustainable satellite township on 1,400 acres. Frischmann Prabhu was retained hours and water tank levels. The water supply scheme sources water from a
to plan and design the water supply system including pipelines, and elevated government authority pipeline, transports the water 1 kilometer to a master
and ground service reservoirs to serve a population of about 450,000. balance reservoir, and pumps the water to three elevated ground service
reservoirs at different elevations at 3, 5, and 10 kilometers distance from the
master balance reservoir.

Bentley Systems, Incorporated

183

9006_YII_Content_1012.indd 183 11/21/2012 12:32:27 PM


Innovation in Water, Wastewater, and Stormwater Networks
Maharashtra Jeevan Pradhikaran
Hydraulic Modeling for Gondia City
Gondia, India

In Maharashtra, India, the city of Gondia’s population of 140,000 was supplied The existing and proposed network of more than 4,000 pipes was assessed
with 70 liters per capita per day of water from the Wainganga River. The using ArcView and ArcEditor for GIS maps, and WaterGEMS for modeling and
intermittent service was inadequate to meet the demands of residents analysis. The network was divided into zones to control water distribution. The
and tourists. The water supply and sanitation department of Maharashtra, analysis took 60 percent less time to generate multiple scenarios. The optimal
Maharashtra Jeevan Pradhikaran, carried out GIS-integrated hydraulic modeling solution cost INR 50 million less than the budgeted amount of INR 610 million.
to provide a 24/7 continuous water supply of 135 liters per capita per day.

Maharashtra Jeevan Pradhikaran


Hydraulic Modeling for Hingoli City
Hingoli, India

In the town of Hingoli, Maharashtra, India, the population of 86,790 was The existing and proposed network of more than 2,000 pipes was assessed
supplied with water just once every six to eight days. The approved water using ArcView and ArcEditor for GIS maps, and WaterGEMS for modeling
supply scheme was designed to upgrade the existing water distribution system and analysis. The optimal solution cost INR 70 million less than the budgeted
to provide consumers with 135 liters per capita per day. Maharashtra Jeevan amount of INR 160 million.
Pradhikaran carried out GIS-integrated hydraulic modeling to transform the
current intermittent supply pattern to 24/7 continuous water supply.
2012 BE Inspired Awards

184

9006_YII_Content_1012.indd 184 11/21/2012 12:32:30 PM


Innovation in Water, Wastewater, and Stormwater Networks
Maharashtra Jeevan Pradhikaran
Hydraulic Modeling for Kagal City
Kagal, India

In Maharashtra, India, the city of Kagal’s population of 34,000 was supplied The existing and proposed network of more than 1,000 pipes was assessed
with water from the Dudhganga River and Jaysing tank at intervals of one using ArcView and ArcEditor for GIS maps, and WaterGEMS for modeling and
to two days. The water supply and sanitation department of Maharashtra, analysis. The network was divided into zones to control water distribution. The
Maharashtra Jeevan Pradhikaran, carried out GIS-integrated hydraulic modeling water supply rehabilitation and augmentation scheme was sanctioned for a
to transform the current intermittent supply pattern to a 24/7 continuous water cost of INR 95.8 million.
supply of 70 liters per capita per day.

Manila Water Company


Improving Efficiency of Pump Operations in Manila
Quezon City, Philippines

Manila Water Company supplies more than 1 million households in metro Manila Water used WaterGEMS Darwin Scheduler to define the optimal pump
Manila and the Philippines province of Rizal. Inefficient pump operation caused operation. Customer profile data was logged, and pump operations were based
high pressure during off-peak periods resulting in constant pipe breakages and on demand patterns. Incorporating peak power costs, the optimization run
low pressure during peak demand. The company conducted a study that cost of pumps revealed the optimal scenario. Trial of the scenario reduced power
USD 1.8 million and will return an annual cost savings of USD 367,000. consumption by 4.5 percent during off-peak and 15.5 percent during peak.
Average pressure increased 6 pounds per square inch.

Bentley Systems, Incorporated

185

9006_YII_Content_1012.indd 185 11/21/2012 12:32:34 PM


Innovation in Water, Wastewater, and Stormwater Networks
Power and Water Corporation
Remote Communities: Optimization of Water Supply
Northern Territory, Australia

Power and Water Corporation provides electricity, water, and sewerage EPANET models and ArcFM GIS data were imported to WaterGEMS for
services to Australia’s Northern Territory, where 80,000 customers are spread development of community water system models. Using WaterGEMS and its
across more than 1.3 million square kilometers. For 72 indigenous communities Darwin Calibrator module, leaks were identified and reduced by 0.5 liters per
and growth towns, limited groundwater resources may not meet future second throughout 20 growth towns. Using WaterGEMS Darwin Scheduler,
demand. Power and Water optimized the water supply system and managed pump operations were optimized to improve availability of water and reduce
demand in these remote communities. energy use by 20 percent. Models developed for this AUD 30,000 project will
allow Power and Water to plan for future development.

Sabesp
Cadiriri Booster Supply Analysis
Sao Paulo, Brazil

In the metropolitan region of Sao Paulo, Brazil, the Cantareira water supply Sabesp used WaterGEMS for hydraulic modeling of various scenarios, resulting
system supplies 864,344 inhabitants. Although the Cadiriri Booster was in the decision to construct a new pipeline and booster in the other sectors.
designed to separately supply the city of Sao Caetano, other sectors have These facilities reduced energy use in the Cadiriri Booster subsystem by 23
drawn water from the booster station and forced it to operate longer than percent. The project introduced a new form of analysis that involved the entire
intended. This BRL 2.5 million project improved water supply in the subsystem, water distribution system topology, demand, and energy consumption.
eliminated derivations from the Cadiriri Booster, and enhanced energy
efficiency.
2012 BE Inspired Awards

186

9006_YII_Content_1012.indd 186 11/21/2012 12:32:37 PM


Innovation in Water, Wastewater, and Stormwater Networks
Sabesp
Jardim Damasceno Pump Station
Sao Paulo, Brazil

The BRL 110 million Jardim Damasceno Pump Station in the far north region Sabesp used WaterCAD to perform hydraulic modeling of multiple supply
of Sao Paulo, Brazil, was designed to solely and exclusively supply water to scenarios to find a solution. The pumping station was designed with four
the 330,000 inhabitants of the Jaragua sector. The pump station will also help motor-pump sets of 2,500 horsepower each, divided into two phases of
to normalize chronic water distribution problems in the sector where poor implementation. The goal of full supply in the region was achieved and 550
communities receive intermittent service due to water shortages in the Jaragua liters per second were added to the average flow at an increased profit.
reservoir for up to 12 hours per day.

Sabesp
Water Supply in Risk Area
Sao Paulo, Brazil

When the Jardim da Conquista pump station shuts down due to power failures, Construction of a new reservoir with an oversized volume provided sufficient
approximately 240,000 people in Sao Paulo, Brazil, remain without water autonomy to ensure water supply until the morning after a power outage.
overnight until Sabesp restarts the pumps the next day. To solve this problem, WaterCAD determined existing operating conditions, tested new pump setups,
Sabesp performed modeling with WaterCAD that simulated the hydraulic and determined how long the pumps would take to fill the new reservoir. The
conditions. By understanding the operation of the entire system, the company total project cost was BRL 20,000, and with resulting savings of BRL 1.1 million,
was able to define a cost-effective solution. the return on investment was 55 times the project cost.

Bentley Systems, Incorporated

187

9006_YII_Content_1012.indd 187 11/21/2012 12:32:40 PM


Innovation in Water, Wastewater, and Stormwater Networks
Shirpur Municipal Council
Hydraulic Modeling
Shirpur, India

In Maharashtra, India, the city of Shirpur’s population of 76,800 was supplied The existing and proposed network of more than 2,000 pipes was assessed
with water from Karvand Dam and four tube wells for about one hour in the using ArcView and ArcEditor for GIS maps, and WaterGEMS for modeling and
morning and one hour in the evening. Under the statewide water and sanitation analysis. The network was divided into zones to control water distribution. The
initiative, Maharashtra Sujal and Nirmal Abhiyan, Shirpur Municipal Council analysis took 60 percent less time to generate multiple scenarios. The water
carried out GIS-based hydraulic modeling to transform the current intermittent supply rehabilitation and augmentation scheme was sanctioned for INR 215
supply to a 24/7 continuous water supply of 135 liters per capita per day. million.

SMEC International Private Limited


Greater Colombo Wastewater Management
Colombo, Sri Lanka

In the western province of Sri Lanka, the Drainage and Water Supply Division The study area covers 4,000 hectares with 284 kilometers of pipe, 13
of Colombo Municipal Council operates and maintains the aging Greater pump stations, and two long sea outfalls. SMEC used SewerCAD to model
Colombo Wastewater Collection and Disposal System. SMEC was selected for every sewer line and generate 30 subsewer networks. SewerCAD’s data
design and supervision of the USD 116 million Phase I project to identify and synchronization with Colombo Municipal Council’s GIS database allowed
rehabilitate current critical areas, and propose less critical areas for Phase II. network modeling of dry and wet weather flows, inflow and infiltration, pipe
flow capacities, and sanitary loads. Priority sewers were selected based on
these analyses.
2012 BE Inspired Awards

188

9006_YII_Content_1012.indd 188 11/21/2012 12:32:43 PM


Innovation in Water, Wastewater, and Stormwater Networks
Société du Canal de Provence – Sri Lanka Bureau
Greater Trincomalee Integrated Water Supply
Trincomalee, Sri Lanka

The Sri Lanka Bureau of Société du Canal de Provence provided hydraulic Network diagnosis was performed by modeling the 430 kilometer distribution
modeling, design, and rehabilitation services for the USD 113 million Greater network in WaterCAD. Recommendations were made for improvements to meet
Trincomalee Integrated Water Supply Project in Eastern Province. The project 2025 requirements. An update of the initial model fine-tuned the water demand,
aims to increase capacity from 25,000 cubic meters per day for 139,000 network layout, sizing and selection of material, and location and definition
inhabitants to 54,552 cubic meters per day for nearly 300,000 inhabitants. of civil structures. The supply of an additional area was incorporated into the
model, and the adequacy of proposed improvements was confirmed for 2025.

Vitya Consultants Pvt. Ltd.


PURA for Sangli Cluster of Maharashtra
Sangli, India

The Ministry of Rural Development, Government of India, undertook an For the INR 500,000 project involving 10 villages in the Sangli district of
innovative project called Provision of Urban Amenities in Rural Areas (PURA). Maharashtra, Vitya Consultants designed and modeled complete water supply
PURA provides infrastructure for basic utility services such as water supply, distribution networks using WaterGEMS and complete sewerage networks
sanitation and sewerage, solid waste management, roads, storm water using SewerGEMS, which allowed the consultants to consider various
drainage, and street lighting in gram panchayats (local, self-governing villages alternatives and arrive at the optimal designs using less manpower. Both water
or small towns). and sewerage systems were designed in less than a week.

Bentley Systems, Incorporated

189

9006_YII_Content_1012.indd 189 11/21/2012 12:32:47 PM


Innovation in Water, Wastewater, and Stormwater Networks
WAPCOS Limited
Gaya Sewerage Scheme
Gaya, India

The INR 200 million sewerage scheme for the city of Gaya, India, aims to reduce WAPCO used SewerGEMS to perform modeling and analysis of various
the pollution caused by the discharge of sewage directly or indirectly to the schemes for the city’s 345 kilometer sewerage network. The preferred
river Falgu. WAPCOS was retained to conduct a feasibility study and prepare sewerage scheme ensures the network will be able to serve a population of
a detailed project report on the optimal usage of existing infrastructure and 745,106 by the year 2044. It includes five pumping stations and two sewage
proposed rehabilitation and augmentation to achieve the desired results. treatment plants. WAPCO realized a 60 percent time savings for the analysis.

WAPCOS Limited
Sewerage Master Plan of Delhi for the Year 2031
New Delhi, India

Delhi Jal Board engaged AECOM India in association with WAPCOS to prepare Integrated survey data and population projections were transferred to
a sewerage master plan for year 2031 as part of its responsibilities for sewage SewerGEMS. Integration of the hydraulic model and GIS database introduced
collection, treatment, and disposal in India’s capital city. The project covered spatial visualization to the iterative design process. SewerGEMS reduced the
Delhi, its unauthorized colonies, and rural villages. The scope included a time required for redesign based on site feasibility. WAPCOS also carried out
topographical survey and geotechnical investigation of 1,100 unauthorized a performance audit of 15 existing wastewater treatment plants, along with
colonies. hydraulic modeling of trunk sewers.
2012 BE Inspired Awards

190

9006_YII_Content_1012.indd 190 11/21/2012 12:32:52 PM


ALPHABETICAL BY ORGANIZATION – INDEX

WINNERS W
ORGANIZATION NAME PROJECT NAME PAGE
3Deling sp. z o.o. Wieliczka Salt Mine Laser Scanning 98

FINALISTS
A. Burmester Arquitectos Associados Lda Electricity of Portugal 66
ADCC Infocad Pvt. Ltd. Deulgaon Raja Sujal Reform Project 180
AECOM Detailed Design of NH 6 138

F
AECOM Udaipur Ring Road 139
AECOM India Pvt. Ltd. Sewerage Master Plan of Delhi for Delhi Jal Board 180

SPECIAL RECOGNITION AWARD WINNER AND FINALIST W| F


Aestudio Competition for New Trade Center 46
Aestudio Strategic Center for Earthquake Emergency 46
Afcons Infrastructure Ltd. Underwater Metro Tunnel Project 152
Afcons Infrastructure Ltd. Jammu‑Udhampur Section Construction 67
Afcons Infrastructure Ltd. Metro Rail Viaduct Construction 67
Air Liquide Engineering India Pvt. Ltd Air Separation Unit Plant 124
AKATT S.A. Automation System of DEYA Lamias 181
Aker Solutions Process Structure for a Refinery Complex 152
F AMEC Cloudbreak Enhancement Project 97
F Ameren Callaway Energy Center eB Supports Nuclear Outage Management 31
Andrea Girotto Architetto Real Classic Mood Café 47
Anglo American plc Geospatial Integration Project 98
Anhui Transport Consulting & Design Institute Co., Ltd. Application of 3D Design Technology in Complex Bridge Design 36
ARCADIS France SEA High‑speed Track Bridges 36
Arkitekterna Krook & Tjäder Friends Arena 47
F Armando Rito Engenharia SA April 4 Bridge 35
Artelia Cyprus Limited Greater Nicosia Sanitary Sewerage Project 181
F Arthur Golding and Associates Helsinki Central Library Competition 45
F Arup South Morang Rail Extension 151
Ashok Manhar & Associates 200‑seat Capacity Auditorium 153
F Astiv Ingeniería Restoration of a Recycled Slag Landfill 81
Aswathanarayana & Eswara Stamping Pit 153
Aurecon Hatch Wiggins Island Coal Export Terminal 99
W Azersu OJSC GIS‑based Infrastructure Asset Management 178
BashNIPIneft Re‑engineering Substation 35/6 Kilovolts 170
BashNIPIneft Trebs Oil Field: Central Collection Point 124
Bassani Edilizia S.p.A. Centro Residenziale Dogana 48
Bayer Technology Services GmbH Conceptual Design With PlantWise 125
F BBKS‑Projekt Sp. z o.o. Taxiways at Rzeszow‑Jasionka Airport 91
Bechtel Australia Pty Ltd Caval Ridge Coal Mine 99
Bina Puri Construction Sdn Bhd 33 Units Alamesra 48
F Borton‑Lawson Lehigh/Pohopoco Bridge Replacement 35
Building Studio Architects The Lantern 49
Byggnadstekniska Byrån i Stockholm AB AkzoNobel Swedish Head Office 154
Camargo Corrêa Jirau Hydropower Plant 22
W Carollo Engineers, Inc. South Secondary Improvements Project 174
Carollo Engineers, Inc. South San Francisco Generator Building 154
Bentley SyStemS, Incorporated

Carson Engineers Stacker‑chase Coal‑blending Facility 114


Caruso Mainardi Architetti Associati Residential Buildings 49
CDM Smith Inc Four Laning of Ludhiana‑Talwandi Section of NH 95 139
CE Con Engineering Auditorium at Mohali 155
W| F CH2M HILL Metro Wastewater Reclamation District, Northern Treatment Plant 11, 176
China Nerin Engineering Co., Ltd. Tongling Nonferrous Metals Copper Smelting Project 100

191

9006_YII_Content_1012.indd 191 11/21/2012 12:32:52 PM


INDEX – ALPHABETICAL BY ORGANIZATION

ORGANIZATION NAME PROJECT NAME PAGE


China Water Resources Beifang Investigation, Design
F Gelantan Hydropower Station (GLTHPP) 113
and Research Co., Ltd.
Chongqing Water Supply Co. Ltd Chongqing Water Networks Operation Demonstration 182
CIMA+ Turcot Interchange 140
F City of Copenhagen Solar Exposure of Copenhagen City 85
F CNGS Engineering Ice‑resistant Offshore Platform LSP‑1 105
CODA LiTA Jukbuin 76
COMSA Multipurpose Hall of Gran Canaria 68
Conseil General de l'Ain Using Point‑cloud Data for Public Consultation for a Road Improvement 140
COWI India Private Limited 3D Property Mapping Using SOSI Standards 92
W Creighton Manning Engineering Fuller Road and Washington Avenue 136
F Crossrail Ltd Asset Information Management System 31
W Crossrail Ltd Crossrail 84
Daelim Industrial Co., Ltd. Saudi Kayan High‑density Polythylene Plant 155
Delhi Jal Board Sewerage Master Plan – 2031 for Delhi 182
Delhi Metro Rail Corporation Kerala High‑speed Rail 132
Desein Indure Pvt. Ltd. 2X20 MW Thermal Power Plant 115
Desein Indure Pvt. Ltd. VISA Raigarh Super Thermal Power Project 115
Dewberry New Jersey Turnpike 23
DPR Construction Arizona State University New Business School 68
DSD Ferrometalco SAE New Doha International Airport Cargo Facility 69
W| F Ecofys Netherlands B.V. Wind Turbine Test Site 15, 32
Egis International A63 Motorway Widening and Improving 141
Ekofarma S.r.l. Furnishing of a Pharmacy 50
ElectraNet Pty Ltd Intelligent Substation Information Modelling 171
Energy Infratech Pvt. Ltd. Teesta‑III Hydro Electric Project 156
W Enogex LLC Implementation of AutoPLANT and ProjectWise 168
Equinox Engineering Ltd. CNRL Primrose East Pipelines 125
ESCOM Consultants Pvt. Ltd. Nestle R&D Centre 156
Falegnameria Grottaroli S.a.s. Store Furnishing 50
Feedback Infrastructure Services Private Limited Design Rimuli to Roxy Section of NH 215 141
Finley Engineering Group, Inc. Palmetto Section 5, SR 826/836 Interchange Bridge 11 ‑ Precast Segmental 37
F Fitzpatrick Engineering Group, PLLC Rehabilitation Center 151
F Fluor/HDR Global Design Consultants RTD FasTracks Eagle P3 Project 21
Forsspac Global Gateway Logistic City 183
F Foth Infrastructure & Environment, LLC NW 62nd Avenue Improvements 137
Francis Design Consulting SARL Villa 567 Cote d'Azur 106
Frischmann Prabhu (India) Pvt. Ltd. Mega City Water Supply System 183
F Gannett Fleming, Inc. Innovative Model Data Integration Processes 179
F GE Water Lanxess India – Thermal Zero Liquid Discharge Wastewater Treatement Plant 175
GE Water & Process Technologies Automated Drawing Release Using ProjectWise 23
GEI Industrial Systems Ltd. FCCU and PRU Revamp Project (A & C) 126
Geico S.p.A. Automotive Paint Shop 69
Georender srl Arco D'Augusto 86
GHAFARI Associates, LLC Sutter Health Eden Medical Center 24
2012 BE InSpIREd AwARdS

F Giprotyumenneftegaz Booster Compressor Station on the Yurharovskoye Oil Field 123


Giulio Vatteroni Architetto 3D Modeling of the Village of Casette 92
GS Engineering & Construction Corporation Ruwais Refinery Expansion Project Package 2 126
Guangzhou Panyu District Shiqiao Architectural Design
Audi 4s Construction 70
Institute Co., Ltd.

192

9006_YII_Content_1012.indd 192 11/21/2012 12:32:52 PM


ALPHABETICAL BY ORGANIZATION – INDEX

WINNERS W
ORGANIZATION NAME PROJECT NAME PAGE
Guizhou Province Traffic Planning, Survey, and Design
Application of RM Bridge V8i to the Longjiang River Super‑large Bridge 37
Institute Limited

FINALISTS
W Guenter Maresch, Ph.D. Professor, University of Salzburg 17
Halcrow Consulting India Pvt. Ltd. Two Lane to Four Lane Widening of NH 59 142

F
Hamkar Company Atlantic Residential Project 157
F Hanson Professional Services Inc. I‑74 Mississippi River Crossing Corridor 21

SPECIAL RECOGNITION AWARD WINNER AND FINALIST W| F


Hatch Associates Pty Ltd Qinghai Magnesium Smelter – Dehydration Facility 100
Hatch Mott MacDonald Windsor‑Essex Parkway 142
HCR Bridge Machinery (M) Sdn. Bhd. Kelana Jaya Light Rail Transit Line Extension 157
Heilonjiang Province Investigation and Design Institute
Fendou Reservoir 116
of Water Resources and Hydropower
F Henan Electric Power Survey and Design Institute Henan 500‑kilovolt Power Grid 3D Digitized and Integrated Operations Platform 169
Hindustan Petroleum Corp. Ltd. (HPCL) IFO Cooling Facility 158
Hindustan Petroleum Corp. Ltd. (HPCL) Softened Water to DM Water Service and Condensate Heat Recovery and Integration 158
W| F Hitachi‑GE Nuclear Energy, Ltd. Integrated Plant Construction System 16, 66
F HNTB Corporation Firm‑wide Design‑build Quality Plan 65
Hokkaido Aero Asahi Co. Ltd. Suspended Power Line Route Planning 171
W HydroChina Zhongnan Engineering Corporation Standard Design and Application for the Pumped Storage Power Station 112
W HydroChina Zhongnan Engineering Corporation Utilization of the Bentley LEARN Training Subscription 12
Hyundai Heavy Industry BP Quad 204 Project 106
Hyundai Heavy Industry Shwe Gas Project 107
I.P.S. Vial S.L. Global Cities and Roads Inventory Management (InCa) 86
IBUG 21, S.L. NIBUG 70
IDM E&C Woonmoon Dam Auxiliary Spillway 71
W IMMCO, Inc. Quality Control Automation 60
Infotech Enterprises Ltd InfiPlan Office Suite 61
Ingenieurbüro Zammit GmbH Production Facility for Auto Body Construction 51
Iowa Department of Transportation New Bridge Inspection Software System 38
ISC Consulting Engineers A/S Upending Hinge Installation of Mono Piles 107
ISGEC Heavy Engineering Ltd. Alcaravan Bioenergy 159
ISGEC John Thompson Ltd. Enka de Colombia 116
W John A. Martin & Associates, Inc. LAX International Terminal Expansion 150
W John McAslan + Partners King's Cross Station Redevelopment 44
John Portman & Associates Bao'an Oct Hotel 51
John Wardle Architects Mineral & Materials Research Hub 52
JSC Mosgiprotrans Moscow‑St. Petersburg High‑speed Rail Line 132
K2 Ingeniería Continuous Bridges Formed by Precast Beams 38
KEPCO Engineering & Construction Company, Inc. Shin‑Uljin Nuclear Plant Units 1 & 2 Project 117
KEPCO Engineering & Construction Company, Inc. Yonghung Thermal Power Plant Units 3 & 4 117
Kirby Building Systems India Ltd. Pipavav Shipyard 159
Kirby Building Systems India Ltd. Pre‑engineered Building Works for Kalyani Global Engineering 160
Kirby Building Systems India Ltd. Renault‑Nissan Automotive India, Tamil Nadu 160
Knowsley SK Ltd Offshore Production Platform Deluge Skid 108
Bentley SyStemS, Incorporated

Kokusai Kogyo Co., Ltd. Sustainable Road Maintenance Using Mobile Mapping System 143
Korea District Heating Engineering Co., Ltd. GoYang Samsong Combined Heat and Power Generation 118
F Kumba Iron Ore Limited Kolomela Environmental Management Systems 97
L&T‑Sargent & Lundy Limited 375 Megawatt Phase III Combined Cycle Plant 118
L&T‑Sargent & Lundy Limited Plant Structures: Interconnecting Coal Gallery 161
F LAB Architecture Studio Guardian Towers 75
LAB Architecture Studio Museum of Bristol M Shed 52

193

9006_YII_Content_1012.indd 193 11/21/2012 12:32:52 PM


INDEX – ALPHABETICAL BY ORGANIZATION

ORGANIZATION NAME PROJECT NAME PAGE


Larsen & Toubro Limited 375 Megawatt GSECL Dhuvaran Heat Recovery Steam Generator 161
Larsen & Toubro Limited 375 Megawatt GSECL Dhuvaran III 119
Larsen & Toubro Limited Ammonia Plant Feedstock Changeover Project 127
Larsen & Toubro Limited GDU‑GSU Module for MHN Project 108
Larsen & Toubro Limited Reformer for Ammonia Syngas Plant 127
Larsen & Toubro Limited India's Largest Coke Oven Plant 162
Larsen & Toubro Limited – ECC Division TSL Raw Material Handling System Package‑1 162
Larsen & Toubro Limited – ECC Division Samakhiali‑Gandhidham Road Project 143
LCA Borgo Della Neve 53
Louisiana Department of Transportation and
ProjectWise Custom PDF Publishing 24
Development
Macawber Beekay Pvt. Ltd. 1X500 Megawatt Bokaro A 163
Mahadeo Khurd & Associates Cricket Stadium 163
Maharashtra Jeevan Pradhikaran Hydraulic Modeling for Gondia City 184
Maharashtra Jeevan Pradhikaran Hydraulic Modeling for Hingoli City 184
Maharashtra Jeevan Pradhikaran Hydraulic Modeling for Kagal City 185
Manila Water Company Improving Efficiency of Pump Operations in Manila 185
Meijer, Inc. The Virtual Store Project 53
F Melbourne Water Eastern Treatment Plant Tertiary Upgrade 175
Minerva Engineers Pty Ltd Western Turner Syncline Phase 1 101
Mississippi Department of Transportation Geotechnical
W gINT Implementation at Mississippi Department of Transportation 80
Department
W Modjeski and Masters, Inc. Huey P. Long Bridge Widening 34
Moh and Associates, Inc. Collaboration and Integration of ProjectWise 25
F Morphosis Architects Giant Interactive Group Corporate Headquarters 45
W Mortenson Construction Spring Valley Wind Project 90
Mouchel Regional Road South Part 144
MTR Corporation Limited ProjectWise for Railway Business 25
F Napier City Council GIS and Asset Management 85
W Nippon Steel & Sumikin Engineering Co., Ltd. Tokyo International Airport Re‑expansion Project 104
F NJS Engineers India Pvt Ltd JICA‑assisted Water Supply Project 179
Ochs Schmidhuber Architekten Unterföhring Nursery 54
OJSC Magnitogorsk Gipromez Hot Rolling Mill's Boiler Room 101
Ove Arup & Partners Augmented Reality for Fulton Street Transit Center 26
Ove Arup & Partners Fulton Street Transit Center 76
W| F Pacific Gas and Electric Company Bentley Substation Implementation 13, 170
Pall India Pvt. Ltd. Slurry Oil Backwash Filter System 128
Parsons Brinckerhoff ProjectWise Automated PDF Generator 26
W| F Parsons Brinckerhoff and Arup JV Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade 10, 22, 138
Pavilion Architecture KREOD 77
PechorNIPIneft Construction of Booster Oil‑refining Station on Bayanduskoe Oil Field 27
PEDELTA Colombia S.A.S. Huasco Viaduct Bridge 39
PEDELTA Colombia S.A.S. South‑East and 44th Street Interchange 39
PEDELTA Colombia S.A.S. The Triplet Bridges 40
W Petra Diamonds Limited Finsch GIS 96
2012 BE InSpIREd AwARdS

Power and Water Corporation Remote Communities: Optimization of Water Supply 186
F Precision Valley Communications Utilizing Bentley in the Hottest Spots 61
Proma S.r.l. Spaces Design for Luxury Cosmetics 54
F PT. Inti Karya Persada Teknik Betara Complex Development Project 123
PT. Link Net Link Net Fiber and Coax Drawing 62

194

9006_YII_Content_1012.indd 194 11/21/2012 12:32:53 PM


ALPHABETICAL BY ORGANIZATION – INDEX

WINNERS W
ORGANIZATION NAME PROJECT NAME PAGE
Quandel Consultants, LLC Dearborn‑Ypsilanti Second Track 133

FINALISTS
F Quigg Engineering Inc. High‑speed Rail 131

R.V. Anderson Associates Limited TTC Streetcar Replacement Projects 144

Rail Vikas Nigam Limited Kolkata Metro Garia to Airport Line 133

F
Ramboll Engineering Consultancy Services India Pvt.
Offshore Platform As‑built Model 109
Ltd.

SPECIAL RECOGNITION AWARD WINNER AND FINALIST W| F


Ramboll Engineering Consultancy Services India Pvt.
Small Bore Branch Support 109
Ltd.
RendArk Shop Monnalisa "Red Leaf" 55

RITES, Ltd. Farakka Bridge Across Farakka Feeder Canal 40

RMF Engineering, Inc. New OSU Chilled Water Plants 55

F Robert Elks & Associates Rock Bolting Rig 105

W Robin Partington Architects Park House 74

Robins & Morton Power & Industrial Carbo Ceramic's Millen Proppant Facility 27

Saanvi Infrastructure Pvt Ltd Hill Bypass Road Kharkhari to Motichur Station 41

Sabesp Cadiriri Booster Supply Analysis 186

Sabesp Jardim Damasceno Pump Station 187

Sabesp Water Supply in Risk Area 187

Sarawak Land and Survey Department Integrated Photogrammetry Solution With MicroStation 87
Saudi Electricity Company/Implemented by Nahil
W Establishment of Kingdom‑wide EDMS at SEC 20
Computer Company
schweizermessebau AG The Diamant 56

Seh Nirman Implementation of GIS in the Middle‑class City of India 87

SEIMAF Ingenierie Study Details of Pipes and Hoppers 176

Seoyeong Engineering Co., Ltd. North Cheonan Industrial Complex Underground Piping Management (Pilot) 93
W| F Shaw Power Group Virginia City Hybrid Energy Center 14, 114

F Shawmut Design and Construction Dudley Square Municipal Building 65

Shinryo Corporation Japan‑China Friendship Center HVAC Renewal 71

Shirpur Municipal Council Hydraulic Modeling 188

Shreecon Consultants Army Public School 164


SJM Tech S.a.s. 3D Mining Complex Virtual Tour 102

SMEC International Private Limited Greater Colombo Wastewater Management 188

SNCF Feasibility Study on the Kinshasa‑Ilebo Railway 134

Societe du Canal de Provence ‑ Sri Lanka Bureau Greater Trincomalee Integrated Water Supply 189

F Sotepa Ltda. Humberto de Campos Street Extension 137

South Carolina Department of Transportation Outdoor Advertising Permitting System 88

W Southern Company Data Quality Manager Implementation ROI 30

F Southern Company Design Application Integration 113

Soyuzdorproekt Ltd Reconstruction of the E‑1 15 (M8 Kholmogory) 145

F Stanley Beaman & Sears Atlanta History Center Design Competition 75

Störmer Murphy and Partners Intelligent Quarters 56

Studio Agnellini Renovation of Residential Building 57

Studio Tecnico Mannelli e Associati La City 164


Bentley SyStemS, Incorporated

Studio Tecnico Mannelli e Associati Progetto Ville Urbane 165

swb Netze GmbH & Co. KG Sharing GIS Information With Contractors: Utilities Infrastructure Portal (OPA) 172

W Sweco AB Hallandsås “Live BIM” Railway Project 130

Takenaka Corporation G Project 57

F Tandon Urban Solutions Pvt. Ltd. Nadaprabhu Kempegowda Green City Project 91

Tata Consultancy Services Digital Definition of Paper‑converting Production Line 128

195

9006_YII_Content_1012.indd 195 11/21/2012 12:32:53 PM


INDEX – ALPHABETICAL BY ORGANIZATION

ORGANIZATION NAME PROJECT NAME PAGE


Tata Power Extension of Conveyor 165
Tata Power Strengthening of Emergency Stock Out Conveyer at Trombay 166
W Taylor Woodrow‑BAM Nuttall JV Victoria Station Upgrade Jet Grouting 64
Tenaga National Berhad Visualizing Digital Terrain Models From Airborne LiDAR 172
Thouvenot, Wade & Moerchen, Inc. I‑57 Diverging Diamond Interchange 145
Tianjin FAW Toyota Motor Co., Ltd. New Toyota Factory 72
TranSystems Kansas Star Casino Interchange Design 146
Turkish Hard Coal Mining Authority Gas Tracing at ‑1000m With Bentley Geo Web Publisher 102
U3D&C South Pars Gas Field Development Project 93
URS Scott Wilson India Pvt Ltd Re‑engineering Design of Pune Bypass 146
F Utah Transit Authority A New, Innovative Transit Asset Management Solution 131
Vectura Consulting Mälarbanan 134
Ville de Grenoble ProjectWise Interoperable Real Estate Municipal Database 88
Vitya Consultants Pvt. Ltd PURA for Sangli Cluster of Maharashtra 189
WAPCOS Limited Gaya Sewerage Scheme 190
WAPCOS Limited Sewerage Master Plan of Delhi for the Year 2031 190
Warren and Mahoney BRANZ Headquarters 58
Warren and Mahoney University of Otago Plaza 58
Washington State Department of Transportation Point Defiance Bypass 147
Washington State Department of Transportation SR 92 ‑ 99th Ave NE Roundabout 147
Wyoming Department of Transportation Wyoming Diverging Diamond Interchange 148
Zachry Industrial Zachry's Use of ConstructSim 72
Zentech Engineering Co., Ltd. 2 Megawatt‑class Offshore Wind Turbine Project 110
Zentech Engineering Co., Ltd. Modulization Design for Ruwais Refinery Project 110
W Zeton Inc. Modular GTL Commercial Demonstration Plant 122
F Zhejiang Electric Power Design Institute Jinhua Converter Station 169
2012 BE InSpIREd AwARdS

196

9006_YII_Content_1012.indd 196 11/21/2012 12:32:53 PM


PROJECT LOCATION BY COUNTRY – INDEX

WINNERS W
ORGANIZATION NAME PROJECT NAME LOCATION PAGE
ANGOLA

FINALISTS
F Armando Rito Engenharia SA April 4 Bridge Catumbela 35
AUSTRALIA
F AMEC Cloudbreak Enhancement Project Pilbara 97

F
F Arup South Morang Rail Extension Melbourne 151

SPECIAL RECOGNITION AWARD WINNER AND FINALIST W| F


Aurecon Hatch Wiggins Island Coal Export Terminal Gladstone 99
Bechtel Australia Pty Ltd Caval Ridge Coal Mine Moranbah 99
Building Studio Architects The Lantern Melbourne 49
ElectraNet Pty Ltd Intelligent Substation Information Modelling Adelaide 171
John Wardle Architects Mineral & Materials Research Hub Adelaide 52
F Melbourne Water Eastern Treatment Plant Tertiary Upgrade Melbourne 175
Minerva Engineers Pty Ltd Western Turner Syncline Phase 1 Tom Price 101
W| F Parsons Brinckerhoff and Arup JV Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade Brisbane 10, 22, 138
Power and Water Corporation Remote Communities: Optimization of Water Supply Northern Territory 186
F Robert Elks & Associates Rock Bolting Rig Onslow 105
AUSTRIA
W Guenter Maresch, Ph.D. Professor, University of Salzburg Salzburg 17
AZERBAIJAN
W Azersu OJSC GIS‑based Infrastructure Asset Management Baku 178
BOLIVIA
PEDELTA Colombia S.A.S. The Triplet Bridges La Paz 40
BRAZIL
Camargo Corrêa Jirau Hydropower Plant Porto Velho 22
Sabesp Cadiriri Booster Supply Analysis Sao Paulo 186
Sabesp Jardim Damasceno Pump Station Sao Paulo 187
Sabesp Water Supply in Risk Area Sao Paulo 187
F Sotepa Ltda. Humberto de Campos Street Extension Blumenau 137
W Zeton Inc. Modular GTL Commercial Demonstration Plant Aracaju 122
CANADA
CIMA+ Turcot Interchange Montreal 140
Equinox Engineering Ltd. CNRL Primrose East Pipelines Cold Lake 125
Hatch Mott MacDonald Windsor‑Essex Parkway Windsor 142
R.V. Anderson Associates Limited TTC Streetcar Replacement Projects Toronto 144
CHILE
PEDELTA Colombia S.A.S. Huasco Viaduct Bridge Vallenar 39
CHINA
Anhui Transport Consulting & Design Institute
Application of 3D Design Technology in Complex Bridge Design Hefei City 36
Co., Ltd.
China Nerin Engineering Co., Ltd. Tongling Nonferrous Metals Copper Smelting Project Tongling 100
China Water Resources Beifang Investigation,
F Gelantan Hydropower Station (GLTHPP) Pu'er 113
Design and Research Co., Ltd.
Chongqing Water Supply Co. Ltd Chongqing Water Networks Operation Demonstration Chongqing 182
Guangzhou Panyu District Shiqiao Architectural
Audi 4s Construction Guangzhou 70
Design Institute Co., Ltd.
Bentley SyStemS, Incorporated

Guizhou Province Traffic Planning, Survey, and


Application of RM Bridge V8i to the Longjiang River Super‑large Bridge Bijie City 37
Design Institute Limited
Hatch Associates Pty Ltd Qinghai Magnesium Smelter – Dehydration Facility Gomud 100
Heilonjiang Province Investigation and Design
Fendou Reservoir Muling 116
Institute of Water Resources and Hydropower
Henan Electric Power Survey and Design
F Henan 500‑kilovolt Power Grid 3D Digitized and Integrated Operations Platform Zhengzhou 169
Institute

197

9006_YII_Content_1012.indd 197 11/21/2012 12:32:53 PM


INDEX – PROJECT LOCATION BY COUNTRY

ORGANIZATION NAME PROJECT NAME LOCATION PAGE


W HydroChina Zhongnan Engineering Corporation Standard Design and Application for the Pumped Storage Power Station Zunyi 112
W HydroChina Zhongnan Engineering Corporation Utilization of the Bentley LEARN Training Subscription Changsha 12
John Portman & Associates Bao'an Oct Hotel Shenzhen 51
F Morphosis Architects Giant Interactive Group Corporate Headquarters Shanghai 45
MTR Corporation Limited ProjectWise for Railway Business Hong Kong 25
RendArk Shop Monnalisa "Red Leaf" Shanghai 55
Tianjin FAW Toyota Motor Co., Ltd. New Toyota Factory Tianjin 72
F Zhejiang Electric Power Design Institute Jinhua Converter Station Jinhua 169
COLOMBIA
ISGEC Heavy Engineering Ltd. Alcaravan Bioenergy Puerto Lopez 159
ISGEC John Thompson Ltd. Enka de Colombia Medellin 116
PEDELTA Colombia S.A.S. South‑East and 44th Street Interchange Santiago de Cali 39
CONGO
SNCF Feasibility Study on the Kinshasa‑Ilebo Railway Kinshasa 134
CYPRUS
Artelia Cyprus Limited Greater Nicosia Sanitary Sewerage Project Nicosia 181
DENMARK
F City of Copenhagen Solar Exposure of Copenhagen City Copenhagen 85
FINLAND
F Arthur Golding and Associates Helsinki Central Library Competition Helsinki 45
FRANCE
ARCADIS France SEA High‑speed Track Bridges Poitiers 36
Conseil General de l'Ain Using Point‑cloud Data for Public Consultation for a Road Improvement Pont de Veyle 140
Salles to Saint Geours de
Egis International A63 Motorway Widening and Improving 141
Marennes
Francis Design Consulting SARL Villa 567 Cote d'Azur Châteauneuf de Grasse 106
SEIMAF Ingenierie Study Details of Pipes and Hoppers Le Plessis Robinson 176
Ville de Grenoble ProjectWise Interoperable Real Estate Municipal Database Grenoble 88
GERMANY
Ingenieurbüro Zammit GmbH Production Facility for Auto Body Construction Emden 51
Ochs Schmidhuber Architekten Unterföhring Nursery Unterföhring 54
Störmer Murphy and Partners Intelligent Quarters Hamburg 56
swb Netze GmbH & Co. KG Sharing GIS Information With Contractors: Utilities Infrastructure Portal (OPA) Bremen 172
GREECE
AKATT S.A. Automation System of DEYA Lamias Lamia 181
INDIA
ADCC Infocad Pvt. Ltd. Deulgaon Raja Sujal Reform Project Deulgaon Raja 180
AECOM Detailed Design of NH 6 Howrah to Medinipur 138
AECOM Udaipur Ring Road Udaipur 139
AECOM India Pvt. Ltd. Sewerage Master Plan of Delhi for Delhi Jal Board New Delhi 180
Afcons Infrastructure Ltd. Underwater Metro Tunnel Project Kolkata 152
Afcons Infrastructure Ltd. Jammu‑Udhampur Section Construction Udhampur 67
Afcons Infrastructure Ltd. Metro Rail Viaduct Construction Kolkata 67
Air Liquide Engineering India Pvt. Ltd Air Separation Unit Plant Vishakhapatnam 124
2012 BE InSpIREd AwARdS

Aker Solutions Process Structure for a Refinery Complex Eastern 152


Ashok Manhar & Associates 200‑seat Capacity Auditorium Ujjain 153
Aswathanarayana & Eswara Stamping Pit Chennai 153
CDM Smith Inc Four Laning of Ludhiana‑Talwandi Section of NH 95 Ludhiana 139
CE Con Engineering Auditorium at Mohali Chandigarh 155

198

9006_YII_Content_1012.indd 198 11/21/2012 12:32:54 PM


PROJECT LOCATION BY COUNTRY – INDEX

WINNERS W
ORGANIZATION NAME PROJECT NAME LOCATION PAGE
Delhi Jal Board Sewerage Master Plan – 2031 for Delhi New Delhi 182

FINALISTS
Delhi Metro Rail Corporation Kerala High‑speed Rail Thiruvanthapuram to Kasargod 132

Desein Indure Pvt. Ltd. VISA Raigarh Super Thermal Power Project Raigarh 115

Energy Infratech Pvt. Ltd. Teesta‑III Hydro Electric Project Chugthang Village 156

F
ESCOM Consultants Pvt. Ltd. Nestle R&D Centre Manesar 156

SPECIAL RECOGNITION AWARD WINNER AND FINALIST W| F


Feedback Infrastructure Services Private Limited Design Rimuli to Roxy Section of NH 215 Rimuli 141

Frischmann Prabhu (India) Pvt. Ltd. Mega City Water Supply System Panvel 183

F GE Water Lanxess India – Thermal Zero Liquid Discharge Wastewater Treatement Plant Nagda 175

GEI Industrial Systems Ltd. FCCU and PRU Revamp Project (A & C) Mathura 126

Halcrow Consulting India Pvt. Ltd. Two Lane to Four Lane Widening of NH 59 Godhra 142

Hindustan Petroleum Corp. Ltd. (HPCL) IFO Cooling Facility Mumbai 158

Hindustan Petroleum Corp. Ltd. (HPCL) Softened Water to DM Water Service and Condensate Heat Recovery and Integration Mumbai 158

Kirby Building Systems India Ltd. Pipavav Shipyard Amreli 159

Kirby Building Systems India Ltd. Pre‑engineered Building Works for Kalyani Global Engineering Kutch 160

Kirby Building Systems India Ltd. Renault‑Nissan Automotive India, Tamil Nadu Chennai 160

L&T‑Sargent & Lundy Limited 375 Megawatt Phase III Combined Cycle Plant Dhuvaran 118

L&T‑Sargent & Lundy Limited Plant Structures: Interconnecting Coal Gallery Koradi 161

Larsen & Toubro Limited 375 Megawatt GSECL Dhuvaran Heat Recovery Steam Generator Anand 161

Larsen & Toubro Limited 375 Megawatt GSECL Dhuvaran III Anand 119

Larsen & Toubro Limited Ammonia Plant Feedstock Changeover Project Panipat, Haryana, and Bathinda 127

Larsen & Toubro Limited GDU‑GSU Module for MHN Project Mumbai 108

Larsen & Toubro Limited Reformer for Ammonia Syngas Plant Panipat and Bhatinda 127

Larsen & Toubro Limited India's Largest Coke Oven Plant Meramandalli 162

Larsen & Toubro Limited ‑ ECC Division TSL Raw Material Handling System Package‑1 Jamshedpur 162

Larsen & Toubro Limited – ECC Division Samakhiali‑Gandhidham Road Project Samakhiali 143

Macawber Beekay Pvt. Ltd. 1X500 Megawatt Bokaro A Bokaro 163

Mahadeo Khurd & Associates Cricket Stadium Guwahati 163

Maharashtra Jeevan Pradhikaran Hydraulic Modeling for Gondia City Gondia 184

Maharashtra Jeevan Pradhikaran Hydraulic Modeling for Hingoli City Hingoli 184

Maharashtra Jeevan Pradhikaran Hydraulic Modeling for Kagal City Kagal 185

F NJS Engineers India Pvt Ltd JICA‑assisted Water Supply Project Agra 179

Rail Vikas Nigam Limited Kolkata Metro Garia to Airport Line Kolkata 133

RITES, Ltd. Farakka Bridge Across Farakka Feeder Canal Farakka 40

Saanvi Infrastructure Pvt Ltd Hill Bypass Road Kharkhari to Motichur Station Haridwar 41

Seh Nirman Implementation of GIS in the Middle‑class City of India Bhiwandi 87

Shirpur Municipal Council Hydraulic Modeling Shirpur 188

Shreecon Consultants Army Public School Jalandhar 164

F Tandon Urban Solutions Pvt. Ltd. Nadaprabhu Kempegowda Green City Project Bangalore 91

Tata Power Extension of Conveyor Jojebera 165

Tata Power Strengthening of Emergency Stock Out Conveyer at Trombay Mumbai 166

URS Scott Wilson India Pvt Ltd Re‑engineering Design of Pune Bypass Pune 146
Bentley SyStemS, Incorporated

Vitya Consultants Pvt. Ltd PURA for Sangli Cluster of Maharashtra Sangli 189

WAPCOS Limited Gaya Sewerage Scheme Gaya 190

WAPCOS Limited Sewerage Master Plan of Delhi for the Year 2031 Delhi 190

INDONESIA

F PT. Inti Karya Persada Teknik Betara Complex Development Project Jabung 123

PT. Link Net Link Net Fiber and Coax Drawing Jakarta 62

199

9006_YII_Content_1012.indd 199 11/21/2012 12:32:54 PM


INDEX – PROJECT LOCATION BY COUNTRY

ORGANIZATION NAME PROJECT NAME LOCATION PAGE


IRAN
U3D&C South Pars Gas Field Development Project Esfahan 93
IRAQ
Hamkar Company Atlantic Residential Project Arbil 157
ITALY
Aestudio Competition for New Trade Center Scandiano 46
Aestudio Strategic Center for Earthquake Emergency Scandiano 46
Andrea Girotto Architetto Real Classic Mood Café Caserta 47
Bassani Edilizia S.p.A. Centro Residenziale Dogana Ortonovo 48
Caruso Mainardi Architetti Associati Residential Buildings Milan 49
Ekofarma S.r.l. Furnishing of a Pharmacy Rome 50
Georender srl Arco D'Augusto Aosta 86
Giulio Vatteroni Architetto 3D Modeling of the Village of Casette Casette 92
LCA Borgo Della Neve Montefiore 53
Proma S.r.l. Spaces Design for Luxury Cosmetics Alessandria 54
SJM Tech S.a.s. 3D Mining Complex Virtual Tour Buggerru 102
Studio Agnellini Renovation of Residential Building Lerici 57
Studio Tecnico Mannelli e Associati La City Pescara 164
Studio Tecnico Mannelli e Associati Progetto Ville Urbane Pisa 165
JAPAN
W| F Hitachi‑GE Nuclear Energy, Ltd. Integrated Plant Construction System Hitachi 16, 66
Hokkaido and Tsugaru
Hokkaido Aero Asahi Co. Ltd. Suspended Power Line Route Planning 171
Peninsulas
Kokusai Kogyo Co., Ltd. Sustainable Road Maintenance Using Mobile Mapping System Minamiawaji City 143
W Nippon Steel & Sumikin Engineering Co., Ltd. Tokyo International Airport Re‑expansion Project Tokyo 104
Shinryo Corporation Japan‑China Friendship Center HVAC Renewal Tokyo 71
Takenaka Corporation G Project Tokyo 57
KUWAIT
Mouchel Regional Road South Part 144
MALAYSIA
Bina Puri Construction Sdn Bhd 33 Units Alamesra Kota Kinabalu 48
HCR Bridge Machinery (M) Sdn. Bhd. Kelana Jaya Light‑rail Transit Line Extension Klang Valley 157
Sarawak Land and Survey Department Integrated Photogrammetry Solution With MicroStation Sarawak 87
Slim River, Sungkai, Tapah,
Tenaga National Berhad Visualizing Digital Terrain Models From Airborne LiDAR 172
and Tanah Rata
MYANMAR
Hyundai Heavy Industry Shwe Gas Project Rakhine 107
NETHERLANDS
W| F Ecofys Netherlands B.V. Wind Turbine Test Site Lelystad 15, 32
NEW ZEALAND
F Napier City Council GIS and Asset Management Napier 85
Warren and Mahoney BRANZ Headquarters Porirua City 58
Warren and Mahoney University of Otago Plaza Dunedin 58
NORWAY
COWI India Private Limited 3D Property Mapping Using SOSI Standards Oslo 92
2012 BE InSpIREd AwARdS

PHILIPPINES
Forsspac Global Gateway Logistic City Clark 183
Manila Water Company Improving Efficiency of Pump Operations in Manila Quezon City 185
POLAND
3Deling sp. z o.o. Wieliczka Salt Mine Laser Scanning Wieliczka 98

200

9006_YII_Content_1012.indd 200 11/21/2012 12:32:54 PM


PROJECT LOCATION BY COUNTRY – INDEX

WINNERS W
ORGANIZATION NAME PROJECT NAME LOCATION PAGE
F BBKS‑Projekt Sp. z o.o. Taxiways at Rzeszow‑Jasionka Airport Rzeszów 91

FINALISTS
PORTUGAL
A. Burmester Arquitectos Associados Lda Electricity of Portugal Lisbon 66
QATAR

F
DSD Ferrometalco SAE New Doha International Airport Cargo Facility Doha 69

SPECIAL RECOGNITION AWARD WINNER AND FINALIST W| F


Ramboll Engineering Consultancy Services India
Offshore Platform As‑built Model Doha 109
Pvt. Ltd.
Ramboll Engineering Consultancy Services India
Small Bore Branch Support Doha 109
Pvt. Ltd.
RUSSIA
BashNIPINeft Re‑engineering Substation 35/6 Kilovolts Ufa 170
BashNIPIneft Trebs Oil Field: Central Collection Point Naryan‑Mar 124
F CNGS Engineering Ice‑resistant Offshore Platform LSP‑1 Caspian Sea 105
F Giprotyumenneftegaz Booster Compressor Station on the Yurharovskoye Oil Field Nadym 123
JSC Mosgiprotrans Moscow‑St. Petersburg High‑speed Rail Line Moscow to St. Petersburg 132
OJSC Magnitogorsk Gipromez Hot Rolling Mill's Boiler Room Magnitogorsk 101
PechorNIPIneft Construction of Booster Oil‑refining Station on Bayanduskoe Oil Field Usinsk 27
Soyuzdorproekt Ltd Reconstruction of the E‑1 15 (M8 Kholmogory) Moscow 145
Geico S.p.A. Automotive Paint Shop 69
SAUDI ARABIA
Daelim Industrial Co., Ltd. Saudi Kayan High‑density Polythylene Plant Jubail Industrial City 155
Saudi Electricity Company/Implemented by Nahil
W Establishment of Kingdom‑wide EDMS at SEC All Regions 20
Computer Company
SOUTH AFRICA
Anglo American plc Geospatial Integration Project Johannesburg 98
F Kumba Iron Ore Limited Kolomela Environmental Management Systems Postmasburg 97
W Petra Diamonds Limited Finsch GIS Lime Acres 96
SOUTH KOREA
IDM E&C Woonmoon Dam Auxiliary Spillway Daecheon‑ri 71
KEPCO Engineering & Construction Company,
Shin‑Uljin Nuclear Plant Units 1 & 2 Project Uljin 117
Inc.
KEPCO Engineering & Construction Company,
Yonghung Thermal Power Plant Units 3 & 4 Yonghung 117
Inc.
Korea District Heating Engineering Co., Ltd. GoYang Samsong Combined Heat and Power Generation Goyang 118
Pall India Pvt. Ltd. Slurry Oil Backwash Filter System Yeosu 128
Seoyeong Engineering Co., Ltd. North Cheonan Industrial Complex Underground Piping Management (Pilot) Cheonan 93
Zentech Engineering Co., Ltd. 2 Megawatt‑class Offshore Wind Turbine Project Mokpyo 110
Zentech Engineering Co., Ltd. Modulization Design for Ruwais Refinery Project Geyjea 110
SPAIN
F Astiv Ingeniería Restoration of a Recycled Slag Landfill Zumárraga 81
CODA LiTA Jukbuin Barcelona 76
Las Palmas de Gran
COMSA Multipurpose Hall of Gran Canaria 68
Canaria
Falegnameria Grottaroli S.a.s. Store Furnishing Palma de Mallorca 50
Bentley SyStemS, Incorporated

I.P.S. Vial S.L. Global Cities and Roads Inventory Management (InCa) Madrid 86
IBUG 21, S.L. NIBUG Barcelona 70
K2 Ingeniería Continuous Bridges Formed by Precast Beams Elche 38
SRI LANKA
SMEC International Private Limited Greater Colombo Wastewater Management Colombo 188
Societe du Canal de Provence ‑ Sri Lanka Bureau Greater Trincomalee Integrated Water Supply Trincomalee 189

201

9006_YII_Content_1012.indd 201 11/21/2012 12:32:54 PM


INDEX – PROJECT LOCATION BY COUNTRY

ORGANIZATION NAME PROJECT NAME LOCATION PAGE


SWEDEN
Arkitekterna Krook & Tjäder Friends Arena Solna 47
Byggnadstekniska Byrån i Stockholm AB AkzoNobel Swedish Head Office Nacka 154
W Sweco AB Hallandsås “Live BIM” Railway Project Förslöv to Båstad 130
Vectura Consulting Mälarbanan Stockholm 134
SWITZERLAND
schweizermessebau AG The Diamant Basel 56
TAIWAN
Moh and Associates, Inc. Collaboration and Integration of ProjectWise New Taipei City 25
TURKEY
Turkish Hard Coal Mining Authority Gas Tracing at ‑1000m With Bentley Geo Web Publisher Zonguldak 102
UNITED ARAB EMIRATES
Desein Indure Pvt. Ltd. 2X20 MW Thermal Power Plant Dibba 115
GS Engineering & Construction Corporation Ruwais Refinery Expansion Project Package 2 Ruwais 126
F LAB Architecture Studio Guardian Towers Abu Dhabi 75
UNITED KINGDOM
London and South East
F Crossrail Ltd Asset Information Management System 31
England
W Crossrail Ltd Crossrail London 84
Hyundai Heavy Industry BP Quad 204 Project Shetland 106
ISC Consulting Engineers A/S Upending Hinge Installation of Mono Piles 107
W John McAslan + Partners King's Cross Station Redevelopment London 44
Knowsley SK Ltd Offshore Production Platform Deluge Skid Manchester 108
LAB Architecture Studio Museum of Bristol M Shed Bristol 52
Pavilion Architecture KREOD London 77
W Robin Partington Architects Park House London 74
W Taylor Woodrow‑BAM Nuttall JV Victoria Station Upgrade Jet Grouting London 64
UNITED STATES
W Southern Company Data Quality Manager Implementation ROI Birmingham, Alabama 30
DPR Construction Arizona State University New Business School Tempe, Arizona 68
Carollo Engineers, Inc.. South San Francisco Generator Building San Francisco, California 154
GHAFARI Associates, LLC Sutter Health Eden Medical Center Castro Valley, California 24
Infotech Enterprises Ltd InfiPlan Office Suite San Jose, California 61
W John A. Martin & Associates, Inc. LAX International Terminal Expansion Los Angeles, California 150
W| F Pacific Gas and Electric Company Bentley Substation Implementation San Francisco, California 13, 170
W Carollo Engineers, Inc. South Secondary Improvements Project Denver, Colorado 174
W| F CH2M HILL Metro Wastewater Reclamation District, Northern Treatment Plant Denver, Colorado 11, 176
F Fluor/HDR Global Design Consultants RTD FasTracks Eagle P3 Project Denver, Colorado 21
W IMMCO, Inc. Quality Control Automation Denver, Colorado 60
Finley Engineering Group, Inc. Palmetto Section 5, SR 826/836 Interchange Bridge 11 ‑ Precast Segmental Miami, Florida 37
Robins & Morton Power & Industrial Carbo Ceramic's Millen Proppant Facility Millen, Georgia 27
F Stanley Beaman & Sears Atlanta History Center Design Competition Atlanta, Georgia 75
Tata Consultancy Services Digital Definition of Paper‑converting Production Line Albany, Georgia 128
Thouvenot, Wade & Moerchen, Inc. I‑57 Diverging Diamond Interchange Marion, Illinois 145
Chicago, Illinois, to St.
F Quigg Engineering Inc. High‑speed Rail 131
2012 BE InSpIREd AwARdS

Louis, Missouri
F Foth Infrastructure & Environment, LLC NW 62nd Avenue Improvements Johnston, Iowa 137
Iowa Department of Transportation New Bridge Inspection Software System Des Moines, Iowa 38
Davenport, Iowa, and
F Hanson Professional Services Inc. I‑74 Mississippi River Crossing Corridor 21
Moline, Illinois

202

9006_YII_Content_1012.indd 202 11/21/2012 12:32:54 PM


PROJECT LOCATION BY COUNTRY – INDEX

WINNERS W
ORGANIZATION NAME PROJECT NAME LOCATION PAGE
TranSystems Kansas Star Casino Interchange Design Mulvane, Kansas 146

FINALISTS
Louisiana Department of Transportation and
ProjectWise Custom PDF Publishing Baton Rouge, Louisiana 24
Development
W Modjeski and Masters, Inc. Huey P. Long Bridge Widening New Orleans, Louisiana 34

F
GE Water & Process Technologies Automated Drawing Release Using ProjectWise Burlington, Massachusetts 23
F Precision Valley Communications Utilizing Bentley in the Hottest Spots Boston, Massachusetts 61

SPECIAL RECOGNITION AWARD WINNER AND FINALIST W| F


F Shawmut Design and Construction Dudley Square Municipal Building Boston, Massachusetts 65
Meijer, Inc. The Virtual Store Project Grand Rapids, Michigan 53
Dearborn‑Ypsilanti,
Quandel Consultants, LLC Dearborn‑Ypsilanti Second Track 133
Michigan
Mississippi Department of Transportation
W gINT Implementation at Mississippi Department of Transportation Jackson, Mississippi 80
Geotechnical Department
Kemper County,
F Southern Company Design Application Integration 113
Mississippi
F Ameren Callaway Energy Center eB Supports Nuclear Outage Management Fulton, Missouri 31
W Mortenson Construction Spring Valley Wind Project Ely, Nevada 90
Camden County, New
Dewberry New Jersey Turnpike 23
Jersey
W Creighton Manning Engineering Fuller Road and Washington Avenue Albany, New York 136
Ove Arup & Partners Augmented Reality for Fulton Street Transit Center New York, New York 26
Ove Arup & Partners Fulton Street Transit Center New York, New York 76
F Fitzpatrick Engineering Group, PLLC Rehabilitation Center Concord, North Carolina 151
RMF Engineering, Inc. New OSU Chilled Water Plants Columbus, Ohio 55
W Enogex LLC Implementation of AutoPLANT and ProjectWise Western Oklahoma 168
F Borton‑Lawson Lehigh/Pohopoco Bridge Replacement Parryville, Pennsylvania 35
New Florence,
Carson Engineers Stacker‑chase Coal‑blending Facility 114
Pennsylvania
Lehigh County,
F Gannett Fleming, Inc. Innovative Model Data Integration Processes 179
Pennsylvania
South Carolina Department of Transportation Outdoor Advertising Permitting System Columbia, South Carolina 88
Bayer Technology Services GmbH Conceptual Design With PlantWise Baytown, Texas 125
F Utah Transit Authority A New, Innovative Transit Asset Management Solution Salt Lake City, Utah 131
F HNTB Corporation Firm‑wide Design‑build Quality Plan Alexandria, Virginia 65
Parsons Brinckerhoff ProjectWise Automated PDF Generator Norfolk, Virginia 26
W| F Shaw Power Group Virginia City Hybrid Energy Center Virginia City, Virginia 14, 114
Washington State Department of Transportation Point Defiance Bypass Tacoma, Washington 147
Washington State Department of Transportation SR 92 ‑ 99th Ave NE Roundabout Lake Stevens, Washington 147
Wyoming Department of Transportation Wyoming Diverging Diamond Interchange Cheyenne, Wyoming 148
Southeastern United
Zachry Industrial Zachry's Use of ConstructSim 72
States Bentley SyStemS, Incorporated

203

9006_YII_Content_1012.indd 203 11/21/2012 12:32:55 PM


INDEX – ALPHABETICAL BY CATEGORY
ORGANIZATION NAME PROJECT NAME paGe
SPECIAL RECOGNITION AWARD WINNERS
W| F CH2M HILL Metro Wastewater Reclamation District, Northern Treatment Plant 11
W| F Ecofys Netherlands B.V. Wind Turbine Test Site 15
W| F Guenter Maresch, Ph.D. Professor, University of Salzburg 17
W| F Hitachi‑GE Nuclear Energy, Ltd. Integrated Plant Construction System 16
W| F HydroChina Zhongnan Engineering Corporation Utilization of the Bentley LEARN Training Subscription 12
W| F Pacific Gas and Electric Company Bentley Substation Implementation 13
W| F Parsons Brinckerhoff and Arup JV Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade 10
W| F Shaw Power Group Virginia City Hybrid Energy Center 14
CONNECTING PROJECT TEAMS
Camargo Corrêa Jirau Hydropower Plant 22
Dewberry New Jersey Turnpike 23
F Fluor/HDR Global Design Consultants RTD FasTracks Eagle P3 Project 21
GE Water & Process Technologies Automated Drawing Release Using ProjectWise 23
GHAFARI Associates, LLC Sutter Health Eden Medical Center 24
F Hanson Professional Services Inc. I‑74 Mississippi River Crossing Corridor 21
Louisiana Department of Transportation
ProjectWise Custom PDF Publishing 24
and Development
Moh and Associates, Inc. Collaboration and Integration of ProjectWise 25
MTR Corporation Limited ProjectWise for Railway Business 25
Ove Arup & Partners Augmented Reality for Fulton Street Transit Center 26
Parsons Brinckerhoff ProjectWise Automated PDF Generator 26
W| F Parsons Brinckerhoff and Arup JV Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade 22
PechorNIPIneft Construction of Booster Oil‑refining Station on Bayanduskoe Oil Field 27
Robins & Morton Power & Industrial Carbo Ceramic’s Millen Proppant Facility 27
Saudi Electricity Company/Implemented by Nahil
W Establishment of Kingdom‑wide EDMS at SEC 20
Computer Company
INNOVATION IN ASSET LIFECYCLE INFORMATION MANAGEMENT
F Ameren Callaway Energy Center eB Supports Nuclear Outage Management 31
F Crossrail Ltd Asset Information Management System 31
W| F Ecofys Netherlands B.V. Wind Turbine Test Site 32
W Southern Company Data Quality Manager Implementation ROI 30
INNOVATION IN BRIDGES
Anhui Transport Consulting & Design Institute Co., Ltd. Application of 3D Design Technology in Complex Bridge Design 36
ARCADIS France SEA High‑speed Track Bridges 36
F Armando Rito Engenharia SA April 4 Bridge 35
F Borton‑Lawson Lehigh/Pohopoco Bridge Replacement 35
Finley Engineering Group, Inc. Palmetto Section 5, SR 826/836 Interchange Bridge 11 ‑ Precast Segmental 37
Guizhou Province Traffic Planning, Survey, and
Application of RM Bridge V8i to the Longjiang River Super‑large Bridge 37
Design Institute Limited
Iowa Department of Transportation New Bridge Inspection Software System 38
K2 Ingeniería Continuous Bridges Formed by Precast Beams 38
W Modjeski and Masters, Inc. Huey P. Long Bridge Widening 34
PEDELTA Colombia S.A.S. Huasco Viaduct Bridge 39
PEDELTA Colombia S.A.S. South‑East and 44th Street Interchange 39
PEDELTA Colombia S.A.S. The Triplet Bridges 40
RITES, Ltd. Farakka Bridge Across Farakka Feeder Canal 40
Saanvi Infrastructure Pvt Ltd Hill Bypass Road Kharkhari to Motichur Station 41
INNOVATION IN BUILDING
Aestudio Competition for New Trade Center 46
Aestudio Strategic Center for Earthquake Emergency 46
Andrea Girotto Architetto Real Classic Mood Café 47
Arkitekterna Krook & Tjäder Friends Arena 47
F Arthur Golding and Associates Helsinki Central Library Competition 45
Bassani Edilizia S.p.A. Centro Residenziale Dogana 48
Bina Puri Construction Sdn Bhd 33 Units Alamesra
2012 BE InSpIREd AwARdS

48
Building Studio Architects The Lantern 49
Caruso Mainardi Architetti Associati Residential Buildings 49
Ekofarma S.r.l. Furnishing of a Pharmacy 50
Falegnameria Grottaroli S.a.s. Store Furnishing 50

204

9006_YII_Content_1012.indd 204 11/21/2012 12:32:56 PM


ALPHABETICAL BY CATEGORY – INDEX

WINNERS W
ORGANIZATION NAME PROJECT NAME paGe
Ingenieurbüro Zammit GmbH Production Facility for Auto Body Construction 51
W John McAslan + Partners King’s Cross Station Redevelopment 44

FINALISTS
John Portman & Associates Bao’an Oct Hotel 51
John Wardle Architects Mineral & Materials Research Hub 52
LAB Architecture Studio Museum of Bristol M Shed 52
LCA Borgo Della Neve 53

F
Meijer, Inc. The Virtual Store Project 53
F Morphosis Architects Giant Interactive Group Corporate Headquarters

SPECIAL RECOGNITION AWARD WINNER AND FINALIST W| F


45
Ochs Schmidhuber Architekten Unterföhring Nursery 54
Proma S.r.l. Spaces Design for Luxury Cosmetics 54
RendArk Shop Monnalisa “Red Leaf” 55
RMF Engineering, Inc. New OSU Chilled Water Plants 55
schweizermessebau AG The Diamant 56
Störmer Murphy and Partners Intelligent Quarters 56
Studio Agnellini Renovation of Residential Building 57
Takenaka Corporation G Project 57
Warren and Mahoney BRANZ Headquarters 58
Warren and Mahoney University of Otago Plaza 58
INNOVATION IN COMMUNICATIONS NETWORKS
W IMMCO, Inc. Quality Control Automation 60
Infotech Enterprises Ltd InfiPlan Office Suite 61
F Precision Valley Communications Utilizing Bentley in the Hottest Spots 61
PT. Link Net Link Net Fiber and Coax Drawing 62
INNOVATION IN CONSTRUCTION
A. Burmester Arquitectos Associados Lda Electricity of Portugal 66
Afcons Infrastructure Ltd. Jammu‑Udhampur Section Construction 67
Afcons Infrastructure Ltd. Metro Rail Viaduct Construction 67
COMSA Multipurpose Hall of Gran Canaria 68
DPR Construction Arizona State University New Business School 68
DSD Ferrometalco SAE New Doha International Airport Cargo Facility 69
Geico S.p.A. Automotive Paint Shop 69
Guangzhou Panyu District Shiqiao Architectural
Audi 4s Construction 70
Design Institute Co., Ltd.
W| F Hitachi‑GE Nuclear Energy, Ltd. Integrated Plant Construction System 66
F HNTB Corporation Firm‑wide Design‑build Quality Plan 65
IBUG 21, S.L. NIBUG 70
IDM E&C Woonmoon Dam Auxiliary Spillway 71
F Shawmut Design and Construction Dudley Square Municipal Building 65
Shinryo Corporation Japan‑China Friendship Center HVAC Renewal 71
W Taylor Woodrow‑BAM Nuttall JV Victoria Station Upgrade Jet Grouting 64
Tianjin FAW Toyota Motor Co., Ltd. New Toyota Factory 72
Zachry Industrial Zachry’s Use of ConstructSim 72
INNOVATION IN GENERATIVE DESIGN
CODA LiTA Jukbuin 76
F LAB Architecture Studio Guardian Towers 75
Ove Arup & Partners Fulton Street Transit Center 76
Pavilion Architecture KREOD 77
W Robin Partington Architects Park House 74
F Stanley Beaman & Sears Atlanta History Center Design Competition 75
INNOVATION IN GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING
F Astiv Ingeniería Restoration of a Recycled Slag Landfill 81
Mississippi Department of Transportation
W gINT Implementation at Mississippi Department of Transportation 80
Geotechnical Department
INNOVATION IN GOVERNMENT
Bentley SyStemS, Incorporated

F City of Copenhagen Solar Exposure of Copenhagen City 85


W Crossrail Ltd Crossrail 84
Georender srl Arco D’Augusto 86
I.P.S. Vial S.L Global Cities and Roads Inventory Management (InCa) 86
F Napier City Council GIS and Asset Management 85
Sarawak Land and Survey Department Integrated Photogrammetry Solution With MicroStation 87

205

9006_YII_Content_1012.indd 205 11/21/2012 12:32:56 PM


INDEX – ALPHABETICAL BY CATEGORY
ORGANIZATION NAME PROJECT NAME paGe
Seh Nirman Implementation of GIS in the Middle‑class City of India 87
South Carolina Department of Transportation Outdoor Advertising Permitting System 88
Ville de Grenoble ProjectWise Interoperable Real Estate Municipal Database 88
INNOVATION IN LAND DEVELOPMENT, ENGINEERING, AND MANAGEMENT
F BBKS‑Projekt Sp. z o.o. Taxiways at Rzeszow‑Jasionka Airport 91
COWI India Private Limited 3D Property Mapping Using SOSI Standards 92
Giulio Vatteroni Architetto 3D Modeling of the Village of Casette 92
W Mortenson Construction Spring Valley Wind Project 90
Seoyeong Engineering Co., Ltd. North Cheonan Industrial Complex Underground Piping Management (Pilot) 93
F Tandon Urban Solutions Pvt. Ltd. Nadaprabhu Kempegowda Green City Project 91
U3D&C South Pars Gas Field Development Project 93
INNOVATION IN MINING AND METALS
3Deling sp. z o.o. Wieliczka Salt Mine Laser Scanning 98
F AMEC Cloudbreak Enhancement Project 97
Anglo American plc Geospatial Integration Project 98
Aurecon Hatch Wiggins Island Coal Export Terminal 99
Bechtel Australia Pty Ltd Caval Ridge Coal Mine 99
China Nerin Engineering Co., Ltd. Tongling Nonferrous Metals Copper Smelting Project 100
Hatch Associates Pty Ltd Qinghai Magnesium Smelter – Dehydration Facility 100
F Kumba Iron Ore Limited Kolomela Environmental Management Systems 97
Minerva Engineers Pty Ltd Western Turner Syncline Phase 1 101
OJSC Magnitogorsk Gipromez Hot Rolling Mill’s Boiler Room 101
W Petra Diamonds Limited Finsch GIS 96
SJM Tech S.a.s. 3D Mining Complex Virtual Tour 102
Turkish Hard Coal Mining Authority Gas Tracing at ‑1000m With Bentley Geo Web Publisher 102
INNOVATION IN OFFSHORE ENGINEERING
F CNGS Engineering Ice‑resistant Offshore Platform LSP‑1 105
Francis Design Consulting SARL Villa 567 Cote d’Azur 106
Hyundai Heavy Industry BP Quad 204 Project 106
Hyundai Heavy Industry Shwe Gas Project 107
ISC Consulting Engineers A/S Upending Hinge Installation of Mono Piles 107
Knowsley SK Ltd Offshore Production Platform Deluge Skid 108
Larsen & Toubro Limited GDU‑GSU Module for MHN Project 108
W Nippon Steel & Sumikin Engineering Co., Ltd. Tokyo International Airport Re‑expansion Project 104
Ramboll Engineering Consultancy Services India
Offshore Platform As‑built Model 109
Pvt. Ltd.
Ramboll Engineering Consultancy Services India
Small Bore Branch Support 109
Pvt. Ltd.
F Robert Elks & Associates Rock Bolting Rig 105
Zentech Engineering Co., Ltd. 2 Megawatt‑class Offshore Wind Turbine Project 110
Zentech Engineering Co., Ltd. Modulization Design for Ruwais Refinery Project 110
INNOVATION IN POWER GENERATION
Carson Engineers Stacker‑chase Coal‑blending Facility 114

China Water Resources Beifang Investigation,


F Gelantan Hydropower Station (GLTHPP) 113
Design and Research Co., Ltd.

Desein Indure Pvt. Ltd. 2X20 MW Thermal Power Plant 115


Desein Indure Pvt. Ltd. VISA Raigarh Super Thermal Power Project 115
Heilonjiang Province Investigation and Design
Fendou Reservoir 116
Institute of Water Resources and Hydropower
W HydroChina Zhongnan Engineering Corporation Standard Design and Application for the Pumped Storage Power Station 112
ISGEC John Thompson Ltd. Enka de Colombia 116
KEPCO Engineering & Construction Company, Inc. Shin‑Uljin Nuclear Plant Units 1 & 2 Project 117
KEPCO Engineering & Construction Company, Inc. Yonghung Thermal Power Plant Units 3 & 4 117
Korea District Heating Engineering Co., Ltd. GoYang Samsong Combined Heat and Power Generation 118
L&T‑Sargent & Lundy Limited 375 Megawatt Phase III Combined Cycle Plant 118
Larsen & Toubro Limited 375 Megawatt GSECL Dhuvaran III 119
2012 BE InSpIREd AwARdS

W| F Shaw Power Group Virginia City Hybrid Energy Center 114


F Southern Company Design Application Integration 113
INNNOVATION IN PROCESS MANUFACTURING
Air Liquide Engineering India Pvt. Ltd Air Separation Unit Plant 124

206

9006_YII_Content_1012.indd 206 11/21/2012 12:32:56 PM


ALPHABETICAL BY CATEGORY – INDEX

WINNERS W
ORGANIZATION NAME PROJECT NAME paGe
BashNIPIneft Trebs Oil Field: Central Collection Point 124
Bayer Technology Services GmbH Conceptual Design With PlantWise 125

FINALISTS
Equinox Engineering Ltd. CNRL Primrose East Pipelines 125
GEI Industrial Systems Ltd. FCCU and PRU Revamp Project (A & C) 126
F Giprotyumenneftegaz Booster Compressor Station on the Yurharovskoye Oil Field 123
GS Engineering & Construction Corporation Ruwais Refinery Expansion Project Package 2 126

F
Larsen & Toubro Limited Ammonia Plant Feedstock Changeover Project 127
Larsen & Toubro Limited Reformer for Ammonia Syngas Plant

SPECIAL RECOGNITION AWARD WINNER AND FINALIST W| F


127
Pall India Pvt. Ltd. Slurry Oil Backwash Filter System 128
F PT. Inti Karya Persada Teknik Betara Complex Development Project 123
Tata Consultancy Services Digital Definition of Paper‑converting Production Line 128
W Zeton Inc. Modular GTL Commercial Demonstration Plant 122
INNOVATION IN RAIL AND TRANSIT
Delhi Metro Rail Corporation Kerala High‑speed Rail 132
JSC Mosgiprotrans Moscow‑St. Petersburg High‑speed Rail Line 132
Quandel Consultants, LLC Dearborn‑Ypsilanti Second Track 133
F Quigg Engineering Inc. High‑speed Rail 131
Rail Vikas Nigam Limited Kolkata Metro Garia to Airport Line 133
SNCF Feasibility Study on the Kinshasa‑Ilebo Railway 134
W Sweco AB Hallandsås “Live BIM” Railway Project 130
F Utah Transit Authority A New, Innovative Transit Asset Management Solution 131
Vectura Consulting Mälarbanan 134
INNOVATION IN ROADS
AECOM Detailed Design of NH 6 138
AECOM Udaipur Ring Road 139
CDM Smith Inc Four Laning of Ludhiana‑Talwandi Section of NH 95 139
CIMA+ Turcot Interchange 140
Conseil General de l’Ain Using Point‑cloud Data for Public Consultation for a Road Improvement 140
W Creighton Manning Engineering Fuller Road and Washington Avenue 136
Egis International A63 Motorway Widening and Improving 141
Feedback Infrastructure Services Private Limited Design Rimuli to Roxy Section of NH 215 141
F Foth Infrastructure & Environment, LLC NW 62nd Avenue Improvements 137
Halcrow Consulting India Pvt. Ltd. Two Lane to Four Lane Widening of NH 59 142
Hatch Mott MacDonald Windsor‑Essex Parkway 142
Kokusai Kogyo Co., Ltd. Sustainable Road Maintenance Using Mobile Mapping System 143
Larsen & Toubro Limited – ECC Division Samakhiali‑Gandhidham Road Project 143
Mouchel Regional Road South Part 144
W| F Parsons Brinckerhoff and Arup JV Airport Link, Northern Busway (Windsor to Kedron) and Airport Roundabout Upgrade 138
R.V. Anderson Associates Limited TTC Streetcar Replacement Projects 144
F Sotepa Ltda. Humberto de Campos Street Extension 137
Soyuzdorproekt Ltd Reconstruction of the E‑1 15 (M8 Kholmogory) 145
Thouvenot, Wade & Moerchen, Inc. I‑57 Diverging Diamond Interchange 145
TranSystems Kansas Star Casino Interchange Design 146
URS Scott Wilson India Pvt Ltd Re‑engineering Design of Pune Bypass 146
Washington State Department of Transportation Point Defiance Bypass 147
Washington State Department of Transportation SR 92 ‑ 99th Ave NE Roundabout 147
Wyoming Department of Transportation Wyoming Diverging Diamond Interchange 148
INNOVATION IN STRUCTURAL ENGINEERING
Afcons Infrastructure Limited Underwater Metro Tunnel Project 152
Aker Solutions Process Structure for a Refinery Complex 152
F Arup South Morang Rail Extension 151
Ashok Manhar & Associates 200‑seat Capacity Auditorium 153
Aswathanarayana & Eswara Stamping Pit 153
Byggnadstekniska Byrån i Stockholm AB AkzoNobel Swedish Head Office 154
Bentley SyStemS, Incorporated

Carollo Engineers, Inc. South San Francisco Generator Building 154


CE Con Engineering Auditorium at Mohali 155
Daelim Industrial Co., Ltd. Saudi Kayan High‑density Polythylene Plant 155
Energy Infratech Pvt. Ltd. Teesta‑III Hydro Electric Project 156
ESCOM Consultants Pvt. Ltd. Nestle R&D Centre 156
F Fitzpatrick Engineering Group, PLLC Rehabilitation Center 151

207

9006_YII_Content_1012.indd 207 11/21/2012 12:32:56 PM


INDEX – ALPHABETICAL BY CATEGORY
ORGANIZATION NAME PROJECT NAME paGe
Hamkar Company Atlantic Residential Project 157
HCR Bridge Machinery (M) Sdn. Bhd. Kelana Jaya Light Rail Transit Line Extension 157
Hindustan Petroleum Corp. Ltd. (HPCL) IFO Cooling Facility 158
Hindustan Petroleum Corp. Ltd. (HPCL) Softened Water to DM Water Service and Condensate Heat Recovery and Integration 158
ISGEC Heavy Engineering Ltd. Alcaravan Bioenergy 159
W John A. Martin & Associates, Inc. LAX International Terminal Expansion 150
Kirby Building Systems India Ltd. Pipavav Shipyard 159
Kirby Building Systems India Ltd. Pre‑engineered Building Works for Kalyani Global Engineering 160
Kirby Building Systems India Ltd. Renault‑Nissan Automotive India, Tamil Nadu 160
L&T‑Sargent & Lundy Limited Plant Structures: Interconnecting Coal Gallery 161
Larsen & Toubro Limited 375 Megawatt GSECL Dhuvaran Heat Recovery Steam Generator 161
Larsen & Toubro Limited India’s Largest Coke Oven Plant 162
Larsen & Toubro Limited ‑ ECC Division TSL Raw Material Handling System Package‑1 162
Macawber Beekay Pvt. Ltd. 1X500 Megawatt Bokaro A 163
Mahadeo Khurd & Associates Cricket Stadium 163
Shreecon Consultants Army Public School 164

Bentley’s mission is to provide innovative software and services for


Studio Tecnico Mannelli e Associati
Studio Tecnico Mannelli e Associati
La City
Progetto Ville Urbane
164
165

the enterprises and professionals who design, build, and operate the
Tata Power
Tata Power
Extension of Conveyor
Strengthening of Emergency Stock Out Conveyer at Trombay
165
166

world’s infrastructure – sustaining the global economy and


INNOVATION IN UTILITY TRANSMISSION AND DISTRIBUTION NETWORKS
BashNIPINeft Re‑engineering Substation 35/6 Kilovolts 170

environment for improved quality of life.


W
ElectraNet Pty Ltd
Enogex LLC
Intelligent Substation Information Modelling
Implementation of AutoPLANT and ProjectWise
171
168
F Henan Electric Power Survey and Design Institute Henan 500‑kilovolt Power Grid 3D Digitized and Integrated Operations Platform 169
Hokkaido Aero Asahi Co. Ltd. Suspended Power Line Route Planning 171
W| F Pacific Gas and Electric Company Bentley Substation Implementation 170
swb Netze GmbH & Co. KG Sharing GIS Information With Contractors: Utilities Infrastructure Portal (OPA) 172
Tenaga National Berhad Visualizing Digital Terrain Models From Airborne LiDAR 172
The Year in FInfrastructure 2012 isPower
Zhejiang Electric a Bentley Systems,
Design Institute Incorporated Jinhua
publication that Station
Converter showcases 169
the extraordinaryINNOVATION
work of Bentley usersAND
IN WATER sustaining the world’s
WASTEWATER infrastructure.
TREATMENT PLANTSFor additional print
W www.bentley.com/2012yearbook.
copies, go to Carollo Engineers, Inc South Secondary Improvements Project 174
W| F CH2M HILL Metro Wastewater Reclamation District, Northern Treatment Plant 176
For information about how to enter your innovative project for consideration in the next
F GE Water Lanxess India – Thermal Zero Liquid Discharge Wastewater Treatement Plant 175
Be Inspired Awards competition or for additional information about this program,
F Melbourne Water Eastern Treatment Plant Tertiary Upgrade 175
visit www.bentley.com/beinspired.
SEIMAF Ingenierie Study Details of Pipes and Hoppers 176
INNOVATION IN WATER, WASTEWATER, AND STORMWATER NETWORKS
onlIne VerSIonS
ADCC Infocad Pvt. Ltd. Deulgaon Raja Sujal Reform Project 180
AECOM India Pvt. Ltd. Sewerage Master Plan of Delhi for Delhi Jal Board 180
digital versions of Be Inspired Awards publications are available online at
AKATT S.A. Automation System of DEYA Lamias 181
www.bentley.com/yearininfrastructure. choose to view a specific issue or search within each
Artelia Cyprus Limited Greater Nicosia Sanitary Sewerage Project 181
issue or across all issues using terms, titles, or keywords.
W Azersu OJSC GIS‑based Infrastructure Asset Management 178
Chongqing
also browse Bentley’s Water Supply
Be Inspired Co.portfolios
project Ltd at www.bentley.com/projects,
Chongqing Water Networks
whichOperation Demonstration 182
Delhiand
feature the winners Jal fiBoard Sewerage
nalists in Bentley’s annual Be Inspired Awards Master Plan
competition. – 2031 for Delhi
through 182
these multimediaForsspac
portfolios of exemplary project achievements, Bentley Global shares
Gatewayinnovative
Logistic City
best 183
Frischmann
practices with the architects,Prabhu (India) constructors,
engineers, Pvt. Ltd. Mega City Water
geospatial professionals, andSupply
owner-System 183
F Gannett Fleming, Inc. Innovative Model Data Integration Processes 179
operators who sustain the world’s infrastructure.
Maharashtra Jeevan Pradhikaran Hydraulic Modeling for Gondia City 184
Maharashtra Jeevan Pradhikaran Hydraulic Modeling for Hingoli City 184
Maharashtra Jeevan Pradhikaran Hydraulic Modeling for Kagal City 185
Manila Water Company Improving Efficiency of Pump Operations in Manila 185
F NJS Engineers India Pvt Ltd JICA‑assisted Water Supply Project 179
Power and Water Corporation Remote Communities: Optimization of Water Supply 186
Sabesp Cadiriri Booster Supply Analysis 186
ISBn number: 978-1-934493-19-9.
Sabesp Jardim Damasceno Pump Station 187
Sabesp Water Supply in Risk Area 187
2012 BE InSpIREd AwARdS

published by Bentley Systems, Incorporated


Shirpur Municipal Council Hydraulic Modeling 188
685 Stockton drive
SMEC International Private Limited Greater Colombo Wastewater Management 188
exton, pa 19341 USa
Societe du Canal de Provence ‑ Sri Lanka Bureau Greater Trincomalee Integrated Water Supply 189
Vitya Consultants Pvt. Ltd PURA for Sangli Cluster of Maharashtra 189
www.bentley.com
WAPCOS Limited Gaya Sewerage Scheme 190
WAPCOS Limited Sewerage Master Plan of Delhi for the Year 2031 190
208

9006_YII_Content_1012.indd 208 11/21/2012 12:32:58 PM


recognizing the critical importance of being a good corporate citizen, Bentley is
uncompromisingly committed to supporting ecological sustainability. this support
goes beyond the stewardship of environmental resources to include investment
in strategic educational and training initiatives that foster a workforce of skilled
infrastructure professionals capable of meeting the world’s growing sustainability
challenges.
The Year in Infrastructure 2012 is one small example of Bentley’s commitment
to promoting sustainable development through its business practices. as part of
this effort, this publication has been printed on Forest Stewardship council (FSc)
certified paper, which identifies products that contain wood fiber from well-
managed forests.

© 2012 Bentley Systems, Incorporated. The Year in Infrastructure 2012 is published by Bentley Systems, Incorporated, 685 Stockton drive, exton, pa USa 19341. Bentley, the “B” logo, Bentley, Be, Bentley learn, Bentley map,
Bentley plantSpace, Bentley plantWise, Bentley Select, autopIpe, autoplant, cloudWorx, conSpan, culvertmaster, eB, Flowmaster, Generativecomponents, GeopaK, Geo Web publisher, gInt, Hammer, Hevacomp, Inroads,
InspectTech, LEAP, MicroStation, MicroStation PowerDraft,, MicroStation PowerDraft, MX, MXRAIL, MXROAD, Optram, PlantWave, PlantWise, Pointools, PondPack, PowerCivil, ProConcrete, ProjectWise, promis•e, ProSteel, RAM,
SacS, Select, Sewercad, SewerGemS, speedikon,Staad, Staad.pro, Stormcad, Watercad, and WaterGemS are either registered or unregistered trademarks or service marks of Bentley Systems, Incorporated, or one of its direct
or indirect wholly owned subsidiaries. Google earth is a trademark of Google Inc. adobe is a registered trademark of adobe Systems Incorporated in the United States and/or other countries. oracle is a registered trademark of oracle
and/or its affiliates. microsoft is a registered trademark of microsoft corporation in the United States and/or other countries. other brands and product names are trademarks of their respective owners.

9006_YII_Content_1012.indd 209 11/21/2012 12:32:59 PM


THE YEAR IN INFRASTRUCTURE 2012
www.bentley.com

corporate Headquarters
685 Stockton drive • exton, pa 19341 • United States
1-800-Bentley (1-800-236-8539) • outside the United States +1 610-458-5000

Bentley emea
2nd Floor • Block 2, park place • Upper Hatch Street • dublin 2 • Ireland • +353 1 436 4600

Bentley asia
Unit 1402-06, tower 1 • china central place, Beijing 100025 • china • +86 10 5929 7000

 


© 2012 Bentley Systems, Incorporated   

9006_YII_Content_1012.indd 210 11/21/2012 12:33:02 PM

You might also like