You are on page 1of 9

Electrical Safety Observation at MEG Project M

SN Exact Location Equipment number Agency


1 South Oil Jetty NRP/PDRP/MEG-LSTK- M/s NRP-LSTK-03
3/MDB-01 1

10

11

12

13

14

15

16

SN Exact Location Equipment number Agency


South Oil Jetty NRP/PDRP/MEG-LSTK- M/s NRP-LSTK-03
3/PDB-01 1

10

11

12

13

14

15

SN Exact Location Equipment number Agency


South Oil Jetty NRP/PDRP/MEG-LSTK- M/s NRP-LSTK-03
3/PDB-02 1

5
6

10

11

12

13

14

15
Paradip Refinery
Fire & Safety Department
MEG Project M/s NRP PROJECTS (P) LTD. - LSTK-03, CT Site

Checklist
Temporary Ditribution Boards are in working condition & have suitable isolater switch with HRC
fuses and suitable glands. Main fuse rating is …..Amp

ELCB/RCCB(30mA Sensitivity) is connected in mains supply on temp board and tested for tripping

Double earthing is provided to all baords and connected electrical equipments

The power cable used is not damaged and in healthy condition

The extension board have industrial type switch sockets and plug only

Temporary distribution boards have been provided with canopy and stand

No scrap/unwanted objetcs are placed in/on the temporaray distribution boards

All the cable entering in the board are propelry sealed

Name of contractor is marked/painted on each temporary supply baord along with contact nos

Adequate illumination in work area

Wooden structure not acceptable. Only MS/Metal Structure with minimum height of incoming and
all outgoing feeders from ground level of 1.5 ft is acceptable

Availability of Extinguisher

Stencilling/marking of Incoming source & outgoing devices done on Distribution Board/ Panel

Cables inserted in plug points with Plug Tops

Electrical Panels/Distribution boards installed away from water logging area

Availability of Electrical rubber mat

Checklist
ELCB/RCCB(30mA Sensitivity) is connected in mains supply on temp board and tested for tripping

Double earthing is provided to all boards and connected electrical equipments

The power cable used is not damaged and in healthy condition

The extension board have industrial type switch sockets and plug only

Temporary distribution boards have been provided with canopy and stand

No scrap/unwanted objetcs are placed in/on the temporaray distribution boards

All the cable entering in the board are propelry sealed

Name of contractor is marked/painted on each temporary supply baord along with contact nos

Adequate illumination in work area

Wooden structure not acceptable. Only MS/Metal Structure with minimum height of incoming and
all outgoing feeders from ground level of 1.5 ft is acceptable

Availability of Extinguisher

Stencilling/marking of Incoming source & outgoing devices done on Distribution Board/ Panel

Cables inserted in plug points with Plug Tops

Electrical Panels/Distribution boards installed away from water logging area

Availability of Electrical rubber mat

Checklist

ELCB/RCCB(30mA Sensitivity) is connected in mains supply on temp board and tested for tripping

Double earthing is provided to all baords and connected electrical equipments

The power cable used is not damaged and in healthy condition

The extension board have industrial type switch sockets and plug only

Temporary distribution boards have been provided with canopy and stand
No scrap/unwanted objetcs are placed in/on the temporaray distribution boards

All the cable entering in the board are propelry sealed

Name of contractor is marked/painted on each temporary supply baord along with contact nos

Adequate illumination in work area

Wooden structure not acceptable. Only MS/Metal Structure with minimum height of incoming and
all outgoing feeders from ground level of 1.5 ft is acceptable

Availability of Extinguisher

Stencilling/marking of Incoming source & outgoing devices done on Distribution Board/ Panel

Cables inserted in plug points with Plug Tops

Electrical Panels/Distribution boards installed away from water logging area

Availability of Electrical rubber mat


Date 07.05.2020

Yes/No Remarks Photographs

Yes

Yes Checked and found ok

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

SLD,Electrician name &


Yes No,Shock treatment chart
needs to be displayed

Yes

Yes

Yes

Yes/No Remarks Photographs


Yes Checked and found ok

Yes

Yes*

Yes

Yes

Yes

Yes

Yes

Yes

Yes

SLD,Electrician name &


No No,Shock treatment chart
needs to be displayed

Yes

Yes

Yes

Yes/No Remarks Photographs

Yes Checked and found ok

Yes

Yes

Yes

Yes
Yes

Yes

Yes

Yes

Yes

SLD,Electrician name &


Yes No,Shock treatment chart
needs to be displayed

Yes

Yes

Yes