Professional Documents
Culture Documents
2.0 Resources
1. Project Planning and Control with PERT and CPM by B.C.Punmia and
K.K.Khandelwal
2. S Levy, “Construction Process Planning and Management” Elsevier Publication,
1st Edition.
3. P S Gahlot, “Construction Planning and Management” New Age International
4. Allan Ashworth, “Contractual Procedures in the Construction Industry (6th
Edition)”
5. Goodman and Love, “Project Planning and Management”
3.0 Course outline
Week 1:
Construction as industry and its challenges, Role of construction management,
Methods of construction managements. Basic requirements of construction management:
Learning structures.
Week 2:
Life cycle of construction projects: Conceptual planning, ananlysis and design,
procurement, utilization and manintenance.
Weeks 3:
Stages of awarding contract, types of contract, contract documents, arbitration and
settlement of disputes, contract laws and handling of contracts, commissioning of project.
Project planning, scheduling, controlling methods for planning, decision making in project
management.
Weeks 4&5:
Barcharts, milestone charts, defining activities and their interdependence, drawing of
network, time and resource estimations, elements of network and development of
network.
Weeks 6&7:
Use of network as scheduling techniques, use of network as control techniques i.e.
project monitoring.Network Analysis: PERT and CPM.
Week 8:
Estimation and rate analysis: CPM – Cost Model, IT in Construction, Planning and
Management.
1.0 Assessment
Weight This assessment
Assessment towards relates to the
Outline of assessment
Type Grade following expected
Point learning outcomes
Test 20% This assessment is relevant to challenges, UL01, UL02,
role and methods of construction UL03, UL04,
management, basic requirements of UL03, UL04, ULO5
construction project and life cycle of
construction projects. This assessment is
relevant to contractual agreements, network
and activities.
Project 40% Project should be related to ongoing activities ULO6, ULO7,
Submission & of any real time civil construction project. ULO8.
Presentation
Final Exam 40% Overall assessment of the unit UL01,
UL02,UL03UL04,
UL05, ULO6.
Attendance 75%
(hurdle
requirement)