Services capability
GPI AsiaTel has been working in Teleco & Non-Telco sectors for more than 10-years
and now is capable of providing a full portfolio of services in Gov. & Non-Gov. Sectors
to ensure customer satisfaction maintaining the quality with lowest possible cost. We
have well experienced Engineers and site supervisors under whose guidance we can
ensure that quality, time scheduling and customer satisfaction can be achieved.
GPI AsiaTel is one of the Leading Telecom, Optical fiber & Civil Service Providers in
Bangladesh delivering Technical Support Services to Gov. & Non-Gov. Sectors
specially :
Plot# 13,R#413,Sector-
1,Purbachal ,Dhaka ;
Area : 4000 SFT
Location of
S/N Description Project Work Order Customer Period Status
Works.
Project 230kV Double Kalpataru Kalpataru
Construction Materials Supply
Circuit Faridpur- Power Power 2020 to till Faridpur to
1 (2.5FM Sylhet sand & 12- Ongoing
Barishal Transmission Transmission Transmission now. Barishal
16MM,4-8MM Stone)
Line Limited Limited
Project 400kV Double
Kalpataru Kalpataru
Construction Materials Supply Circuit and Associated
Power Power 2019 to till Bagura to
2 (2.5FM Sylhet sand & 12- 230kV & 132kV Ongoing
Transmission Transmission now. Rahanpur
16MM,4-8MM Stone) Bagura-Rahanpur
Limited Limited
Transmission Line
Project 400kV Double
Construction Materials Supply KEC KEC Meghnaghat
Circuit Meghnaghat- 2019 to Till
3 (2.5FM Sylhet sand & 12- International International to Ongoing
Madunaghat now.
16MM,4-8MM Stone) Limited Limited Fatikchhari
Transmission Line
Bangladesh Bangladesh
Construction Materials Supply Dhaka ,
Stone & Sand Supply Machine Tools Machine 2016 to Till
4 (2.5FM Sylhet sand & 12- Gazipur & Ongoing
etc. Factory Ltd. Tools Factory now.
16MM,4-8MM Stone) Sylhet
(BMTF) Ltd. (BMTF)
Construction of
Matarbar,m
Construction Materials Supply matarbari ultra
5 Hyundai Hyundai 2018 to 2019 oheshkhali,c Completed
(2.5FM Sylhet sand) supercritical power
ox’sbazar
plant project
ROBI Civil Construction
Construction of Tower foundation of Tower 2018 to Till All over
6 edotco edotco Ongoing
Including Design & Consultancy foundation/Obsidian now. Bangladesh
/Dismantle
Civil works for Green Field & Roof
Civil works involving
Top Tower with fabrication & Everyway/ Everyway/ All over
7 Green Field , Roof Top 2007 to 2011 Completed
Erection , Power connection & Airtel Airtel Bangladesh
sites construction
Acquisition with Solar solution
Satisfaction is the key
Project Ongoing / Completed
Obsidian Frame Contract
Location of
S/N Description Project Work Order Customer Period Status
Works.
GPI AsiaTel was awarded by O&M
VIGOR &
Refueling, Maintenance of Portable Since 2018 Services at
1 VIGOR Plus Edotco ROBI Ongoing
Genset , DG , DGoW ,PGoW with to till now Hill-Tracts &
(O&M)
HR & Logistic Support (O&M) CTG Region
GPI AsiaTel was awarded by
O&M
Refueling, Maintenance of Portable ULKA (O&M) Since 2018
2 ROBI Airtel Services at Ongoing
Genset , DG , DGoW ,PGoW with to till now
CTG Region
HR & Logistic Support
GPI AsiaTel was awarded by
O&M
Refueling, Maintenance of Portable TIGER (O&M) Since 2019
3 Banglalink Banglalink Services at Ongoing
Genset , DG , DGoW ,PGoW with to till now
CTG Region
HR & Logistic Support
GPI AsiaTel was engaged with
Disaster
Disaster Support Services with PG , 2014 to Till All over
4 Support Edotco ROBI Ongoing
Vehicle , HR , Refueling specially now. Banglaldesh
Services
Comilla , Nokahalai , CTG region
Around 1400 sites Rectifier &
Rectifier &
Battery Maintenance works at SAFT All over
5 Battery Banglalink 2009 to 2011 Completed
Banglalink Power System (SAFT) by (Malaysia) Banglaldesh
Maintenance
NSN.
GPI AsiaTel was awarded by
Bhoirab ,
Maintenance works of PG Running
6 Maintenance Huawei Huawei 2011 to 2012 Brammanbari Completed
with Manpower with Vehicle at GP
a
Umbrella Project with Huawei.
GPI was authorized service provider Authorized
of Anritsu Pte Ltd & SAFT Power service SAFT via All over
7 SAFT 2009 to 2011 Completed
Systems for their DC Power provider with NSN Banglaldesh
Systems Mintenance
10/4/2020 16
Project On going Rollout
Frame Contract Satisfaction is the key
Experience of Telecom Planning and Installation with Supply Services [ GPI AsiaTel ]
S/ Location of
Description Project Work Order Customer Period Status
N Works.
GPI AsiaTel was awarded by
6-Years Agreement with
GrameenPhone for all types All types of Roll
Grameen Grameen 2011 to Till All over
1 of Rollout Out , Swap Ongoing
Phone Phone now. Bangladesh
/Swap/DT/Optimization with with DT
Supply & Transportation
works
GPI AsiaTel was awarded by
All types of
9-Years Agreement with ROBI
Implementation
for all types of Installation, 2009 to Till All over
2 , Swap with ROBI ROBI Ongoing
Commissioning works at now. Banglaldesh
Power
Implementation Deptt. with
Management
Supply
GPI AsiaTel was awarded by
ZTE for HR & Telecom HR , Switching ,
Banglalink / 2011 to Till All over
3 installation (TI) & Network TI & Network ZTE Ongoing
Banglalion now. Bangladesh
Optimization Annual Frame Optimization
bidding for last 5- years.
Switching/TDM & Battery ,
Roll out ,
Rectifier Swap With
Switching/TDM 2010 to Till All over
4 Transportation & Logistic Banglalink Banglalink Ongoing
& Battery , now. Bangladesh
facility all over Bangladesh
Rectifier Swap
for the last 6-Years.
GPI AsiaTel was awarded by
Swap with
Agreement with Ericsson for
Installation, 2014 to Till All over
5 BTS & MW Installation, Ericsson ROBI Ongoing
Commissioning now. Bangladesh
Commissioning with Swap
10/4/2020 works 17
works for the last 3-Years.
Project On going
Frame Contract Satisfaction is the key
Experience of Telecom Planning and Installation with Supply Services [ GPI AsiaTel ]
S/ Location of
Description Project Work Order Customer Period Status
N Works.
GPI AsiaTel have awarded by
Agreement with Ericsson for ROBI/GP/AirTel 2015 to Till All over
6 Ericsson ROBI/GP/AirTel Ongoing
DT (pre & Post) works for DT & HR now. Bangladesh
last 2 years.
GPI AsiaTel was awarded by
5 Years Agreement with
edotco for all types of 2013 to Till All over
7 edotco edotco edotco Ongoing
Installation, Commissioning now. Banglaldesh
& Swap , Roll Out of Power
Management works .
GPI AsiaTel was awarded by
Bangladesh Machine Tools Bangaladesh Dhaka ,
Stone & Sand Machine Tools 2016 to Till
8 Factory Ltd (BMTFL) for 2- Machine Tools Gazipur & Ongoing
Supply etc. Factory now.
Years Agreement to supply Factory Ltd. Narayangonj
Different Items
Awarded by TeleTalk to
Installation & Dismantle of
Installation &
MW sites Reinstalled and 2016 to Till All over
9 Dismantle of TeleTalk TeleTalk Ongoing
Commissioning with Material now. Banglaldesh
MW
& Logistic all over
Bangladesh
Supply of Medical related
Supply & 2016 to Till
10 Equipment’s/Parts to PG BSMMU PG Hospital Dhaka Ongoing
Installation now.
Hospital /BSMMU , Dhaka
GPI AsiaTel was awarded by
edotco for all types of Site AirTel Obsidian
2017 to Till All over
11 Obsidian & Auction activities / All types of edotco edotco Ongoing
now. Bangladesh
of TI , Civil ,Tower , SAQ, Dismentle
Power works .
Project On going/Completed Satisfaction is the key
Frame Contract
Experience of Telecom Planning and Installation with Supply Services [ GPI AsiaTel ]
Location of
S/N Description Project Work Order Customer Period Status
Works.
IT Service &
GPI AsiaTel was awarded by IT
Different Medical
Service & Different Medical 2014 to Till Dhaka &
12 Instruments & AC NPTI /SPACE NPTI /SPACE Ongoing
Instruments & AC Supply with now. Jessore
Supply with
Maintenance & Civil works.
Maintenance
GPI AsiaTel was awarded by Swap with
Agreement with Ericsson for Installation, All over
13 Ericsson GP/AirTel 2015 to 2016 Completed
Installation, Commissioning Commissioning Banglaldesh
works. works
GPI AsiaTel was awarded by
Supply of
Alkatel-Lucent Supply of
14 Different Items of Alkatel-Lucent Alkatel-Lucent 2009 to 2017 Dhaka Completed
Different Items of Parts of SAFT
Parts of SAFT
from Malaysia
GPI AsiaTel was awarded by 2-
Installation,
Years Agreement with Huawei Banglalink, All over
15 Commissioning & Huawei 2011 to 2012 Completed
for all types of Installation, ROBI, AirTel, Banglaldesh
Swap works
Commissioning works
GPI AsiaTel was awarded &
completed by the Agreement Nokia Siemens All over
16 Rollout works ROBI 2014 to 2015 Completed
with NSN for Rollout works for Network Banglaldesh
2-year
Power System(SAFT/Eltek) Swap Power
& Battery Swap with New Roll System(SAFT/Elt All over
17 Banglalink Banglalink 2009 to 2011 Completed
out at different Region all over ek) Swap & Bangladesh
Bangladesh Battery Swap
Project Completed Satisfaction is the key
Frame Contract
Experience of Telecom Planning and Installation with Supply Services [ GPI AsiaTel ]
Location of
S/N Description Project Work Order Customer Period Status
Works.
Installation &
Survey with Power Connection Commissioning
All over
20 and Installation & Comm ,Dismentle and Warid Warid 2010 to 2011 Completed
Banglaldesh
,Dismentle of TI Survey with
Power Connection
Installation &
Installation & Comm ,Dis &
Commissioning GP / All over
21 Swap of MW , A-Bis, HR-Supply NEC 2015 to 2016 Completed
,Dismentle & Bangllaink Banglaldesh
for 2-Years Agreement.
Swap of MW
Installation &
Installation & Comm ,Dismentle Commissioning GP / All over
22 NourBangla 2015 to 2016 Completed
for 2-Years Agreement. ,Dismentle of Bangllaink Banglaldesh
MW & BTS
Organogram for Telco _GPI AsiaTel
Project
Project Manager Support Teams
APM
Project Finance
Documentation Specialist Secretary Manager
Admin Manager
Project
Implementation Team QA/QC Implementation Team Survey Team
Supervision Mgmt
Procurement Manager
PS Engineer - 1 Survey Engr-1
Quality
Commissioning Engr. 2 Survey Engr-4..
PS Engineer – 4… Controller..
Delivery Technicians..
Commissioning Engr. 3
Commissioning Engr. 4…
10/4/2020 21
Organogram Of HR (Civil Construction ) GPI AsiaTel Satisfaction is the key
10/4/2020 22
Organogram Tools & Vehicle GPI AsiaTel Satisfaction is the key
10/4/2020 23
Organogram Office (Civil Construction ) GPI AsiaTel Satisfaction is the key
10/4/2020 24
Organogram for Construction & Maintenance
by GPI AsiaTel Satisfaction is the key
Office Stuff & Team Information Satisfaction is the key
SL Department QTY
1 Management 04
2 Admin 05
3 HR 05
4 Finance 07
5 Billing 08
6 Logistics 12
7 Documentations 14
8 Co-coordinator 16
9 APM 11
10 PM 07
11 Engineer 62
12 SAE 18
13 Team Supervisor 09
14 Team Leader 69
15 Technician 178
16 ZTE 52
i) Total Civil Construction Installation & Commissioning 477
Permanent HR
ii) Total Planning /DT HR 11
iii) Total O&M [Permanent=47 + Contractual=290+] 357
(i+ii+iii) Grand Total Human Resource 845
( Permanent + Contractual )
Vehicle & Equipment List Satisfaction is the key
4 Bitumen Distributer Heavy Vehicle Good Condition 7 Used for Heavy Construction Work
5 Dump-Trucks (10 Wheel) Heavy Vehicle Good Condition 8 Used for Heavy Construction Work
6 Dump-Trucks (6 Wheel) Heavy Vehicle Good Condition 8 Used for Heavy Construction Work
7 Mini Excavator Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
8 Pay-Loader Heavy Vehicle Good Condition 3 Used for Heavy Construction Work
9 Grader Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
10 Dozer Heavy Vehicle Good Condition 3 Used for Heavy Construction Work
11 Heavy Excavator Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
12 Tire Roller Heavy Vehicle Good Condition 3 Used for Heavy Construction Work
13 Soil Compactor (10 Ton) Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
14 3 Wheel Steel Roller Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
15 Tandem Roller Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
16 Water Tanker Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
Vehicle & Equipment List
Satisfaction is the key
17 Backhoe Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
18 Crane 25 Ton Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
19 Concrete Batching Plant Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
20 Concrete Mixer Truck Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
Hydraulic Rotary Rig
Machine (600mm to
21 Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
2500mm Capacity, 86m
Depth & Self-Weight 70MT)
22 JAC (1.5 Ton Capacity) Light Vehicle Good Condition 3 Used for Construction & Telecom equipment
transportation
Mahendra (1.15 Ton Used for Construction & Telecom equipment
23 Light Vehicle Good Condition 3
Capacity) transportation
Mahendra (1.5 Ton Used for Construction & Telecom equipment
24 Light Vehicle Good Condition 1
Capacity) transportation
25 JAC (3 Ton Capacity) Light Vehicle Good Condition 5 Used for Construction & Telecom equipment
transportation
26 JAC (2 Ton Capacity) Light Vehicle Good Condition 7 Used for Construction & Telecom equipment
transportation
27 JAC (1.5 Ton Capacity) Light Vehicle Good Condition 6 Used for Construction & Telecom equipment
transportation
28 Toyota Corolla Light Vehicle Good Condition 1 Used for transportation by project Management
29 Toyota Filder Light Vehicle Good Condition 1 Used for transportation by project Management
Satisfaction is the key
Rebuilt-Caterpillar
Satisfaction is the key
Tipper truck
Satisfaction is the key
Unload Dredger
Satisfaction is the key
GPI AsiaTel is fully equipped with all necessary tools and testing equipment and well trained
Engineers & Technician for all type of Drive Test, Cluster Drive, Benchmark, Customer Complain,
Walk Test, Site Visit & Optimization. Following are the few key equipment's that GPI AsiaTel
owns for RF Department
Particular Ammount
Current Movable Asset : 8,36,07,004 BDT
Current Immovable Asset : 32,44,44,000 BDT
Capital and on going PO : 96,50,00,000 BDT
Financial Institution Support : 35,50,00,000 BDT
Satisfaction is the key