You are on page 1of 37

Satisfaction is the key

EOI (Express of Interest)


for Construction Works
Offered
by
GPI AsiaTel to Our Valued Customer
Satisfaction is the key

Established: 8th May 2006

Services capability

GPI AsiaTel has been working in Teleco & Non-Telco sectors for more than 10-years
and now is capable of providing a full portfolio of services in Gov. & Non-Gov. Sectors
to ensure customer satisfaction maintaining the quality with lowest possible cost. We
have well experienced Engineers and site supervisors under whose guidance we can
ensure that quality, time scheduling and customer satisfaction can be achieved.

GPI AsiaTel is one of the Leading Telecom, Optical fiber & Civil Service Providers in
Bangladesh delivering Technical Support Services to Gov. & Non-Gov. Sectors
specially :

Design & Consultancy


Construction Works
Electrical Works
Installation, Testing & Commissioning
Maintenance Network
RNP & RNO, DT , VoIP Service provider
Supplying all types of Items (Telco , Medical & Civil Equipment)
Logistic support with Transportation & Warehousing
Local partner of multinational vendor’s equipment.
Outsourcing & Human Resource provider
Scope of Service & Supply for
Satisfaction is the key
Construction , RO & O&M

 Design & Consultancy


 Construction Works
 Electrical Works
 Installation, Testing & Commissioning
 Maintenance Network
 RNP & RNO, DT , VoIP Service provider
 Supplying all types of Items (Telco , Medical & Civil Equipment)
 Logistic support with Transportation & Warehousing
 Local partner of multinational vendor’s equipment.
 Outsourcing & Human Resource provider
 Mechanical Works
 Manpower Supply
 Heavy Renal Equipment
 Logistics Support
 Quality Control
 Chemical Supply
 Construction Materials Supply
 Admin Materials Supply
 Bridge Materials Supply
 Medical Equipment Supply
 Event Management
 Workshop Materials Supply
 Telecommunication Works
 Technical Consultation
 Electrical Generation & Distribution
 DB (Distribution Board) and timer for Air- Conditioner installation
 Interior Works Electrical Wiring for Office Spaces and work stations, BTS Rooms, MSC
Rooms, BSC Sites, Switching Rooms.
Satisfaction is the key

Contact & Legal Information

01. Firm Name : GPI AsiaTel


02. Current Address : Plot # 711/4 ,Road # 11, Baitul Aman Housing Society,
Adabor , Shyamoli , Dhaka-1207.
03.Registered Address : Plot # 711/4 ,Road # 11, Baitul Aman Housing Society,
Adabor , Shyamoli , Dhaka-1207.
04. e-mail : tarik.gpiasiate@gmall.com,tarik@gpiasiatel.com
04. Nature of Work : i) Telecommunication Service Provider, Exporter,
Importer & Supplier, 1st Class Contractor & Human
Resource Supplier.
05. Trade License No : 05-48571
Dhaka North city corporation, Dhaka
06.Current TIN Number : 185049338292
Previous TIN number : 085-114-5734
07. VAT number : 17061044447
BIN Number : 0001 68803-0402
08. Web Address : www.gpiasiatel.com
Location of GPI Satisfaction is the key

• Location of GPI AsiaTel’s Head Office:


• Plot # 711/4 ,Road # 11, Baitul Aman Housing Society, Adabor , Shyamoli , Dhaka-
1207.
Offices of GPI AsiaTel Satisfaction is the key

Head Offices: Picture


Plot # 711/4 ,Road # 11, Baitul
Aman Housing Society, Adabor ,
Shyamoli , Dhaka-1207.
Area: 7000+ SFT

Main Branch Offices: Picture


House # 31, Road # 01, New
Senpara Karonjai Road , Grand
Hotel More Rangpur Sodor ,
Rangpur.

Area: 3500+ SFT

House # 307, Road # 01 , Word


# 04,Jamtoli , Sirajgonj.

Area: 4000+ SFT


Satisfaction is the key

Warehouse of GPI AsiaTel


• Ware House:
Plot # 711/4 ,Road # 11, Baitul
Aman Housing Society, Adabor ,
Shaymoli , Dhaka-1207. Area:
2500 SFT
Plot#5/A,Road#12,Monsurabad
Housing, Mohammadpur, Dhaka-
1207 ; Area : 7000+ SFT

Plot# 13,R#413,Sector-
1,Purbachal ,Dhaka ;
Area : 4000 SFT

Plot # 695/17 ,Road # 11, Baitul


Aman Housing Society, Adabor ,
Shaymoli , Dhaka-1207. ;
Area: 2500 SFT
Sub-Offices of GPI AsiaTel Satisfaction is the key

Branch Offices: Picture


Mouja: Chandpur, P.O: Ahmed Nagor,
Upozila: Sadar South, Dis: Comilla.
(Laksham Road near by Hazari Pump)
Area: 850 SFT

Vill-Uttar Kuttrapara,P.O+P.S-Sarail, B-Baria,


Bangladesh
Area: 750 SFT

H.N-1004, Road-3 P/S, Shahesta Kha Para


Mekhol, Hathazari,
Dist: Chittagong.
Area: 650 SFT

3315/APC Road, Mottaka Manshon, 25


Rampur word, North Agrabad, Chittagong.

Shologhor BT Road, P.O: Chandpur,


Chandpur Sadar, Chandpur.
Hill Maintenance-Offices of GPI AsiaTel
Satisfaction is the key

Maintenance Offices: Picture


MD. Jashim Uddin, Nagar Villa,
Bangalore ghati, Safar,
Khagrachari.

Marma Unnuan Shogsad,


Matiranga, Kharachari

Md. Belayet Hossain Bhuiyan,


H#622, 2 No Patharghata,
Reserve Bazar, Rangamati Hill
district.
Md. Mannan, Bonorupa Para
Jame Mosjid, Bonorupa,
Bandarban

Md. Salam, Lichu Bagan,


Ragunia, Chittagong
All Local Offices Address of GPI AsiaTel Satisfaction is the key

Zone MP House Address


Cox`s Bazar Greeen Tower-2,Khuroskul,Cox`s Bazar
Cox’s Bazar (Vigor) Teknaf See Bize Road, konnkepara,Teknaf,Cox`s Bazar
Chakaria Fayshakhali,chakaria,Cox`s Bazar
Lohagara Polly Biddut Office, Amirabad,Lohagara,Chittagong
Lohagara (Vigor) Anwara Upazila road,Purba singahara gov.praimary
Anowara
school,Anwara,Chittagong
Hathazari IK Tower ,Anumia Showdagor Bari,Abbasiapole,Bekari Goli,Hathazari
Dhaloy (Vigor)
Fotikchori Puraton Sarkerbari,Vangadigerpar,South Rangamatia,Fotikchori

Sitakundu Sitakundu namer blazer,laboratory building,Sitakundu,Chittagong


Wahidpur (Vigor)
Rangunia Hakim,Moriumnogor chomohani,Porba shuwad bari,Rangunia,Chittagong

CTG-M (Vigor+Roll Khulshi Kulshi,Wireless,Jalalabad tower,Haque Building,Chittagong


Out) Patenga Patenga, Chittagong
Khagrachori (Vigor) Khagrachori Sopto Mia Para,Khagrachori Bas Stand,Khagrachori

Rangamati (Vigor) Rangamati Rangamati,Rejarved Bazar,Belal Saheber Basa

Bandarban (Vigor) Bandarban 6 No:Word Bonorupa Para,Jame Masjed Oposite Site,Bandarban

Cumilla (Roll Out) Sador Dokkhen Chandpur,Ahmad Nagor,Sador Dokkhen,Cumilla

Chandpur (Roll Out) Chandpur Sadar Sologhor B.T Road,chadpur,Chadpur sador,chadpur

3315/A P Si road mottaka manson,25 No:Rampur word,Nourth


Chittagong (Roll Out) Agrabad
Agrabad,Chittagong
Project On going
Satisfaction is the key
Frame Contract

Experience of Construction Activity with Supply & Services [ GPI AsiaTel ]

Location of
S/N Description Project Work Order Customer Period Status
Works.
Project 230kV Double Kalpataru Kalpataru
Construction Materials Supply
Circuit Faridpur- Power Power 2020 to till Faridpur to
1 (2.5FM Sylhet sand & 12- Ongoing
Barishal Transmission Transmission Transmission now. Barishal
16MM,4-8MM Stone)
Line Limited Limited
Project 400kV Double
Kalpataru Kalpataru
Construction Materials Supply Circuit and Associated
Power Power 2019 to till Bagura to
2 (2.5FM Sylhet sand & 12- 230kV & 132kV Ongoing
Transmission Transmission now. Rahanpur
16MM,4-8MM Stone) Bagura-Rahanpur
Limited Limited
Transmission Line
Project 400kV Double
Construction Materials Supply KEC KEC Meghnaghat
Circuit Meghnaghat- 2019 to Till
3 (2.5FM Sylhet sand & 12- International International to Ongoing
Madunaghat now.
16MM,4-8MM Stone) Limited Limited Fatikchhari
Transmission Line
Bangladesh Bangladesh
Construction Materials Supply Dhaka ,
Stone & Sand Supply Machine Tools Machine 2016 to Till
4 (2.5FM Sylhet sand & 12- Gazipur & Ongoing
etc. Factory Ltd. Tools Factory now.
16MM,4-8MM Stone) Sylhet
(BMTF) Ltd. (BMTF)
Construction of
Matarbar,m
Construction Materials Supply matarbari ultra
5 Hyundai Hyundai 2018 to 2019 oheshkhali,c Completed
(2.5FM Sylhet sand) supercritical power
ox’sbazar
plant project
ROBI Civil Construction
Construction of Tower foundation of Tower 2018 to Till All over
6 edotco edotco Ongoing
Including Design & Consultancy foundation/Obsidian now. Bangladesh
/Dismantle
Civil works for Green Field & Roof
Civil works involving
Top Tower with fabrication & Everyway/ Everyway/ All over
7 Green Field , Roof Top 2007 to 2011 Completed
Erection , Power connection & Airtel Airtel Bangladesh
sites construction
Acquisition with Solar solution
Satisfaction is the key
Project Ongoing / Completed
Obsidian Frame Contract

Experience of Telecom Dismantling & CP Disconnection [ GPI AsiaTel ]


Work Location of
S/N Description Project Customer Period Status
Order Works.
GPI AsiaTel was awarded
AirTel
by edotco for all types of
Obsidian / 2017 to All over
1 Tower Obsidian & edotco AirTel Ongoing
All types of Till now Bangladesh
Auction activities of TI ,
Dismantle
Civil ,Tower works .
GPI AsiaTel was awarded
by edotco for all types of 507_Obsidia 2019 to All over
2 edotco ROBI Ongoing
Commercial Power n till now Bangladesh
Disconnection
GPI AsiaTel was awarded
by Robi for all types of
Tower Obsidian & Share GP & ROBI 2017 to All over
3 Edotco Ongoing
Auction activities of TI , Obsidian Share Till now. Bangladesh
Civil ,Tower works .
Project Ongoing / Completed
Satisfaction is the key
HR Frame Contract
S/N Description Project Work Status Total HR
Order Engaged

1. GPI AsiaTel was awarded by ZTE for HR Full HR High Level


with Annual Frame bidding for 4- years. Support ZTE Ongoing Resources
=700+
2. GPI AsiaTel was awarded by
GrameenPhone for 6-Years Agreement HR & Grameen Ongoing 15 to 50
with HR including Rollout Roll Out Phone HR=2000+
/Swap/DT/Optimization works
3. GPI AsiaTel was involved & running the
Maintenance Support all Region During HR Edoto Ongoing Resources
the Disaster Management System of For =1600+
Edotco for PG & DG , HR Supply with Maintenance
Vehicle works at 2015 to 2017.
4. GPI AsiaTel was awarded by 2-Years HR for GP /
Agreement with Huawei for all types of BL/ROBI/ Huawei Completed Resources
Installation, Commissioning works with AirTel =2000+
Umbrella Project including HR & Tools.

5. GPI AsiaTel have awarded by Agreement HR Supply for


with Ericsson for RNO & RNP works with GP/Airtel/ Ericsson Ongoing Resources
HR & Tools ROBI DT 4 to 12
GPI was authorized service provider of
6. Anritsu & SAFT Power Systems for their HR involving SAFT & Completed 3 to 9
DC Power Systems Around 1400 sites Engr & Anritsu
Maintenance works at Banglalink Power Teams.
System (SAFT) by NSN with HR
Project Ongoing / Completed
Frame Contract Satisfaction is the key

Experience of Maintenance Services [ GPI AsiaTel ]

Location of
S/N Description Project Work Order Customer Period Status
Works.
GPI AsiaTel was awarded by O&M
VIGOR &
Refueling, Maintenance of Portable Since 2018 Services at
1 VIGOR Plus Edotco ROBI Ongoing
Genset , DG , DGoW ,PGoW with to till now Hill-Tracts &
(O&M)
HR & Logistic Support (O&M) CTG Region
GPI AsiaTel was awarded by
O&M
Refueling, Maintenance of Portable ULKA (O&M) Since 2018
2 ROBI Airtel Services at Ongoing
Genset , DG , DGoW ,PGoW with to till now
CTG Region
HR & Logistic Support
GPI AsiaTel was awarded by
O&M
Refueling, Maintenance of Portable TIGER (O&M) Since 2019
3 Banglalink Banglalink Services at Ongoing
Genset , DG , DGoW ,PGoW with to till now
CTG Region
HR & Logistic Support
GPI AsiaTel was engaged with
Disaster
Disaster Support Services with PG , 2014 to Till All over
4 Support Edotco ROBI Ongoing
Vehicle , HR , Refueling specially now. Banglaldesh
Services
Comilla , Nokahalai , CTG region
Around 1400 sites Rectifier &
Rectifier &
Battery Maintenance works at SAFT All over
5 Battery Banglalink 2009 to 2011 Completed
Banglalink Power System (SAFT) by (Malaysia) Banglaldesh
Maintenance
NSN.
GPI AsiaTel was awarded by
Bhoirab ,
Maintenance works of PG Running
6 Maintenance Huawei Huawei 2011 to 2012 Brammanbari Completed
with Manpower with Vehicle at GP
a
Umbrella Project with Huawei.
GPI was authorized service provider Authorized
of Anritsu Pte Ltd & SAFT Power service SAFT via All over
7 SAFT 2009 to 2011 Completed
Systems for their DC Power provider with NSN Banglaldesh
Systems Mintenance

10/4/2020 16
Project On going Rollout
Frame Contract Satisfaction is the key

Experience of Telecom Planning and Installation with Supply Services [ GPI AsiaTel ]

S/ Location of
Description Project Work Order Customer Period Status
N Works.
GPI AsiaTel was awarded by
6-Years Agreement with
GrameenPhone for all types All types of Roll
Grameen Grameen 2011 to Till All over
1 of Rollout Out , Swap Ongoing
Phone Phone now. Bangladesh
/Swap/DT/Optimization with with DT
Supply & Transportation
works
GPI AsiaTel was awarded by
All types of
9-Years Agreement with ROBI
Implementation
for all types of Installation, 2009 to Till All over
2 , Swap with ROBI ROBI Ongoing
Commissioning works at now. Banglaldesh
Power
Implementation Deptt. with
Management
Supply
GPI AsiaTel was awarded by
ZTE for HR & Telecom HR , Switching ,
Banglalink / 2011 to Till All over
3 installation (TI) & Network TI & Network ZTE Ongoing
Banglalion now. Bangladesh
Optimization Annual Frame Optimization
bidding for last 5- years.
Switching/TDM & Battery ,
Roll out ,
Rectifier Swap With
Switching/TDM 2010 to Till All over
4 Transportation & Logistic Banglalink Banglalink Ongoing
& Battery , now. Bangladesh
facility all over Bangladesh
Rectifier Swap
for the last 6-Years.
GPI AsiaTel was awarded by
Swap with
Agreement with Ericsson for
Installation, 2014 to Till All over
5 BTS & MW Installation, Ericsson ROBI Ongoing
Commissioning now. Bangladesh
Commissioning with Swap
10/4/2020 works 17
works for the last 3-Years.
Project On going
Frame Contract Satisfaction is the key

Experience of Telecom Planning and Installation with Supply Services [ GPI AsiaTel ]
S/ Location of
Description Project Work Order Customer Period Status
N Works.
GPI AsiaTel have awarded by
Agreement with Ericsson for ROBI/GP/AirTel 2015 to Till All over
6 Ericsson ROBI/GP/AirTel Ongoing
DT (pre & Post) works for DT & HR now. Bangladesh
last 2 years.
GPI AsiaTel was awarded by
5 Years Agreement with
edotco for all types of 2013 to Till All over
7 edotco edotco edotco Ongoing
Installation, Commissioning now. Banglaldesh
& Swap , Roll Out of Power
Management works .
GPI AsiaTel was awarded by
Bangladesh Machine Tools Bangaladesh Dhaka ,
Stone & Sand Machine Tools 2016 to Till
8 Factory Ltd (BMTFL) for 2- Machine Tools Gazipur & Ongoing
Supply etc. Factory now.
Years Agreement to supply Factory Ltd. Narayangonj
Different Items
Awarded by TeleTalk to
Installation & Dismantle of
Installation &
MW sites Reinstalled and 2016 to Till All over
9 Dismantle of TeleTalk TeleTalk Ongoing
Commissioning with Material now. Banglaldesh
MW
& Logistic all over
Bangladesh
Supply of Medical related
Supply & 2016 to Till
10 Equipment’s/Parts to PG BSMMU PG Hospital Dhaka Ongoing
Installation now.
Hospital /BSMMU , Dhaka
GPI AsiaTel was awarded by
edotco for all types of Site AirTel Obsidian
2017 to Till All over
11 Obsidian & Auction activities / All types of edotco edotco Ongoing
now. Bangladesh
of TI , Civil ,Tower , SAQ, Dismentle
Power works .
Project On going/Completed Satisfaction is the key
Frame Contract

Experience of Telecom Planning and Installation with Supply Services [ GPI AsiaTel ]
Location of
S/N Description Project Work Order Customer Period Status
Works.
IT Service &
GPI AsiaTel was awarded by IT
Different Medical
Service & Different Medical 2014 to Till Dhaka &
12 Instruments & AC NPTI /SPACE NPTI /SPACE Ongoing
Instruments & AC Supply with now. Jessore
Supply with
Maintenance & Civil works.
Maintenance
GPI AsiaTel was awarded by Swap with
Agreement with Ericsson for Installation, All over
13 Ericsson GP/AirTel 2015 to 2016 Completed
Installation, Commissioning Commissioning Banglaldesh
works. works
GPI AsiaTel was awarded by
Supply of
Alkatel-Lucent Supply of
14 Different Items of Alkatel-Lucent Alkatel-Lucent 2009 to 2017 Dhaka Completed
Different Items of Parts of SAFT
Parts of SAFT
from Malaysia
GPI AsiaTel was awarded by 2-
Installation,
Years Agreement with Huawei Banglalink, All over
15 Commissioning & Huawei 2011 to 2012 Completed
for all types of Installation, ROBI, AirTel, Banglaldesh
Swap works
Commissioning works
GPI AsiaTel was awarded &
completed by the Agreement Nokia Siemens All over
16 Rollout works ROBI 2014 to 2015 Completed
with NSN for Rollout works for Network Banglaldesh
2-year
Power System(SAFT/Eltek) Swap Power
& Battery Swap with New Roll System(SAFT/Elt All over
17 Banglalink Banglalink 2009 to 2011 Completed
out at different Region all over ek) Swap & Bangladesh
Bangladesh Battery Swap
Project Completed Satisfaction is the key
Frame Contract

Experience of Telecom Planning and Installation with Supply Services [ GPI AsiaTel ]

Location of
S/N Description Project Work Order Customer Period Status
Works.

GPI AsiaTel was awarded by


Agreement with Ericsson for Installation & All over
18 Ericsson AirTel 2015 to 2016 Completed
Installation, Commissioning Swap Project Banglaldesh
works

Agreement for Civil works


Civil works
involving Green Field , Roof Top Everyway/Airtel Everyway/Airtel
involving Green All over
19 sites construction with Tower /Power Trade /Power Trade 2007 to 2011 Completed
Field , Roof Top Banglaldesh
fabrication , Power connection & /Raf-Raf /Raf-Raf
sites construction
Site Acquisition & Solar solution

Installation &
Survey with Power Connection Commissioning
All over
20 and Installation & Comm ,Dismentle and Warid Warid 2010 to 2011 Completed
Banglaldesh
,Dismentle of TI Survey with
Power Connection

Installation &
Installation & Comm ,Dis &
Commissioning GP / All over
21 Swap of MW , A-Bis, HR-Supply NEC 2015 to 2016 Completed
,Dismentle & Bangllaink Banglaldesh
for 2-Years Agreement.
Swap of MW

Installation &
Installation & Comm ,Dismentle Commissioning GP / All over
22 NourBangla 2015 to 2016 Completed
for 2-Years Agreement. ,Dismentle of Bangllaink Banglaldesh
MW & BTS
Organogram for Telco _GPI AsiaTel

Proprietor CEO Satisfaction is the key

High level support


General Manager CTO

Project
Project Manager Support Teams

APM

Project Finance
Documentation Specialist Secretary Manager

Admin Manager
Project
Implementation Team QA/QC Implementation Team Survey Team
Supervision Mgmt

Procurement Manager
PS Engineer - 1 Survey Engr-1

Commissioning Engr. 1 PS Engineer - 2 QA Engineer.. Survey Engr-2


Logistics
Manager
PS Engineer - 3 Survey Engr-3

Quality
Commissioning Engr. 2 Survey Engr-4..
PS Engineer – 4… Controller..
Delivery Technicians..

Commissioning Engr. 3

Commissioning Engr. 4…

GPI AsiaTel Field Teams [Team Leader, Technicians]

10/4/2020 21
Organogram Of HR (Civil Construction ) GPI AsiaTel Satisfaction is the key

10/4/2020 22
Organogram Tools & Vehicle GPI AsiaTel Satisfaction is the key

10/4/2020 23
Organogram Office (Civil Construction ) GPI AsiaTel Satisfaction is the key

10/4/2020 24
Organogram for Construction & Maintenance
by GPI AsiaTel Satisfaction is the key
Office Stuff & Team Information Satisfaction is the key

SL Department QTY
1 Management 04
2 Admin 05
3 HR 05
4 Finance 07
5 Billing 08
6 Logistics 12
7 Documentations 14
8 Co-coordinator 16
9 APM 11
10 PM 07
11 Engineer 62
12 SAE 18
13 Team Supervisor 09
14 Team Leader 69
15 Technician 178
16 ZTE 52
i) Total Civil Construction Installation & Commissioning 477
Permanent HR
ii) Total Planning /DT HR 11
iii) Total O&M [Permanent=47 + Contractual=290+] 357
(i+ii+iii) Grand Total Human Resource 845
( Permanent + Contractual )
Vehicle & Equipment List Satisfaction is the key

Sl no Name Type Present Status QTY Remarks

Asphalt Base Mix Plant


1 (90 ton to 120-ton Heavy Vehicle Good Condition 1 Used for Heavy Construction Work
Capacity)
Asphalt Drum Mix Plant
2 (60 ton to 90-ton Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
Capacity)
3 Paver Heavy Vehicle Good Condition 3 Used for Heavy Construction Work

4 Bitumen Distributer Heavy Vehicle Good Condition 7 Used for Heavy Construction Work

5 Dump-Trucks (10 Wheel) Heavy Vehicle Good Condition 8 Used for Heavy Construction Work

6 Dump-Trucks (6 Wheel) Heavy Vehicle Good Condition 8 Used for Heavy Construction Work

7 Mini Excavator Heavy Vehicle Good Condition 2 Used for Heavy Construction Work

8 Pay-Loader Heavy Vehicle Good Condition 3 Used for Heavy Construction Work

9 Grader Heavy Vehicle Good Condition 2 Used for Heavy Construction Work

10 Dozer Heavy Vehicle Good Condition 3 Used for Heavy Construction Work

11 Heavy Excavator Heavy Vehicle Good Condition 2 Used for Heavy Construction Work

12 Tire Roller Heavy Vehicle Good Condition 3 Used for Heavy Construction Work

13 Soil Compactor (10 Ton) Heavy Vehicle Good Condition 2 Used for Heavy Construction Work

14 3 Wheel Steel Roller Heavy Vehicle Good Condition 2 Used for Heavy Construction Work

15 Tandem Roller Heavy Vehicle Good Condition 2 Used for Heavy Construction Work

16 Water Tanker Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
Vehicle & Equipment List
Satisfaction is the key

Sl no Name Type Present Status QTY Remarks

17 Backhoe Heavy Vehicle Good Condition 2 Used for Heavy Construction Work

18 Crane 25 Ton Heavy Vehicle Good Condition 2 Used for Heavy Construction Work

19 Concrete Batching Plant Heavy Vehicle Good Condition 2 Used for Heavy Construction Work

20 Concrete Mixer Truck Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
Hydraulic Rotary Rig
Machine (600mm to
21 Heavy Vehicle Good Condition 2 Used for Heavy Construction Work
2500mm Capacity, 86m
Depth & Self-Weight 70MT)

22 JAC (1.5 Ton Capacity) Light Vehicle Good Condition 3 Used for Construction & Telecom equipment
transportation
Mahendra (1.15 Ton Used for Construction & Telecom equipment
23 Light Vehicle Good Condition 3
Capacity) transportation
Mahendra (1.5 Ton Used for Construction & Telecom equipment
24 Light Vehicle Good Condition 1
Capacity) transportation
25 JAC (3 Ton Capacity) Light Vehicle Good Condition 5 Used for Construction & Telecom equipment
transportation
26 JAC (2 Ton Capacity) Light Vehicle Good Condition 7 Used for Construction & Telecom equipment
transportation
27 JAC (1.5 Ton Capacity) Light Vehicle Good Condition 6 Used for Construction & Telecom equipment
transportation
28 Toyota Corolla Light Vehicle Good Condition 1 Used for transportation by project Management

29 Toyota Filder Light Vehicle Good Condition 1 Used for transportation by project Management
Satisfaction is the key

Rebuilt-Caterpillar
Satisfaction is the key
Tipper truck
Satisfaction is the key

Unload Dredger
Satisfaction is the key

Installation , Commissioning & Maintenance Tools


GPI AsiaTel is fully equipped with all necessary tools and testing equipment and well trained
Engineers and team leaders for installation, testing and commissioning of BTS, BSC, MW in
Telecommunication and Power system. Following are the few key equipment's that GPI
AsiaTel owns
Item Discription Quantity
Laptop 281
Site Master 08
Power Meter 07
Test Mobile 112
GPS 41
Digital Camera 218
Binocular 82
BTS & MW Installation Tool Box (Complete Set) 197
Digital Earth Tester 05
BER Tester 08
OTDR ( Can be managed as per Customer demand ) 02
Splicing Machine ( Can be managed as per Customer demand ) 02
TEMS Investigation Tools: 15(set)
Planning & DT Tools Satisfaction is the key

GPI AsiaTel is fully equipped with all necessary tools and testing equipment and well trained
Engineers & Technician for all type of Drive Test, Cluster Drive, Benchmark, Customer Complain,
Walk Test, Site Visit & Optimization. Following are the few key equipment's that GPI AsiaTel
owns for RF Department

Item Discription Quantity


ASCOM TEMS Investigation (TEMS 11.0.4, TEMS 15.3 & TEMS 16) 15
Laptop 52
Handsets (Samsung Galaxy S5, Samsung Galaxy S4, Sony Xperia, Sony 55
Ericcson W995, Sony Ericsson K800i, Sony Ericsson K790)
USB GPS 45
USB Data Card 45
USB Hub 30
Mouse 42
Digital Camera 45
Pen drive 45
Compass 45
Power Inverter 42
Vehicles support 32

Note: Tools can be increased as per customer requirements.


Satisfaction is the key
Last Three Financial Year Revenue of GPI AsiaTel

Financial Year Revenue (BDT)


Year Ended 30 June,2019 =
Fiscal Year: 1st July ,2018 to 30th June,2019
1,204,621,879.00
Calendar Year:2018- 2019

Financial Year Revenue (BDT)


Year Ended 30 June,2018 =
Fiscal Year: 1st July ,2017 to 30th June,2018
1,163,435,876.00
Calendar Year:2017- 2018

Financial Year Revenue (BDT)


Year Ended 30 June,2017 =
Fiscal Year: 1st July ,2016 to 30th June,2017
858,515,500.00
Calendar Year:2016- 2017

Particular Ammount
Current Movable Asset : 8,36,07,004 BDT
Current Immovable Asset : 32,44,44,000 BDT
Capital and on going PO : 96,50,00,000 BDT
Financial Institution Support : 35,50,00,000 BDT
Satisfaction is the key

RF Sample by GPI AsiaTel


Satisfaction is the key
Dhaka City Benchmark
Some Work Footage Satisfaction is the key
Some Work Footage Satisfaction is the key
Satisfaction is the key

You might also like