You are on page 1of 8

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

TABLE OF CONTENTS
SHEET REVISION CONTENTS REVISION INFO
1 CONTENTS AND INDEX LIST
2 MAIN CABINETS WIRING
3 EMERGENCY STOP BUTTON OF CTRL PANELS
4 POWER SUPPLY OF CONTROL SYSTEM
5 A CARTRIDGES INJECTION OPTION 2007-06-27 LDF 1X1.36,37,38,39 and Y59 deleted
6 EXTERNAL PUMP BUTTON
7 1-BOOM HOLDING MAGNETS
8 INFLATED BOLT OPTION

NOTICE! This document is the exclusive


DATE NAME ROBOLT 5 THC560 CONTROL SYSTEM 1 / 8
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2006-04-24 PCH CONTROL CIRCUIT DIAGRAM
SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
of subject matter thereof without the
CHECKED 2006-08-03 PCH
CONTENTS AND INDEX LIST DWG NR 3-77012796-A
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED 2006-08-03 AP CONTROL_ POSITION 1JB102 ID-CODE 77012796
3-77012796-A
30
29

77012796
8
2 /
28

ID-CODE
DWG NR
SHEET
27

ROBOLT 5 THC560 CONTROL SYSTEM


26

WY415 3x0.75 GONFLAGE JOINT (OPTION)


Y415 SEAL BLOWING UP (OPTION)
25

WY414 3x0.75 GONFLAGE BOULON (OPTION)


1W93 3x1.5 Y414 BOLT BLOWING UP (OPTION)
MAIN CABINETS WIRING

WY410 3x0.75 POMPE Hte PRESSION (OPTION)


Y410 HIGH PRESSURE PUMP (OPTION)
24

WY75 3x0.75 VANNE INHIBITION CONTROLES HYDRAU (OPTION)


Y75 DRILLING CONTROLS INHIBITING VALVE (OPTION)
1THC

WY58 3x0.75 AUTORISATION MOUVEMENTS CANULE (OPTION)


Y58 INJECTION TUBE MOVEMENT ALLOWED (OPTION)
1JB102
23

1W94 50x1 WY41 3x0.75 FERMETURE PINCE MECHE (OPTION)


1X102
Y41 ROD CLAMP CLOSED (OPTION)
WY40 3x0.75 OUVERTURE PINCE MECHE (OPTION)
Y40
QN

SW

ROD CLAMP OPENED (OPTION)


22

WS812 3x1.5 FILTRES COLMATES/POMPE Hte PRESSION (OPTION)


S812 FILTERS CLOGGED/HIGH PRESSURE PUMP (OPTION)
W42 7x0.5+C WS809 2x1.5 GONFLAGE OK (OPTION)
S809 BLOWING UP OK (OPTION)

CONTROL CIRCUIT DIAGRAM


WS20 2x1.5 TETE AVANT EN POSITION FORATION (OPTION)
21

S20 FRONT HEAD IN DRILLING POSITION (OPTION)


WS19 3x1.5 TETE AVANT EN POSITION INJECTION (OPTION)
S19

POSITION
FRONT HEAD IN INJECTION POSITION (OPTION)
1WS190 2x1.5
20

HORAMETRE FRAPPE
p

1S190 PERCUSSION HOURMETER

CONTROL_
19
18

36x1.5

NAME
PCH
PCH
AP
1W102
17

DRAWN BY 2006-04-24
CHECKED 2006-08-03
APPROVED 2006-08-03
DATE
16

NOTICE! This document is the exclusive

returned on request. The document must


not be copied, reproduced, disclosed to
any third party or used in manufacture
of subject matter thereof without the
property of Sandvik and it must be

prior written consent of Sandvik.


15

ELECTRICAL SWITCHGEAR
ARMOIRE PRINCIPALE
14

MP

Copyright © Sandvik Mining and Construction


13

SANDVIK
12
11
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

(OPTION)
UNIT CONTROL
CENTRAL GREASING
CONTROL PANEL
BUTTON OF
EMERGENCY STOP
POSTE OPERATEUR
D’URGENCE
BOUTON ARRET

AUTO/MANUAL USE
WATER PUMP CONTROL
POMPE A EAU
COMMANDE AUTO/MANU

AUTO/MANU USE
COMPRESSOR CONTROL
COMPRESSEUR
COMMANDE AUTO/MANU

RESET
PRESSURE SWITCH
AIR/WATER
PRESSOSTATS AIR/EAU
REMISE A ZERO

SWITCH
START-STOP
POWERPACK
POWERPACK
MARCHE-ARRET
COMMUTATEUR

(OPTION)
GRAISSAGE
CENTRALE DE
MP
X500 526 X500 577 X500 506 X500 510 X500 509 X500 512 X500 511 X500 513 X110 17 1X110 131 1X110 130 X500 573 X500 574 X500 501

1W102 01 1W102 02 1W102 03 1W102 17 1W102 18 1W102 19 1W102 20 1W102 21 1W102 04 1W102 06 1W102 05 1W102 24

1X102 A11X102 A21X102 A3 1X102 B71X102 B8 1X102 B91X102 B10 1X102 C1 1X102 A41X102 A6 1X102 A51X102 C2 1X102 C3 1X102 C4
A1 A2 A3 B7 B8 B9 B10 C1 A4 A6 A5 C2 C3 C4

1X1 1 1X1 2 1X1 3 1X1 17 1X1 18 1X1 19 1X1 20 1X1 21 1X1 4 1X1 6 1X1 5 1X1 22 1X1 23 1X1 24

1JB102

1W94 01 1W94 02 1W94 03 1W94 17 1W94 18 1W94 19 1W94 20 1W94 21 1W94 04 1W94 06 1W94 05 1W94 22 1W94 23 1W94 24

1X94 1 1X94 2 1X94 3 1X94 17 1X94 18 1X94 19 1X94 20 1X94 21 1X94 4 1X94 6 1X94 5 1X94 22 1X94 23 1X94 24
1 2 3 17 18 19 20 21 4 6 5 22 23 24

1.3 2.1 0 1 S 2.1 1.3 0 1 S 2.1 1.3 2.1 0 1 S 2.1 1.3

1.4 2.2 2.2 1.4 2.2 1.4 2.2 2.2 1.4


1S77 SH501 SH502 S505 1SH78

1/704
7/12

1JB94 1 2
3 1
SH501 0 STOP
SH502 1 RUNNING
1S78 S START
4 2

NOTICE! This document is the exclusive


DATE NAME ROBOLT 5 THC560 CONTROL SYSTEM 3 / 8
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2006-04-24 PCH CONTROL CIRCUIT DIAGRAM
SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
of subject matter thereof without the
CHECKED 2006-08-03 PCH
EMERGENCY STOP BUTTON OF CTRL PANELS DWG NR 3-77012796-A
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED 2006-08-03 AP CONTROL_ POSITION ID-CODE 77012796
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

BY ELEC/DIESEL
DRILLING POWERED

ELEC/DIESEL
FORATION MODE

SWITCH GEAR
OF MAIN
CONTROL FUSES
PRINCIPALE
DE L’ARMOIRE
DISJONCTEURS

HOURMETER
PERCUSSION
FRAPPE
HORAMETRE
COLOURS
BU = BLUE
BR = BROWN
BK = BLACK
WH = WHITE
GY = GRAY
PK = PINK
TR = TRANSPARENT
VI = VIOLET
YE = YELLOW
GR = GREEN
Y/G = YEL/GRE
RD = RED

1X102
MP-X450 F451.2 1W102 14 B4 B4
MP
1X102 1/710 4/12
MP-1X110 122 1W102 07 A7 A7
X500 591 X500 592 X500 593
MP-F451.1 1X102
1 2 MP-1X110 121 1W102 10 A10 A10 1/712 4/12
10A
1W102 34 1W102 35 1W102 36

1X102 D4 D5 D6 1X1 13
D4 D5 D6 1/8 6/11
1WS190 01

1THC- 13
1S190 p
1X1 34 1X1 35 1X1 36 14

1WS190 02
1JB102 +24VDC 1X1 14

MAIN PANEL POWER SUPPLY


-0VDC
1W94 34 1W94 35 1W94 36 1X102
MP-1X110 124 1W102 11 B1 B1

ALTERNATIVES
1X102
KVL MP-X500 557 1W102 09 A9 A9
1X94 34 1X94 35 1X94 36
34 35 36 MP-X500 1V582K

2 1 SLU 1X102
S6 1 3 MP-X500 584 1W102 08 A8 A8
1 2 1.3 2.1
1 X DRILLING POWERED
1.4 2.2
2 X BY DIESEL
2 4
1X102
1W102 13 B3 B3

1JB94 1X102 1/702 4/12


MP-X500 501 1W102 12 B2 B2 1X1 12

OPTION DIESEL/DIESEL-ELEC

NOTICE! This document is the exclusive


DATE NAME ROBOLT 5 THC560 CONTROL SYSTEM 4 / 8
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2006-04-24 PCH CONTROL CIRCUIT DIAGRAM
SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
of subject matter thereof without the
CHECKED 2006-08-03 PCH
POWER SUPPLY OF CONTROL SYSTEM DWG NR 3-77012796-A
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED 2006-08-03 AP CONTROL_ POSITION 1JB102 ID-CODE 77012796
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

(OPTION)
INHIBITING VALVE
DRILLING CONTROLS
(OPTION)
CONTROLES HYDRAU
VANNE INHIBITION

(OPTION)
IN THE HOLE
INJECTION TUBE
(OPTION)
AVANCE CANULE
(OPTION)
OUT THE HOLE
INJECTION TUBE
(OPTION)
RECUL CANULE

(OPTION)
MOVEMENT ALLOWED
INJECTION TUBE
(OPTION)
MOUVEMENTS CANULE
AUTORISATION

(OPTION)
POSITION
IN DRILLING
FRONT HEAD
(OPTION)
FORATION
EN POSITION
TETE AVANT
(OPTION)
POSITION
IN INJECTION
FRONT HEAD
(OPTION)
INJECTION
EN POSITION
TETE AVANT

(OPTION)
POSITION
IN INJECTION
FRONT HEAD
(OPTION)
INJECTION
EN POSITION
TETE AVANT
INJECTION
CARTOUCHES/
CARTRIDGES
INJECTION
OPTION

3/30
1/710 1X1 16 1/714 6/11
1X1 11 1/711 7/12
3/30
1/712 1W94 16 ONLY IF
RESIN INJ. IS NOT
16 WS19 01
1X94
16
1JB94
11 13 11 13 21
1 2
1K72.1 S114 1K72.3 S19 p
23 26
14 12 14 14 12 14 22

WS19 02 03
S533
4 3 3
4 2
2 4 4
WS20 01
37 38 39
1X94 37 38 1X94 39
21 11
S20 p 1K72.2
24
22 14 12
1W94 37 38 1W94 39

WS20 02

1X1 37 1X1 38 1X1 39 1X1 25

WY75 BR
WY40 BR WY58 BR
11 13 W42 03
WY41 BR
Y75 Y40 Y41 Y58 1XV6 1XV7
BR BR BR BR 12 14

1 1 1 1 30
A1 A1 A1 QN- YE
2 2 2 2 1K72.1 1K72.2 1K72.3 H20
A2 A2 A2 31
W42 07
BU BU BU BU 1/703 6/11

WY75 BU WY40 BU WY58 BU

1/702 WY41 BU 1X1 24 1/702a 6/11


3/30 1X1 12

14 11 13 14 11 25 14 11 23
12 12 12
1K72.1 1K72.2 1K72.3

NOTICE! This document is the exclusive


DATE NAME ROBOLT 5 THC560 CONTROL SYSTEM 5 / 8
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2006-04-24 PCH CONTROL CIRCUIT DIAGRAM
SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
of subject matter thereof without the
CHECKED 2006-08-03 PCH
CARTRIDGES INJECTION OPTION DWG NR 3-77012796-A
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED 2006-08-03 AP CONTROL_ POSITION 1JB102 ID-CODE 77012796
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

(OPTION)
EXTERNAL PUMP
(OPTION)
POMPE EXTERNE

(OPTION)
TEST
EXTERNAL PUMP
(OPTION)
EXTERNE
TEST POMPE
MP
X500 539 X500 541 X500 537 X500 544 X500 508 X500 547 X500 546

1W102 26 1W102 27 1W102 28 1W102 29 1W102 30 1W102 31 1W102 32

C6 C7 C8 C9 C10 D1 D2
1X102 C6
1X102 1X102
C7
1X102
C8 C9
1X102 C10
1X102 D1
1X102 D2

1X1 26 1X1 27 1X1 28 1X1 29 1X1 30 1X1 31 1X1 32

1W94 26 1W94 27 1W94 28 1W94 29 1W94 30 1W94 31 1W94 32

1X94 26 1X94 27 1X94 28 1X94 29 1X94 30 1X94 31 1X94 32


26 27 28 29 30 31 32
1JB94

S503 1.3 2.1 S504 1.3 2.1


0 1 S 1 0 2

1.4 2.2 1.4 2.2

12 1 2
3 1 3 1
0 2
S503 1 X S504 0 X
S XX 1 XX
4 2 4 2

NOTICE! This document is the exclusive


DATE NAME ROBOLT 5 THC560 CONTROL SYSTEM 6 / 8
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2006-04-24 PCH CONTROL CIRCUIT DIAGRAM
SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
of subject matter thereof without the
CHECKED 2006-08-03 PCH
EXTERNAL PUMP BUTTON DWG NR 3-77012796-A
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED 2006-08-03 AP CONTROL_ POSITION ID-CODE 77012796
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

(OPTION)
INDICATOR LIGHT
SLU OIL FLOW
(OPTION)
HUILE SLU
VOYANT DEBIT

PERCUSSION
FRAPPE

(OPTION)
SLU OIL FLOW
(OPTION)
DEBIT HUILE SLU
FEED
POUSSEE

ROTATION
ROTATION
3/30
1/8
4/30
1/714
24VDC 1X1
7
1W94 07
1X94 7
1 2 7
1S73 1 1
1S73
M X M A B 1.1 2.1
A XX
B X
IS NOT
ONLY IF SLU
1.2 2.2
1K73 11 1 2
27 10 9
12 14
RETURN AUTO 1X94 10 1X94 9
M=OFF
A=HOLDING 1W94 10 1W94 09
B=RELEASE
FEED/PERCUSSION 1X1 10 1X1 9

1X1 8
1W93 02

1JB93 1 1JB93-1X1 1 1JB93-1X1 2


W42 01
-1X1
1S70 1S71 1S72
10 BK BK BK BK BK BK
20
QN- 1XV5
1H72 31 9 BK BK BK BK BK BK
1JB93 1JB93 1JB93
-1X1 3 -1X1 3 -1X1 3 A1
+1THC 1K73
W42 07

1W93 03 A2
1/703
4/30
1/703a 7/12
1/702a 1X1 12 1/702b
4/30 7/12

14 11 14
ELECTRO-AIMANTS DE MAINTIEN DES JOYSTICKS 12
HOLDING MAGNETS OF THE JOYSTICKS
1K73

NOTICE! This document is the exclusive


DATE NAME ROBOLT 5 THC560 CONTROL SYSTEM 7 / 8
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2006-04-24 PCH CONTROL CIRCUIT DIAGRAM
SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
of subject matter thereof without the
CHECKED 2006-08-03 PCH
1-BOOM HOLDING MAGNETS DWG NR 3-77012796-A
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED 2006-08-03 AP CONTROL_ POSITION 1JB102 ID-CODE 77012796
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

(OPTION)
FILTERS CLOGGED
(OPTION)
FILTRES COLMATES

(OPTION)
HIGH PRESSURE PUMP
(OPTION)
POMPE Hte PRESSION

(OPTION)
SEAL BLOWING UP
(OPTION)
GONFLAGE JOINT

(OPTION)
BOLT BLOWING UP
(OPTION)
GONFLAGE BOULON

(OPTION)
BLOWING UP OK
(OPTION)
GONFLAGE OK
BOULON EXPANSIF/
INFLATED BOLT
OPTION

4/30
1/711 1X1 37
WS812 01

11 13
p S812 WS809 01

12 14
WS812 02 WS812 03
1X1 40 1X1
41
1W94 41 S809 13

INFLATED BOLT SWITCH 1X94 41 1JB94 p


M=INFLATING OFF 1 2 41
14
A=SEAL BLOWING UP 3 1
SH810
B=BOLT BLOWING UP M
M A B 2.1 1.3
A X WS809 02
COMMUTATEUR GONFLAGE B XX 2.2 1.4
M=ARRET GONFLAGE 4 2
A=GONFLAGE JOINT 42 43 1X1 15
B=GONFLAGE BOULON 1X94 1X94 43
42
1W94 42 1W94 43
1XV8 1X1 42 1X1 43
1W94 15
C6
1X102
C6
1W102 33 15
1X94
WY410 BR WY415 BR WY414 BR
1JB94 15
W42 02
MP- 538
X500 Y410 Y415 Y414
BR BR BR

25 1 1 1 X1
QN- YE SH810 GR
H812 2 2 2
31 X2

BU BU BU
WY410 BU WY415 BU WY414 BU

2/30
1/704
1/703a
6/30
6/30
1/702b 1X1 12

NOTICE! This document is the exclusive


DATE NAME ROBOLT 5 THC560 CONTROL SYSTEM 8 / 8
SANDVIK property of Sandvik and it must be
returned on request. The document must
DRAWN BY 2006-04-24 PCH CONTROL CIRCUIT DIAGRAM
SHEET
not be copied, reproduced, disclosed to
any third party or used in manufacture
of subject matter thereof without the
CHECKED 2006-08-03 PCH
INFLATED BOLT OPTION DWG NR 3-77012796-A
Copyright © Sandvik Mining and Construction prior written consent of Sandvik. APPROVED 2006-08-03 AP CONTROL_ POSITION 1JB102 ID-CODE 77012796