You are on page 1of 12
JGG CORPORATION Job Code 0-7577-20 EEGRSUGE ALGERIA S.p.A | Owner's Doc. No. SONATRACH Contractor's Doc. sooo aie HASSI R'MEL BOOSTING No. $-3000-3160-007 PHASE Ill PROJECT Soot ; = 7 SONATRACH Activité E&P Péle Exploitation & Production Division Production Direction Régionale Hassi-R’mel REALISATION DES INSTALLATIONS DE SEPARATION ET DE COMPRESSION ENTREE BOOSTING PHASE III Contract N° : E/05/SH/E-P/DP/HR/2016 CONSTRUCTION PROCEDURE FOR FIELD PSV TESTING FOR CONSTRUCTION For Approval T.Sakaue | T.Sakave | TSakave 10-SEP-2019 | ALL TSakaue | TSakave | TSakave | o7-oct-2019 | 3,4,6,11 For Construction REV. DATE PAGE | ISSUE PURPOSE/DESCRIPTION | PREP'D | CHK'D | APPD A ° 1/22 EEERMUGC ALGERIA S.p.A SONATRACH HASSI R'MEL BOOSTING PHASE IIl PROJECT | Owners Doc. No. _| CONSTRUCTION PROCEDURE | Contractor's Doc. No. ‘S-3000-3160-007 FOR FIELD PSV TESTING Sheet 2 LoF [ 21 INDEX 4. SCOPE... 2. STANDARD REGULATION AND CODES. 3. SAFETY 3 4, ABBREVIATION & DEFINITION. 5. PRESSURE RELIEF VALVE STORAGE AND HANDLING.. 5.1 Storag 52 Handing Visual Inspection Before Performance Test. 7.2 Performance Test.. 8. SEAT TIGHTNESS TEST. 8.1 Test Medium 82 Test Pressure. 8.3 Test Method... 84 Acceptance Criteria. 9. DOCUMENTATION. 10. VALIDITY... 41. ATTACHMENTS. 11.1. ANNEX-1 Acceptance Criteria for Seat Tightness ou 11.2. ANNEX-2 Master PSV List for Poping Test. qo wt \ 2/22 SONATRACH EEEESUBG ALGERIA S.p. HASSI RMEL BOOSTING PHASE Il PROJECT BEE] UGG CORPORATION |—ommers Dos. No. CONSTRUCTION PROCEDURE _| Contractor's Doc. No. ‘$-3000-3160-007 FOR FIELD PSV TESTING Sheet 3 OF 21 ‘SCOPE This document describes the CONTRACTOR’s Field Test Procedure for Field PSV Test (Popping Test! Function Stability Test and Seat Tightness) of Pressure Relief Valve for HASSI R'MEL BOOSTING PHASE Ill PROJECT. Valves shall be subject to Algerian government (DGM) inspection in accordance with the project ‘specification $-3000-1670-301. DGM inspector will attend the field test of these valves. The testing shall not be conducted without DGM inspector's attendance. Valves of skid-mounted type (already installed / mounted on fabricated package equipment) is not subject to DGM inspection, ‘This procedure covers both PSV series RE & RPS. 2 STANDARD REGULATION AND CODES Work shall be in accordance withthe latest revision of all applicable Codes, Standards Specification ‘and Regulation isted below. The term “atest revision” shal be interpreted as the revisions including ‘addenda of the publications effective on the date of purchase order or contract award. Except as modified by the requirements specified herein or the details of the drawings, all Work governed by the ‘Specification shall comply with the applicable provisions of the referenced publications. Code and Project Specification API STD 526 Flanged Steel Pressure-relief Valves API STD 827 ‘Seat Tightness of Pressure Relief Valves ASME BPV Code Sec VII Rules for Construction of Pressure Vessels ‘$-3000-1366-501 ‘SPECIFICATION FOR PRESSURE RELIEF VALVES. ‘$-3000-1670-001 Field Quality Control Plan and Procedure '$-3000-1670-301 REQUIREMENTS FOR FIELD INSPECTION BY ALGERIAN ‘AUTHORITY $-3000-1676-502 Inspection and Test Plan for Pressure Relief Valve at Field V-2166-501-A-801 Installation, Operation and Maintenance Manual 3 SAFETY ‘+ Be careful not to stand in front of outlet side of safety relief valve during inspection. ‘+ Puton the earplug, protective glasses and other safety protectors during inspection, Test bench should have valid 3° party certificate including related part (Air reserve, Pressure 3/22 ATEEREUGC ALGERIA S.p-A SONATRACH HASSI R'MEL BOOSTING PHASE Ill PROJECT UGG GORPORATION |—owners Dos. No- T CONSTRUCTION PROCEDURE | Contractor's Doc. No. '$-3000-3160-01 FOR FIELD PSV TESTING Sheet 4 recoreder...) ‘® Test bench must be barricaded area, and allowed only authorized person's entry. 4. ABBREVIATION & DEFINITION Owner SONATRACH La Société Nationale pour la Recherche, la Production, le Transport, la ‘Transformation et la Commercialisation des Hydrocarbures Dcm : General Direction of Mines CONTRACTOR The Consortium JGC CORPORATION / JGC Algeria SUBCONTRACTOR: —_The person, firm or corporation to whom the Purchase Order is issued (GTP, REC, SARPI etc) 5. PRESSURE RELIEF VALVE STORAGE AND HANDLING 541 Storage To ensure use of the safety valve in the best condition at all times, make sure to store it as specified below. ® Donot remove protective sheets (guard packs) or plastic plugs from the inlet/outlet of the safety valve before it is mounted on piping or the like. @ Store the safety valve on a fiat interior floor of 50°C max. not exposed to direct sunlight, high temperature and humidity. @ Store the safely vaive as erected. Otherwise, poor seat tightness or unstable operation may be caused. ® Donot place anything on the safety valve. Presence/absence of dent Presence/absence of rust or the like Sealing wires 5.2 Handling te eho carefully while strictly observing the following items \he \ Presence/absence of inlet/outlet protective sheets (guard packs) or plastic plugs 4122 107 OF 2 | SONATRAGH Basa. HiASSIRMEL BOOSTING SHAGE Il PROJECT UGE CORPORATION | oyiners Doc. No. CONSTRUCTION PROCEDURE | Contractor's Doc. No. 'S-3000-3160-007 FOR FIELD PSV TESTING Sheet 5 | OF 21 @ _Be careful not to apply vibrations to the safety valve during its transportation as much as possible. © Confirm that both inlet of PSV was protected by guard pack to prevent the foreign gets into inside Of the valve during issuance to site for erection or for popping shop (Figure 01) ® Ensure that the flange gasket surface of the safely valve may not be damaged during its transportation, ® When lifting the safety valve, do not set a rope or hook against a lever of the safety valve with the lever or inside of the bonnet. ® During field installation temporary blind gasket should be installed to avoid any foreign substance Fig. 01 6 TESTBENCH Test bench and pressure gauge shall be given an individual reference number and calibrated with rized testing company duly recogni thority. Certificate Number shall be recorded, and certificate shall be attached in Test Report. BBe sure to conduct the required inspections on the test bench meeting the following requirements. © The test bench shall be internally clean, free of sand, dust, rust and other defects. Otherwise, foreign matters are caught by seat surface during operational tests and leakage from the seat surface may be caused. (@_Use-2 pieces of accurate prossure-gauges-of proper pressure-range; @ Test bench should provide different PG range to make the reading more clear @ The test bench should be provided by pressure recorder ‘The test fluid shall be ordinary-temperature dry air or nitrogen. - © The chamber shall be of volume shown in the below Table-1 z 5/22 sounrnacn SGOENGG ALGERIA DLA | scsi mer oct Ne tse prover GG] JBC CORPORATION ‘Owner's Doc. No. CONSTRUCTION PROCEDURE _| Contractor's Doc. No. FOR FIELD PSV TESTING ‘$-3000-3160-007 Sheet 6 | OF 2 Table-1 Recommend Chamber Volume Cold differential test pressure Recommended chamber volume <25MPa 20L, >2.5MPa oat ® Opening of 20 mm min. in diameter shall be provided between the chamber and the safety valve inlet ® 80-mesh min. fiter shall be provided at the chamber inlet. ® Secure mounting of the safety valve shall be available, Recommended test bench specifications Fig. 2 Recommended test bench specification TESTING AND INSPECTION 7.1 Visual inspection Before Performance Test ® The inspection at an indoor place (inside of building, etc.) where there is no dust. ® Clean the inside of chamber cleanly before entering upon the inspection so that any foreign ‘matter or material should not be caught by the seat surface. 7.2 Performance Test 724 Testitems ® Set Pressure (C.0.1.P : Cold Differential Test Pressure as showing in ANNEX-2) ® Functional Stability 722 Test Medium The test medium shall be dry air or nitrogen near ambient temperature. 6/22 SONATRACH SERRVGG ALGERIA SA] ues SNe hoe pnouecr UGE GORPORATION ree no CONSTRUCTION PROCEDURE | Contractor's Doc. No. ‘S-3000-3160-007 FOR FIELD PSV TESTING Sheet 7 | OF zt | 7.23 Test Method Check the popping pressure according to the following procedures. © Mount the safety valve on the test bench securely ® Increase the pressure gradually to actuate the safety valve. @ When the popping pressure is within the allowable range, operate the safety valve 3 times in succession to check that the popping pressure is stable within the allowable range. @ When the inspection is made on a test bench, itis possible that accurate blowing is not obtained. In such @ case, conduct adjustment by tuming the adjusting ring downward by 1 or 2 notches after itis restrained by the disc. © Relating to the popping pressure, do not conduct the adjustment based on the set pressure but the cold differentia test pressure (value including back pressure correction and temperature correction) 7.24 — Acceptance Criteria @ Set Pressure Set pressure of Pressure safety valves shall be carried out API 526 Para 9.2 and tolerance of set pressure of pressure relief valve shall be applied ASME Sec.VIll UG-126. ‘Table-2 Tolerance of set pressure (C.D.T.P) _Unit: bar (MPa) Set Pressures Tolerances 5 5 (05) 0.15 (0.015) > 5 (05) + 3% of set pressure @ Functional stability The functional stability shall be performed three times to check that the set pressure is within the tolerance.

You might also like