area tabulation

AREA IN SQ.
A B C D E DESCRIPTION
METER
A RECEPTION + 52.4631
5.9238
LOBBY
4.4238 6.3048 2.2714
MANAGER OFFICE 11.5358
CR 1A 5.3487
0 CR 1B 4.3697
LAUNDRY ROOM 1.9238
KITCHEN 26.2057
3.0762 CR 1B
ELEVATOR 1 LAUNDRY ROOM 12.1292
STAFF LOUNGE 18.2486
STAFF LOUNGE
3.0762 TOTAL GROUND 160.0000
FLOOR AREA
1
KITCHEN
4.4238
4.9238
2.0762 2.5000
2
15.0000
2.5000 2.5762
CR 1A
3 RECEPTION
3.7500
B LOBBY
7.5000
MGR OFFICE
B'
HOTEL
FLOOR PLAN
4 3.0762 4.9238 5.0000
scale 1:100
A'
GROUND FLOOR LAYOUT PLAN
PROJECT TITLE: SHEET NO.
FLORES, SHEENA MAE M. Republic act 9266 PROPOSED THREE
Drawings and specifications duly signed, stamped or sealed as STORY HOTEL
CIVIL ENGINEER instruments of service are the property and documents of the
architect whether the object for which they are made is executed BUILDING
3 PRC NO. DATE: AUG 29, 2017
or not. It shall be unlawful for any person without the written
consent of the architect or author of the said documents to
duplicate or to make copies of the said documents for use in the
repetition of and for other projects or building, whether executed
LOCATION: A-02
PTR TIN partly or in whole

You might also like