Eni S.p.A.

Exploration & Production Division

COMPANY SPECIFICATION

CRYOGENIC VALVE TEST PROCEDURE AT -196°C

11544.PIP.MEM.SDS

Rev. 1

March 2006

1 General revision SP TEIC TEIC 15.03.06


0 Issue Progemi STIN STIN 01.11.93
REV. DESCRIPTION PREP’D CECK’D APPR’D DATE

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 2 di 13

FOREWORD

Rev. 0 Total Number of pages 11 sheets


November 1993
Issue

Rev. 1 Total Number of pages 12


March 2006

This specification has been restructured both conceptually and graphically; the
general revision has been carried out in accordance with CEE requirements,
underlining the functional details and deleting the discriminatory elements.
In the normative references have been added: PED directive, in case it is
required for the project, and BS 6364 code for cryogenic valves.

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 3 di 13

INDEX

1 GENERAL

1.1 Scope

1.2 Normative references


1.2.1 European normative references
1.2.2 Normative references of ISO, IEC and other national organizations
1.2.3 Normative references of other organizations

2 FUNCTIONAL NORMATIVE REQUIREMENTS

2.1 Functional requirements


2.2 Testing apparatus
2.3 Test procedure
2.3.1 Requirements before cryogenic test
2.3.2 Sealing and operative tests
2.3.3 Acceptance criteria
2.3.4 Requirements after cryogenic test
2.4 Ergonomics
2.5 Safety
2.6 Requirements for Quality Management and Quality Assurance

3 SUPPLEMENTARY ELEMENTS

3.1 Appendix and Attachments


3.1.1 Appendix

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 4 di 13

1 GENERAL

1.1 Scope

This specification describes the method for conducting seal and operating tests
of cryogenic valves using liquid nitrogen at -196°C.

The following valves are within the scope of this specification:

1. Manual valves, in particular:


• gate valves,
• globe valves,
• ball valves,
• butterfly valves,
• check and throttling valves,
• manual needle valve are excluded.

2. Automatic valves:
• All, including needle valves.

1.2 Normative references


1.2.1 European normative references
PED 97/23/CE Direttiva 97/23/CE del parlamento Europeo e del
Consiglio, del 29 maggio 1997

1.2.2 ISO, IEC and other National Organizations Normative


At the issue of this revision there are no applicable ISO, IEC and other National
Organizations Normative.

1.2.3 Other Organizations Normative


ANSI/FCI 70-2 Control valve seat leakage
API Std. 598 Valve Inspection and Testing
API Spc. 6D Pipeline Valves (Steel Gate, Plug, Ball, and
Check Valves)
BS 6364 Specification for Valves in cryogenic service

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 5 di 13

2 FUNCTIONAL NORMATIVE REQUIREMENTS

2.1 Functional requirements

For each supply lot the following valves shall be subjected to cryogenic test:

• One valve of minimum size, for each type of valve and for each pressure
class;
• One valve of medium size, for each type of valve and for each pressure class;
• One valve of maximum size, for each type of valve and for each pressure
class.

Valves smaller than 2” size shall not be tested.

The valves to be tested and testing apparatus shall be clean, dry and oil free.

The valve ends shall be properly sealed (using flanges, plugs etc.) and a
connection shall be provided on both ends for inlet/outlet of the test fluid.
Additionally, a connection shall be provided on the outlet end for a “T” type
thermocouple to measure the temperature inside the valve.

2.2 Testing Apparatus

The testing apparatus shall be installed as shown in Appendix 2 (Fig. App 2.a,
Fig. App 2.b and Fig. App 2.c) and shall include:

a) “T” type thermocouple for low temperatures;


b) pressure gauge (sample, class 1.0 vfs, with full scale not exceeding twice the
maximum test pressure);
c) temperature indicator (sample, class 0.5 vfs);
d) valves;
e) rotameter/flow meter (duly sized) to measure leaks;
f) liquid nitrogen tank, for cooling;
g) pressurised gaseous helium cylinders for testing;
h) tubes and fittings;
i) vat/tub, of adequate size to contain the valve;
j) material for thermal insulation.

The material for pipes, fittings, flanges and valves shall be stainless steel.

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 6 di 13

2.3 Testing Procedure

The test shall be carried out according to the instructions given below; reference
shall be made to the test apparatus described under 2.2.

2.3.1 Requirements before cryogenic test

The valve to be tested shall be positioned with its stem in vertical position, and
the flow direction on the horizontal axis.

Before cooling, the valves shall be hydrotested (body and seats) in accordance
with API Std. 598 (Manual gate valves, globe valves, check valves, and butterfly
valves), API Spc. 6D (Manual ball valves) and ANSI/FCI 70-2 (Control valves)
with seal class as per individual specifications.

A pneumatic valve seat test shall be carried out in accordance with API Std. 598
(Manual gate and butterfly valves), API Spc. 6D (Manual ball valves) and
ANSI/FCI 70-2 (Control valves) with seal class as per individual specifications.

After successful test results, the valve shall be cleaned and thoroughly dried
under vacuum as per 2.1 above.

2.3.2 Tightness and operative tests

In the vat where liquid nitrogen will be admitted, valves shall be positioned semi-
open with the exception of ball valves with soft insert seats. These should be
positioned either fully open or fully closed.
The time required for reaching the test temperature shall be such as to avoid
thermal shocks.
The nitrogen level shall be kept constant at the top flange of the bonnet for the
whole duration of the tests.

During the whole staying in the vat, except for the time required for testing the
seats, the valve internal part shall be kept under helium pressure to avoid
nitrogen droplets inlet from the outside.

The test shall begin when the temperature inside the valve has lowered to the
minimum value obtainable (≤ -190°C) and kept constant for at least 30 minutes.

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 7 di 13

The tightness of the stuffing box shall be checked during the test, using a sniffer
to detect helium leaks. Watery solutions shall not be used. The acceptable
leakage shall be less than or equal to 5x10-4 std cm3 per second.

After the constant temperature period above, the On/Off valves (both manual and
actuated) shall be operated ten times into open and closed positions. All torque
values shall be recorded and shall be in accordance with the ones specified in
the following paragraph 2.3.4.

After said constant temperature period the Control valves shall be operated five
times.

After the operability check, the valve shall be closed and a seal test shall be
performed, using helium at a pressure of 6 bar to be maintained for 10 minutes
as a minimum.
For trunnion type ball valves, the tube which conveys helium leaks to the bubble-
counter and flow meter may be connected to the vent located at the top of the
valve body instead of being connected to the outlet flange.
Each seat shall be tested individually after depressurising the valve body and the
area downstream the other seat.

2.3.3 Acceptance criteria

The maximum allowable leakages at the internal test temperature shall be as


follows:

Maximum allowable leakage (ml/min)

Manual Valves
Nom. Gate/Globe/Check Butterfly Control
Size (see Appendix 1)
Metal Ball Valves
(inch)
Soft Seat to
Metal Dir "A" Dir "B"
2 10 30 300
3 10 48 300 300 75
4 15 60 400 400 100
6 20 90 600 600 150 Values
8 30 100 800 800 200 according to
10 40 125 1000 1000 250 relevant seal
12 50 150 1200 1200 300 classes of
14 60 175 1400 1400 350 ANSI/FCI
16 70 200 1600 1600 400 70-2
18 80 225 1800 1800 450
20 90 250 2000 2000 500
24 120 300 2400 2400 600

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 8 di 13

2.3.4 Requirements after the cryogenic test

During the heating operation, the valve shall be operated open/closed at 2 - 3


intervals until ambient temperature has been reached. All torque values shall be
recorded. Precautions shall be taken to prevent moisture from entering the valve.

For manually operated valves the maximum torque at the valve operating device
shall not exceed 343,23 Nm (35 kgm); in case this torque value is exceeded, the
valve shall be equipped with reduction gear even if this is not required by the
application standard.

The motorized valves shall be tested complete with the actuator. Torque values
shall not exceed 80% of the rated torque of the actuator.

The test shall not be carried out for control valves.

Upon completion of cryogenic tests, the valves shall be pneumatically re-tested


at ambient temperature as specified above.
The leaks recorded during this test shall not exceed the ones recorded before
valve cooling.

The Manufacturer shall provide copies of instrument calibration certificates to the


Purchaser’s Inspector.

2.4 Ergonomics

There are no ergonomic requirements applicable to the subject of this


specification.

2.5 Safety

There are no safety requirements applicable to the subject of this specification.

2.6 Requirements for Quality Management and Quality Assurance

Possible requirements for Quality Management and Quality Assurance are


included in the applicable Specification attached to the bid.

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 9 di 13

3 SUPPLEMENTARY ELEMENTS

3.1 Appendix and Attachments

3.1.1 Appendix
Appendix 1 Direction of the test for butterfly valves”
Appendix 2 Testing apparatus for ball and control valves, gate –
globe - check valves and butterfly valves

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 10 di 13

Appendix 1 – “DIRECTION OF THE TEST FOR BUTTERFLY VALVES”

DIRECTION “A” DIRECTION “B”

Fig. App. 1 A:
Schematic drawing showing the two directions in which the seal test shall
be performed for butterfly valves:

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 11 di 13

Appendix 2 - “TESTING APPARATUS”

FIG. App. 2 a: Testing apparatus for ball and control valves

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 12 di 13

FIG. App. 2 b: Testing apparatus for gate - globe and check valves

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 11544.PIP.MEM.SDS
Rev. 1 March 2006
Exploration & Production Division Sheet 13 di 13

FIG. App. 2 c: Testing apparatus for butterfly valves

Documento RISERVATO di proprietà di Eni S.p.A. Divisione E&P. Esso non sarà mostrato a Terzi né utilizzato per scopi diversi da quelli per i quali è stato inviato.
CONFIDENTIAL document and sole property of Eni S.p.A. Division E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.