You are on page 1of 16

STRATEGI OPERAIONAL PEMBANGKIT LISTRIK INDEPENDEN UNTUK

MENCAPAI TARGET “ZERO BLACKOUT” DI SUATU KAWASAN INDUSTRI

WEBINAR FAKULTAS VOKASI ITNY 20 - 6 - 2020

Masterplan

Type A

Type B1

Type B2

Type B3
Type B4
Type B5
Type C
Type D
Type E 2

1
Singapore
Tanah Merah - Changi

Travel Time by
About 50 mins
World Trade Centre Ferry
About 90 trips
Frequency
every day

+- 20km
Nongsa
Batu Ampar
Sekupang Batam Centre

BIP Pulau Batam


Waterfront City

Basic Infrastructure in Batam

Nongsa

Tg.Uncang

Punggur

2
Self-Contained Development

• Ready-built factories and prepared land for


custom-built factories 5
• Commercial town centre with shops, banking
facilities and food centre

Self-Contained Development
…..industrial facilities

Type A (9,217 sqm) Type D (5,571 sqm)


Detached, three-storey Detached, two-storey

6
Type B (2,100 sqm) Type E (2,920 sqm) Type C (972 sqm)
Detached, Semi-detached, Terraced,
single-storey single-storey single-storey

3
Self-Contained Development

• Ready-built factories and prepared land for


custom-built factories 7

• Commercial town centre with shops, banking


facilities and food centre

Self – Contained Development


Type B Factory
Single-storey Detached
Built-in Area: 1,800 - 2,700 sqm

4
Supporting Amenities

Wet Market Banking Facility

Supermarket Food Centre

BUSINESS LICENCE

VISAS & WORK MANPOWER


PERMIT RECRUITMENT &
MANAGEMENT
ONE STOP
SERVICE

ESTATE
SHIPPING &
MANAGEMENT
LOGISTICS
& SECURITY

10

5
Tenants

11

Self – Sufficient Environment

Power Plant (121,6 MW)


18 units x 6.2MW – Gas Engines
1 unit Gas Turbine (10MW) on standby
12

6
13

14

7
15

Ruang Kontrol Mesin


16

8
Objective and Target Operation

17

Company POLICY
In order to achive ZERO BLACKOUT
(Maintaince Capacity/cability, and continuity&quality of power supply)

Continuity Plan
FOR POWER SUPPLY IN BIP

1. SUFFICIENT CAPACITY / Capability


2. HOT SPINNING (N+2)
3. RING SYSTEM OR DOUBLE
FEEDER
4. MOBILE GENSET FOR BACK
UP
5. WELL TRAINED O&M TEAMS
6. EMBARKING SCADA or EMS
7. REGULARLY PQ MONITOR

Excellent leadership and team work

9
1. SUFFICIENT CAPACITY / CAPABILITY

I. CURRENT LOAD DEMAND:


• Day time : 56 MW (75 MW)
• Nihgt time : 40 MW (60 Mw)

II. INSTALLED CAPACITY :


• 18 Units Diesel Generator @ 6.2 MW, sub total cap. 111.6 MW
• 1 unit Gas Turbine 10.0 MW
• Total installed Capacity. 121.6 MW

19

2. HOT SPINNING (Operation Management)

LOAD DEMAND:
• Day time : 56 MW
• Nihgt time : 40 MW

NUMBERS ENGINE RUNNING ( ENGINE RUNNING)


• Day time + Hot Spining reserve : 56 + 12 = 68 MW  14 units running
• Night time + Hot spinning reserve : 40 + 12 = 52 MW  11 units running

• HOT SPINNING
Day time 68 – 56 = 12 MW  2 DG running
Night time 52 – 40 = 12 MW  2 DG running

20

10
Capability – Availibilty = S (MO)

 Engine Maintenance (Mechanic & Electric)


• 18 Units Diesel Generator
15 (running) units = 3 units
 1 or 2 unit standby by; 1 or 2 unit MO
• 1 unit Gas Turbine  stand by
#DG Overhaul every 24.000 rhs (Major), 12.000rhs (Minor)

 Electric (Trasnmission & Distribution )


 Inspection daily, weekly, monthly
 Switchgear Major Services & maintenance every 2 years

21

3. RING SYSTEM OR DOUBLE FEEDER

2. Double Feeder
1. Ring Feeder

22

Double Feeder
Double Feeder

11
STN T/F

STN T/F
LOT 101

LOT 107

LOT 106

LOT 103

LOT 108

LOT 114

LOT 110

LOT 112

LOT 102

TS2-1

C 9A
SPARE
E1-B3
7 9 11

1 2 3 4 5 6 8 10 12 13 14 15

STN T/F

STN T/F

TS2-2
TS2
TELEX MWT TS1 TS3

E1-1 E1-1A E1-1B

LOT 13B

LOT 13A
LOT 13

LOT 16

LOT 15
BIP CC TC

E1-B2
6 9

1 2 3 5 7 8

LOT 20

LOT 23

LOT 21

LOT 17

LOT 19

LOT 18

LOT 22
E1 - B1
5 7

1 2 3 4 6 8 9 10

1.5 MVA, Meiden


HVSB HVSB HVSB HVSB HVSB HVSB
E1-A12 E1-A11 E1-A10 E1-A9 E1-A8 E1-A7
1.5 MVA, Meiden

1.5 MVA, Meiden

1.5 MVA, Meiden

1.5 MVA, Meiden

1.5 MVA, Meiden

1.5 MVA, Meiden


1.5 MVA, Meiden

HVSB HVSB HVSB HVSB HVSB


E1-A5 E1-A4 E1-A3 E1-A2 E1-A1

23
LOT 201

STN T/F
Spare

E1 S/S
4 5 6 13 14

1 2 3 7 8 9 10 11 12 15 16 17 18

SH 1 SH 3 SH 2

4. MOBILE GENSET FOR BACK UP

24

(1) 250 kVA at Power House 2 (2) 500kVA at Power House 3 (3) 500 kVA Beside WTP

12
Conduct O&M Technical Training

25

Team Diskusi

26

13
Conduct Switchgear annual services

27

Conduct Switchgear annual services

28

14
Conduct Switchgear annual services

29

• Gold Price on National and International Quality Conventions

30

15
• Gold Price on National and International Quality Conventions

31

Finish
Terima Kasih

32

16

You might also like