400
200 mm SURFACE BED 200 EXISTING
600
WITH MESH REF 245
200
WITH MESH REF 245 LAYERWORKS 1. THIS DRAWING TO BE READ IN CONJUNCTION WITH ARCHITECTS DRAWING.
PLACED 50 mm FROM TOP
200
PLACED 50 mm FROM TOP
400
2. ALL DIMENSIONS ARE IN mm AND ARE TO BE CHECKED ON SITE.
ANY DISCREPANCIES TO BE BROUGHT TO THE ATTENTION OF THE ENGINEER.
3. BEAM SIZES ARE GIVEN DEPTH x BREADTH.
1150
4. CONCRETE COVER TO REINFORCING IS TO BE MAINTAINED BY THE USE OF EITHER
300X300X200 DEEP SUMP NYLON SPACERS OR PRECAST CONCRETE BLOCKS WITH BINDING WIRES CAST IN.
±100
10 mm SOFTBOARD 10 mm SOFTBOARD 5. REINFORCED CONCRETE : REQUIRED CHARACTERISTIC
300
200
±100
200 x 400 M190 BLOCK WALL EXISTING LAYERWORKS CUBE STRENGTH AT 28 DAYS SHALL BE AS FOLLOWS :
CONCRETE FILLED PLASTER AND PAINT FOUNDATION 25 MPa
200
TO ALL EXPOSED FACES
31500x22500x600 DP CONCRETE BASE 230 300 230 COLUMNS 30 MPa
R.C WALLS 30 MPa
SECTION A-A 200 6560 200 BEAMS 30 MPa
1:50 SLABS (SUSPENDED) 30 MPa
SECTION F-F STAIRS
PLINTHS
30 MPa
30 MPa
ON CUTTING PODS 6. ALL REINFORCEMENT TO BE INSPECTED BY ENGINEER PRIOR TO CASTING
1:50
OF CONCRETE. MINIMUM 1 DAYS NOTICE REQUIRED FOR INSPECTION.
FOUNDATION 50mm
6000 6000 2275 8550 1125 4000
COLUMNS 50mm
POLYSUPHIDE SEALER POLYSUPHIDE SEALER R.C WALLS 50mm
200 mm SURFACE BED
13000x6000x600 DP 16500x6000x600 DP 200 mm SURFACE BED 8350x8850x600 DP 200 mm SURFACE BED 13000x4000x600 DP POLYSUPHIDE WITH MESH REF 245 BEAMS 50mm
CONCRETE BUND WALL SEALER
CONCRETE BASE CONCRETE BASE CONCRETE BASE SLABS (SUSPENDED) 50mm
600
230 155 WITH MESH REF 245 WITH MESH REF 245 CONCRETE BASE PLACED 50 mm FROM TOP
400
600
600
EXISTING SURFACE PLACED 50 mm FROM TOP PLACED 50 mm FROM TOP STAIRS 50mm
PLINTHS 50mm
200
200
9. ALL WORK SHALL COMPLY WITH SANS 2001.
10. DESIGN HAS BEEN CARRIED OUT IN ACCORDANCE WITH SANS 10100,10160,
10162, 10163 & 10164 AS APPLICABLE.
11. THE WORKS WILL BE INSPECTED FROM TIME TO TIME BY THE CONSULTING
TO ASCERTAIN THAT THE CONTRACTOR IS CARRING OUT THE WORK IN GENERAL
±100
10 mm SOFTBOARD 10 mm SOFTBOARD 10 mm SOFTBOARD CONFORMITY WITH THE ENGINEERING DRAWINGS & DOCUMENTS, SUCH
±100
200 mm SURFACE BED 200 x 400 M190 BLOCK WALL EXISTING LAYERWORKS INSPECTIONS ARE NOT CARRIED OUT FOR THE BENEFIT OF THE CONTRATOR &
WITH MESH REF 245 CONCRETE FILLED PLASTER AND PAINT DO NOT RELIEVE HIM OF THE RESPONSIBILITY FOR THE PROPER CONSTRUCTION
PLACED 50 mm FROM TOP TO ALL EXPOSED FACES OF THE WORKS IN ACCORDANCE WITH THE ENGINEERING DRAWINGS, DOCUMENTS
4570
5030
13. ALL LOAD-BEARING BRICKWORK TO HAVE A MINIMUM CRUSHING STRENGTH
OF 14 MPa
14. SLIP JOINT TO BE PROVIDED ON TOP OF ALL LOAD BEARING BRICKWORK TO
BREAK THE BOND BETWEEN BRICKWORK & CONCRETE.
15. ALL FLOOR LEVELS, UNLESS OTHERWISE INDICATED, ARE FINISH FLOOR LEVELS
12700
16. FLOORS ARE DESIGNED FOR :
6050 6650 IMPOSED LOAD OF KPa
MOVABLE PARTITIONS 150 KPa
200 mm SURFACE BED 200 mm SURFACE BED
POLYSUPHIDE 10750x6050x600 DP 12500x6650x600 DP POLYSUPHIDE 300X300X200 DEEP SUMP
WITH MESH REF 245 DOWEL JOINT WITH MESH REF 245
SEALER CONCRETE BASE CONCRETE BASE SEALER
PLACED 50 mm FROM TOP F
600
200
10 mm SOFTBOARD 10 mm SOFTBOARD
230 6100 230
100
100
EXISTING LAYERWORKS
6560
SECTION C-C
1:50
DETAIL PLAN :
CUTTING PODS
1:50
600
600
WITH MESH REF 245 WITH MESH REF 245 DPCONCRETE BASE WITH MESH REF 245 WITH MESH REF 245
200
350 200 450
PLACED 50 mm FROM TOP PLACED 50 mm FROM TOP PLACED 50 mm FROM TOP PLACED 50 mm FROM TOP
200
200
INCOMING EFFLUENT
Section
FLUID LEVEL 900 PIPE POSITION AND FLUID LEVEL 900 MANHOLE STEPIRONS Ø2mm wire to be fed through
DIRECTION IS SITE SPECIFIC Ø3mm holes 30mm apart
ST GOBAIN PRODUCT
110Ø uPVC 5mm from edge & bent upwards
NO.2304
1250
on the outside to keep in place
900
200
110Ø uPVC EXTRACTION PIPE
M190 BLOCK WALL M190 BLOCK WALL
EXTRACTION PIPE
CONCRETE FILLED CONCRETE FILLED 30
SCREED TO 1:50 SCREED TO 1:25
10 mm SOFTBOARD 10 mm SOFTBOARD
250
250
±100
600
600
600
30
EXISTING LAYERWORKS 75mm BLINDING LAYER 75mm BLINDING LAYER
200 200 2000 200 200 200 200 2000 200 200
SECTION H-H 2800 2800 Plan
200 x 400 M190 BLOCK WALL
CONCRETE FILLED PLASTER AND PAINT
1:50 SECTION H-H SECTION G-G TO ALL EXPOSED FACES
EXISTING ASPHALT TO BE
1200X1000X150 PRECAST SAW CUT TO FORM JOINT 200 mm SURFACE BED
1200 1200
PANELS (400kg) G2800 FLOAT DETAIL EXISTING SURFACE 200
WITH MESH REF 245
PLACED 50 mm FROM TOP
Scale 1:10
200 1590 610 200 200
200
200
400
4 No. 100mm Ø PIPES
470
±100
MANHOLE COVER
FINISHED GROUND LEVEL
150
610
PIPE END. TOP OF PIPE TO BE FLUSH
250 mm M190 BLOCK WALL EXISTING LAYERWORKS
25Ø CONDUIT WITH TOP OF 110 PIPE WHEN AT REST
R.C SLAB CONCRETE FILLED
2800
110Ø ENDCAP WITH 32Ø CENTRAL HOLE
60 60 100 100 PIPE TO BE FIXED TO MANHOLE TO BE HILTI NAILED (X4) TO SLAB
WALL WITH S/S HOLDERBATS
SECTION D-D
225
32Ø CONDUIT
1120
THROUGH SLAB
H H
BUNDED TRUCK AREA
1:50
500
200
110Ø ENDCAP WITH 32Ø CENTRAL
350 Freeboard
HOLE TO BE HILTI NAILED (X4) TO SLAB
200
G SEE PLAN & SECTION
PLAN VIEW
LIQUID LEVEL CONSTRUCTION
300 900 300 900 300 CONSERVANCY TANK DETAILS 05 SECTION CC REVISED J.B 08.06.2020
Scale 1:50 04 TRENCH SECTION ADDED J.B 22.04.2020
LEVEL INDICATOR 03 CUTTING POD AND BASE 09 REVISED J.B 27.03.2020
Scale 1:20 02 CUTTING POD ADDED. MINOR REVISIONS J.B 23.03.2020
01 CONSTRUCTION J.B 16.03.2020
GREASED GREASED
100
1:10 RAMP
NGL
200
& ASSOCIATES
600
600
600
50
TITLE
H.MBUYI
DRAWING No. REV.
1 : 10
1 : 10 DATE SCALE 20003-101 05
FEB - 2020 AS SHOWN A0