Professional Documents
Culture Documents
WP16 WP15
WP17
Thai Nippon Steel Engineering and Construction Corporation
Collects WellHead
fluids.
Can have Testing Facility
Normally Designed for
unmanned operation.
Bridge Flare
WHP Support
1 Tripod Tripod
WHP
3
Contains risers from
WHPs. Facilities for pig Utility & Supplies utilities for CPP.
receipt and launching. Living Qtrs Also provides
Normally no processing accomodation for operating
facilities.
Platform personnel.
Thai Nippon Steel Engineering and Construction Corporation
Well Head
Platform
Overview
Thai Nippon Steel Engineering and Construction Corporation
FIQ
Vent from other
PIC
sources
Gas
Choke Valve
From Other Pressure Control
Flowline
Wells
LIC LIC
Shutdown
Valve FIQ
Test Manifold
FIQ Level Control Valve
DHSV
Air Cooler Pressure Reducing Valve
Kicker Line
Sump Tank
To CCVT
To Hydraulic Oil Unit
Other
Pipeline (Sealine) to
Processing Plant
Instrument Gas Filter Pig Launcher Barred "T" ESD
Valve
Thai Nippon Steel Engineering and Construction Corporation
TEST SEPARATOR
To separate oil, water, gas
Primary
Function
To measure individual flow of oil, water, gas In
order to evaluate well performance
Design
Function
WELL TESTING
TEST SEPARATOR
(CAN BE 2 PHASE OR WELL BLOWDOWN
CAN BE 3 PHASE)
WELL CLEANING
Thai Nippon Steel Engineering and Construction Corporation
PIGGING SYSTEM
PIPELINE CLEANING
PIGGING
WAX REMOVAL
Cold Vent
B To Turbo generator
y
p
a
To Well head control panel
From Pipeline
s
Filter
s
Elements To Other consumers
Condensate
To Closed Drain
DRAIN SYSTEM
INJECTION
PUMP
Thai Nippon Steel Engineering and Construction Corporation
Well Head
Installation
Thai Nippon Steel Engineering and Construction Corporation
Upper Deck
Lower Deck
Deck
Boat Landing
Jacket
Thai Nippon Steel Engineering and Construction Corporation
Thai Nippon Steel Engineering and Construction Corporation
Jacket Installation
Thai Nippon Steel Engineering and Construction Corporation
Jacket Installation (Cont’d)
Thai Nippon Steel Engineering and Construction Corporation
Jacket Installation (Cont’d)
Thai Nippon Steel Engineering and Construction Corporation
Jacket Installation (Cont’d)
Thai Nippon Steel Engineering and Construction Corporation
Deck Installation
Thai Nippon Steel Engineering and Construction Corporation
Deck Installation (Cont’d)
Thai Nippon Steel Engineering and Construction Corporation
Well Head
Platform
Visit Service Boat
Thai Nippon Steel Engineering and Construction Corporation
Vent Boom
Pedestal Crane
Vent Tip
Thai Nippon Steel Engineering and Construction Corporation
Corrosion
Inhibitor
Storage Tank
Sump Tank
Thai Nippon Steel Engineering and Construction Corporation
Helideck
Netting
Thai Nippon Steel Engineering and Construction Corporation
Boat Impact
Boat Landing
Thai Nippon Steel Engineering and Construction Corporation
Christmas Tree
Thai Nippon Steel Engineering and Construction Corporation
Pig Launcher
Thai Nippon Steel Engineering and Construction Corporation
Personnel Protection
Thai Nippon Steel Engineering and Construction Corporation
Flashing Light
Thai Nippon Steel Engineering and Construction Corporation
Liferafts
Thai Nippon Steel Engineering and Construction Corporation
Portable
Extinguisher
Thai Nippon Steel Engineering and Construction Corporation
END