19212 19212
3210 1940 1800 7090 1911 2999 3210 1940 1800 7090 5032
1
Air Conditioning (outdoor)
DOWN
DOWN
2880
2880
TOILET TOILET
Dressing
Room(8.9 CF-2
CF-1
CF-1
UP
UP
2450
2450
CF-2
CF-2
AREA: 23 SQ.M
13060
13060
2500
2500
AREA: 42 SQ.M
TOILET
3
AREA: 65 SQ.M
CF-2
2500
2500
TOILET
Storage Room
1800
AREA: 22 SQ.M
2260
2260
CF-2 CF-2
AREA: 23 SQ.M
24850
24850
24850
24850
CF-2
DOWN
Cleaners
DOWN
2400
Room
2260
2260
2400
TOILET
AREA: 23 SQ.M
UP
UP
Public
Entry
toilet
(10 CF-1
2500
2500
2350
2350
ELEVATOR OPEN CF-2
CF-2
5
DROP CEILING +- 100mm
CF-1
USING 12MM THK. GYPSUM BOARD
PAINTED FLAT LATEX FINISH
DROP CEILING WITH COVE LGIHTING
2500
2500
CF-2
TOILET DESIGN USING 12MM THK. GYPSUM BOARD
PAINTED FLAT LATEX FINISH
AREA: 44.30 SQ.M AREA: 44.30 SQ.M
5050
5050
AREA: 18.15 SQ.M
2430
2430
TOILET
CF-2 CF-2 CF-2
6
1470
1470
1470
1470
Air Conditioning (outdoor)
GILBERT N. PINPIN
ARCHITECT
MANILA
PLACE ISSUED :
ARCHITECTURAL PLAN REFLECTED CEILING PLAN
A-2
LOCATION : 826 MATIMYAS ST. BRGY. 525, SAMPALOC, MANILA 0040590
PRC NUMBER : LOCATION : 7373 BAKAWAN STREET, MAKATI CITY LOCATION : 7373 BAKAWAN STREET, MAKATI CITY CADD BY : R.D. MAGAT