D.L= 28.

8
L.L= 6.68 500 500.00 500 500.00 500 500.00 500 500.00 500 500.00 500

L (m) 5 6 4 5.8 2.8 1.3 4.3 4

M (Kn.m) -70.86 115.73 -77.31 74.21 -19.98 77.28 -73.95 86.55 -12.78 -8.19 -12.11756 38.76 -35.11 66.35 0.00
0 % M (Kn.m) -70.85869 115.7279 -77.31 74.21 -19.98 77.28 -73.95 86.55 -12.78 -8.19 -12.11756 38.76 -35.11 66.35 0.00

115.73
74.21 77.28 86.55
38.76
-19.98 -12.78 -8.19-12.12
-35.11
-70.86 -77.31 -73.95
R 0.070 0.114 0.076 0.073 0.020 0.076 0.073 0.085 0.013 -0.008 0.012 0.038 0.035
TYPE OF REINFORCEMENT S.R S.R S.R S.R S.R S.R S.R S.R S.R S.R S.R S.R S.R
R'
Z 260.85 242.60 258.41 259.59 278.63 258.42 259.69 254.81 280.96 287.53 281.17 272.35 273.59
As (mm2) 743.41 1305.52 818.75 782.37 196.25 818.46 779.37 929.59 124.49 -77.98 117.94 389.49 351.23
Steel 5.0 9.0 6.0 6.0 2.0 6.0 6.0 7.0 1.0 1.0 1.0 3.0 3.0

14 14
113.36 14 14 14 14 14 14 14 14 14 14 14
101.29 83.51 85.30
65.55 70.19
0 -13.06
-15.83 0
-71.73 -59.18 -67.27
-111.85 -99.52 -104.49
Slab or Beam B width of beam (mm) 500 120
Slab Th 310 d= 285 mm
Fcu 25 Mpa 0.12187 0.8358
Fy 420 Mpa
NO OF SPANS 2 beam no 13
L1= 5m 5
L2= 6m
4m
5.8 m
2.8 m
1.3 m 3.7
4.3 m 35
4m
DL= 28.8 Kn/m 4 0
LL= 6.68 Kn/m
total 35.48 Kn/m R
B(mid span) 500 mm 0.12187 S.R
B(support) 500 mm

CANT
35
5.212023 120.4776 1.8

0
‫سكن كريم‬
‫‪ F‬نموذج‬

‫‪35.48‬‬

‫‪L‬‬ ‫‪2.5‬‬ ‫=‪m‬‬ ‫‪36‬‬


‫‪42.27‬‬ ‫‪0‬‬ ‫=‪b‬‬ ‫‪120‬‬
‫‪46.43‬‬ ‫‪5.2‬‬ ‫=‪R‬‬ ‫‪0.1477‬‬
‫=‪z‬‬ ‫‪226.0‬‬
‫=‪as‬‬ ‫‪435.9‬‬
‫‪18‬‬
‫‪1.71‬‬

‫‪7.28‬‬ ‫‪47.58928571429‬‬
‫‪18.4‬‬
A

Page 4
Beam no 13 ‫سكن كريم‬
‫ نموذج‬F
simply supported
L= 5 m H= 310 mm
Wu= 35.48 Kn/m
Mu= 110.88 Kn.m
bf= 500 mm 5
0.156 R= 0.1092
Z= 244.7 mm 88.70 110.88
As= 1239.9 mm2
diameter 20 mm
# 4 as= 1256
88.70
Vmax= 88.70 Vd(Kn)= 78.59 As= 1239.9 mm2 bw= 500 mm
V= 0.551 Mpa p= 0.870 %
Vc= 0.602 Mpa use min rmft 1 8 mm Asv= 100.48
Vs= 0.241 Mpa spacing min of 200 mm
Vs+Vc 0.844 Mpa OK 0.75*d 213.75 mm
taken spacing 200 mm

length of top steel= 5.5 m


length of bottom steel= 5.5 m
Beam no 13 ‫سكن كريم‬
‫ نموذج‬F
L 5 6
K 0.20 0.00
D.F 1.00 0.00
F.E.m
case 1 110.88 -848.64
737.77 0.00
848.64
case 2 110.88 -520.29
409.41 0.00
520.29
-149.27
case 3 64.29 -848.64
784.35 0.00
848.64
424.32

D.L=(Kn/m) 28.8
L.L=(Kn/m) 6.68 B= 500 500 500

L (m) 5 6
m dist m (Kn.m) 0.00 848.64 0.0
0 % m (Kn.m) 0.00 848.64 0.00
848.64

m (Kn.m)

R 0.000 0.836 0.000


Z 285.00 #NUM! 285.00
As (mm 2) 0.00 #NUM! 0.00
Steel 1 #NUM! 1

14 18 14

247.88

35.00
0 0
-81.03
reactions(kn) -81.03 506.31 -35.00
-258.43

Vmax= 247.88 Vd(Kn)= 237.77 As= #NUM! mm2 b= 500 mm


V= 1.669 mpa p= #NUM! %
Vc= #NUM! mpa use min rmft 1 8 Asv= 100.48
Vs= 0.362 mpa spacing min of 200 mm
Vs+Vc #NUM! mpa Ok 0.75*d 213.75 mm
taken spacing 200 mm

4
4 #NUM!
14 18

1 14 4 14
Beam no 13 ‫سكن كريم‬
‫ نموذج‬F
L 5 6
K 0.20 0.17
D.F 0.55 0.45
F.E.m
case 1 110.88 -159.66
26.61 22.18
137.49
case 2 110.88 -92.57
-9.98 -8.32
100.89
60.43
case 3 64.29 -159.66
52.02 43.35
116.31
101.51

D.L=(Kn/m) 28.8
L.L=(Kn/m) 6.68 B= 500 500 500

L (m) 5 6
m dist m (Kn.m) 66.08 137.49 106.8
10 % m (Kn.m) 72.96 123.74 113.62
123.74

m (Kn.m)
-72.96
-106.75
R 0.072 0.122 0.112
Z 260.06 238.98 243.53
As (mm 2) 767.76 1417.02 1276.90
Steel 4 5 5

16 20 20

127.06

63.95

0 0

-85.82
reactions(kn) 63.95 240.51-113.45 85.82

Vmax= 127.06 Vd(Kn)= 116.95 As= 1417.0 mm2 b= 500 mm


V= 0.821 mpa p= 0.994 %
Vc= 0.630 mpa use min rmft 2 8 ` 200.96
Vs= 0.724 mpa spacing min of 200 mm
Vs+Vc 1.354 mpa Ok 0.75*d 213.75 mm
taken spacing 200 mm

3.7 m 4.4 m 4.4 m


4 5 4
14 20 14

4 16 5 20
5.6 m 6.6 m
Beam no 13.00 ‫سكن كريم‬
‫ نموذج‬F

L 5 6 4
K 0.15 0.166667 0.19
D.F 0.47 0.53 0.47 0.53
F.E.M
case 1 110.88 -106.44 106.44 -70.96
-2.10 -2.33 -16.70 -18.78
-8.35 -1.17
3.95 4.39 0.55 0.62
0.27 2.20
-0.13 -0.14 -1.03 -1.16
112.60 90.29

case 2 110.88 -61.71 61.71 -70.96


-23.29 -25.87 4.35 4.89
2.18 -12.94
-1.03 -1.14 6.09 6.85
86.56 59.22
67.60 19.68 41.35

case 3 64.29 -106.44 106.44 -41.14


19.97 22.19 -30.73 -34.57
-15.36 11.09
7.28 8.09 -5.22 -5.87 65.41338
91.53 81.58
73.10

DL=Kn/m 28.8
LL=Kn/m 6.68 B= 500 500 500 500 500

L (m) 5 6 4
-ve M dist M (Kn.m) 71.82 112.60 73.10 90.29 44.44
0% M (Kn.m) 71.82 112.60 73.10 90.29 44.44
112.60 90.29

M (Kn.m) 71.82 73.10 44.44


R Rp=.156 0.071 0.111 0.072 0.089 0.044
Z 260.49 243.98 260.01 253.32 270.39
As (mm 2) 754.50 1263.04 769.44 975.44 449.74
Steel 3 5 4 4 3

18 20 18 18 14 0

110.16
93.53
66.18

0 0
-48.39
-111.22 -102.72
reactions (Kn) 66.18 221.38 196.25 48.39

Vmax= 111.22 Vd(Kn)= 101.11 As= 1263.04 b= 500


V= 0.710 p= 0.886 8
Vc=
Vs=
0.606
0.543
use min rmft 2 8
spacing min of
φ
Asv=
200
200.96
mm
Vs+Vc 1.149 OK 0.75*d 213.75 mm
taken spacing 200 mm
L(m) 3.8 4.4 2.2 4 3.1
4 14 5 4 4 4 14
20 14 18

4 4 4
18 18 14

L(m) 5.6 6.60 4.6


‫سكن كريم‬
Beam no 13 ‫ نموذج‬F

L 5 6 4 5.8
K 0.15 0.17 0.25 0.13
D.F 0.47 0.53 0.40 0.60 0.66 0.34
F.E.M
case 1 110.88 -106.44 106.44 -47.30667 47.31 -149.19
-2.10 -2.33 -23.65 -35.48 67.15 34.73
-11.83 -1.17 33.58 -17.74
5.60 6.22 -12.96 -19.45 11.69 6.05
-6.48 3.11 5.85 -9.72
3.07 3.41 -3.58 -5.38 6.41 3.31
117.45 68.18 105.10

case 2 110.88 -61.71 61.71 -47.31 47.31 -86.50


-23.29 -25.87 -5.76 -8.64 25.83 13.36
-2.88 -12.94 12.92 -4.32
1.36 1.52 0.01 0.01 2.85 1.47
88.95 43.02 71.67
66.40 -9.35 13.62 50.67

case 3 64.29 -106.44 106.44 -27.43 27.43 -149.19


19.97 22.19 -31.60 -47.41 80.25 41.51
-15.80 11.09 40.13 -23.70
7.49 8.32 -20.49 -30.73 15.62 8.08
91.74 65.44 99.60 99.39243
81.07 13.62
693.38 1226.47 846.60 712.04 142.18 1097.50 1037.93

D.L= 28.80
L.L= 6.68 500 500 500 500 500 500 500

L (m) 5 6 4 5.8
-ve M dist M (Kn.m) 70.86 117.45 81.07 68.18 13.64 105.10 103.38
12 % M (Kn.m) 77.91 103.35 92.21 60.00 24.04 92.49 109.59
103.35 60.00 92.49

77.91 92.21 24.04 109.59

R 0.077 0.102 0.091 0.059 0.024 0.091 0.108


Z 258.18 247.95 252.55 264.86 277.29 252.43 245.29
As (mm 2) 825.81 1140.76 999.22 619.98 134.63 1002.67 1222.70
Steel 3 4 4 2 1 4 8

20 20 20 20 20 20 14

113.67 118.84
68.03 62.84
0 0

-79.08 -86.95
-109.37 -99.21
reactions 68.03 223.04 162.05 197.92 86.95

Vmax= 118.84 Vd(Kn)= 108.73 As= 1222.70 b= 500


V= 0.763 Mpa p= 0.858
Vc= 0.600 Mpa use shear rmft 3 8 mm Asv= 301.44
Vs= 1.086 Mpa spacing min of 200 mm
Vs+Vc 1.685 Mpa OK 0.75*d 213.75 mm TRUNC(G46/(3.14*G49^2/4))+1
taken spacing 200 mm

L(m) 3.8 4.4 2.7 4 2 4 4.4


2 10 4 2 10 2 2 10 4 2 10
20 20 20

3 4 1 8
20 20 20 14

5.6 6.6 4.60 6.4


‫سكن كريم‬
Beam no 13.00 ‫ نموذج‬F

L 5 6 4 5.8 2.8
K 0.150 0.17 0.25 0.17 0.27
D.F 0.47 0.53 0.40 0.60 0.59 0.41 0.39 0.61
F.E.M
case 1 110.88 -106.44 106.44 -47.30667 47.31 -99.46 99.46 -34.7704
-2.10 -2.33 -23.65333 -35.48 30.87 21.29 -25.33388 -39.35799
-11.83 -1.17 15.43 -17.74 -12.67 10.644
5.60 6.22 -5.71 -8.56 18.00 12.41 -4.16828 -6.47572
-2.85 3.11 9.00 -4.28 -2.08 6.21
1.35 1.50 -4.84 -7.27 3.77 2.60 -2.430125 -3.775373
115.73 74.18 77.92 84.38

case 2 110.88 -61.71 61.71 -47.31 47.31 -57.67 57.67 -34.7704


-23.29 -25.87 -5.76 -8.64 6.13 4.23 -8.967116 -13.93106
-2.88 -12.94 3.07 -4.32 -4.48 2.114674
1.36 1.52 3.95 5.92 5.21 3.59 -0.828124 -1.28655
88.95 46.96 54.33 49.99
66.40 20.31 9.776397

case 3 64.29 -106.44 106.44 -27.43 27.43 -99.46 99.46 -20.16


19.97 22.19 -31.60 -47.41 42.63 29.40 -31.05543 -48.24683
-15.80 11.09 21.32 -23.70 -15.53 14.70075
7.49 8.32 -12.96 -19.45 23.22 16.01 -5.756939 -8.943815
91.74 72.96 69.58 77.35
77.31 75.73019
As= 642.65 1120.09 748.24 717.97 196.62 754.13 732.97 816.68 94.62
Steel

D.L= 28.8
L.L= 6.68 500 500.00 500 500.00 500 500.00 500 500.00 500

L (m) 5 6 4 5.8 2.8


M (Kn.m) 66.40 115.73 77.31 74.18 20.31 77.92 75.73 84.38 9.78
0% M (Kn.m) 66.39836 115.7279 77.31 74.18 20.31 77.92 75.73 84.38 9.78

115.73 74.18 77.92 84.38

66.40 77.31 20.31 75.73 9.78

R 0.065 0.114 0.076 0.073 0.020 0.077 0.075 0.083 0.010


Z 262.52 242.60 258.41 259.60 278.52 258.17 259.01 255.66 281.92
As (mm2) 692.20 1305.52 818.75 782.02 199.61 825.94 800.17 903.23 94.90
Steel 3.0 5.0 3.0 3.0 1.0 3.0 3.0 3.0 1.0

20 20 20 20 20 20 20 20 14

65.55 113.36 113.36 70.03 101.78


101.78 79.81 79.81
65.55 70.03
0 0
-19.54
-71.89
-111.85 -99.52 -104.01
111.85 99.52 71.89 104.01 19.54
reactions 65.55 225.21 169.54 173.67 183.81 19.54

Vmax= 113.36 Vd(Kn)= 103.25 As= 1665 b= 500.00


V= 0.725 p= 1.168421
Vc= 0.664475 use min rmft 3 8 mm Asv= 301.44
Vs= 1.085727 spacing min of 200 mm
Vs+Vc 1.750201 0.75*d 213.75 mm
taken spacing 200 mm
3.8 3.9 2.4 4.1 2 4 2.6 4 2.4
6 14 5 20 6 14 3.0 20 6 14 3.0 6 14 3.0 6 14
20 20

3.0 20 3.0 20 1.0 20 3.0 20 1.0 14

5.6 6.6 4.6 6.40 3.4


Beam no 13 ‫سكن كريم‬
‫ نموذج‬F

L 5 6 4 5.8 2.8 1.3


K 0.150 0.17 0.25 0.17 0.36 0.58
D.F 0.47 0.53 0.40 0.60 0.59 0.41 0.33 0.67 0.38 0.62
F.E.M
case 1 110.88 -106.44 106.44 -47.30667 47.31 -99.46 99.46 -23.18027 23.18 -7.49515
-2.10 -2.33 -23.65333 -35.48 30.87 21.29 -24.836 -51.446 -5.99725 -9.687866
-11.83 -1.17 15.43 -17.74 -12.42 10.644 -2.998625 -25.723
5.60 6.22 -5.71 -8.56 17.85 12.31 -2.489192 -5.156183 9.835265 15.88774
-2.85 3.11 8.92 -4.28 -1.24 6.15 4.917632 -2.58
1.35 1.50 -4.81 -7.22 3.27 2.25 -3.604943 -7.467383 0.985741 1.592351
115.73 74.21 77.27 85.33 -0.30

case 2 110.88 -61.71 61.71 -47.31 47.31 -57.67 57.67 -23.18027 23.18 -4.345714
-23.29 -25.87 -5.76 -8.64 6.13 4.23 -11.22875 -23.25955 -7.201446 -11.63311
-2.88 -12.94 3.07 -4.32 -5.61 2.114674 -3.600723 -11.62978
1.36 1.52 3.95 5.92 5.88 4.06 0.48383 1.002219 4.44668 7.183098
88.95 46.96 55.00 49.04 8.80
66.40 19.98 5.853376

case 3 64.29 -106.44 106.44 -27.43 27.43 -99.46 99.46 -13.44 13.44 -7.49515
19.97 22.19 -31.60 -47.41 42.63 29.40 -28.00725 -58.01502 -2.273031 -3.671819
-15.80 11.09 21.32 -23.70 -14.00 14.70075 -1.136515 -29.00751
7.49 8.32 -12.96 -19.45 22.32 15.39 -4.416264 -9.147975 11.09111 17.9164
91.74 72.96 68.67 81.74 -6.75
77.31 73.98677 10.86987

D.L= 28.8
L.L= 6.68 500 500.00 500 500.00 500 500.00 500 500.00 500

L (m) 5 6 4 5.8 2.8 1.3


M (Kn.m) -70.86 115.73 -77.31 74.21 -19.98 77.27 -73.99 85.33 -8.49 -0.30 -11.245
0% M (Kn.m) -70.85869 115.7279 -77.31 74.21 -19.98 77.27 -73.99 85.33 -8.49 -0.30 -11.245

115.73
74.21 77.27 85.33

-8.49 -0.30 -11.25


-19.98

R 0.070 -70.86
0.114 0.076 0.073 -77.31 0.020 0.076 0.073 0.084 0.008 -73.99 0.000 0.011
Z 260.85 242.60 258.41 259.59 278.63 258.42 259.67 255.29 282.33 285.09 281.45
As (mm2) 743.41 1305.52 818.75 782.37 196.25 818.33 779.75 914.76 82.27 -2.85 109.34
Steel 5.0 7.0 6.0 6.0 4.0 8.0 7.0 9.0 4.0 4.0 4.0

14 16 14 14 12 12 12 12 12 14 12

113.36 101.50
65.55 70.19 80.25
22.83
0 -19.09 0
-23.29
-71.73
-111.85 -99.52 -104.28
reactions 0.00 0.00 0.00 0.00 0.00 0.00

Vmax= 113.36 Vd(Kn)= 103.25 As= 1665 b= 400


V= 0.906 p= 1.460526
Vc= 0.71573 use min rmft 2 8 mm Asv= 200.96
Vs= 0.603181 spacing min of 200 mm
Vs+Vc 1.318912 ok 0.75*d 213.75 mm
taken spacing 200 mm
4 4 4 8.0 4 4 4
14
φ 7 16
φ 14 6
φ φ
14 14
φ φ12 φ
14 9   14 4  14  14
12
4  12
5 φ14 6 14
φ 4 φ12 7 12
φ 4  12
‫سكن كريم‬
Beam no 13 ‫ نموذج‬F

5 6 4 5.79999999999999 2.80000000000001 4.3


1.29999999999999
L 5 6 4 5.8 2.8 1.3 4.3
K 0.150 0.17 0.25 0.17 0.36 0.77 0.17
D.F 0.47 0.53 0.40 0.60 0.59 0.41 0.33 0.67 0.32 0.68 0.82 0.18
F.E.M
case 1 110.88 -106.44 106.44 -47.30667 47.31 -99.46 99.46 -23.18027 23.18 -4.996767 5.00 -82.00315
-2.10 -2.33 -23.65333 -35.48 30.87 21.29 -24.836 -51.446 -5.7655 -12.418 62.77298 14.23341
-11.83 -1.17 15.43 -17.74 -12.42 10.644 -2.88275 -25.723 31.38649 -6.209
5.60 6.22 -5.71 -8.56 17.85 12.31 -2.526919 -5.234331 -1.79574 -3.867748 5.061365 1.147635
-2.85 3.11 8.92 -4.28 -1.26 6.15 -0.89787 -2.62 2.530682 -1.93
1.35 1.50 -4.81 -7.22 3.28 2.26 -1.711524 -3.5453 0.027422 0.059062 1.576428 0.357446
115.73 74.21 77.28 87.19 -12.69 66.26

case 2 110.88 -61.71 61.71 -47.31 47.31 -57.67 57.67 -23.18027 23.18 -2.897143 2.90 -82.00315
-23.29 -25.87 -5.76 -8.64 6.13 4.23 -11.22875 -23.25955 -6.431234 -13.85189 64.48452 14.62149
-2.88 -12.94 3.07 -4.32 -5.61 2.114674 -3.215617 -11.62978 32.24226 -6.925945
1.36 1.52 3.95 5.92 5.88 4.06 0.358446 0.742496 -6.535665 -14.07682 5.645794 1.280151
88.95 46.96 55.00 48.91 -1.42 66.10
66.40 19.98 11.02213 48.9524

case 3 64.29 -106.44 106.44 -27.43 27.43 -99.46 99.46 -13.44 13.44 -4.996767 5.00 -47.54571
19.97 22.19 -31.60 -47.41 42.63 29.40 -28.00725 -58.01502 -2.677123 -5.766111 34.68445 7.864497
-15.80 11.09 21.32 -23.70 -14.00 14.70075 -1.338561 -29.00751 17.34223 -2.883055
7.49 8.32 -12.96 -19.45 22.32 15.39 -4.350481 -9.011711 3.698748 7.966535 2.350168 0.532887
91.74 72.96 68.67 81.81 -14.55 39.15
77.31 73.95388 -7.304457

D.L= 28.8
L.L= 6.68 500 500.00 500 500.00 500 500.00 500 500.00 500 500.00 500

L (m) 5 6 4 5.8 2.8 1.3 4.3

M (Kn.m) -70.86 115.73 -77.31 74.21 -19.98 77.28 -73.95 87.19 -15.52 -12.69 -11.87472 66.26 -52.28
0% M (Kn.m) -70.85869 115.7279 -77.31 74.21 -19.98 77.28 -73.95 87.19 -15.52 -12.69 -11.87472 66.26 -52.28242

115.73
74.21 77.28 87.19
66.26

-19.98 -15.52 -11.87


-12.69
-52.28
-70.86 -77.31 -73.95

R 0.070 0.114 0.076 0.073 0.020 0.076 0.073 0.086 0.015 -0.013 0.012 0.065 0.051
TYPE OF REINFORCEMENT S.R S.R S.R S.R S.R S.R S.R S.R S.R S.R S.R S.R S.R
R'
Z 260.85 242.60 258.41 259.59 278.63 258.42 259.69 254.56 280.07 288.91 281.25 262.57 267.64
As (mm2) 743.41 1305.52 818.75 782.37 196.25 818.46 779.37 937.34 151.70 -120.24 115.55 690.67 534.62
Steel 5.0 6.0 6.0 6.0 2.0 6.0 6.0 7.0 1.0 1.0 1.0 3.0 3.0

14 18 14 14 14 14 14 14 14 14 14 18 18

113.36 101.18 91.69


65.55 70.19 85.34
0 -14.00 0
-37.68 -60.87
-71.73 -83.80
-111.85 -99.52 -104.60
‫تقرير انشائي‬
‫سكن كريم‬
‫‪ F‬نموذج‬

‫معطيات التصميم‬
‫المقاومة المميزة للخرسانة‬

‫)‪ Ec (n/mm‬مالحظات‬ ‫)‪Fcu(N/mm‬‬ ‫العنصر الخرساني‬


‫‪20000‬‬ ‫‪25‬‬ ‫البالطات‬
‫‪20000‬‬ ‫‪25‬‬ ‫الجيزان‬
‫‪20000‬‬ ‫‪25‬‬ ‫األعمدة‬
‫‪20000‬‬ ‫‪25‬‬ ‫الجدران المسلحة‬
‫‪25‬‬ ‫الجدران العادية‬
‫‪20000‬‬ ‫‪25‬‬ ‫األساسات‬
‫‪20000‬‬ ‫‪25‬‬ ‫الزنانير األرضية‬
‫‪20000‬‬ ‫‪25‬‬ ‫األدراج‬
‫‪20‬‬ ‫خرسانة النظافة‬
‫‪20‬‬ ‫تصفيحة الحجر‬
‫‪30‬‬ ‫األرضيات‬
‫‪20000‬‬ ‫‪25‬‬ ‫خزانات المياه‬

‫المقاومة المميزة لحديد التسليح‬


‫)‪ Es (N/mm‬مالحظات‬ ‫)‪Fy (N/mm‬‬ ‫نوع الحديد‬
‫‪200000‬‬ ‫‪414‬‬ ‫حديد التسليح‬
‫‪200000‬‬ ‫‪276‬‬ ‫حديد الكانات‬
‫‪200000‬‬ ‫‪414‬‬ ‫حديدالمدة األرضية‬
‫‪200000‬‬ ‫فوالذ األنشاء‬

‫‪Slab Th‬‬ ‫‪310 mm‬‬


‫‪Fcu‬‬ ‫‪25 MPA‬‬
‫‪Fy‬‬ ‫‪420 MPA‬‬
‫=‪DL‬‬ ‫‪39.56 kn/m2‬‬
‫=‪LL‬‬ ‫‪2.0 kn/m2‬‬
‫= ‪qall‬‬ ‫‪0.22 MPA‬‬

‫طريقة التحليل ‪ :‬توزيع العزوم‬


‫طريقة التصميم ‪ :‬حاالت الحدود‬
‫كودة األحمال والقوى األردنية‬ ‫‪-‬الكودات المستعملة‪ :‬أ‬
‫ب‪ -‬كودة الخرسانة العادية والمسلحة األردنية‬

‫المهندس المصمم‪ :‬محمد عبد القادر داود‬


design of footings:- ‫سكن كريم‬
F4 0.35 mPa 8 floors ‫ نموذج‬F
Pu= 2171.62 Kn
qd= 0.35 Mpa
qu= 0.5075 Mpa

Pw 2
Af = = 6.20 m
q. d
b1= 2.40 m
b2= 3.20 m 25 φ 18
19 φ 18

assumed H = 500 mm 0.5

Mu short direction = qu∗b 1∗(( b 2− bc 2 )/ 2)2 /2=


b= 3200 mm
982.52 kn.m 2.40 χ3.20
R= 0.0505
Z= 423.1 mm
As= 6354.8 mm2 Asmin= 3200
25 φ 18

Mu long direction = qu∗b 2∗(( b 1− bc 1 )/2 )2 /2= 736.89 kn.m


b= 2400 mm
R= 0.0505
Z= 423.1243 mm
As= 4766.1 mm2 Asmin= 2400
19 φ 18

check punching shear

shear perimeter =
2∗( bc 1+2∗1 . 5∗d )∗( bc 2+ 2∗1 .5∗d ) = 7800 mm

Vc=
0 . 27∗φc √ ρ∗Fcu = 0.597 Mpa
1 16.33895
Vp= Pu/per/d = 0.370 Mpa OK 18 φ 18

design of columns
C4 2 φ 10 mm/20cm
Pu= 3148.856 Kn 0.2

column dimensions 1000 mm χ 200 mm