Professional Documents
Culture Documents
Site Investigation Observation Closing Report
Site Investigation Observation Closing Report
D
A
T
E
1
5 400 KV SA LINE
1
J LOCATION NO 49/-
U 49/1
L
Y
2
0
2
0
D
A
T
E
1
5 400 KV SA LINE
1
J LOCATION NO 49/-
U 49/1
L
Y
2
0
2
0
D
D
A
T
E
1
5 400 KV SA LINE
J LOCATION NO 48/0 -
U 49/0
L
Y
2
0
2
0
HARSHVARDHAN
CORRECTIVE ACTION & PREVENTIVE ACTION REG
Corrective / Preventive
Nature of complaint / Finder-Fixer/Observations
Action Proposed
Instructed to the
AMC of M/s JBS
personnel to
cut/trim the
trees which is
coming in the
line corridor of
span no-49/0 to
49/1 in 1st this
month July-
2020.
Instructed to the
AMC of M/s JBS
personnel to
cut/trim the
trees which is
coming in the
line corridor of
span no-49/0 to
49/1 in 1st this
month July-
2020.
Instructed to the AMC
of M/s JBS personnel
to cut/trim the trees
which is coming in the
line corridor of span
no-49/0 to 49/1 in 1st
this month July-2020.
PREVENTIVE ACTION REGISTER
Verification of Effectiveness