Professional Documents
Culture Documents
Supply & laying of RCC full round pipe 150 mm, 2M as per
specification and standard method of construction for cable
S5 - 4.1 wherever required. This rate also includes stacking, loading, Nos.
unloading, labour and transporting of material fron site store to
site.
Supply & laying of RCC Half round pipe 150 mm, 1M as per
specification and standard method of construction for cable
S5 - 4.2 wherever required. This rate also includes stacking, loading, Mtrs
unloading, labour and transporting of material fron site store to
site.