S3 - 1.1 11 kV, 3C x 300 mm2 round armoured XLPE cable Km. 7.07
S3 - 4.1 11 kV outdoor Ring Main Unit SF - 6 Type (2 Isolators + 1 Breaker) Set 6.00
S3 - 4.2 11 kV outdoor Ring Main Unit SF - 6 Type (2 Isolators + 2 Breaker) Set 7.00
S3 - 4.3 11 kV outdoor Ring Main Unit SF - 6 Type (2 Isolators + 3 Breaker) Set 1.00
Supply of 11 kV Horn Gap Fuse Set (H.G. Fuse) Set for Distribution
S3 - 9.1 transformer centre as per specification. This includes the cost of Set 13.00
loading, unloading and transportation of all materials to the site store.
S3- 10 11 kV, 200 Amp Air Break Switch Set (A.B. Switch)
S3 - 18.1 LT feeder pillar 6 way with ACB for 250 & 315 kVA transformer No. 3.00
S3 - 18.2 LT Distribution Box with MCCB for 200 KVA Transformer No. 9.00
S3 - 18.3 LT Distribution Box with MCCB for 100 KVA Transformer No. 5.00
S3 - 18.4 LT Distribution Box with MCCB for 63 KVA Transformer No. 2.00
S3 - 19.6 G.I.Strip (25 X 3 mm) (0.6 kg/M + Galvanizing weight) Kg. 1,225.00
G.I. Wires : Supply of G.I. Wire, G.I. Stay Wire, G.I. Barbed
wire as per site requirement and specification and standard
S3 - 24
installation practice. This includes the cost of loading, unloading
and transportation of all materials to the site store.
S3 - 27.1 Flood lights with junction box & 150W LED Lamp No. 365.00
Tubular pole 9 Mtr. Long 88.9C, 137.7 mm painted with two coats of
S3 - 27.2 No. 365.00
anti rust lead free primer and two coats of silver enamel paint.
Supply and making steel structure work and painting the same with
S3 - 27.3 two coats of antirust lead free primer and two coats of silver enamel Kg. 12,775.00
paint.
S3 - 30.10 1Cx16 mm2 XLPE insulated Al. cable for energising the Street light Mtr 7.80
Supply of new meter box along with accessories & shifting of single
phase meter along with accessories for shifting meter on the boundry
S3 - 33.1 No. 2,133.00
wall outside the premises. This includes the cost of loading,
unloading and transportation of all materials to the site store.
Qty
BOQ Qty Remark/Justification
Difference
1.644 -0.396 BOQ QTY is less than LOA QTY.As per site
condition,distance betwwen proposed DTC
& RMU locations is reduced
28 0
BOQ QTY is same as LOA QTY.
0 0
BOQ QTY is same as LOA QTY.
0 0
BOQ QTY is same as LOA QTY.
7.00 0
3.00 0
BOQ QTY is same as LOA QTY.
1.00 0
BOQ QTY is same as LOA QTY.
12.14 6.6203
10.00 -12 BOQ QTY is less than LOA QTY. As per site
survey,qty is reduced
11.00 0
BOQ QTY is same as LOA QTY.
29.00 0
BOQ QTY is same as LOA QTY.
260.00 -48 BOQ QTY is less than LOA QTY. As per site
survey. requirement of 6 Way Feeder Pillar
is reduced. So cable qty reduced
554.00 170 BOQ QTY is more than LOA QTY. As per site
survey. requirement of 4 Way Feeder Pillar
is increased. So cable qty increased
BOQ QTY is less than LOA QTY. As per
800.00 -382 actual site requirement,cable qty is
reduced
-3
BOQ QTY is less than LOA QTY. Not
necessary as per site survey.
26.00 0 BOQ QTY is same as LOA QTY.
40.00 0 BOQ QTY is same as LOA QTY.
- -
39.00 -26 BOQ QTY is less than LOA QTY. As per site
requirement,unwanted qty is reduced as
separate earthig is provided for RMU .
40.00 0
BOQ QTY is same as LOA QTY.
5.00 0 BOQ QTY is same as LOA QTY.
40.00 0
BOQ QTY IS SAME AS loa QTY
Heat Shrinkable Cable jointing kit straight through detail are not mention in the
revised Drawing number LPTE/NCRMP-Satpati/HT-1-4 HT
Heat Shrinkable Cable jointing kit straight through detail are not mention in the
revised Drawing number LPTE/NCRMP-Satpati/HT-1-4
Heat Shrinkable termination jointing kit outdoor detail are note mention in the
revised Drawing number LPTE/NCRMP-Satpati/HT-1-4
Revised Drawing number LPTE/NCRMP-Satpati/HT-1-4 have mentionRMU detail
drawing wise 4,3,1,1. total 9 nos RMU show in drawing
Refrence Revised drawing -Nishap high school 200KVA DTR cable length 317.9
meter , LT NW drawing Maliyaghar 100kVA DTRcable length 974.4meter , LT New
drawwing Kamishah stop 200KVA DTRcable length 545.5 meter.LT NW drawing
Radhakrishna 100 DTR cable length 1329.3 meter .LT new drawing Satapti Maliya
ghar 200KVA DTR 373 meter,LT New drawing Phad 100KVADTR 498.1 meter,LT new
Drawing Segatpada 703.8 meter,LT new drawing Custom 200kva DTR 667.8
meter,LT new drawing Pro Pir Banadar 315KVA 206.4 meter,LT newDrawing
Pro.Bhagesh Hotel200KVA DTR 440.1 meter,LT new drawing Taddipada 200kva
324.8 meter,LT new drawing Ram mandir 200kva DTR 454.6meter,LT new drawing
Sarvodya 100KVA DTR 1315.1 meter,LT newdrawing Police station 522.2 meter,LT
new drawing samark 250 KVA DTR 839.5 meter. LT new drawing machhimar 200KVA
new DTR 258.2 meter LTnew drawing JALJA 315KVA DTR 577.8 meter, LTnew
Darwing JALJA2 100 KVA DTR 430.9 meter,LT new Drawing Shikthri 100KVA DTR
223.7meter,LT new drawing Shiv shakti200kva DTR 277.1METER. Total Cable length
11280.2 meter 11280.2
Refrence refrence drawing -Nishap high school 200KVA DTR cable length 524 meter
, LT NW drawing Maliyaghar 100kVA DTRcable length 1552.4 meter , LT New
drawwing Kamishah stop 200KVA DTRcable length 767.2 meter.LT NW drawing
Radhakrishna 100 DTR cable length 1258 meter .LT new drawing Satapti Maliya ghar
200KVA DTR 634 meter,LT New drawing Phad 100KVADTR 492 meter,LT new
Drawing Segatpada 966.5 meter,LT new drawing Custom 200kva DTR 527.7
meter,LT new drawing Pro Pir Banadar 315KVA 160.2 meter,LT newDrawing
Pro.Bhagesh Hotel200KVA DTR 497.2 meter,LT new drawing Taddipada 200kva
383meter,LT new drawing Ram mandir 200kva DTR586.1 meter,LT new drawing
Sarvodya 100KVA DTR 1213.2 meter,LT newdrawing Police station 790 meter,LT
new drawing samark 250 KVA DTR 768 meter. LT new drawing machhimar 200KVA
new DTR 262.5 meter LTnew drawing JALJA 315KVA DTR,589.7meter, LTnew
Darwing JALJA2 100 KVA DTR 453.9 meter,LT new Drawing Shikthri 100KVA DTR
431.2 meter,LT new drawing Shiv shakti200kva DTR 804.7 METER. Total Cable
length 13261.5 meter 13261.5
s
As per revised drawing AB cable length 1822.1 meter
25