Appendix 29

ARC WELDING INSPECTION CHECKLIST

Contractor: ____________________________ Approved: _____________________


(SHO / Project Manager)
Date: ____________________________

Inspected by: ___________________________ Signature: _______________________


( )

Type of Equipment: _____________________

Maker and model: _______________________

Serial No: _______________________

Location: _______________________

Condition
Description Remarks

YES NO
Physical Appearance

Shock Prevented built-in insulated

Switch / Trigger

Earthling / Grounding

Electric Cables / joints

Size of cables are proportional to


voltage supply
Electrode Holders used in good
condition and kept properly
Hand Gloves

Safety Goggles

Face Shield

Other related P.P.E